This is a Specification Book for a construction project in Texas involving water, sanitary, drainage, and paving facilities in Woodson's Reserve Section 47. The project encompasses the construction of infrastructure systems including water distribution lines, sanitary sewer systems, storm drainage facilities, and pavement installation within the designated development area. The scope of work requires contractors to complete all necessary site preparation, material procurement, installation, testing, and final inspection of utilities and road surfaces in accordance with local and state standards. Specific details regarding project timelines, bidder meetings, site visits, and contract award dates would be contained within the specification document itself to guide potential bidders through the procurement process.

The specification book establishes technical requirements, material standards, and construction methodologies that bidders must follow to submit compliant proposals. Pricing structures, bonding requirements, insurance obligations, and payment terms are detailed within the document to ensure all contractors understand the financial and administrative conditions of the contract. The project likely includes detailed plans, engineering drawings, and performance specifications that define the scope boundaries and quality standards expected for water, sanitary, and drainage infrastructure installation, along with pavement construction specifications to ensure durability and compliance with applicable codes and regulations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Texas Board of Professional Engineers and Land Surveyors Reg. No. F-23290 1575 Sawdust Road, Suite 400 The Woodlands, Texas 77380 281.363.4039

NA

CMM Seal

NA

Snapshot

NA

Text Box 7/22/26

NA

Text Box

ISSUED FOR BIDDING PURPOSES ONLY

NOT FOR CONSTRUCTION

SPECIFICATIONS AND CONTRACT DOCUMENTS

FOR CONSTRUCTION OF

WATER, SANITARY, DRAINAGE, AND PAVING FACILITIES

IN

WOODSON’S RESERVE SECTION 47

FOR

MONTGOMERY COUNTY MUNICIPAL UTILITY DISTRICT NO. 152A

MONTGOMERY COUNTY, TEXAS

TABLE OF CONTENTS

BIDDING REQUIREMENTS Page No.

Invitation to Bid .......................................................................................................... A-1 Instruction to Bidders................................................................................................. A-2 Bid Form .................................................................................................................... A-5

CONDITIONS OF THE CONTRACT

General Conditions of the Contract ........................................................................... GC-1 Special Conditions of the Contract ............................................................................. SC-1 Standard Form of Agreement ................................................................................... SF-1 Certificate of Interested Parties ................................................................................. CIP-1 Attachment A to Agreement ...................................................................................... AA-1 Performance and Payment Bonds ............................................................................ PB-1 Prevailing Wage Rates ............................................................................................... PW-1

SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

Summary of Work ..................................................................................................... 01010-1 Cutting and Patching ................................................................................................. 01070-1 Submittals ................................................................................................................. 01300-1 Construction Progress Schedule ............................................................................... 01330-1 Shop Drawings, Product Data and Samples .............................................................. 01340-1 Schedule of Values .................................................................................................... 01370-1 Laboratory Services ................................................................................................... 01410-1 Field Project Representative Services ....................................................................... 01420-1 Construction Staking WS&D & Paving ....................................................................... 01430-1 Temporary Facilities and Controls ............................................................................ 01500-1 Cleaning and Adjusting .............................................................................................. 01710-1 Project Record Documents ....................................................................................... 01720-1

A - 2

INSTRUCTION TO BIDDERS

1.0 INVITATION

a. The Work. Bids are invited on a general contract for construction of Water, Sanitary, Drainage & Paving

Facilities in Woodson’s Reserve Section 47.

b. The Owner.

Montgomery County MUD No. 152A 1300 Post Oak Blvd Suite 2400 Houston, TX 77056

d. The Engineer.

Quiddity Engineering, LLC.

1575 Sawdust Road, Suite 400

The Woodlands, Texas 77380 Attention: Cameron M. Miller, P.E.

Telephone: (832) -914-4032

2.0 RECEIPT OF BIDS

a. Sealed bids, in duplicate, will be received until 10:00 a.m., Friday, July 31st, 2026, electronically, via the project page on CivcastUSA.

b. Bids received after this time will not be opened.

c. A non-mandatory pre-bid conference will be held Friday, July 24th, 2026 at 10:00am local time via teleconference call.

d. Bid opening will be held immediately after the time for receipt of bids has expired.

e. Bids will be opened publicly and read aloud. All interested parties are invited to attend.

3.0 BIDDING DOCUMENTS

a. Bidding documents include all documents available during the bidding period, including the instruction to bidders, contract forms, conditions of the contract, specifications, drawings and addenda, if any.

d. Bidders may purchase copies of the bidding documents at www.civcastusa.com. Said documents may be examined without charge in the office of Quiddity Engineering, LLC. Construction Division, 1575 Sawdust Rd, Suite 400, The Woodlands, TX 77380.

4.0 SEPARATED CONTRACT PROVISIONS

a. Contractor must abide by all state and local laws regulating sales tax exemption for work being performed for tax exempt entities. Provisions are provided in Section 5.03 of the Special Conditions.

b. Contractor is responsible for obtaining all permits required by the work at no additional cost to the Owner, except as may specifically be exempted in the Special Conditions.

5.0 EXAMINATION

A - 3

a. Bidder shall carefully examine the bidding documents and the site to determine the actual conditions under which work will be done.

b. Data in the bidding documents pertaining to existing conditions is for convenience only and does not supplant obtaining firsthand information at the site.

c. Adjusting payments will not be authorized for work that could have been foreseen by a careful examination of the site.

d. Submission of a bid constitutes acceptance by the bidder of existing site conditions as a part of the requirements of this work.

6.0 COMPLETION TIME

a. The work shall be substantially completed within 120 (maximum) calendar days from date of Notice to

Proceed.

b. Submission of a bid constitutes acceptance by the bidder of the completion time as a part of the requirements of this work.

7.0 QUESTIONS

a. In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer.

b. Necessary replies will be issued to bidders of record as addenda, which becomes a part of the bidding instruments. Oral instructions do not form a part of the bidding instruments.

c. Bidders should contact the Engineer not less than 72 hours before bid opening to secure any addenda that may affect bidding.

8.0 SUBMITTAL

a. Submit bid and other required data in an opaque, sealed envelope. If submitted by mail, enclose bid envelope in another envelope addressed for mailing. Plainly identify the sealed envelope with the following information:

Do not open before 10:00 a.m., Friday, July 31st, 2026.

Bid Construction of Water, Sanitary, Drainage and Paving Facilities in Woodson’s Reserve Section 47.

Owner: Montgomery County M.U.D. No. 152A Bidder:

b. Submit bid on the bid form provided. Fill in all blanks. If no amount is to be included, insert three zeros in the space. Include all unit cost items and all alternatives shown on the bid form; failure to comply may be cause for rejections. No segregated bids or assignments will be considered.

c. Do not alter the bid form with written memoranda or qualifications. Any explanation, alteration, or other statements proposed by the bidder must be written separately, signed independently, and included in the bid envelope. Bids may not be modified after submittal.

d. Sign in longhand below the typed name of the person authorized to bind the bidder to a contract. When the bidder is a corporation, the bid must be signed with the legal name of the corporation followed by the name of the State of Incorporation and the legal signature of a person authorized to bind the corporation to a contract.

A - 4

9.0 BID SECURITY

a. For construction contracts $50,000, the bidder shall submit a certified or cashier's check on a responsible bank in the State equal to two percent (2%) cashier’s check or five percent (5%) bid bond of the maximum total bid amount. Make the cashier's check or bid bonds payable to the Owner.

b. The bid security will be forfeited to the Owner by the bidder as damages as default if the bidder fails to execute and deliver a contract and bonds as required.

10.0 PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND

Bidder must be capable of executing a satisfactory performance bond and payment bond for 100 percent (100%) of the contract sum in accord with the conditions of the contract.

11.0 WITHDRAWAL

a. Bids may be withdrawn any time before bid opening but may not be resubmitted.

b. Bids may not be withdrawn or modified after bid opening time unless the award of the contract has been delayed more than 90 days.

12.0 QUALIFICATIONS OF BIDDERS

a. The Owner may make any investigations deemed necessary to determine the bidder's ability to perform the work. When requested, furnish such information and data necessary for this purpose.

b. The Owner reserves the right to reject any bid if evidence submitted by or investigation of the bidder indicate that the bidder is not properly qualified in the opinion of the Owner, to complete the work satisfactorily.

13.0 AWARD OF CONTRACT

The Owner is not obligated to accept the lowest bid or any bid. The Owner reserves the right to reject any or all bids and to waive any informalities in bids or in bidding. The Owner may accept any bid deemed advantageous. The contract award may include full consideration of unit prices, alternates, and time of completion.

14.0 RETURN OF SIGNED CONTRACTS

By submitting a bid, the Contractor agrees to return signed contracts with proper bonds and insurance certificates within 7 calendar days after the Engineer has given the unsigned contracts to the Contractor. Should the Contractor fail to return properly executed contracts within 7 days, the Engineer may disqualify that Contractor and recommend that the Owner enter into contracts with the next highest bidder.

o 0 o - -

DIVISION 2 - SITE WORK

Clearing and Grubbing .............................................................................................. 02120-1 Embankment ............................................................................................................. 02212-1 Excavation, Trenching and Backfilling for Utilities .................................................... 02220-1 Cement-Sand Backfill ................................................................................................ 02221-1 Structural Excavation & Backfill ................................................................................. 02222-1 Roadway Excavation .................................................................................................. 02223-1 Trench Safety System ................................................................................................ 02226-1 Waste Material Disposal ........................................................................................... 02227-1 Grading & Compaction of Subgrade ......................................................................... 02230-1 Lime Stabilization of Pavement Subgrade ................................................................. 02241-1 Lime-Fly Ash .............................................................................................................. 02242-1 Storm Sewers ............................................................................................................ 02500-1 Concrete Drainage Structures ................................................................................... 02513-1 Manholes ................................................................................................................... 02514-1 Concrete Construction for Structures ....................................................................... 02515-1 Dewatering and Drainage of Excavation ................................................................... 02530-1 Water Distribution Mains........................................................................................... 02555-1 Sanitary Sewers .......................................................................................................... 02560-1 Well Point System ...................................................................................................... 02600-1 Portland Cement Concrete Pavement ...................................................................... 02614-1 Control of Erosion and Erosion Control Structures ................................................... 02630-1 Concrete Slope Paving ............................................................................................... 02650-1 Traffic Signs ............................................................................................................. 02725-1 Pavement Marking Material .................................................................................... 02735-1 Hydro-Mulch Seeding ................................................................................................. 02800-1 Seeding ....................................................................................................................... 02805-1 Dewatering and Filling Ponds ..................................................................................... 02900-1

DIVISION 3 - PAVEMENT

Concrete Formwork .................................................................................................. 03100-1 Concrete Joints and Embedded Items ...................................................................... 03150-1 Concrete Reinforcement ........................................................................................... 03200-1 Cast-in-Place Concrete .............................................................................................. 03300-1

END OF TABLE OF CONTENTS

A-1

INVITATION TO BID

Sealed bids in duplicate addressed to Montgomery County Municipal Utility District No. 152A will be received electronically, until 10:00 a.m., Friday, July 31st, 2026, and then publicly opened and read for furnishing all plant, labor, material, and equipment and performing all work required for the Construction of Water, Sanitary, Drainage, and Paving Facilities in Woodson’s Reserve Section 47.

The bids will only be received electronically through CivcastUSA. The electronic bids will be publicly opened and read via conference call. Physical bids will not be accepted. The number for this call is:

1-832-856-3756. Enter access code 487 830 695# when prompted. People who want to attend the bid opening must do so by teleconference.

Scope of Work of the Contract includes Construction of Water, Sanitary, Drainage, and Paving Facilities in Woodson’s Reserve Section 47.

For construction contracts $50,000 and over but less than $250,000, the bidder shall submit a certified or cashier's check on a responsible bank in the State equal to two percent (2%) of the maximum total bid amount. For construction contracts over $250,000, the bidder shall submit either a 2% certified or cashier’s check or five percent (5%) bid bond of the maximum total bid amount. Make the cashier's check or bid bonds payable to the Owner.

Plans, specifications, and bidding documents are available at www.civcastusa.com. Said documents may be examined without charge in the office of Quiddity Engineering, LLC. Construction Division, 1575 Sawdust Rd Suite 400, The Woodlands, TX 77380.

Bids received after the closing time will not be considered. A NON-MANDATORY pre-bid conference will be held Friday, July 24th, 2026 at 10:00 AM. The number for this call is: 832-856-3756. Enter access code 240 085 110# when prompted.

The Owner reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of 90 days from the date bids are opened.

ATTENTION: Pursuant to Texas Government Code 2252.908, on behalf of Montgomery County Municipal District No. 152A (the “District”), the bidder shall submit a printed, executed, and notarized original of a completed Certificate of Interested Parties form (Form 1295) with the bid. Failure to do so will result in the district’s inability to execute the contract. To complete the disclosure of interested parties form, or for further information, please visit the Texas Ethics Commission’s website at https://www.ethics.state.tx.us.

The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.

- - o 0 o - -

Bid Form of ________________________________________________ an individual proprietorship / a corporation organized and existing under laws of the State of Texas / a partnership of _______________________________________________.

OWNER: Montgomery County MUD 152A

PROJECT: Construction of Water, Sanitary, Drainage, and Paving Facilities in Woodson's Reserve Section 47

DATE: 4/28/2026

JOB NO.: W5950-0068-01

ITEM DESCRIPTION UNIT QUANTITY UNIT ITEM

NO. PRICE TOTAL

WOODSON'S RESERVE SECTION 47 WATER, SANITARY, DRAINAGE, & PAVING FACILITIES (UNITS A-F)

UNIT A: MOVE-IN & START-UP

A 1. Move-in and start-up, including maintenance, performance, and payment bonds for 100 percent (100%) of the contract amount. Requires a written schedule provided to Engineer before payment of item. LS 1 $ $

SUBTOTAL, UNIT A $

UNIT B: WATER DISTRIBUTION SYSTEM

B 1. 6-inch C-900 AWWA (DR18) Class 235, waterline (including fittings, bedding, backfill and testing), complete in place. LF 1,471 $ $

B 2. 8-inch C-900 AWWA (DR18) Class 235, waterline (including fittings, bedding, backfill and testing), complete in place. LF 2,014 $ $

B 3. Flushing valve, bury as shown, (including lead and gate valve), complete in place. EA 6 $ $

B 4. Final adjustment of all flush valves, as directed by the Engineer. EA 6 $ $

B 5. 6" gate valve and box, bury as shown, (including lead), complete in place. EA 4 $ $

B 6. 8" gate valve and box, bury as shown, (including lead), complete in place. EA 10 $ $

B 7. 6" plug and clamp, complete in place. EA 4 $ $

B 8. 8" plug and clamp, complete in place. EA 4 $ $

B 9. 2" blow off and box, complete in place. EA 8 $ $

Bid Form

WOODSON'S RESERVE SECTION 47 WATER, SANITARY, & DRAINAGE FACILITIES (UNITS B-E)

A-5

ITEM DESCRIPTION UNIT QUANTITY UNIT ITEM

NO. PRICE TOTAL

B 10. Connect proposed 8-inch waterline to existing 8-inch waterline, including removal of existing 2-inch blow-off and 8-inch plug, complete in place. EA 1 $ $

SUBTOTAL, UNIT B $

UNIT C: SANITARY SEWER SYSTEM

C 1. 6-inch sanitary sewer pipe, 0-12 foot depth, including air testing, mandrel testing, bedding and backfill), complete in place. LF 113 $ $

C 2. 6-inch sanitary sewer pipe, >12 foot depth, including air testing, mandrel testing, bedding and backfill), complete in place. LF 60 $ $

C 3. 8-inch sanitary sewer pipe, 0-12 foot depth, including air testing, mandrel testing, bedding and backfill), complete in place. LF 1,259 $ $

C 4. 8-inch sanitary sewer pipe, >12 foot depth, including air testing, mandrel testing, bedding and backfill), complete in place. LF 1,886 $ $

C 5. Sanitary sewer manhole, standard depth, complete in place. EA 28 $ $

C 6. Extra depth sanitary sewer manhole, 8-12 foot depth, complete in place. VF 75 $ $

C 7. Extra depth sanitary sewer manhole, greater than 12 foot depth, complete in place. VF 35 $ $

C 8. Final vertical adjustment of sanitary sewer manholes 3-inches above adjacent natural ground, complete in place. EA 28 $ $

C 9. Single or double near side 6-inch sanitary sewer leads (including wye and plugs), complete in place. EA 33 $ $

C 10. Single or double far side 6-inch sanitary sewer leads (including wye and plugs), complete in place. EA 8 $ $

C 11. Single or double far side 8-inch sanitary sewer leads (including wye and plugs), complete in place. EA 4 $ $

C 12. Sanitary sewer stacks, 0-3 foot depth, complete in place. EA 18 $ $

C 13. Sanitary sewer stacks, greater than 3 foot depth, complete in place. VF 127 $ $

A-6

C 14. Sanitary sewer far-side stacks, 0-3 foot depth, complete in place. EA 2 $ $

C 15. Sanitary sewer far-side stacks, greater than 3 foot depth, complete in place. VF 2 $ $

C 16. Remove existing 8-inch plug & connect proposed 8-inch sanitary sewer to existing 8-inch sanitary sewer (including bedding, backfill, and testing), complete in place. EA 1 $ $

C 17. 8-inch sanitary sewer plug, complete in place. EA 2 $ $

C 18. 6-inch sanitary sewer plug, complete in place. EA 2 $ $

SUBTOTAL, UNIT C $

UNIT D: DRAINAGE SYSTEM

D 1. 18-inch RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), complete in place. LF 342 $ $

D 2. 24-inch RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), complete in place. LF 1,260 $ $

D 3. 30-inch RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), complete in place. LF 305 $ $

D 4. 36-inch RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), complete in place. LF 463 $ $

D 5. 42-inch RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), complete in place. LF 495 $ $

D 6. 48-inch RCP, ASTM C-76, Class III, all depths, (including bedding and backfill), complete in place. LF 342 $ $

D 7. Type "C" manhole for 24"-42" pipe, all depths, complete in place. EA 17 $ $

D 8. Type "C" Large manhole for 48" pipe or larger, all depths, complete in place. EA 4 $ $

D 9. Type "C" manhole with 5'x6' Precast Box per detail, all depths, complete in place. EA 5 $ $

D 10. Final vertical adjustments of Type "C" manholes 3-inches above adjacent finished ground, complete in place. EA 26 $ $

D 11. Lower portion "B-B" inlets, complete in place. EA 16 $ $

D 12. Upper portion "B-B" inlets, complete in place. EA 16 $ $

A-7

D 13. Lower portion "C" inlets, complete in place. EA 6 $ $

D 14. Upper portion "C" inlets, complete in place. EA 6 $ $

D 15. Timber frame grates with filter fabric in place and maintained over lower stage inlets. EA 22 $ $

D 16. 8-inch brick wall plug for end of 24-inch RCP, complete in place. EA 2 $ $

D 17. Concrete Headwall with Parallel Wings per TxDOT specifications, complete in place EA 2 $ $

D 18. 5-inch thick reinforced concrete slope paving, (including filter fabric, weep holes, toe walls, re-bar, and expansion joints), complete in place. SY 64 $ $

D 19. Rip rap, complete in place. SY 63 $ $

SUBTOTAL, UNIT D $

UNIT E: ADDITIONAL ITEMS

E 1. Excess utility excavation material to be spread and compacted (to 95%) on lots, as directed by Engineer. CY 7,340 $ $

E 2. Utilities construction staking by Quiddity Engineering, LLC. Staking to be performed one time only. All additional staking is at the expense of the contractor. LS 1 22,500.00$ 22,500.00$

E 3. Trench safety system for 1-23" pipe, all depths. LF 7,145 $ $

E 4. Trench safety system for 24-inch and greater pipe, all depths. LF 2,865 $ $

E 5. Well point system (>12' pipe depth), complete in place and operated per specifications, as directed by LF 2,000 $ $

($25.00 min. bid) E 6. Additional cost above minimum bid for Well Point system, complete in place and operated per specifications, as directed by Engineer. LF 200 $ $

E 7. Wet sand construction for sanitary sewer & storm sewer, per City of Houston Detail, as directed by Engineer. LF 500 $ $

($25.00 min. bid) E 8. Additional cost above minimum bid for wet sand construction, complete in place, per specifications, as directed by Engineer. LF 200 $ $

E 9. 25' x 75' Stabilized Construction Access, installed, maintained and removed by Contractor. EA 1 $ $

A-8

E 10. Inlet protection (sand bags, hay bales, or approved equal) as per Pollution Prevention Site Plan (including installation, maintenance, and removal after construction). EA 24 $ $

E 11. Placement of reinforced filter fabric fence, along back of curb, and as directed by engineer (including installation, maintenance and removal). LF 11,507 $ $

SUBTOTAL, UNIT E $

TOTAL, WOODSON'S RESERVE SECTION 47 WS&D FACILITIES (UNITS A-E) $

MONTGOMERY COUNTY MUD 152A

UNIT F: WOODSON'S RESERVE SECTION 47 PAVING FACILITIES

F 1. Final lot grading per grading plan including filling (or cutting), grading, and compacting (to 95%) all lots and reserves, backlot utility easements and existing swales on this property as directed by the Engineer. Grading of lots to be smooth with no ruts and ready to be seeded.

Easements to be stripped if necessary, at no additional cost to the owner. Lot 86 $ $

F 2. Roadway excavation. Excavated material to be used Lot and Right-of-Way Fill. Fill material shall be spread and compacted (to 95%) as directed by Engineer. Cut behind curb and replacement of material is considered incidental. No adjustments will be made based on variance of actual quantities. Final Grading within the right-of-way is considered incidental. CY 2,000 $ $

F 3. Lime for subgrade @ (10 lbs/SY) as directed by Engineer. Ton 61 $ $

F 4. Fly-Ash for subgrade @ (40 lbs/SY) as directed by Engineer. Ton 242 $ $

F 5. Manipulation, grading, and compaction of subgrade for concrete pavement. SY 12,100 $ $

F 6. 6-inch reinforced concrete pavement, complete in place. SY 11,328 $ $

F 7. 6-inch concrete curb, complete in place. LF 3,535 $ $

F 8. 4-inch x 12-inch concrete curb, complete in place. LF 3,432 $ $

F 9. Type 7 Wheelchair ramps, including 5-foot by 5-foot (4.5-inch thick) landing pad, complete in place according to detail. EA 12 $ $

A-9

F 10. Blue reflectorized traffic buttons at each flushing valve, as per detail, complete in place. EA 6 $ $

F 11. R1-1 stop sign and two name street sign, including post, per Harris County detail, complete in place. EA 6 $ $

F 12. R2-5cP Speed limit sign with residential sign, including post, complete in place. EA 1 $ $

F 13. Reflectorized pavement markings Type I (White) (12") (Solid), for Crosswalk, per detail sheet 5, complete in place. LF 1,051 $ $

F 14. Reflective Pavement Markings Type I, 24-Inch Solid White Stop Bar, (100 mil), Complete in Place, as per TxDOT Specifications 666, including Surface Prepration as per TxDOT Specs. 678 LF 84 $ $

F 15. 6-inch PVC schedule 40 irrigation sleeves, including 2' stub up, complete in place, as directed by Engineer. LF 650 $ $

F 16. Paving construction staking to be performed by Quiddity Engineering, LLC. Staking to be performed one time only. All additional staking is at the expense of the contractor. LS 1 19,000.00$ 19,000.00$

F 17. As-Built topographic survey to be performed by Quiddity Engineering, LLC. Survey to be performed one time only. All additional surveys are at the expense of the contractor. LS 1 17,500.00$ 17,500.00$

F 18. Hydro-mulch seeding in R.O.W. as directed by Engineer.

Contractor to ensure growth of vegetation by whatever means necessary including re-seeding or watering at no separate pay, as directed by Engineer. Ac. 1.57 $ $

F 19. Broadcast Seeding of Lots as specified in Standard Specifications including all returns to Natural grade.

Contractor to ensure growth and coverage of at least eighty percent (80%) of disturbed area by vegetation by whatever means necessary, including re-seeding, over-seeding, fertilization and mowing. Ac. 12.0 $ $

SUBTOTAL, UNIT F $

SUMMARY

TOTAL BASE (UNITS A-F) $

WATER, SANITARY, DRAINAGE, AND PAVING FACILITIES FOR WOODSON'S RESERVE SECTION 47

MONTGOMERY COUNTY MUD 152A

TOTAL, (UNIT F)

PAVING FACILITIES FOR WOODSON'S RESERVE SECTION 47

A-10

N/A Yes

$1,000/day

N/A Yes

$1,000/day

N/A Yes

$1,000/day

Days TOTAL Contract Period of Performance

Agreed to be Contractor = (Total Base Bid)

(Completion time not to exceed 130 calendar days) Estimated Mobilization Date =

Percent Self-Performed=

The undersigned Bidder has carefully examined the Instructions to Bidders, this Proposal, the General Conditions of Agreement, the Technical Specifications and the drawings for the work herein above described and referred to in the Invitation to Bid and has carefully examined the site of the work and will provide all necessary labor, superintendence, machinery, equipment, tools, materials, services and other means of construction to complete all the work upon which he bids, as called for in the Contract, the Specifications and shown on the drawings, and in the manner prescribed therein and according to the requirements of the Engineer as therein set forth for the amounts above and below.

Calendar Days to Complete

It is understood that the bidder shall specify the number of calendar days for each stage of work in the table below not to exceed 130 calendar days after the date on which work is to be commenced as established by the Contract Documents.

15 (Max)

Late Completion Penalty

Max Calendar Days to Complete

Description Early Completion

Bonus

The amounts set forth above are current estimates by Contractor of the amounts that will be determined during the progress of the Work. The separated progress billings from Contractor to the Owner/Engineer shall reflect the actual amounts expended for the items enumerated in (a), (b), and (c), above.

SUBSTITUTIONS: If necessary, attach detailed explanation to proposal.

TOTAL

______ days

A-11

First Stage Utilities for Woodson's Reserve Section 47

______ days 50 (Max)

Paving Facilities

130 (max)_____ days

Second Stage Utilities for Woodson's Reserve Section 47

______ days 65 (Max)

Date Signed

By (Title)

SEAL (if Bidder is a Corporations)

Acknowledge reciept of Addenda Below:

A-12

The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for 90 days following date of bid opening.

Addendum No. _______ _______ _______ _______ _______

It is agreed that the contract price may be increased or decreased to cover work added or deleted by order of the Engineer, in accordance with the provisions of the General Conditions of Agreement.

Date Received _______ _______ _______ _______ _______

The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are submitted as correct and final.

It is understood that the bid security accompanying this proposal shall be returned to the undersigned unless, in case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a construction contract and execute bonds as required within 7 calendar days after the Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner as a result of such failure on the part of the undersigned.

- - o 0 o - -

(Address)

(Telephone Number)

In the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Performance and Payment Bonds as provided in the Specifications.

The award may be made on the Base Bid alone or the Base Bid, Completion Time specified, and any or all of the Items listed under Alternates or Substitutions, if any.

It is understood that the Owner reserves the right to reject any and all bids.

(Company)

GC-1

TABLE OF CONTENTS

FOR

GENERAL CONDITIONS OF AGREEMENT

1. DEFINITIONS OF TERMS

1.01 Owner, Contractor and Engineer ................................................................................................ GC-3

1.02 Contract Documents ................................................................................................................... GC-3

1.03 Sub-Contractor ............................................................................................................................ GC-3

1.04 Written Notice ............................................................................................................................ GC-3

1.05 Work ............................................................................................................................................ GC-3

1.06 Extra Work .................................................................................................................................. GC-4

1.07 Working Day ................................................................................................................................ GC-4

1.08 Calendar Day ............................................................................................................................... GC-4

1.09 Substantially Completed ............................................................................................................. GC-4

2. RESPONSIBILITIES OF THE ENGINEER AND THE CONTRACTOR

2.01 Owner-Engineer Relationship ..................................................................................................... GC-4

2.02 Observation of the Work ............................................................................................................ GC-4

2.03 Payments for Work ..................................................................................................................... GC-5

2.04 Initial Determinations ................................................................................................................. GC-5

2.05 Objections ................................................................................................................................... GC-5

2.06 Lines and Grades ......................................................................................................................... GC-5

2.07 Contractor's Duty and Superintendence ..................................................................................... GC-5

2.08 Contractor's Understanding ........................................................................................................ GC-6

2.09 Character of Workers .................................................................................................................. GC-6

2.10 Contractor's Buildings ................................................................................................................. GC-7

2.11 Sanitation .................................................................................................................................... GC-7

2.12 Shop Drawings ............................................................................................................................ GC-7

2.13 Preliminary Approval .................................................................................................................. GC-7

2.14 Defects and Their Remedies ....................................................................................................... GC-8

2.15 Changes and Alterations ............................................................................................................. GC-8

3. GENERAL OBLIGATIONS AND RESPONSIBILITIES

3.01 Keeping of Drawings and Specifications Accessible .................................................................... GC-8

3.02 Ownership of Drawings ............................................................................................................... GC-8

3.03 Right of Entry .............................................................................................................................. GC-8

3.04 Collateral Contracts ..................................................................................................................... GC-9

3.05 Discrepancies and Omissions ...................................................................................................... GC-9

3.06 Equipment, Materials and Construction Plant ............................................................................ GC-9

3.07 Damages ...................................................................................................................................... GC-9

3.08 Protection Against Accident to Employees and the Public ......................................................... GC-9

3.09 Performance and Payment Bonds .............................................................................................. GC-9

3.10 Losses from Natural Causes ...................................................................................................... GC-10

3.11 Protection of Adjoining Property; Indemnification ................................................................... GC-10

3.12 Protection Against Claims of Sub-Contractors, etc ................................................................... GC-10

3.13 Intellectual Property Rights and Indemnification .................................................................... GC-11

3.14 Laws and Ordinances; Indemnification ..................................................................................... GC-12

GC-2

3.15 Assignment and Subletting ....................................................................................................... GC-12

3.16 Indemnification ......................................................................................................................... GC-12

3.17 Insurance ................................................................................................................................... GC-13

3.18 Certificate of Insurance ............................................................................................................. GC-17

4. PROSECUTION AND PROGRESS

4.01 Time and Order of Completion ................................................................................................. GC-17

4.02 Extension of Time ...................................................................................................................... GC-18

4.03 Hindrances and Delays .............................................................................................................. GC-18

5. MEASUREMENT AND PAYMENT

5.01 Quantities and Measurements ................................................................................................. GC-18

5.02 Estimated Quantities................................................................................................................. GC-18

5.03 Price of Work ............................................................................................................................ GC-19

5.04 Partial Payments ....................................................................................................................... GC-19

5.05 Use of Completed Portions ....................................................................................................... GC-20

5.06 Warranty ................................................................................................................................... GC-20

5.07 Guarantee ................................................................................................................................. GC-20

5.08 Final Completion and Acceptance ............................................................................................. GC-21

5.09 Final Payment............................................................................................................................ GC-21

5.10 Payments Withheld ................................................................................................................... GC-21

5.11 Delayed Payments..................................................................................................................... GC-21

6. EXTRA WORK AND CLAIMS

6.01 Change Orders .......................................................................................................................... GC-22

6.02 Minor Changes .......................................................................................................................... GC-22

6.03 Extra Work ................................................................................................................................ GC-22

6.04 Time of Filing Claims ................................................................................................................. GC-23

6.05 Arbitration ................................................................................................................................. GC-23

7. ABANDONMENT OF CONTRACT

7.01 Termination for Convenience of Owner ................................................................................... GC-24

7.02 Default....................................................................................................................................... GC-25

7.03 Remedies for Default of Contractor .......................................................................................... GC-25

7.04 Abandonment by Owner ........................................................................................................... GC-26

GC-3

GENERAL CONDITIONS OF AGREEMENT

1. DEFINITIONS OF TERMS

1.01 OWNER, CONTRACTOR AND ENGINEER

The OWNER, the CONTRACTOR and the ENGINEER are those persons or organizations identified as such in the

Agreement and are referred to throughout the Contract Documents as if singular in number and masculine in gender. The term ENGINEER means the ENGINEER or his duly authorized representative. The ENGINEER shall be understood to be the ENGINEER of the OWNER, and nothing contained in the Contract Documents shall create any contractual or agency relationship between the ENGINEER and the CONTRACTOR.

1.02 CONTRACT DOCUMENTS

The Contract Documents shall consist of the Notice to Bidders (Advertisement), Special Conditions (Instructions to

Bidders), Proposal, signed Agreement, Performance and Payment Bonds (when required), Special Bonds (when required), General Conditions of the Agreement, Special Conditions of the Contract, Technical Specifications, Construction Drawings, and all modifications thereof incorporated in any of the documents before the execution of the agreement.

The Contract Documents are complementary, and what is called for by any one shall be as binding as if called for by all. In case of conflict between any of the Contract Documents, priority of interpretation shall be in the following order: Signed Agreement, Performance and Payment Bonds, Special Bonds (if any), Proposal, Special

Conditions of the Contract, Notice to Bidders, Technical Specifications, Construction Drawings, and General

Conditions of Agreement.

1.03 SUB-CONTRACTOR

The term Sub-Contractor, as employed herein, includes only those having a direct contract with the CONTRACTOR and it includes one who furnishes material worked to a special design according to the construction drawings or specifications of this work, but does not include one who merely furnishes material not so worked.

1.04 WRITTEN NOTICE

Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered mail to the last business address known to him who gives the notice.

1.05 WORK

The CONTRACTOR shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, services, insurance, and all water, light, power, fuel, transportation and other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The CONTRACTOR shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have a well known technical or trade meaning shall be held to refer to such recognized standards.

GC-4

1.06 EXTRA WORK

The term "Extra Work" as used in this contract shall be understood to mean and include all work that may be required by the ENGINEER or OWNER to be done by the CONTRACTOR to accomplish any change, alteration or addition to the work shown upon the construction drawings, or reasonably implied by the specifications, and not covered by the CONTRACTOR'S Proposal, except as provided under "Changes and Alterations", herein.

1.07 WORKING DAY

A "Working Day" is defined as any day not including Saturdays, Sundays or any legal holidays, in which weather or other conditions not under the control of the CONTRACTOR, will permit construction of the principal units of the work for a period of not less than seven (7) hours between 7:00 a.m. and 6:00 p.m.

1.08 CALENDAR DAY

"Calendar Day" is any day of the week or month, no days being excepted. No allowance will be made for inclement weather if the CONTRACTOR was able or would have been able to prosecute the principal units of work for a period of not less than seven (7) hours between 7:00 a. m. and 6:00 p. m.

1.09 SUBSTANTIALLY COMPLETED

By the term "substantially completed" is meant that the structure has been made suitable for use or occupancy or the facility is in condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment.

2. RESPONSIBILITIES OF THE ENGINEER AND THE CONTRACTOR

2.01 OWNER-ENGINEER RELATIONSHIP

The ENGINEER will be the OWNER'S representative during construction. The duties, responsibilities and limitations of authority of the ENGINEER as the OWNER'S representative during construction are as set forth in the Contract

Documents and shall not be extended or limited without written consent of the OWNER and ENGINEER. The

ENGINEER will advise and consult with the OWNER, and all of OWNER'S instructions to the CONTRACTOR shall be issued through the ENGINEER.

2.02 OBSERVATION OF THE WORK

The ENGINEER shall make periodic visits to the site to familiarize himself generally with the progress of the executed work and to determine if such work generally meets the essential performance and design features and the technical and functional engineering requirements of the Contract Documents; provided and except, however, that the ENGINEER shall not be responsible for making any detailed, exhaustive, comprehensive or continuous on-site inspection of the quality or quantity of the work or be in any way responsible, directly or indirectly, for the construction means, methods, techniques, sequences, quality, procedures, programs, safety precautions or lack of same incident thereto or in connection therewith. Notwithstanding any other provision of this agreement or any other Contract Document, the ENGINEER shall not be in any way responsible or liable for any acts, errors, omissions or negligence of the CONTRACTOR, any subcontractor or any of the CONTRACTOR'S or subcontractor's agents, servants or employees or any other person, firm or corporation performing or attempting to perform any of the work.

GC-5

2.03 PAYMENTS FOR WORK

The ENGINEER shall review CONTRACTOR'S applications for payment and supporting data, determine the amount owed to the CONTRACTOR and approve, in writing, payment to CONTRACTOR in such amounts; such approval of payment to CONTRACTOR constitutes a representation to the OWNER of ENGINEER'S professional judgment that the work has progressed to the point indicated to the best of his knowledge, information and belief, but such approval of an application for payment to CONTRACTOR shall not be deemed as a representation by ENGINEER that ENGINEER has made any examination to determine how or for what purpose CONTRACTOR has used the moneys paid on account of the Contract price.

2.04 INITIAL DETERMINATIONS

The ENGINEER initially shall determine all claims, disputes and other matters in question between the

CONTRACTOR and the OWNER relating to the execution or progress of the work or the interpretation of the

Contract Documents and the ENGINEER'S decision shall be rendered in writing within a reasonable time. Should the ENGINEER fail to make such decision within a reasonable time, appeal to arbitration may be taken as if his decision had been rendered against the party appealing.

2.05 OBJECTIONS

In the event the ENGINEER renders any decision which, in the opinion of either party hereto, is not in accordance with the meaning and intent of this contract, either party may file with the ENGINEER within thirty days his written objection to the decision, and by such action may reserve the right to submit the question so raised to arbitration as hereinafter provided.

2.06 LINES & GRADES

Unless otherwise specified, the ENGINEER or his representative shall furnish all lines and grades. Whenever necessary, construction work shall be suspended to permit performance of this work, but such suspension will be as brief as practicable and the CONTRACTOR shall be allowed no extra compensation therefore. The CONTRACTOR shall give the ENGINEER ample notice of the time and place where lines and grades will be needed. All stakes, marks, etc. shall be carefully preserved by the CONTRACTOR, and in case of careless destruction or removal by him or his employees, such stakes, marks, etc. shall be replaced at the CONTRACTOR'S expense.

2.07 CONTRACTOR'S DUTY AND SUPERINTENDENCE

The CONTRACTOR shall give adequate attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants. The superintendent shall represent the CONTRACTOR in his absence and all directions given to him shall be as binding as if given to the CONTRACTOR.

The CONTRACTOR is and at all times shall remain an independent contractor, solely responsible for the manner and method of completing his work under this contract, with full power and authority to select the means, method and manner of performing such work, so long as such methods do not adversely affect the completed improvements, the OWNER and ENGINEER being interested only in the result obtained and conformity of such completed improvements to the construction drawings, specifications and contract.

Likewise, the CONTRACTOR shall be solely responsible for the safety of himself, his employees and other persons, as well as for the protection of the safety of the improvements being erected and the property of himself or any other person, as a result of his operations hereunder.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .