CM131547009_Market_Survey.docx
DOCX document 52 KB Posted
- Attached to
- 4 NSN IQC SOURCES SOUGHT Federal contract opportunity
- Solicitation number
- SPE7MX-13-R-0014
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DLA Land & Maritime - Market Survey
PROJECT NUMBER: CM13157009
Contract Specialist: JOSUE R. SIERRA Phone: 614-692-7017 Email: josue.sierra@dla.mil Fax Number: 614-693-1558
| Address: | DLA Land & Maritime |
| PO Box 3990 | |
| Columbus, OH 43218-3990 |
DLA Land & Maritime is considering a solicitation and subsequent Award of an Indefinite Quantity Contract (IQC)* for the item(s) listed below. As a potential supplier of this item, we are asking that you fill out this market survey to the best of your knowledge so that we can generate a realistic and beneficial solicitation. Your answers to these questions will aid in our ability to develop a solicitation that best meets the needs of the Warfighter while also optimizing the benefits of having a long term contract for both the Government and the Contractor. IF YOU WOULD PREFER TO DISCUSS THE ANSWERS TO THESE QUESTIONS VERBALLY VS IN THE BELOW QUESTIONAIRE, PLEASE FEEL FREE TO CONTACT THE POC IDENTIFIED ABOVE TO DO SO.
Indefinite Quantity Contract (IQC): These contracts are intended for use with items for which recurring demands are anticipated, and as a means of reducing the time and expense required to solicit and make repetitive individual awards. Establishment of an IQ Contract (called a “Basic Contract”) will permit future Purchase Requests to be awarded by issuing a delivery order against the basic contract. All terms, conditions, and pricing are negotiated/awarded up front with the basic, allowing the delivery order to be issued quickly. Most contract terms will be for a BASE PERIOD with the possibility of one or more option periods. In nearly all instances, the total contract length, including options, will not exceed FIVE years. The items on the contract will be ordered on each delivery order (DO) within stated minimum and maximum quantities, and on an as needed basis. The delivery order quantities are estimated based on previous and forecasted demands, and the contractor will be guaranteed a minimum quantity as specified in the contract.
**In the Estimated Delivery column below, please indicate the absolute best delivery (in Days) you would be able to provide the listed item with the quantity indicated in the Estimated Annual Demand column. NOTE: Maximum requested quantity could be 2 times this figure per the contract.
Company Fill-ins
| NSN |
| Nomenclature |
| Cage |
| Part/Dwg Number |
| PLT |
| Estimated Annual Demand Quantity |
| Commercial Item? |
| Minimum Quantity Apply? |
| Applicable Price Breaks |
| Estimated Delivery** |
| 2920014770238 |
| STATOR ASSEMBLY,AL |
| 93742 |
| 692499 |
| 75 |
| 63 |
| 2990014772195 |
| MUFFLER,EXHAUST |
| 93742 |
| 98-19607 |
| 90 |
| 340 |
| 5915013820205 |
| CAPACITOR-RESISTOR |
| 93742 |
| 88-20530 |
| 60 |
| 164 |
| 6115014768607 |
| GENERATOR, ALTERNATING CURR |
| 93742 |
| 692497 |
| 131 |
| 114 |
I. GENERAL INTEREST QUESTIONS:
1. Please check your companies size and status:
|_| Large or |_| Small Business / |_| Manufacturer or |_| Dealer
2. Approximately how many employees do you currently have? ____________
3. Do you have a parent company? |_| YES |_| NO
4. If YES to #3 above approximately how many employees does your parent company have? ___________
5. If you are a Dealer/Distributor are you independent from the OEMs?
|_| YES (Example: if you have reliable access to the OEMs products and can set your own price)
If YES: Based on sources in table above, list the OEMs that you are independent from:
|_| NO (Example: the OEM has strict control over the resale prices the dealers can charge)
|_| Check here if you would prefer to discuss this via telephone call
6. If you are a dealer for the actual manufacturer of these items, who is the manufacturer and approximately how many employees does the manufacturer have?
7. Is your company interested in pursuing a Long-Term Contract for any or all of these items? |_| YES |_| NO
8. If NO to #8 above and/or to specifics NSNs, please explain why below:
Questions 9-10 pertain to the requirement for certified Cost or Pricing data. For contracts estimated over $700,000.00*, certified Cost or Pricing Data “may” be required. FAR 15.408, Table 15-2 contains the guidelines for submitting this data. A sample format can be found at http://www.dcaa.mil. At this website, go to “Publications” and click on “Information for Contractors”. Navigate to Chapter 3 for guidance on pricing proposals. You can also view a Checklist on this website which highlights common inadequacies found in certified data. This checklist is called “Criteria for Adequate Contract Pricing Proposals” on the DCAA website. See provision FAR 52.215-20. Questions regarding cost or pricing data can be addressed to the Contract Specialist, your cognizant DCAA or DCMA office or the DLA Land & Maritime Business Counseling Center (BCC) at 1-800-262-3272 or email: DSCC.BCC@dla.mil.
PLEASE NOTE:
· COST OR PRICING DATA IS NOT REQUIRED FOR COMMERCIAL ITEMS. HOWEVER, IT IS THE CONTRACTING OFFICER’S AUTHORITY TO DETERMINE AN ITEM(S) COMMERCIAL OR NOT.
· PLEASE NOTE THAT A FAILURE TO PROVIDE ADEQUATE COST OR PRICING DATA UPON RECEIPT OF YOUR PROPOSAL MAY RESULT IN THE SOLICITATION BEING CANCELLED WITH NO AWARD BEING MADE.
9. If required, will you be able to provide such data?
|_| YES
|_| NO
10. If you are a dealer, you will be required to obtain Cost or Pricing data from the actual manufacturer. Will you be able to provide the required Cost or Pricing Data from the manufacturer?
|_| YES
|_| NO
*Note: The value of the contract is based on the Contract Maximum dollar value that is in the Contract Limitations clause of a solicitation. This Contract Maximum is based on the estimated combined value of all items on the solicitation, inclusive of all contract years combined (base year plus option years) and is then inflated to allow for a possible increase in annual demands over the life of the contract.
Your answers to questions 11-18 will be used to determine the optimum contract length (i.e. Base plus X option periods/years). There will normally be “BASE PERIOD” and then the Government will have the option to accept other periods/years, which are called “Option Periods.” NOTE: Regardless of how the contract would be structured in regards to BASE period and option periods, typically DLA will not issue a contract for less than THREE years or in excess of FIVE years total, including all option periods. NOTE: The length of the Base Period will not impact/change any guaranteed minimums or maximums on the contract (i.e. a contract with a one year base period would have the same guaranteed minimum/contract maximum as a contract with a three year base period.)
11. How many years would be your ideal Base period in order to provide the best price to the Government?
|_| 1 Base Year |_| 2 Base Years |_| 3 Base Years |_| Number of Base Years DOES NOT affect Price
11. Please provide a brief explanation as to why this length of Base Period provides the best price and/or is optimal: __________________________________________________________________________________
a. If you suggested an “ideal” base period of more than ONE year, would you be willing to accept a Base Period less than your “ideal” Base period but no less than ONE year? YES |_| NO |_|
i. Please list any concerns you might have with doing so:_______________________________
b. If you suggested a Base Period of more than ONE year, would you be able to hold pricing steady for the entire Base Period or would you require an annual price adjustment?
|_| I can hold my prices for the Base Period |_| I would require an annual price adjustment
12. Assuming an option period is equal to one year, how many option periods AFTER the Base period would you be willing to accept? 0 |_| 1 |_| 2 |_| 3 |_| 4 |_|
13. Assuming an option period is equal to one year, how many option periods AFTER the BASE period would be optimal: 0 |_| 1 |_| 2 |_| 3 |_| 4 |_|
NOTE: If you recommend an option period of greater than one year, please explain here: __________________
14. If NONE to #10 or #11 above please explain why below:
15. Please provide any additional information that you feel would help us to set up a Base Period/Option Period structure that is most beneficial to the Government and Industry: _____________________________________
16. Considering the raw materials used to make this item(s) and fluctuations/volatility in pricing for these items/raw materials versus the benefits of having items on a long term contract, rate your risk for pricing option years:
| Low |
| Moderate |
| High |
1st Option year
2nd Option Year
3rd Option Year
4th Option Year
17. What components/raw materials are the primary drivers in the pricing of these items (i.e. steel, rubber, oil, plastics, etc.)
| Component |
| Percentage of the make-up of the item |
| Example: Rubber |
| 50% |
18. What is the industry standard for contract term for long term agreements/contracts for these items and/or the raw materials? ________________________________________
19. Do you carry these items in your inventory? |_| YES |_| NO
20. Are these items quantity sensitive? |_| YES |_| NO
21. Do these items contain hazardous material? |_| YES |_| NO
22. Do you deal through Dealers/Distributors or do you prefer to deal with the Government? |_| Dealer |_| Gov’t
23. What quantity ranges would result in better pricing of the items you are able to supply (i.e. do you have economic production quantities?) We will consider your recommendations if it is within our demand forecast?
Qty Range 1: _________________
Qty Range 2: _________________
Qty Range 3: _________________
Qty Range 4: _________________
II. COMMERCIAL QUESTIONS:
1. Are any of these items Commercial Items per FAR 2.101(b)? |_| YES |_| NO
2. If YES to #1 above are these items available is a PUBLISHED Catalog/Price List? |_| YES |_| NO
3. If YES to #2 above can you supply us with a copy of your Price List? |_| YES |_| NO
4. If NO to #1 above are these items modified items of a type available in the commercial market place (Meaning these items do not have to be identical, but are closely related)? |_|YES |_| NO
5. If NO to #4 above do these items have minor modifications of a type not customarily available in the commercial market place (Example: minor modifications means the items needs to retain a predominance of non-governmental functions or essential physical characteristics)? |_|YES |_| NO
6. If NO to #1 above – if these items are not currently in the commercial market place, will these items be available in the commercial market place in time to satisfy the government’s delivery requirements on this project? |_| YES |_| NO
7. If YES to #1 above can you provide UNREDACTED commercial sales history, listing in catalogs or brochures, known established price list to commercial market place, availability or announcement to the general public?
|_| YES |_| NO
8. The Government, and the Government only, must determine not only if an item is commercial but also if the commercial prices are Fair and Reasonable. This is usually accomplished through proof that commercial market forces have driven the setting of the commercial price. Such proof would describe the commercial market acceptance of the price or, more plainly, invoices proving that the item has been sold commercially at like prices, for like quantities. Is your company willing and able to provide such proof, if the government determines it is needed to verify price reasonableness? |_| YES |_| NO
9. Are the following clauses/provisions inconsistent with commercial practices; if so, identify the commercial practice:
D46C02 (52.246-9062) Repackaging to correct packaging deficiencies (SEP 2008) |_| YES Identify: ______________________________________________ |_| NO
E46C14 (52.246-9019) Material and inspection report |_| YES Identify: ______________________________________________ |_| NO
E46C30 (52.246-9007) Product verification testing |_| YES Identify: ______________________________________________ |_|NO
I23B04 (252.223-7006) Prohibition on storage and disposal of toxic and hazardous material |_| YES Identify: ______________________________________________ |_| NO
I25B04 (252.225-7005) Identification of expenditures in the United States |_| YES Identify: ______________________________________________ |_| NO
I27A01 (52.227-1) Authorization and consent |_| YES Identify: ______________________________________________ |_| NO
I46C07 (52.246-9056) Warranty period for overseas shipments (SEP 2008) |_| YES Identify: ______________________________________________ |_| NO
I47A07 (52.247-68) Report of shipment (RESHIP) |_| YES Identify: ______________________________________________ |_| NO
I53A01 (52.253-1) Computer generated forms (JAN 1991) |_|YES Identify: ______________________________________________ |_| NO
L17C01 (52.217-9002) Conditions for evaluation and acceptance of offers for part numbered items (JUL 2002) |_| YES Identify: ______________________________________________ |_| NO
M13C02 (52.213-9001) Evaluation factor for source inspection |_|YES Identify: ______________________________________________ |_| NO
III. FOB POINT QUESTIONS:
1. The Government prefers that contractors offer on an FOB Destination basis. Your price would include transportation charges to any location in the United States. Is Fob Destination acceptable? |_| YES |_| NO
2. Does your price typically include FOB Destination? |_| YES |_| NO
3. Would FOB Destination impact the price compared to FOB Origin? |_| YES |_| NO
4. If YES to #3 above what is the impact on price (Example: Estimated percentage of increase in price)?
5. If NO to #3 above does this mean the price for FOB Destination and FOB Origin would be the same?
|_| YES |_| NO
6. Is Inspection/Acceptance at Origin acceptable? |_| YES |_| NO
Note: For Stock Buys, source inspection would be mandatory if FOB Origin is utilized. Would the cost of source inspection impact pricing more than shipping? |_| YES |_| NO
IV. ZONE QUESTIONS:
1. If this solicitation is FOB Destination, would the government incur savings if unit prices were based on various shipping destinations (zones) within the US? |_| YES |_| NO
2. Is there any specific NSNs on this project that you think would significantly impact Shipping Prices (Example: size or weight of specific NSNs)? |_| YES |_| NO
3. If YES to #2 above please list NSNs or CLIN Numbers and what the impact would be (Example: percentage of increase in price):
4. Would you typically provide the same price for anywhere in the US? |_| YES |_| NO
5. If YES to #4 above does the location make a significant difference in Price? |_| YES |_| NO
6. What is the difference in price (estimated percentage of increase)?
7. Would you prefer to provide pricing for one or multiple zones (Please choose one):
|_| One Zone |_| Multiple Zones
V. DELIVERY QUESTIONS:
1. Would you require phased delivery* for quantities above the QFD quantity (Note the QFD is roughly equal to the ADQ from pg. 1 of this survey divided by 4). Delivery orders could be for quantities up to the DO Maximum usually 4 x the QFD quantity. |_| YES |_| NO
*Note: This would mean phased delivery on a single delivery order; if a new order was placed it would revert back to the required delivery.
2. What would the Max QTY be if you could deliver within the PLT: ____________________________________
3. Would a minimum delivery order quantity and/or dollar value apply to these NSNs? |_| YES |_| NO
4. If YES to #4 above please list the applicable minimums for each item and please complete the estimated deliveries per items above, and if applicable, the maximum monthly quantities that can be supplied on the attached Excel Spreadsheet.
VI. OTHER MISCELLANOUS QUESTIONS:
1. Can you provide STD-COM PKG with MIL-STD-129 Markings? |_| YES |_| NO
2. Do you have any other NSNs, ideas, or comments for additional “family” groupings? |_| YES |_| NO
3. If YES to #2 above please explain why: _________________________________________________________
4. Do you have EDI capability? |_| YES |_| NO
5. Would you prefer to have the pricing to be Firm Fixed Price for base year and all subsequent years?
|_| YES |_| NO
OR
6. Would you prefer to have the base years pricing adjusted based on the Producer Price Index (PPI) EPA?
|_| YES |_| NO
7. If YES to #6 above, do you have a recommended index that is applicable to these items. If so, please provide the index and please provide an explanation as to why you feel it’s a good fit.
8. If the Government determines that Cost and Price Data is needed, will your company’s accounting system be able to furnish this data as required by FAR Part 15 Table 15.2? |_| YES |_| NO
Note: We strongly urge you do a thorough review of the booklet "Information for Contractors" at http://www.dcaa.mil. The booklet is downloadable from the left Scroll Down on the website under "Publications". Chapter 3 is particularly relevant, especially the example submittal at chapter end.
VII. FINAL COMMENTS:
Please Provide Your Company Name & Cage Code: ________________________________________________
Please Provide Your Company Phone & Fax Number: ______________________________________________
Please Provide Your Name & Signature: __________________________________________________________
Please return survey by the close of business on 06/14/2013 to the contract specialist listed at the top of the page. If you have any additional comments, please feel free to submit those with this survey. We sincerely appreciate your time, and thank you for providing this information.
- 1 -
File details come from the government source that posted it. Updated .