Amendment 0004 extending receipt of offers and listing vendor questions with corresponding Government answers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPE8EC17R00010005.pdf | ||
| NAVSUP_WSS_PD-515_-_dtd_16_NOV_2016.pdf | ||
| Amendment_0004_Attachment_2_CDRL-30K_CRANE_PD_515-.pdf | ||
| SPE8EC17R00010003.pdf | ||
| NAVSUP_WSS_PD-515_-_dtd_03_NOV_2016.pdf | ||
| Amendment_0003_Attachment_2.pdf | ||
| SPE8EC17R00010002.pdf | ||
| SPE8EC17R00010001.pdf | ||
| SPE8EC17R0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
SPE8EC
1. Solicitation, as referenced in Block 9a, above, is hereby extended. The closing date for receipt of proposals is revised to December 2, 2016, 11:00 A.M., Local Philadelphia Time.
2. Purchase Description NAVSUP WSS PD-515, Dated 16 November 2016 has been revised and is hereby incorporated as an attachment to this amendment.
3. Contract Data Requirements List corresponding to CLINS 0003 - 0010 of pages 11 -12 of solicitation is reflected as Attachment 2 of this amendment.
4. Contractor Questions and corresponding answers are reflected on Page 2 of this amendment.
DLA Troop Support Construction & Equipment 700 Robbins Avenue Philadelphia, PA 19111-5096
1000050350
SPE8EC17R0001
1 1
11/21/2016
10/18/2016
SPE8EC-17-R-0001-0004 Page 2 of 2
4. Continued: Vendor Questions/Government Answers:
Para 3.11.3.2 Hook Lift Speed. This requirement states: "The main hook block lifting speed with the recommended number part lines shall not be less than 100 feet per minute".
Comment: Typically, industry measures and publishes the maximum single line speed of the hoist which in most cases is not less than the requirement. However, as additional parts of line are reeved onto the hookblock and boom nose, those speeds are significantly reduced which would then be noticed at the hook lift speed. For example, if the single line speed is 100 fpm and the crane uses 4 parts of line, the hook lift speed would be 25 fpm. (100/4). Is the "recommended number part lines" considered the single part line?
ANSWER: "Recommended number part lines" would refer to parts of line needed to hoist the max rated load. NAVSUP WSS also determined the intent of this paragraph was to limit the maximum wire rope speed. Para 3.11.3.2 Will be rewritten as follows:
"3.11.3.2. Hook lift speed. The main hook block lifting speed, with the number of parts line required to lift the maximum rated load, shall not be greater than 100 feet per minute.
Para. 3.16.3 This requirement states that Exhaust gases shall be discharged vertically above the operator's head or at the rear or side rear of the crane within the plane outline of the crane. Would it be acceptable if the exhaust is on the side of the crane in lieu of the side rear?
ANSWER: Exhaust systems that exit from the side of the crane are acceptable provided that the side exhaust exited in a location to prevent the exhaust from entering the operators compartment. Should a side exhaust be incorporated it is preferred that the exhaust exit on the opposite side of the crane from the operators compartment. In accordance with B30.5, all exhaust pipes shall be guarded or insulated to prevent contact with personnel when performing normal duties.
Para 3.18.3 Hoses. Please provide clarification on what the Governments intent is on this specification.
We do not understand what a replacement hose assembly fitted with field attachable fittings are that will fit in the place of the original hose assembly. Is there a type of hose that needs to be used in order to accomplish this?
ANSWER: This statement is trying to describe the Navy's provisioning concept that would allow a hose assembly to be built quickly from commonly available individual components (fittings & hose) while the crane is deployed/underway in lieu of purchasing/stocking spares of every individual hose assembly.
There is no specific make or part number of hose recommended by the Navy.
Para 3.26.5 Cold starting aid. Comment: Engines of the size usually found to power cranes of this size in some cases use an Intake Grid Heater in lieu of glow plugs. Would a Grid Heater be an acceptable means of a cold starting aid?
ANSWER: Intake grid heaters are an acceptable cold weather starting aid.