Traffic Signal Upgrade Specification and Bidding Document

This is a specification book and bidding document for a traffic signal upgrade project issued by Montgomery County Municipal Utility District No. 152A on behalf of Montgomery County Municipal Utility District No. 152B in Montgomery County, Texas. The project involves construction of a fully actuated traffic signal with safety lighting at the intersection of State Highway 99 at Townsen Boulevard/Imperial Promenade Street for Woodson's Reserve. Work includes drilling shaft for traffic signal poles, installing PVC conduit, bare electrical conductor, tray cable, aluminum signs, reflective pavement markings in various configurations, vehicle signal sections with LED lights in green, yellow, and red, traffic signal cable, vehicle loop detection installation, and pavement sealers with arrow and word markings. The bid opening is scheduled for 11:00 a.m. on Friday, September 11, 2026, with a non-mandatory pre-bid conference on Friday, September 4, 2026 at 11:00 a.m. Both the bid opening and pre-bid conference will be conducted via teleconference. Sealed bids must be submitted electronically through CivcastUSA. The contract term is 240 calendar days maximum from the date of Notice to Proceed, with contractor mobilization required within 10 calendar days of the written Notice to Proceed. Construction staking will be performed one time only by Quiddity Engineering, LLC at a fixed cost of $3,000.

Bid security requirements depend on contract value: contractors must submit a certified or cashier's check equal to 2 percent of the maximum total bid amount for contracts $50,000 and over but less than $250,000, or either a 2 percent cashier's check or 5 percent bid bond for contracts over $250,000. Contractors must execute performance and payment bonds equal to 100 percent of the contract sum. The document adopts Texas Department of Transportation specifications dated September 1, 2024 and requires compliance with prevailing wage rates. A Certificate of Interested Parties form (Form 1295) must be submitted with the bid as mandated by Texas Government Code 2252.908. Contractor must provide comprehensive general liability insurance with general aggregate of $2,000,000, comprehensive automobile liability combined single limit of $1,000,000, and excess umbrella liability of $2,000,000. Workers' compensation insurance is required as mandated by Texas Labor Code. The contractor must obtain all required permits at no additional cost to the Owner and maintain a one-year warranty period from work completion. Partial payments are made monthly with 10 percent retained until final payment, which occurs 30 to 35 days after the Engineer issues a Certificate of Completion.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Texas Board of Professional Engineers and Land Surveyors Reg. No. F-23290 1575 Sawdust Road, Suite 400 The Woodlands, Texas 77380 281.363.4039

12/9/2024

8/20/2026

ISSUED FOR BIDDING

PURPOSES ONLY

NOT FOR CONSTRUCTION

SPECIFICATIONS AND CONTRACT DOCUMENTS

FOR CONSTRUCTION OF

TRAFFIC SIGNAL UPGRADE ON SH-99 AT TOWNSEN BOULEVARD/IMPERIAL PROMENADE ST

FOR

WOODSON’S RESERVE

ON BEHALF OF

MONTGOMERY COUNTY MUNICIPAL UTILITY DISTRICT NO. 152B

IN

MONTGOMERY COUNTY, TEXAS

TABLE OF CONTENTS

BIDDING REQUIREMENTS Page No.

Invitation to Bid .......................................................................................................... A-1

Instruction to Bidders................................................................................................. A-2

Bid Form .................................................................................................................... A-5

CONDITIONS OF THE CONTRACT

General Conditions of Agreement ............................................................................. GC-1

Special Conditions of the Contract ............................................................................ SC-1

Standard Form of Agreement ................................................................................... SF-1

Attachment A to Agreement ...................................................................................... AA-1

Performance and Payment Bonds ............................................................................ PB-1

Prevailing Wage Rates ............................................................................................... PW-1

SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

Summary of Work ..................................................................................................... 01010-1

Cutting and Patching ................................................................................................. 01070-1

Submittals ................................................................................................................. 01300-1

Construction Progress Schedule ............................................................................... 01330-1

Shop Drawings, Product Data and Samples .............................................................. 01340-1

Schedule of Values .................................................................................................... 01370-1

Laboratory Services ................................................................................................... 01410-1

Field Project Representative Services ....................................................................... 01420-1

Construction Staking .................................................................................................. 01430-1

Temporary Facilities and Controls ............................................................................ 01500-1

Cleaning and Adjusting .............................................................................................. 01710-1

Project Record Documents ....................................................................................... 01720-1

NOTE: SPECIFICATIONS ADOPTED BY THE TEXAS DEPARTMENT OF TRANSPORTATION DATES SEPTEMBER 1,2024

SHALL GOVERN THIS PROJECT. SEE PLANS FOR REFERENCES TO TXDOT SPECIFICATIONS

END OF TABLE OF CONTENTS

A-1

INVITATION TO BID

Sealed bids in duplicate addressed to Montgomery County Municipal Utility District No. 152A will be received electronically, until 11:00 a.m., Friday, September 11, 2026, and then publicly opened and read for furnishing all plant, labor, material, and equipment and performing all work required for the

Construction of Traffic Signal Upgrade on SH 99 at Townsen Blvd/Imperial Promenade St for Woodson’s

Reserve on behalf of Montgomery County 152B.

The bids will only be received electronically through CivcastUSA. The electronic bids will be publicly opened and read via conference call. Physical bids will not be accepted. The number for this call is:

1-832-856-3756. Enter access code 326 5185 886# when prompted. People who want to attend the bid opening must do so by teleconference.

Scope of Work of the Construction of Traffic Signal Upgrade on SH 99 at Townsen Blvd/Imperial

Promenade St for Woodson’s Reserve on behalf of Montgomery County 152B in Montgomery County, Texas.

For construction contracts $50,000 and over but less than $250,000, the bidder shall submit a certified or cashier's check on a responsible bank in the State equal to two percent (2%) of the maximum total bid amount. For construction contracts over $250,000, the bidder shall submit either a 2% certified or cashier’s check or five percent (5%) bid bond of the maximum total bid amount. Make the cashier's check or bid bonds payable to the Owner.

Plans, specifications, and bidding documents are available at www.civcastusa.com. Said documents may be examined without charge in the office of Quiddity Engineering, LLC. Construction Division, 1575

Sawdust Rd Suite 400, The Woodlands, TX 77380.

Bids received after the closing time will not be considered. A NON-MANDATORY pre-bid conference will be held Friday, September 4, 2026 at 11:00 AM. The number for this call is: 832-856-3756. Enter access code 709 345 112# when prompted.

The Owner reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of 90 days from the date bids are opened.

ATTENTION: Pursuant to Texas Government Code 2252.908, on behalf of Montgomery County Municipal

Utility District No. 152A (the “District”), the bidder shall submit a printed, executed, and notarized original of a completed Certificate of Interested Parties form (Form 1295) with the bid. Failure to do so will result in the district’s inability to execute the contract. To complete the disclosure of interested parties form, or for further information, please visit the Texas Ethics Commission’s website at https://www.ethics.state.tx.us.

The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.

- - o 0 o - -

A - 2

INSTRUCTION TO BIDDERS

1.0 INVITATION

a. The Work. Bids are invited on a general contract for construction of Construction of Traffic Signal Upgrade on SH 99 at Townsen Blvd/Imperial Promenade St for Woodson’s Reserve on behalf of Montgomery County

152B in Montgomery County, Texas.

b. The Owner.

Montgomery County MUD No. 152A

1300 Post Oak Blvd, Suite 2400

Houston, TX 77056

d. The Engineer.

Quiddity Engineering, LLC.

1575 Sawdust Road, Suite 400

The Woodlands, Texas 77380

Attention: Cameron M. Miller, P.E.

Telephone: (832) -914-4032

2.0 RECEIPT OF BIDS

a. Sealed bids, in duplicate, will be received until 11:00 a.m., Friday, September 11, 2026, electronically via the project page on CivcastUSA.

b. Bids received after this time will not be opened.

c. A non-mandatory pre-bid conference will be held Friday, September 04, 2026 at 11:00 a.m. local time via teleconference call.

d. Bid opening will be held immediately after the time for receipt of bids has expired.

e. Bids will be opened publicly and read aloud. All interested parties are invited to attend.

3.0 BIDDING DOCUMENTS

a. Bidding documents include all documents available during the bidding period, including the instruction to bidders, contract forms, conditions of the contract, specifications, drawings and addenda, if any.

d. Bidders may purchase copies of the bidding documents at www.civcastusa.com. Said documents may be examined without charge in the office of Quiddity Engineering, LLC. Construction Division, 1575 Sawdust

Rd, Suite 400, The Woodlands, TX 77380.

4.0 SEPARATED CONTRACT PROVISIONS

a. Contractor must abide by all state and local laws regulating sales tax exemption for work being performed for tax exempt entities. Provisions are provided in Section 5.03 of the Special Conditions.

b. Contractor is responsible for obtaining all permits required by the work at no additional cost to the

Owner, except as may specifically be exempted in the Special Conditions.

A - 3

5.0 EXAMINATION

a. Bidder shall carefully examine the bidding documents and the site to determine the actual conditions under which work will be done.

b. Data in the bidding documents pertaining to existing conditions is for convenience only and does not supplant obtaining firsthand information at the site.

c. Adjusting payments will not be authorized for work that could have been foreseen by a careful examination of the site.

d. Submission of a bid constitutes acceptance by the bidder of existing site conditions as a part of the requirements of this work.

6.0 COMPLETION TIME

a. The work shall be substantially completed within 240 (maximum) calendar days from date of Notice to

Proceed.

b. Submission of a bid constitutes acceptance by the bidder of the completion time as a part of the requirements of this work.

7.0 QUESTIONS

a. In ample time to permit consideration before reply, submit questions about bidding instruments to the

Engineer.

b. Necessary replies will be issued to bidders of record as addenda, which becomes a part of the bidding instruments. Oral instructions do not form a part of the bidding instruments.

c. Bidders should contact the Engineer not less than 72 hours before bid opening to secure any addenda that may affect bidding.

8.0 SUBMITTAL

a. Submit bid and other required data in an opaque, sealed envelope. If submitted by mail, enclose bid envelope in another envelope addressed for mailing. Plainly identify the sealed envelope with the following information:

Do not open before 11:00 a.m., Friday, September 11, 2026.

Bid Construction of Traffic Signal Upgrade on SH 99 at Townsen Blvd/Imperial Promenade St for Woodson’s

Reserve on behalf of Montgomery County Municipal Utility District No. 152B in Montgomery County, Texas.

Owner: Montgomery County M.U.D. No. 152B

Bidder:

b. Submit bid on the bid form provided. Fill in all blanks. If no amount is to be included, insert three zeros in the space. Include all unit cost items and all alternatives shown on the bid form; failure to comply may be cause for rejections. No segregated bids or assignments will be considered.

c. Do not alter the bid form with written memoranda or qualifications. Any explanation, alteration, or other statements proposed by the bidder must be written separately, signed independently, and included in the bid envelope. Bids may not be modified after submittal.

A - 4

d. Sign in longhand below the typed name of the person authorized to bind the bidder to a contract. When the bidder is a corporation, the bid must be signed with the legal name of the corporation followed by the name of the State of Incorporation and the legal signature of a person authorized to bind the corporation to a contract.

9.0 BID SECURITY

a. For construction contracts $50,000, the bidder shall submit a certified or cashier's check on a responsible bank in the State equal to two percent (2%) cashier’s check or five percent (5%) bid bond of the maximum total bid amount. Make the cashier's check or bid bonds payable to the Owner.

b. The bid security will be forfeited to the Owner by the bidder as damages as default if the bidder fails to execute and deliver a contract and bonds as required.

10.0 PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND

Bidder must be capable of executing a satisfactory performance bond and payment bond for 100 percent (100%) of the contract sum in accord with the conditions of the contract.

11.0 WITHDRAWAL

a. Bids may be withdrawn any time before bid opening but may not be resubmitted.

b. Bids may not be withdrawn or modified after bid opening time unless the award of the contract has been delayed more than 90 days.

12.0 QUALIFICATIONS OF BIDDERS

a. The Owner may make any investigations deemed necessary to determine the bidder's ability to perform the work. When requested, furnish such information and data necessary for this purpose.

b. The Owner reserves the right to reject any bid if evidence submitted by or investigation of the bidder indicate that the bidder is not properly qualified in the opinion of the Owner, to complete the work satisfactorily.

13.0 AWARD OF CONTRACT

The Owner is not obligated to accept the lowest bid or any bid. The Owner reserves the right to reject any or all bids and to waive any informalities in bids or in bidding. The Owner may accept any bid deemed advantageous. The contract award may include full consideration of unit prices, alternates, and time of completion.

14.0 RETURN OF SIGNED CONTRACTS

By submitting a bid, the Contractor agrees to return signed contracts with proper bonds and insurance certificates within 7 calendar days after the Engineer has given the unsigned contracts to the Contractor. Should the Contractor fail to return properly executed contracts within 7 days, the Engineer may disqualify that Contractor and recommend that the Owner enter into contracts with the next highest bidder.

- - o 0 o - -

Bid of ________________________________________________ an individual proprietorship / a corporation organized and existing under laws of the State of Texas / a partnership of _______________________________________________.

OWNER:

PROJECT:

DATE: 8/20/2026

JOB NO.: W5950-0065-01

ITEM DESCRIPTION UNIT QUANTITY UNIT ITEM

NO. PRICE TOTAL

UNIT A: MOVE-IN & START-UP

A 1. Move-in and start-up, including maintenance, performance, and payment bonds for 100 percent

(100%) of the contract amount. Requires a written schedule provided to Engineer before payment of item. LS 1 $ $

SUBTOTAL, UNIT A $

UNIT B: TRAFFIC SIGNAL MODIFICATION

B 1. DRILL SHAFT (TRF SIG POLE) (36 IN) LF 15 $

B 2. CONDT (PVC) (SCH 80) (2") LF 20 $

B 3. ELEC CONDR (NO.6) BARE LF 460 $

B 4. TRAY CABLE (4 CONDR) (12 AWG) LF 775 $

B 5. ALUMINUM SIGNS (TY A) SF 25 $

B 6. REMOVE SM RD SN SUP&AM EA 2 $

B 7. REMOVE SM RD SN SUP&AM (SIGN ONLY) EA 4 $

B 8. REFL PAV MRK TY I (W)6"(DOT)(090MIL) LF 120 $

B 9. REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 590 $

B 10. REFL PAV MRK TY I (W)24"(SLD)(090MIL) LF 620 $

B 11. REFL PAV MRK TY I (W)(ARROW)(090MIL) EA 4 $

B 12. REFL PAV MRK TY I(W)(DBL ARROW)(090MIL) EA 5 $

B 13. REFL PAV MRK TY I (W)(WORD)(090MIL) EA 4 $

B 14. RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL) LF 100 $

B 15. PAVEMENT SLER 6" LF 340 $

BID FORM

Construction of Traffic Signal Modification Work Consisting of Installation of Fully Actuated Traffic Signal With

Safety Lighting

A-5

ITEM DESCRIPTION UNIT QUANTITY UNIT ITEM

NO. PRICE TOTAL

B 16. PAVEMENT SLER 8" LF 590 $

B 17. PAVEMENT SLER 24" LF 620 $

B 18. PAVEMENT SLER (ARROW) EA 4 $

B 19. PAVEMENT SLER (WORD) EA 4 $

B 20. PAVEMENT SLER (DBL ARROW) EA 5 $

B 21. REFL PAV MRK TY I (W)6"(BRK)(090MIL) LF 120 $

B 22. ELIM EXT PM & MRKS (6") LF 180 $

B 23. ELIM EXT PM & MRKS (8") LF 800 $

B 24. ELIM EXT PM & MRKS (12") LF 420 $

B 25. ELIM EXT PM & MRKS (24") LF 465 $

B 26. ELIM EXT PM & MRKS (ARROW) EA 7 $

B 27. ELIM EXT PM & MRKS (WORD) EA 7 $

B 28. PAV SURF PREP FOR MRK (6") LF 60 $

B 29. PAV SURF PREP FOR MRK (24") LF 155 $

B 30. PAV SURF PREP FOR MRK (DBL ARROW) EA 5 $

B 31. INSTALL HWY TRF SIG (UPGRADE) EA 1 $

B 32. VEH SIG SEC (12")LED(GRN) EA 4 $

B 33. VEH SIG SEC (12")LED(YEL) EA 4 $

B 34. VEH SIG SEC (12")LED(RED) EA 4 $

B 35. BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM EA 4 $

B 36. TRF SIG CBL (TY A)(12 AWG)(7 CONDR) LF 1,050 $

B 37. TRF SIG CBL (TY C)(14 AWG)(2 CONDR) LF 2,250 $

B 38. INS TRF SIG PL AM(S)1 ARM(44')LUM EA 1 $

B 39. VEH LP DETECT (SAWCUT) LF 405 $

B 40. REMOVAL OF SIGNAL HEAD ASSM EA 1 $

B 41. REMOVAL OF SIGNAL RELATED SIGNS EA 1 $

A-6

ITEM DESCRIPTION UNIT QUANTITY UNIT ITEM

NO. PRICE TOTAL

B 42. Construction staking to be performed by Quiddity

Engineering, LLC. Staking to be performed one time only. All additional staking is at the expense of the contractor. EA 1 3,000.00$ 3,000.00$

SUBTOTAL, UNIT B $

TOTAL BASE BID $

A-7

1.

2.

Days

The amounts set forth above are current estimates by Contractor of the amounts that will be determined during the progress of the Work. The separated progress billings from Contractor to the Owner/Engineer shall reflect the actual amounts expended for the items enumerated in (a), (b), and (c), above.

Description

Calendar

Days to

Complete

Traffic Signal Modification

SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.

BASE BID COMPLETION TIME FRAME TABLE

(Add) (Deduct)

(Add) (Deduct)

It is understood that the Bidder shall specify the number of calendar days for each stage of work in the table below. The

Completion Time includes rain days.

It is understood and agreed that the work shall be complete in full within total contract period of performance as specified below after the date on which work is to be commenced as established by the Contract Documents.

The award may be made on the Base Bid alone or the Base Bid, Completion Time specified, and any or all of the Items listed under Alternates or Substitutions, if any.

It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of the

Engineer, in accordance with the provisions of the General Conditions of Agreement.

Contractor must mobilize within 10 calendar days from the date of the written Notice to Proceed. If the Contractor mobilizes prior to the 10th day, then the project completion time will start based on the actual mobilization date.

Maximum Calendar

Days to Complete

Percent Self-Performed =

The undersigned Bidder has carefully examined the Instructions to Bidders, this Proposal, the General Conditions of

Agreement, the Technical Specifications and the drawings for the work herein above described and referred to in the

Invitation to Bid and has carefully examined the site of the work and will provide all necessary labor, superintendence, machinery, equipment, tools, materials, services and other means of construction to complete all the work upon which he bids, as called for in the Contract, the Specifications and shown on the drawings, and in the manner prescribed therein and according to the requirements of the Engineer as therein set forth for the amounts above and below.

Total Contract Period of Performance =

Estimated Mobilization Date =

(Completion time not to exceed 240 calendar days)

The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for 90 days following date of bid opening.

A-8

Date Signed

By

SEAL (if Bidder is a Corporations)

Acknowledge reciept of Addenda Below:

(Company)

Addendum No. _______ _______ _______ _______ _______

(Witness)

(Title)

(Address)

- - o 0 o - -

In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Performance and Payment

Bonds as provided in the Specifications.

The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are submitted as correct and final.

Date Received _______ _______ _______ _______ _______

It is understood that the Owner reserves the right to reject any and all bids.

(Telephone Number)

It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a construction contract and execute bonds as required within 7 calendar days after the Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner as a result of such failure on the part of the undersigned.

A-9

GC-1

TABLE OF CONTENTS

FOR

GENERAL CONDITIONS OF AGREEMENT

1. DEFINITIONS OF TERMS

1.01 Owner, Contractor and Engineer ................................................................................................ GC-3

1.02 Contract Documents ................................................................................................................... GC-3

1.03 Sub-Contractor ............................................................................................................................ GC-3

1.04 Written Notice ............................................................................................................................ GC-3

1.05 Work ............................................................................................................................................ GC-3

1.06 Extra Work .................................................................................................................................. GC-4

1.07 Working Day ................................................................................................................................ GC-4

1.08 Calendar Day ............................................................................................................................... GC-4

1.09 Substantially Completed ............................................................................................................. GC-4

2. RESPONSIBILITIES OF THE ENGINEER AND THE CONTRACTOR

2.01 Owner-Engineer Relationship ..................................................................................................... GC-4

2.02 Observation of the Work ............................................................................................................ GC-4

2.03 Payments for Work ..................................................................................................................... GC-5

2.04 Initial Determinations ................................................................................................................. GC-5

2.05 Objections ................................................................................................................................... GC-5

2.06 Lines and Grades ......................................................................................................................... GC-5

2.07 Contractor's Duty and Superintendence ..................................................................................... GC-5

2.08 Contractor's Understanding ........................................................................................................ GC-6

2.09 Character of Workers .................................................................................................................. GC-6

2.10 Contractor's Buildings ................................................................................................................. GC-7

2.11 Sanitation .................................................................................................................................... GC-7

2.12 Shop Drawings ............................................................................................................................ GC-7

2.13 Preliminary Approval .................................................................................................................. GC-7

2.14 Defects and Their Remedies ....................................................................................................... GC-8

2.15 Changes and Alterations ............................................................................................................. GC-8

3. GENERAL OBLIGATIONS AND RESPONSIBILITIES

3.01 Keeping of Drawings and Specifications Accessible .................................................................... GC-8

3.02 Ownership of Drawings ............................................................................................................... GC-8

3.03 Right of Entry .............................................................................................................................. GC-8

3.04 Collateral Contracts ..................................................................................................................... GC-9

3.05 Discrepancies and Omissions ...................................................................................................... GC-9

3.06 Equipment, Materials and Construction Plant ............................................................................ GC-9

3.07 Damages ...................................................................................................................................... GC-9

3.08 Protection Against Accident to Employees and the Public ......................................................... GC-9

3.09 Performance and Payment Bonds .............................................................................................. GC-9

3.10 Losses from Natural Causes ...................................................................................................... GC-10

3.11 Protection of Adjoining Property; Indemnification ................................................................... GC-10

3.12 Protection Against Claims of Sub-Contractors, etc ................................................................... GC-10

3.13 Intellectual Property Rights and Indemnification .................................................................... GC-11

3.14 Laws and Ordinances; Indemnification ..................................................................................... GC-12

3.15 Assignment and Subletting ....................................................................................................... GC-12

GC-2

3.16 Indemnification ......................................................................................................................... GC-12

3.17 Insurance ................................................................................................................................... GC-13

3.18 Certificate of Insurance ............................................................................................................. GC-17

4. PROSECUTION AND PROGRESS

4.01 Time and Order of Completion ................................................................................................. GC-17

4.02 Extension of Time ...................................................................................................................... GC-18

4.03 Hindrances and Delays .............................................................................................................. GC-18

5. MEASUREMENT AND PAYMENT

5.01 Quantities and Measurements ................................................................................................. GC-18

5.02 Estimated Quantities ................................................................................................................. GC-18

5.03 Price of Work ............................................................................................................................ GC-19

5.04 Partial Payments ....................................................................................................................... GC-19

5.05 Use of Completed Portions ....................................................................................................... GC-20

5.06 Warranty ................................................................................................................................... GC-20

5.07 Guarantee ................................................................................................................................. GC-20

5.08 Final Completion and Acceptance ............................................................................................. GC-21

5.09 Final Payment ............................................................................................................................ GC-21

5.10 Payments Withheld ................................................................................................................... GC-21

5.11 Delayed Payments ..................................................................................................................... GC-21

6. EXTRA WORK AND CLAIMS

6.01 Change Orders .......................................................................................................................... GC-22

6.02 Minor Changes .......................................................................................................................... GC-22

6.03 Extra Work ................................................................................................................................ GC-22

6.04 Time of Filing Claims ................................................................................................................. GC-23

6.05 Arbitration ................................................................................................................................. GC-23

7. ABANDONMENT OF CONTRACT

7.01 Termination for Convenience of Owner ................................................................................... GC-24

7.02 Default....................................................................................................................................... GC-25

7.03 Remedies for Default of Contractor .......................................................................................... GC-25

7.04 Abandonment by Owner ........................................................................................................... GC-26

GC-3

GENERAL CONDITIONS OF AGREEMENT

1. DEFINITIONS OF TERMS

1.01 OWNER, CONTRACTOR AND ENGINEER

The OWNER, the CONTRACTOR and the ENGINEER are those persons or organizations identified as such in the

Agreement and are referred to throughout the Contract Documents as if singular in number and masculine in gender. The term ENGINEER means the ENGINEER or his duly authorized representative. The ENGINEER shall be understood to be the ENGINEER of the OWNER, and nothing contained in the Contract Documents shall create any contractual or agency relationship between the ENGINEER and the CONTRACTOR.

1.02 CONTRACT DOCUMENTS

The Contract Documents shall consist of the Notice to Bidders (Advertisement), Special Conditions (Instructions to

Bidders), Proposal, signed Agreement, Performance and Payment Bonds (when required), Special Bonds (when required), General Conditions of the Agreement, Special Conditions of the Contract, Technical Specifications, Construction Drawings, and all modifications thereof incorporated in any of the documents before the execution of the agreement.

The Contract Documents are complementary, and what is called for by any one shall be as binding as if called for by all. In case of conflict between any of the Contract Documents, priority of interpretation shall be in the following order: Signed Agreement, Performance and Payment Bonds, Special Bonds (if any), Proposal, Special

Conditions of the Contract, Notice to Bidders, Technical Specifications, Construction Drawings, and General

Conditions of Agreement.

1.03 SUB-CONTRACTOR

The term Sub-Contractor, as employed herein, includes only those having a direct contract with the CONTRACTOR and it includes one who furnishes material worked to a special design according to the construction drawings or specifications of this work, but does not include one who merely furnishes material not so worked.

1.04 WRITTEN NOTICE

Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered mail to the last business address known to him who gives the notice.

1.05 WORK

The CONTRACTOR shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, services, insurance, and all water, light, power, fuel, transportation and other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The CONTRACTOR shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have a well known technical or trade meaning shall be held to refer to such recognized standards.

GC-4

1.06 EXTRA WORK

The term "Extra Work" as used in this contract shall be understood to mean and include all work that may be required by the ENGINEER or OWNER to be done by the CONTRACTOR to accomplish any change, alteration or addition to the work shown upon the construction drawings, or reasonably implied by the specifications, and not covered by the CONTRACTOR'S Proposal, except as provided under "Changes and Alterations", herein.

1.07 WORKING DAY

A "Working Day" is defined as any day not including Saturdays, Sundays or any legal holidays, in which weather or other conditions not under the control of the CONTRACTOR, will permit construction of the principal units of the work for a period of not less than seven (7) hours between 7:00 a.m. and 6:00 p.m.

1.08 CALENDAR DAY

"Calendar Day" is any day of the week or month, no days being excepted. No allowance will be made for inclement weather if the CONTRACTOR was able or would have been able to prosecute the principal units of work for a period of not less than seven (7) hours between 7:00 a. m. and 6:00 p. m.

1.09 SUBSTANTIALLY COMPLETED

By the term "substantially completed" is meant that the structure has been made suitable for use or occupancy or the facility is in condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment.

2. RESPONSIBILITIES OF THE ENGINEER AND THE CONTRACTOR

2.01 OWNER-ENGINEER RELATIONSHIP

The ENGINEER will be the OWNER'S representative during construction. The duties, responsibilities and limitations of authority of the ENGINEER as the OWNER'S representative during construction are as set forth in the Contract

Documents and shall not be extended or limited without written consent of the OWNER and ENGINEER. The

ENGINEER will advise and consult with the OWNER, and all of OWNER'S instructions to the CONTRACTOR shall be issued through the ENGINEER.

2.02 OBSERVATION OF THE WORK

The ENGINEER shall make periodic visits to the site to familiarize himself generally with the progress of the executed work and to determine if such work generally meets the essential performance and design features and the technical and functional engineering requirements of the Contract Documents; provided and except, however, that the ENGINEER shall not be responsible for making any detailed, exhaustive, comprehensive or continuous on-site inspection of the quality or quantity of the work or be in any way responsible, directly or indirectly, for the construction means, methods, techniques, sequences, quality, procedures, programs, safety precautions or lack of same incident thereto or in connection therewith. Notwithstanding any other provision of this agreement or any other Contract Document, the ENGINEER shall not be in any way responsible or liable for any acts, errors, omissions or negligence of the CONTRACTOR, any subcontractor or any of the CONTRACTOR'S or subcontractor's agents, servants or employees or any other person, firm or corporation performing or attempting to perform any of the work.

GC-5

2.03 PAYMENTS FOR WORK

The ENGINEER shall review CONTRACTOR'S applications for payment and supporting data, determine the amount owed to the CONTRACTOR and approve, in writing, payment to CONTRACTOR in such amounts; such approval of payment to CONTRACTOR constitutes a representation to the OWNER of ENGINEER'S professional judgment that the work has progressed to the point indicated to the best of his knowledge, information and belief, but such approval of an application for payment to CONTRACTOR shall not be deemed as a representation by ENGINEER that ENGINEER has made any examination to determine how or for what purpose CONTRACTOR has used the moneys paid on account of the Contract price.

2.04 INITIAL DETERMINATIONS

The ENGINEER initially shall determine all claims, disputes and other matters in question between the

CONTRACTOR and the OWNER relating to the execution or progress of the work or the interpretation of the

Contract Documents and the ENGINEER'S decision shall be rendered in writing within a reasonable time. Should the ENGINEER fail to make such decision within a reasonable time, appeal to arbitration may be taken as if his decision had been rendered against the party appealing.

2.05 OBJECTIONS

In the event the ENGINEER renders any decision which, in the opinion of either party hereto, is not in accordance with the meaning and intent of this contract, either party may file with the ENGINEER within thirty days his written objection to the decision, and by such action may reserve the right to submit the question so raised to arbitration as hereinafter provided.

2.06 LINES & GRADES

Unless otherwise specified, the ENGINEER or his representative shall furnish all lines and grades. Whenever necessary, construction work shall be suspended to permit performance of this work, but such suspension will be as brief as practicable and the CONTRACTOR shall be allowed no extra compensation therefore. The CONTRACTOR shall give the ENGINEER ample notice of the time and place where lines and grades will be needed. All stakes, marks, etc. shall be carefully preserved by the CONTRACTOR, and in case of careless destruction or removal by him or his employees, such stakes, marks, etc. shall be replaced at the CONTRACTOR'S expense.

2.07 CONTRACTOR'S DUTY AND SUPERINTENDENCE

The CONTRACTOR shall give adequate attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants. The superintendent shall represent the CONTRACTOR in his absence and all directions given to him shall be as binding as if given to the CONTRACTOR.

The CONTRACTOR is and at all times shall remain an independent contractor, solely responsible for the manner and method of completing his work under this contract, with full power and authority to select the means, method and manner of performing such work, so long as such methods do not adversely affect the completed improvements, the OWNER and ENGINEER being interested only in the result obtained and conformity of such completed improvements to the construction drawings, specifications and contract.

Likewise, the CONTRACTOR shall be solely responsible for the safety of himself, his employees and other persons, as well as for the protection of the safety of the improvements being erected and the property of himself or any other person, as a result of his operations hereunder. Engineering construction drawings and specifications as well as any additional information concerning the work to be performed passing from or through the ENGINEER shall not be interpreted as requiring or allowing CONTRACTOR to deviate from the construction drawings and

GC-6

specifications, the intent of such drawings, specifications and any other such instructions being to define with particularity the agreement of the parties as to the work the CONTRACTOR is to perform. CONTRACTOR shall be fully and completely liable, at his own expense, for design, construction, installation and use, or non-use, of all items and methods incident to performance of the contract, and for all loss, damage or injury incident thereto, either to person or property, including, without limitation, the adequacy of all temporary supports, shoring, bracing, scaffolding, machinery or equipment, safety precautions or devices, and similar items or devices used by him during construction.

Any review of work in progress, or any visit or observation during construction, or any clarification of construction drawings and specifications, by the ENGINEER, or any agent, employee, or representative of either of them, whether through personal observation on the project site or by means of approval of shop drawings for temporary construction or construction processes, or by other means or method, is agreed by the CONTRACTOR to be for the purpose of observing the extent and nature of work completed or being performed, as measured against the drawings and specifications constituting the contract, or for the purpose of enabling CONTRACTOR to more fully understand the construction drawings and specifications so that the completed construction work will conform thereto, and shall in no way relieve the CONTRACTOR from full and complete responsibility for the proper performance of his work on the project, including but without limitation the propriety of means and methods of the CONTRACTOR in performing said contract, and the adequacy of any designs, construction drawings or other facilities for accomplishing such performance. Deviation by the CONTRACTOR from drawings and specifications that may have been in evidence during any such visitation or observation by the ENGINEER, or any of his representatives whether called to the CONTRACTOR'S attention or not shall in no way relieve CONTRACTOR from his responsibility to complete all work in accordance with said drawings and specifications.

2.08 CONTRACTOR'S UNDERSTANDING

It is understood and agreed that the CONTRACTOR has, by careful examination, satisfied himself as to the nature and location of the work, the conformation of the ground, the character, quality and quantity of the materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, the general and local conditions, and all other matters which can in any way affect the work under this contract. CONTRACTOR also understands and agrees that any soil reports and log borings are available for

CONTRACTOR’S information only. The report is not a warranty of subsurface conditions, nor is it a part of the

Contract Documents. The CONTRACTOR is expected to examine the site and such reports and then decide for himself the character of the materials to be encountered. No verbal agreement or conversation with any officer, agent or employee of the OWNER or ENGINEER either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained.

OWNER and ENGINEER disclaim any responsibility for the accuracy, true location and extent of the surface and subsurface investigations that have been prepared by others. OWNER and ENGINEER further disclaim responsibility for interpretation of that data by CONTRACTOR, i.e. projecting soil-bearing values, rock profiles, soil stability and the presence, level and extent of underground water or underground facilities.

2.09 CHARACTER OF WORKERS

The CONTRACTOR agrees to employ only orderly and competent persons, skillful in the performance of the type of work required under this contract, to do the work; and agrees that whenever the ENGINEER shall inform him in writing that any persons on the work are, in his opinion, incompetent, unfaithful or disorderly, such persons shall be discharged from the work and shall not again be employed on the work without the ENGINEER'S written consent.

GC-7

2.10 CONTRACTOR'S BUILDINGS

The building of structures for housing men, or the erection of tents or other forms of protection, will be permitted only at such places as the ENGINEER shall direct, and the sanitary conditions for the grounds in or about such structures shall at all times be maintained in a manner satisfactory to the ENGINEER.

2.11 SANITATION

Necessary sanitary conveniences for the use of laborers on the work, properly secluded from public observation, shall be constructed and maintained by the CONTRACTOR in such manner and at such points as shall be approved by the ENGINEER, and their use shall be strictly enforced.

2.12 SHOP DRAWINGS

The CONTRACTOR shall submit to the ENGINEER, with such promptness as to cause no delay in his own work or in that of any other Contractor, four checked copies, unless otherwise specified, of all shop and/or setting drawings and schedules required for the work of the various trades, and the ENGINEER shall pass upon them with reasonable promptness, making desired corrections. The CONTRACTOR shall make any corrections required by the

ENGINEER, file with him two corrected copies and furnish such other copies as may be needed. The ENGINEER'S approval of such drawings or schedules shall not relieve the CONTRACTOR from responsibility for deviations from drawings or specifications, unless he has in writing called the ENGINEER'S attention to such deviations at the time of submission, nor shall it relieve him from responsibility for errors of any sort in shop drawings or schedules. It shall be the CONTRACTOR'S responsibility to fully and completely review all shop drawings to ascertain their effect on his ability to perform the required contract work in accordance with the construction drawings and specifications and within the contract time.

Such review by the ENGINEER shall be for the sole purpose of determining the sufficiency of said drawings or schedules to result in finished improvements in conformity with the drawings and specifications, and shall not relieve the CONTRACTOR of his duty as an independent contractor as previously set forth, it being expressly understood and agreed that the ENGINEER does not assume any duty to pass upon the propriety or adequacy of such drawings or schedules, or any means or methods reflected thereby, in relation to the safety of either person or property during CONTRACTOR'S performance hereunder.

2.13 PRELIMINARY APPROVAL

The ENGINEER shall not have the power to waive the obligations of this contract for the furnishing by the

CONTRACTOR of good material, and of his performing good work as herein described, and in full accordance with the drawings and specifications. No failure or omission of the ENGINEER to discover, object to or condemn any defective work or material shall release the CONTRACTOR from the obligations to fully and properly perform the contract, including without limitation, the obligation to at once tear out, remove and properly replace the same at any time prior to final acceptance upon the discovery of said defective work or material; provided, however, that the ENGINEER shall, upon request of the CONTRACTOR, inspect and accept or reject any material furnished, and in event the material has been once accepted by the ENGINEER, such acceptance shall be binding on the OWNER, unless it can be clearly shown that such material furnished does not meet the specifications for this work.

Any questioned work may be ordered taken up or removed for re-examination, by the ENGINEER, prior to final acceptance, and if found not in accordance with the specifications for said work, all expense of removing, re-examination and replacement shall be borne by the CONTRACTOR, otherwise the expense thus incurred shall be allowed as EXTRA WORK, and shall be paid for by the OWNER; provided that, where inspection or approval is specifically required by the specifications prior to performance of certain work, should the CONTRACTOR proceed with such work without requesting prior inspection or approval he shall bear all expense of taking up, removing, and replacing this work if so directed by the ENGINEER.

GC-8

2.14 DEFECTS AND THEIR REMEDIES

It is further agreed that if the work or any part thereof, or any material brought on the site of the work for use in the work or selected for the same, shall be deemed by the ENGINEER as unsuitable or not in conformity with the specifications, the CONTRACTOR shall, after receipt of written notice thereof from the ENGINEER, forthwith remove such material and rebuild or otherwise remedy such work so that it shall be in full accordance with this contract.

2.15 CHANGES AND ALTERATIONS

The CONTRACTOR further agrees that the OWNER may make such changes and alterations as the OWNER may see fit, in the line, grade, form, dimensions, construction drawings or materials for the work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of this contract and the accompanying Performance and Payment Bonds.

If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with, except as provided for unit price items under Section 5 "Measurement and Payment". If the amount of work is increased, and the work can fairly be classified under the specifications, such increase shall be paid for according to the quantity actually done and at the unit price, if any, established for such work under this contract, except as provided for unit price items under

Section 5 "Measurement and Payment;" otherwise, such additional work shall be paid for as provided under Extra

Work. In case the OWNER shall make such changes or alterations as shall make useless any work already done or material already furnished or used in said work, then the OWNER shall recompense the CONTRACTOR for any material or labor so used, and for any actual loss occasioned by such change, due to actual expenses incurred in preparation for the work as originally planned.

3. GENERAL OBLIGATIONS AND RESPONSIBILITIES

3.01 KEEPING OF DRAWINGS AND SPECIFICATIONS ACCESSIBLE

The ENGINEER shall furnish the CONTRACTOR with five (5) sets of all drawings and specifications without expense to him, and the CONTRACTOR shall keep one copy of the same constantly accessible on the work, with the latest revisions noted thereon.

3.02 OWNERSHIP OF DRAWINGS

All drawings, specifications and copies thereof furnished by the ENGINEER shall not be reused on other work, and, with the exception of the signed contract sets, are to be returned to him on request at the completion of the work.

All models are the property of the OWNER.

3.03 RIGHT OF ENTRY

The OWNER reserves the right to enter the property or location on which the works herein contracted for are to be constructed or installed, by such agent or agents as he may…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .