This document is a Justification for Other Than Full and Open Competition (JOFOC) for Solicitation SPE7M523R0031 / PR 7002805925 for the procurement of a Transformer, Power.
The JOFOC cites 10 U.S.C. 3204(a)(1) as the authority to award this as a sole source contract to the only approved source, Hitachi Energy (0D3T2). Hitachi Energy retains the data rights, manufacturing knowledge, and technical data that are essential to maintaining the quality of the part, and which are not economically available to the Government. A Sources Sought was posted with no responses received. The Government intends to determine the price as fair and reasonable through various pricing analysis methods. The acquisition will be synopsized for 16 days on the DLA Internet Bid Board (DIBBS) and solicited for 30 days. The estimated value of the contract is included. The JOFOC has been reviewed and approved by the appropriate authorities.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
SOLICITATION SPE7M523R0031 / PR 7002805925
The use of the authority cited is based on 10 U.S.C. 3204(a)(1):
[X] AMC 3. Acquire, for the second or subsequent time, directly from the manufacturer.
[X] AMSC C. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from the approved source(s). The approved source(s) retain data rights, manufacturing knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. If one source is approved, AMCs 3, 4, or 5 are valid. If at least two sources are approved or if data is adequate for an alternate source to qualify in accordance with the design control activity's procedures, AMCs 1 or 2 are valid.
A Technical Referral was sent to the Product Specialist to validate the AMC/AMSC codes and source of supply.
The Product Specialist certified the technical information on February 14, 2023.
Hitachi Energy (0D3T2) is the only source approved by the design control activity. Hitachi Energy retains the data rights, manufacturing knowledge, or technical data that is not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part.
6. Efforts to ensure that offers are solicited from as many sources as practicable are:
[X] The acquisition will be synopsized for 16 days on or about July 5, 2023 on the DLA Internet Bid Board (DIBBS) and will be solicited for 30 days on or about July 21, 2023 on the DLA Internet Bid Board (DIBBS).
A Sources Sought was posted to https://SAM.gov on 5/26/2023 with a respond by date of 6/7/2023.
o No responses or inquiries were received from any interested party.
7. I hereby determine that the anticipated cost to the Government will be fair and reasonable.
To determine the cost as fair and reasonable, Price Analysis will be calculated using past procurement history, a Learning Curve, PPI, current market value of item and/or similar items, negotiation procedures, traceability, and the use of resources available through the Pricing Office.
Contracting Officer has determined that it is in the best interest of the Government to proceed as a non-commercial item, using FAR Part 15 procedures in lieu of FAR Part 12.
9. Additional facts supporting other than full and open competition are:
[ X ] Based upon the technical certification on file in DLA Land and Maritime – VEP technical data is not available and cannot be developed to permit full and open competition. The data presently available reflects the minimum needs of the Government.
10. A listing of sources, if any, indicating an interest in the acquisition is:
Hitachi Energy (0D3T2)
11. This item is subject to the following methods of locating additional sources:
Solicitation will be included, but is not limited to, the following Procurement Notes:
Solicitation will include, but is not limited to, the following Procurement Notes:
L04 Offers for Part Numbered Items M06 Evaluation of Offers for Part Numbered Items
DFARS PGI 206.303-2(B). A copy of the most recent J&A, January 2022 (SPE7M522C0008) is included in the file.
CONTRACTING OFFICER CERTIFICATION
I hereby certify that the information contained in this justification is accurate and complete to the best of my knowledge and belief.
The estimated PR Value of this J&A is The estimated Maximum Value (at the top price break) of this J&A is
Christine Boyer, Contracting Officer Date
APPROVAL/CERTIFICATION
BOYER.CHRISTI
NE.D.1249699639
Digitally signed by
BOYER.CHRISTINE.D.1249699
Date: 2023.06.26 12:35:17 -04'00'
Competition Advocate Date Date
APPROVAL REQUIREMENTS
( ) Up to $750,000 Contracting Officer
(X) $750,000 to $15,000,000 Competition Advocate
( ) $15,000,00 –$100,000,000 Head of the Contracting Activity (HCA)
( ) over $100,000,000 Senior Procurement Executive (AQ)
Attachments Technical Certification Tech Referrals Previous J&A SPE7M522C0008
DAPO.DOUGLA
S.A.1230220014
Digitally signed by
DAPO.DOUGLAS.A.1230220014
Date: 2023.06.26 15:27:37 -04'00'