This is a Request for Quotations (RFQ) issued by the Defense Logistics Agency (DLA) Troop Support for the procurement of Collapsible Joint Modular Intermodal Container (JMIC) assemblies. The solicitation number is SPE8ED-27-T-0004, issued on October 2, 2026, with a quote submission deadline of October 13, 2026. The requirement is for six units of NSN 8145-01-588-1810 (Collapsible JMIC), with delivery required within 220 calendar days from contract award to USNS Alan Shepard T AKE 3. The unit cost has been historically set at $3,625.56 per unit across recent contracts with supplier CAGE 0SWN5, suggesting an expected total contract value of approximately $21,753.36 for the base quantity.
This acquisition includes mandatory First Article Approval (FAT) testing and Production Lot Testing (PLT) requirements. Contractors must deliver two First Article test units to Naval Surface Warfare Center, Indian Head Division, Detachment Earle (NSWC IHD DET PICATINNY) within 150 calendar days, with Government testing taking approximately 90 days and approval notification within 30 days thereafter. Production lot samples (up to 2 percent of production quantity) must be submitted for Government testing with a 15-day test timeline plus 5-day approval window. The item is classified as critical and requires source inspection at origin. Quotations must be submitted via the DLA Internet Bid Board System (DIBBS) at https://www.dibbs.bsm.dla.mil. The solicitation incorporates the DLA Master Solicitation for Automated Simplified Acquisitions, technical and quality requirements via reference to the DLA Technical and Quality Master List, and standard FAR, DFARS, and DLAD clauses covering areas including hazardous materials handling, covered defense telecommunications equipment restrictions, small business program representations, employment eligibility verification, and payment submission via Wide Area Workflow (WAWF).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
4. CERT.FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5. ISSUED BY
7. DELIVERY
9. DESTINATION
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5 ON OR
BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (See Continuation Sheets)
12. DISCOUNT FOR PROMPT PAYMENT
d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
16. SIGNER
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not useable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
1. REQUEST NO.
SPE8ED-27-T-0004
2. DATE ISSUED
2026 OCT 02
3. REQUISITION/PURCHASE REQUEST NO.
7018561771
RATING
DO-C9
DLA TROOP SUPPORT
CONSTRUCTION & EQUIPMENT CONTAINERS
700 ROBBINS AVENUE
PHILADELPHIA PA 19111-5096
USA
Name: Ogden Howard Buyer Code:PEPCDD3 Tel: 445-737-1263 Fax: (215) 737-7557 Email: ogden.howard@dla.mil
6. DELIVER BY (Date)
SEE SCHEDULE
8. TO:
c. CITY
d. STATE
b. STREET ADDRESS
a. NAME OF CONSIGNEE
e. ZIP CODE
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%)
15. Date of Quotation
a. NAME (Type or Print)
AREA CODE
c. TITLE (Type or Print)d. CITY
c. COUNTY
b. STREET ADDRESS
e. STATE f. ZIP CODE
See Schedule
2026 OCT 13
NUMBER
FOB DESTINATION
OTHER
(See Schedule)
CAGE
b. TELEPHONE
PAGE OF PAGES
POC INFORMATION:
WHEN TECHNICAL DATA IS PROVIDED IT MUST BE OBTAINED AT:https://pcf1x.bsm.dla.mil/cfolders. DISCREPANCIES FOUND IN TECHNICAL DATA SHOULD SUBMIT REQUEST TO THE DLA CUSTOMER SERVICE WEBSITE:https://www.pdmd.dla.mil/cs/
ALL OTHER QUESTIONS (SOLICITATION REQUIREMENTS, ITEM DESCRIPTION, AWARD CHOICE, ETC.), PLEASE CONTACT THE BUYER SHOWN ABOVE.
QUESTIONS REGARDING OPERATION OF THE DLA-BSM INTERNET BID BOARD SYSTEM SHOULD BE E-MAILED TO: DibbsBSM@dla.mil
FOR IMMEDIATE ASSISTANCE, PLEASE REFER TO THE FREQUENTLY ASKED QUESTIONS (FAQS) ON BSM DIBBS AT:
https://www.dibbs.bsm.dla.mil/Refs/help/DIBBSHelp.htm OR PHONE 1-844-347-2457 (Press 5 then speak or enter D-L-A).
MASTER SOLICITATION
THIS SOLICITATION INCORPORATES THE TERMS AND CONDITIONS SET FORTH IN THE DEFENSE LOGISTICS AGENCY (DLA) MASTER SOLICITATION FOR AUTOMATED SIMPLIFIED ACQUISITIONS REVISION 105 (MAY 20, 2026) WHICH CAN BE FOUND ON THE WEB AT:
https://www.dla.mil/Portals/104/Documents/J7Acquisition/FinalMasterSolicitationForAutomatedSimplifiedAcquisitionsRevision5-20-26.pdf
This solicitation incorporates technical/quality requirements (‘R’ or ‘I’ number in section B). The full text is in the DLA Technical and Quality Master List of Requirements at:
http://www.dla.mil/HQ/Acquisition/Offers/eprocurement.aspx The revisionof the TQ Master in effect on the award date controls.
THE FULL TEXT OF THE FAR, DFARS, AND DLAD PROVISIONS, CLAUSES, ANDPROCUREMENT NOTES CAN BE VIEWED AT THE FOLLOWING WEBSITES:
FAR: https://www.acquisition.gov, (this site is to be utilized for the FAR only; do not utilize for DFARS, DLAD, etc.)
DFARS: http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
DLA Master Solicitation, Technical/Quality Requirements, Procurement Notes, and DLAD: https://www.dla.mil/Acquisition/Policy-and-Directives
14. SIGNATURE OF PERSON AUTHORIZED TO SIGN
QUOTATION
1 27
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 27 PAGES
SPE8ED-27-T-0004
SECTION A
THIS BUY MAY BE A CANDIDATE FOR AUTOMATED AWARD. HOWEVER, AUTOMATED
SOLICITATIONS CONTAINING FIRST ARTICLE TEST REQUIREMENTS ARE NOT
CANDIDATES FOR AN AUTOMATED AWARD. ALL QUOTES MUST BE SUBMITTED VIA THE
DLA INTERNET BID BOARD SYSTEM (DIBBS) AT https://www.dibbs.bsm.dla.mil.
MICRO-PURCHASE QUOTES MAY BE AWARDED PRIOR TO RETURN DATE.
ALL QUOTES MUST BE SUBMITTED VIA THE DLA INTERNET BID BOARD SYSTEM
(DIBBS) AT https://www.dibbs.bsm.dla.mil.
FAR 52.219-6 Notice of Total Small Business Set-Aside
NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM 332439
Refer to the corresponding small business size standard http://www.sba.gov/content/table-small-business-size-standards
However, the small business size standard for a concern that submits an offer but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees if the acquisition is
1) an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award; or 2) uses the HUBZone price evaluation preference to award to a HUBZone concern, unless the concern waived the evaluation preference.
ORIGIN INSPECTION REQUIRED - FAR 52.246-2 APPLIES
Fast Pay does not apply to this solicitation
PAGE 3 OF 27 PAGES
FIRST ARTICLE APPROVAL – GOVERNMENT TESTING REQUIRED (FAR 52.209-4 AND
ALT I)
THE CONTRACTOR SHALL DELIVER 2 UNIT(S) OF
LOT/ITEM 8145 / 15881810
WITHIN 150 CALENDAR DAYS FROM THE DATE OF
THIS CONTRACT TO THE GOVERNMENT AT THE LOCATION SPECIFIED BELOW FOR
FIRST ARTICLE TESTS.
N38634
NSWC IHD DET PICATINNY
ATTN: CODE W64(TEST AND EVALUATION)
BLDG 3355
Whiter Road
PICATINNY ARSENAL
NJ
7806-5000
WITHIN 30 CALENDAR DAYS AFTER THE GOVERNMENT
RECEIVES THE FIRST ARTICLE, THE CONTRACTING OFFICER SHALL NOTIFY THE
CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR
DISAPPROVAL OF THE FIRST ARTICLE.
DISPOSITION OF FIRST ARTICLES:
Procurement Note E02: Supplemental First Article Exhibit Disposition - Government Maintained (MAY 2020)
The first article units will be held by the Government, either destroyed in testing or maintained as a manufacturing standard. The contractor will be required to produce/deliver the full quantity indicated on the contract order, the first article units will not be part of the production quantity.
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required.
The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
NSWC IHD DET PICATINNY
N38634
NSWC IHD DET PICATINNY
PAGE 4 OF 27 PAGES
SPE8ED-27-T-0004
SECTION A
ATTN: CODE W64(TEST AND EVALUATION)
BLDG 3355
Whiter Road
PICATINNY ARSENAL
NJ
7806-5000
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 15 test plus 5 evaluation calendar days for the test results to be provided to the contractor.
(6) If a PLT sample fails, the entire production lot quantity produced fails. The contractor shall propose corrective action, if appropriate.
(7) PLT samples will be returned to the contractor with a copy of the test report, at contractor expense.
Due to the volatility of demands, and frequent quantity changes on open purchase requests, offerors are highly encouraged to submit quantity ranges when quoting. If a PR is evaluated manually, quoting ranges provides the buyer the option to combine requirements or reduce the quantity as needed without resoliciting or adding any additional administrative burden for either party involved when making an award.
This does not apply to Auto IDC.
If you anticipate quoting on a solicitation after the closing date, please submit a DIBBS quote with a bid type of “No Bid” and place an anticipated quote date or the reason you are not willing to quote. This does not prevent you from submitting an actual quote on DIBBS at a later date. It will overlay your previous no quote. This informs buyers of your intention to quote and prevents multiple calls for updates and cancelling of requirements assumed to be non-procurable due to no
PAGE 5 OF 27 PAGES
SPE8ED-27-T-0004
SECTION A
quotes/sources. The submission of an anticipated quote date does not preclude DLA from making an award to another acceptable timely offer.
APEX Accelerators, formally known as the Procurement Technical
Assistance Program (PTAP), is designed to increase the number of
U.S. businesses capable of bidding and performing on local, state, and federal government contracts. APEX Accelerators provide critical assistance to new and existing businesses interested government contracting to enhance the defense industrial base at no cost. Visit https://www.apexaccelerators.us/#/ for more information.
6, THE OFFEROR, BY SUBMISSION OF ITS QUOTATION, REPRESENTS IT WILL NOT
PROVIDE COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES TO THE
GOVERNMENT IN THE PERFORMANCE OF ANY AWARD RESULTING FROM THIS
SOLICITATION, IN ACCORDANCE WITH PARAGRAPH (d) OF THE CLAUSE AT FAR
52.204-24, REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT, OR IN ACCORDANCE WITH ITS EXISTING
REPRESENTATION IN PARAGRAPH (c) OF THE PROVISION AT DFARS 252.204-7016, COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES –
REPRESENTATION.
Caution Notice: Offerors are required to comply with domestic material restrictions. The Berry Amendment, the Buy American Act, and other domestic material restrictions may apply. Offerors are instructed to refer to the solicitation clauses related to foreign sourcing for more information on applicability. The Berry Amendment threshold has been reduced to $150,000 and vendors must carefully review related clauses
DFARS 252.225-7006, 252.225-7012, and 252.225-7015 for applicability requirements. If your offer is based on a non-domestic material, you are required to provide disclosure information in your quote and/or through written notification to the point of contact listed in the solicitation.
DoD Class Deviation 2023-O0001: A small business joint venture offeror must submit, with its offer, the representation required in paragraph
(c) of FAR solicitation provision 52.212-3, Offeror Representations and
PAGE 6 OF 27 PAGES
SPE8ED-27-T-0004
SECTION A
Certifications-Commercial Products and Commercial Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business
Program Representations, in accordance with 52.204-8(d) and 52.212- 3(b) for the following categories:
(A) Small business;
(B) Service-disabled veteran-owned small business;
(C) Women-owned small business (WOSB) under the WOSB Program;
(D) Economically disadvantaged women-owned small business under the WOSB
Program; or
(E) Historically underutilized business zone small business.
ACCESSING & USE OF VENDOR SHIPMENT MODULE (VSM) IS CHANGING
Within approximately 2 months, ALL DLA contractors will be required to register via DLA’s Account Management & Provisioning System (AMPS) to access VSM. Without AMPS approval, contractors will not be able to access VSM or ship to DLA.
Contractors using VSM WebServices MUST update their internal schema or lose access and shipping ability. Online VSM users do not need schema changes.
Required actions:
• Review VSM announcements. Schema updates are in the April 23, 2025 post: https://www.dibbs.bsm.dla.mil/notices/msgdspl.aspx?msgid=1259
• Additional notices:
https://www.dibbs.bsm.dla.mil/notices/msgdspl.aspx?msgid=1267 https://www.dibbs.bsm.dla.mil/notices/msgdspl.aspx?msgid=1252 https://www.dibbs.bsm.dla.mil/notices/msgdspl.aspx?msgid=1229
AMPS registration is not available at this time; however, check DLA's
DIBBS "Notices" section daily for updates.
• To receive AMPS/User Guide updates via email, contact:
JSONWEBServiceInquiry@dla.mil
PAGE 7 OF 27 PAGES
Unless AM is specifically authorized in the solicitation/contract, quotes/offers may not include parts or supplies made using the additive manufacturing process. The Government will not evaluate offers that include an item or items produced using AM, and such offers are not eligible for award for the current procurement. A quoter/offeror proposing to supply an AM- produced item may submit a request to the contracting officer for approval of the item for evaluation by the
Engineering Support Activity (ESA) for acceptability for future procurements of the same items. See L31 Additive Manufacturing (JUN
2018)
Procurement History for NSN/FSC:015881810/8145
CAGE Contract Number Quantity Unit Cost AWD Date Surplus Material
0SWN5 SPE8ED26P0956P00001 3.000 3625.56000 20260709 N
0SWN5 SPE8ED26P0950 6.000 3625.56000 20260623 N
0SWN5 SPE8ED26P0780P00001 1.000 3625.56000 20260423 N
0SWN5 SPE8ED26P0601P00001 1.000 3625.56000 20260310 N
0SWN5 SPE8ED26P0567P00002 9.000 3625.56000 20260303 N
0SWN5 SPE8ED26P0566P00002 10.000 3625.56000 20260303 N
0SWN5 SPE8ED26P0546P00001 3.000 3625.56000 20260226 N
0SWN5 SPE8ED26P0520P00001 5.000 3625.56000 20260223 N
0SWN5 SPE8ED26P0303 1.000 3625.56000 20251217 N
0SWN5 SPE8ED26P0265P00001 6.000 3625.56000 20251204 N
0SWN5 SPE8ED26P0111P00002 5.000 3625.56000 20251029 N
0SWN5 SPE8ED26P0130 1.000 3625.56000 20251028 N
0SWN5 SPE8ED26P0050 1.000 3625.56000 20251006 N
0SWN5 SPE8ED25P1704 2.000 3625.56000 20250922 N
0SWN5 SPE8ED25P1608 20.000 3625.56000 20250903 N
0SWN5 SPE8ED25P1316 1.000 3625.56000 20250701 N
0SWN5 SPE8ED25P1272 2.000 3625.56000 20250616 N
0SWN5 SPE8ED25P1029P00002 2.000 3625.56000 20250528 N
0SWN5 SPE8ED25P1086P00001 24.000 3625.56000 20250513 N
0SWN5 SPE8ED25P0980P00001 10.000 3625.56000 20250423 N
PAGE 8 OF 27 PAGES
SPE8ED-27-T-0004
SECTION B
PR: 7018561771
NSN/MATERIAL:8145015881810
ITEM DESCRIPTION
COLLAPSIBLE,JMIC
COLLAPSIBLE JMIC 3.
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE
SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE
ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE
APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON
REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ006: QUALITY CONFORMANCE INSPECTION REQUIREMENTS
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
NAVAL SEA SYSTEMS COMMAND (53711)
P/N 7517221-1
RQ047: Ordnance Handling Equipment Contact Information
RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT
CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED
UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY
USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
UNLESS OTHERWISE NOTED
FIRST ARTICLE TESTING IS REQUIRED
CRITICAL ITEM - SOURCE INSPECTION REQUIRED.
PRODUCTION LOT TESTING APPLIES
TECHNICAL DATA AVAILABILITY:
THE DRAWING(S) LISTED BELOW ARE AVAILABLE AT
DLA DURING "OPEN SOLICITATION ONLY".
TO RECEIVE A COPY OF THE DRAWING(S)<(>,<)>
FOR EBS SOLICITATIONS USE URL
HTTPS://WWW.DIBBS.BSM.DLA.MIL/RFQ/
TDP Rev B Gen 2
IAW BASIC DRAWING NR 53711 7517221
REVISION NR F DTD 07/19/2021
PART PIECE NUMBER:
PAGE 9 OF 27 PAGES
SPE8ED-27-T-0004
SECTION B
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7516536
REVISION NR B DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7516617
REVISION NR DTD 06/16/2006
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7516774
REVISION NR DTD 10/11/2006
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517168
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517169
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517170
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517171
REVISION NR A DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517172
REVISION NR A DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517173
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517174
REVISION NR B DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517175
REVISION NR A DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517176
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517177
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517178
REVISION NR B DTD 11/01/2005
PAGE 10 OF 27 PAGES
SPE8ED-27-T-0004
SECTION B
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517179
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517222
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517223
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517224
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517226
REVISION NR C DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517227
REVISION NR B DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517228
REVISION NR B DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517229
REVISION NR B DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517230
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517231
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517232
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517233
REVISION NR A DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517234
REVISION NR A DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517225
REVISION NR A DTD 08/02/2010
PAGE 11 OF 27 PAGES
SPE8ED-27-T-0004
SECTION B
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517235
REVISION NR A DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517236
REVISION NR B DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517237
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517238
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517239
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517240
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517241
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517242
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517244
REVISION NR B DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517245
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517246
REVISION NR B DTD 11/06/2009
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517247
REVISION NR B DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517248
REVISION NR A DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517249
REVISION NR A DTD 08/02/2010
PAGE 12 OF 27 PAGES
SPE8ED-27-T-0004
SECTION B
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517250
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517251
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517252
REVISION NR B DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517253
REVISION NR B DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517254
REVISION NR C DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517255
REVISION NR A DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517256
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517257
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517258
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517259
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517260
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517261
REVISION NR B DTD 11/01/2005
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 8410933
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 8410941
REVISION NR A DTD 11/01/2005
PAGE 13 OF 27 PAGES
SPE8ED-27-T-0004
SECTION B
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 8410942
REVISION NR DTD 08/02/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE QAP 53711 7517221
REVISION NR DTD 10/13/2010
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE DRAWING NR 53711 7517221
REVISION NR G DTD 08/13/2014
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE QAP 14153 SQAP-FAT3
REVISION NR DTD 08/26/2025
PART PIECE NUMBER:
TDP Rev B Gen 2
IAW REFERENCE QAP 14153 SQAP-PLT3
REVISION NR DTD 07/17/2025
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE .
0001 7018561771 0001 EA 6.000
NSN/MATERIAL:8145015881810
DELIVERY (IN DAYS):0220
DELIVER FOB: DESTINATION
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
PREP FOR DELIVERY:
PKGING DATA - MIL-STD-2073-1E
QUP:001 PRES MTHD:10 CLNG/DRY:1 PRESV MAT:00
WRAP MAT:00 CUSH/DUNN MAT:00 CUSH/DUNN THKNESS:0
UNIT CONT:00 OPI:O
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:00 -00 No special marking
DLA TROOP SUPPORT
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
SQAP
NSNs 8145-01-588-1810 ,,,,,,,,,,24 JAN 2013 8145-01-588-1825 8145-01-588-1830
PAGE 14 OF 27 PAGES
SPE8ED-27-T-0004
SECTION B
PR: 7018561771 PRLI: 0001 CONT’D
DRAWING: (53711) 7517221
1. This supplemental quality assurance provision is to be used in conjunction with the following drawing: Naval Sea Systems Command (53711) drawings 7517221 and DL7517221. This document is applicable to the following item: Collapsible Joint Modular Intermodal Container (JMIC) Assembly.
2. This SQAP establishes the requirements and schedule for the required Government First Article Test Sample and Government Production Lot Sampling Testing, when DLA is the procuring activity.
3. The JMIC shall be fabricated in accordance with drawings Naval Sea Systems Command drawings 7517221 and DL7517221.
4. Government First Article Testing is required as follows:
4.1 Competitive procurement of the subject item is approved contingent upon submittal, examination, inspection, testing, and approval of the First Article samples. The First Article Sample shall consist of two (2) JMIC Assemblies.
4.2 Prior to submission of the First Article for inspection, the contractor shall perform a complete inspection to assure conformance to all drawing requirements. The inspection is to be performed in the presence of the DCMA-Quality Assurance Representative (QAR). A copy of the dimensional, material, inspection reports, and surface treatments shall be mailed to the testing activity together when the First Article Test Sample is delivered.
4.3 The First Article Inspection Report is to be prepared in the contractor#s format. As a minimum the content of the report shall appear as presented in Data Item Description (DID) DI-NDTI-80809.
4.4 The First Article evaluation and testing shall be accomplished by and delivered to:
,,Director ,,Naval Surface Warfare Center ,,Indian Head Division, Detachment Earle ,,Bldg C-45, Code E423 ,,201 Highway 34 South ,,Colts Neck, NJ 07722-5023
4.5 First Article Testing shall consist of, but not limited to the following tests, inspections, and examinations:
(a) 100% dimensional conformance to drawing requirements.
(b) Material properties (physical characteristics and chemical composition).
(c) Finish Requirements.
(d) Visual Inspections.
(e) Serialization.
(f) Paragraphs 3.6.1 through 3.6.9 of PHST-176A
4.6 Scheduled lead time for new suppliers is estimated as follows:
ACTION; ACTION ACTIVITY; *CALENDAR DAYS
Submission of First Article;Contractor; 150
Testing & Evaluation Government; Test Activity; 90
Approval of Test Report/; DSCP-Contracting Officer; 30 Notification of Failure
*Calendar days are subsequent to the date of the contract.
Ten (10) days prior to shipment of the sample, the contractor shall notify the designated testing activity, in writing, of the anticipated shipping date, with an information copy to the DSCP-Contracting Officer.
These ten (10) days are included in the contractor#s 150 day lead time
PAGE 15 OF 27 PAGES
SPE8ED-27-T-0004
SECTION B
PR: 7018561771 PRLI: 0001 CONT’D
for submission of the First Article sample
4.7 Waiver of First Article may be granted if the bidder has previously furnished production quantities of the same or similar article to DLA or the Navy, within 36 months since the completion of the previous contract and articles thus furnished have exhibited satisfactory performance in service. All FAT waiver requests shall be submitted to the DSCP Contracting Officer and they will be coordinated between DLA and the Navy.
4.8 Copy of the Approval/Disapproval notification shall be forwarded to the Defense Supply Center Philadelphia, ATTN; DSCP-NASA, J. Stitsworth, 700 Robbins Ave, Philadelphia, PA, 19111-5096.
5. Quality Conformance Inspection Production Lot Sampling Testing.
Unless otherwise specified in the contract or purchase order, prior to delivery, the Government shall perform a sample lot inspection of the production containers. The DCMA-QAR shall randomly select up to 2% of the total production quantity containers. If the total production quantity is less than 100, the minimum sample shall be one (1) container. Seven days before the production quantities are to be tendered for acceptance, the contractor shall arrange to have the DCMA-QAR select the sample. Unless otherwise specified, the contractor shall be responsible for the delivery of the production lot samples to:
,,Naval Surface Warfare Center ,,Indian Head Division, Detachment Earle ,,Bldg C-45, Code E423 ,,201 Highway 34 South ,,Colts Neck, NJ 07722-5023
5.1 Scheduled Lead Time for Production Lot Testing is as follows:
ACTION; ACTION ACTIVITY; * CALENDAR DAYS
Submission of Production Sample; Contractor; Per Schedule
Testing & Evaluation; Government Test Activity ;15
Approval of Test Report/; DSCP-Contracting Officer; 5 Notification of Failure
PARCEL POST ADDRESS:
N23193
USNS ALAN SHEPARD T AKE 3
UNIT 100494 BOX 1
FPO AP 96678
US
RDD 777 SHIPMENT. TRANSPORTATION SEE DLAD PROC NOTE C19. FIRST DESTINATION TRANSPORTATION SEE DLAD PROC
NOTE C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
N23193
USNS ALAN SHEPARD T AKE 3
DLA VENDORS: USE VSM FOR
US
M/F: (TCN) N231936048S650
RDD: 777
PROJ: HK5 TP 2
SUPP ADD: YNDK02 SIG: A
PAGE 16 OF 27 PAGES
SPE8ED-27-T-0004
SECTION B
PR: 7018561771 PRLI: 0001 CONT’D
FOR GOVERNMENT USE ONLY: (IPD) 05
DIC: A41 DIST: 9B ADV: FC: F4
Need Ship Date:00/00/0000 Original Required Delivery Date:02/20/2026
GOVERNMENT FIRST ARTICLE TEST – THE NUMBER OF UNITS SHOWN SIGNIFIES THE
TEST REQUIREMENT. SEE FAR CLAUSE 52.209-4 CITED IN SECTION A OF THIS
SOLICITATION FOR THE ACTUAL QUANTITY REQUIRED.
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%
0002 0000000000 EA 1.000
NSN/MATERIAL:0001S00000052
DELIVERY (IN DAYS):0150
THIS LINE ITEM SIGNIFIES THE FIRST ARTICLE TEST REQUIREMENT (FAT). SEE
CLAUSES FOR INFORMATION CONCERNING THE FAT REQUIREMENT. OFFERS THAT DO
NOT CITE A PRICE FOR THIS LINE ITEM SHALL BE EVALUATED UNDER THE
ASSUMPTION THAT THERE IS NO SEPARATE CHARGE FOR THE FAT. IN THE EVENT
THE FAT REQUIREMENT IS WAIVED, NO AWARD WILL BE MADE FOR THIS LINE ITEM.
THE NUMBER OF UNITS SHOWN APPEARS AS “1 EA”. THIS QUANTITY SIGNIFIES
THE TEST REQUIREMENT. OFFERORS WILL FIND THE ACTUAL QUANTITY REQUIRED
BY THE GOVERNMENT FOR THE FAT LINE ITEM PER FAR 52.209-3 OR 52.209-4 IN
SECTION A OF THIS SOLICITATION.
DELIVER FOB: DESTINATION
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
Need Ship Date:00/00/0000 Original Required Delivery Date:00/00/0000
PRODUCTION LOT TESTING - GOVERNMENT TESTING REQUIRED (REFER TO
PROCUREMENT NOTE E04 FOR ADDITIONAL INFORMATION)
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%
PAGE 17 OF 27 PAGES
SPE8ED-27-T-0004
SECTION B
PR: PRLI: CONT’D
0003 0000000000 EA 1.000
NSN/MATERIAL:S00000061
DELIVERY (IN DAYS):0200
THIS LINE ITEM SIGNIFIES THE PRODUCTION LOT TEST REQUIREMENT (PLT).
DELIVER FOB: DESTINATION
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
Need Ship Date:00/00/0000 Original Required Delivery Date:00/00/0000
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 18 OF 27 PAGES
SECTION F - DELIVERIES OR PERFORMANCE
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) (FAR)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
252.223-7001 HAZARD WARNING LABELS (DEC 1991) (DFARS)
(a) “Hazardous material,” as used in this clause, is defined in the Hazardous Material Identification and Material Safety Data clause of this contract.
(b) The Contractor shall label the item package (unit container) of any hazardous material to be delivered under this contract in accordance with the Hazard Communication Standard (29 CFR 1910.1200 et seq). The Standard requires that the hazard warning label conform to the requirements of the standard unless the material is otherwise subject to the labelling requirements of one of the following statutes:
(1) Federal Insecticide, Fungicide and Rodenticide Act;
(2) Federal Food, Drug and Cosmetics Act;
(3) Consumer Product Safety Act;
(4) Federal Hazardous Substances Act; or
(5) Federal Alcohol Administration Act.
(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be labelled in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.
MATERIAL
(If None, Insert “None.”) ACT
(d) The apparently successful Offeror agrees to submit, before award, a copy of the hazard warning label for all hazardous materials not listed in paragraph
(c) of this clause. The Offeror shall submit the label with the Material Safety Data Sheet being furnished under the Hazardous Material Identification and Material Safety Data clause of this contract.
(e) The Contractor shall also comply with MIL-STD-129, Marking for Shipment and Storage (including revisions adopted during the term of this contract).
(End of clause)
SECTION I - CONTRACT CLAUSES
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DoD OFFICIALS (SEPT 2011) (DFARS)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) (DFARS)
252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016) (DFARS)
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) (DFARS)
252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR REPORTED CYBER INCIDENT
INFORMATION (JAN 2023) (DFARS)
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (MAY 2024) (DFARS)
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION TO LITIGATION SUPPORT (JAN 2023) (DFARS)
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES
(JAN 2023) (DFARS)
252.204-7024 NOTICE ON THE USE OF THE SUPPLIER PERFORMANCE RISK SYSTEM (MAR 2023) (DFARS)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 19 OF 27 PAGES
SPE8ED-27-T-0004
SECTION I - CONTRACT CLAUSES (CONTINUED)
252.222-7006 RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS (JAN 2023) (DFARS)
252.223-7006 PROHIBITION ON STORAGE, TREATMENT, AND DISPOSAL OF TOXIC OR HAZARDOUS MATERIALS - BASIC (SEPT
2014) (DFARS)
252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JAN 2023) (DFARS)
252.225-7007 PROHIBITION ON ACQUISITION OF UNITED STATES MUNITIONS LIST ITEMS FROM COMMUNIST CHINESE MILITARY
COMPANIES (DEC 2018) (DFARS)
252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013) (DFARS)
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018) (DFARS)
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) (DFARS)
(a) Definitions. As used in this clause -- “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall --
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https:// wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items --
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
When creating documents in WAWF, an invoice and receiving report are both required unless an exception at DFARS 232.7002
(a) applies. The invoice and receiving report may be submitted separately or together as a combo type document. See DFARS appendix F for detailed instructions on preparing the WAWF receiving report. ***NOTE: For contracts in accordance with fast payment procedures, if the customer does not have a registered acceptor in WAWF, submit an invoice only.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
N/A for supply contracts/submit an invoice 2in1 for service contracts (Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm https://www.sam.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/ https://wawf.eb.mil/
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 20 OF 27 PAGES
SPE8ED-27-T-0004
Routing Data Table*
Field Name in WAWF Data to be entered in
WAWF
Pay Official DoDAAC See Resulting Award
Issue By DoDAAC See Resulting Award
Admin DoDAAC** See Resulting Award
Inspect By DoDAAC See Resulting Award if applicable
Ship To Code See Resulting Award if applicable
Ship From Code See Resulting Award if applicable
Mark For Code See Resulting Award if applicable
Service Approver (DoDAAC)
See Resulting Award if applicable
Service Acceptor (DoDAAC)
See Resulting Award if applicable
Accept at Other DoDAAC See Resulting Award if applicable
LPO DoDAAC See Resulting Award if applicable
DCAA Auditor DoDAAC See Resulting Award if applicable
Other DoDAAC(s) See Resulting Award if applicable
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Contact the local contract administrator found in block 6 of the DD 1155 (Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006) (DFARS)
252.240-7997 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (DEVIATION 2026-O0025) (FEB 2026) (DFARS)
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991) (DFARS)
252.244-7999 SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES (DEVIATION 2026-O0015) (FEB 2026)
(DFARS)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 21 OF 27 PAGES
252.246-7003 NOTIFICATION OF POTENTIAL SAFETY ISSUES (JAN 2023) (DFARS)
252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA—BASIC (OCT 2024) (DFARS)
(a) Definitions. As used in this clause -- "Foreign-flag vessel" means any vessel that is not a U.S.-flag vessel.
"Ocean transportation" means any water-borne transportation aboard a ship, vessel, boat, barge, ferry, or the like outside the internal waters of the United States as defined in 33 CFR 2.24.
"Subcontractor" means a supplier, materialman, distributor, or vendor at any level below the prime contractor whose contractual obligation to perform results from, or is conditioned upon, award of the prime contract and who is performing any part of the work or other requirement of the prime contract.
"Supplies" means supplies that are clearly identifiable for eventual use by or owned by DoD at the time of transportation by sea, or are otherwise transported by DoD, regardless of ownership or use by DoD. An item is clearly identifiable for eventual use by DoD if, for example, the contract documentation contains a reference to a DoD contract number or a military destination.
"U.S.-flag vessel" means either a vessel belonging to the United States or a vessel of the United States as that term is defined in 46 U.S.C. 116.
(b) If the transportation of supplies by sea is anticipated under this contract, the Contractor shall --
(1) Notify the Contracting Officer and Maritime Administration (MARAD) at Cargo.Marad@dot.gov --
(i) Within 3 business days after contract award; or
(ii) Immediately prior to the shipment departure date necessary to meet delivery schedules, whichever is earlier; and
(2) Include in the notification --
(i) A statement of the Contractor's intent to transport supplies by sea;
(ii) The contract number; and
(iii) The task-order or delivery-order number, when applicable.
(c)(1) The Contractor shall use U.S.-flag vessels when transporting any supplies by sea under this contract.
(2) A subcontractor transporting supplies by sea under this contract shall use U.S.-flag vessels if --
(i) This contract is a construction contract; or
(ii) The supplies being transported are --
(A) Other than commercial products; or
(B) Commercial products that -- (1)The Contractor is reselling or distributing to the Government without adding value (generally, the Contractor does not add value to items that it subcontracts for f.o.b. destination shipment);
(2)Are shipped in direct support of U.S. military contingency operations, exercises, or forces deployed in humanitarian or peacekeeping operations; or (3)Are commissary or exchange cargoes transported outside of the Defense Transportation System in accordance with 10 U.S.C. 2643.
(d) The Contractor and its subcontractors may request, via the Contracting Officer, a waiver of the requirement to use a U.S.-flag vessel, or identification of any available U.S.-flag vessels, if the Contractor or a subcontractor sufficiently explains that --
(1) U.S.-flag vessels are not available at a fair and reasonable rate for commercial vessels of the United States; or
(2) U.S.-flag vessels are otherwise not available.
(e) The Contractor must submit any request for use of foreign-flag vessels in writing to the Contracting Officer at least 45 days prior to the sailing date necessary to meet its delivery schedules. The Contracting Officer will process requests submitted after such date(s) as expeditiously as possible, however, if a DoD waiver is not approved prior to the shipper's sailing date, this will not of itself constitute a compensable delay under this or any other clause of this contract. Requests shall contain at a minimum --
(1) Type, weight, and cube of cargo;
(2) Required shipping date(s) and required delivery date(s);
(3) Special handling and discharge requirements;
(4) Loading and discharge points;
(5) Name of shipper and consignee;
(6) Prime contract number; and
(7) A documented description of current, diligent efforts made to secure U.S.-flag vessels, including points of contact (with names and telephone numbers) with at least two U.S.-flag carriers contacted. Copies of quotes will suffice for this purpose. Copies of telephone notes, emails, and other relevant communications will otherwise be considered for this purpose.
(f) The Contractor shall, within 30 days after each shipment covered by this clause, provide the Contracting Officer and MARAD at Cargo.Marad@dot.gov, Attention: Military Team, one copy of the rated on board vessel operating carrier's ocean bill of lading, which shall contain the following information:
(1) Prime contract number;
(2) Name of vessel;
(3) Vessel flag of registry;
(4) Date of loading;
(5) Port of loading;
(6) Port of final discharge;
(7) Description of commodity;
(8) Gross weight in pounds and cubic feet if available;
(9) Total ocean freight in U.S. dollars; and
(10) Name of the carrier.
(g) If this contract exceeds the simplified acquisition threshold, the Contractor shall provide with its final invoice under this contract a representation that to the best of its knowledge and belief --https://www.ecfr.gov/current/title-33/section-2.24 https://www.govinfo.gov/link/uscode/46/116 mailto:Cargo.Marad@dot.gov mailto:Cargo.Marad@dot.gov
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 22 OF 27 PAGES
SPE8ED-27-T-0004
SECTION I - CONTRACT CLAUSES (CONTINUED)
(1) No ocean transportation was used in the performance of this contract;
(2) Ocean transportation was used and only U.S.-flag vessels were used for all ocean shipments under the contract;
(3) Ocean transportation was used, and the Contractor had received a prior-approved waiver for U.S.-flag vessels for all foreign-flag ocean transportation; or
(4) Ocean transportation was used and some or all of the shipments were made on foreign-flag vessels without the written consent of DoD. The Contractor shall describe these shipments in the following format:
ITEM DESCRIPTION CONTRACT LINE ITEMS QUANTITY
TOTAL
(h) If this contract exceeds the simplified acquisition threshold and the final invoice does not include the required representation, the Government will reject and return it to the Contractor as an improper invoice for the purposes of the Prompt Payment clause of this contract. In the event there has been unauthorized use of foreign-flag vessels in the performance of this contract, the Contracting Officer is entitled to equitably adjust the contract, based on the unauthorized use.
(i) If the Contractor did not anticipate transporting any supplies by sea at the time of contract award and, therefore, did not provide the notification required by paragraph (b) of this clause, but prior to shipment of supplies, the Contractor learns that supplies will be transported by sea, the Contractor shall --
(1) Provide the notification required by paragraph (b) of this clause to the Contracting Officer and MARAD as soon as it is known that supplies will be transported by sea; and
(2) Comply with all the terms and conditions of this clause.
(j) Subcontracts. In the award of subcontracts, for the types of supplies described in paragraph (c)(2) of this clause, including subcontracts for commercial products, the Contractor shall flow down the requirements of this clause as follows:
(1) The Contractor shall insert the substance of this clause, including this paragraph (j), in subcontracts that exceed the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation.
(2) The Contractor shall insert the substance of paragraphs (a) through (f) of this clause, and this paragraph (j), in subcontracts that are at or below the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation.
252.247-7025 REFLAGGING OR REPAIR WORK (OCT 2024) (DFARS)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017) (FAR)
52.204-13 SYSTEM FOR AWARD MANAGEMENT -- MAINTENANCE (DEVIATION 2026-O0038) (FEB 2026) (FAR)
52.211-5 MATERIAL REQUIREMENTS (AUG 2000) (FAR)
52.213-4 TERMS AND CONDITIONS -- SIMPLIFIED ACQUISITIONS (NONCOMMERCIAL) (DEVIATION 2026-O0038) (FEB 2026) (FAR)