SPE7M227Q0080.pdf

PDF 143 KB Posted

Attached to
GUIDE, LAUNCHING SHU AND 3 MORE ITEMS
Solicitation number
SPE7M227Q0080
Issued by

About this file

This is a Request for Quotations (RFQ) issued by the Defense Logistics Agency (DLA) Weapons Support Nuclear Reactor Program for the procurement of launching shuttle guides, a critical application item (CAI) for aircraft launch and recovery equipment (ALRE). The solicitation RFQ number SPE7M2-27-Q-0080 was issued November 25, 2026, with quotations due by December 2, 2026. The government seeks 30 units (NSN 1720-00-885-9392, part number 408297-1) with firm fixed pricing across four contract line items: production units (600 days after date of order), contractor first article testing report (350 days ADO), production test and inspection report (600 days ADO), and certificate of quality compliance (600 days ADO). Inspection and acceptance occur at origin; FOB is origin with delivery to DLA Distribution New Cumberland Facility. Pricing must be provided for three quantity increments: 1-30 units, 31-60 units, and 61-90 units.

This is not a small business set-aside. The procurement involves restricted source requirements mandating that offerors must be approved by the Naval Air Warfare Center (NAWC) Aircraft Division Lakehurst or provide products from approved sources; sources not currently approved must submit full source approval requests by the solicitation closing date. Additional requirements include EJCP certification for downloading export-controlled drawings, compliance with higher-level quality standards (SAE AS9100), Cybersecurity Maturity Model Certification (CMMC) Level 2, and non-destructive testing accreditation. All items must meet aircraft launch and recovery equipment traceability requirements with bare item markings per technical drawings. Government surplus and certificate of conformance are not acceptable for this critical application item. Payment will be made electronically through the Wide Area Workflow (WAWF) system; quoters must complete all representations and certifications, including those regarding foreign ownership, delinquent taxes, inverted domestic corporations, buy American compliance, and export controls.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

4. CERT.FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5. ISSUED BY

7. DELIVERY

9. DESTINATION

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5 ON OR

BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (See Continuation Sheets)

12. DISCOUNT FOR PROMPT PAYMENT

d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

14. SIGNATURE OF PERSON AUTHORIZED TO SIGN

QUOTATION

16. SIGNER

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not useable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

SPE7M2-27-Q-0080

1. REQUEST NO.

2026 NOV 25

2. DATE ISSUED

7018271551

3. REQUISITION/PURCHASE REQUEST NO.

DO-C9

RATING

DLA WEAPONS SUPPORT

NUCLEAR REACTOR PROGRAM

PO BOX 3990

COLUMBUS OH 43218-3990

USA

Buyer: Kyle Barr PMCMBBZ Tel: 614-692-1243 Fax: 614-692-6923 Email: Kyle.Barr@dla.mil

SEE SCHEDULE

6. DELIVER BY (Date)

8. TO:

c. CITY

d. STATE

b. STREET ADDRESS

a. NAME OF CONSIGNEE

e. ZIP CODE

a. 10 CALENDAR DAYS

b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS

15. DATE OF QUOTATION

a. NAME (Type or Print)

AREA CODE

c. TITLE (Type or Print)d. CITY

c. COUNTY

b. STREET ADDRESS

e. STATE f. ZIP CODE

See Schedule

2026 DEC 02

NUMBER

FOB DESTINATION

OTHER

(See Schedule)

CAGE

b. TELEPHONE

See attached schedule to complete quote information.

Quoter must also complete the following:

a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .

b. Prices quoted are:

___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .

___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.

___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;

___ Customer ________________________.

___ Other (provide basis) ______________________________________ _______________________________________ .

c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .

d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.

e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:

f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 2 OF 27 PAGES

SPE7M2-27-Q-0080

*************PLEASE READ THE FOLLOWING CAREFULLY****************

*******NOTE TO CONTRACTORS********

****THIS IS AN AIRCRAFT LAUNCH RECOVERY EQUIPMENT (ALRE) ITEM****

****CRITICAL APPLICATION ITEM (CAI)****

NSN# 1720-00-885-9392

NOMENCLATURE: Guide

PART NUMBER: 408297-1

IN SUPPORT AND PREPARATION OF THIS SOLICITATION FOR THIS ALRE ITEM, TDR NO. 25-12193 WAS USED.

FOB: ORIGIN

INSPECTION/ACCEPTANCE: ORIGIN

*******************************NOTE************************************

**CONTRACTORS MUST BE EJCP CERTIFIED TO DOWNLOAD EXPORT CONTROLLED DRAWINGS**

NOTE THAT EJCP EXPIRES IN 3 YEARS FROM DATE OF CERTIFICATION. CHECK TO ENSURE THAT EJCP HAS NOT EXPIRED. THIS IS A

REQUIREMENT BASED ON EXPORT DRAWINGS.

PLEASE NOTE IN THE SOLICITATION THERE ARE ADDITIONAL LINE ITEMS BEGINNING WITH “S0…”. THESE LINES COINCIDE WITH THE “CONTRACT DATA REQUIREMENTS LIST” (CDRLS) FOUND IN THE TECH DOC BIDSET DOWNLOADABLE FROM DIBBS.

THE CDRLS WILL BECOME DELIVERABLES AT TIME OF AWARD AND WILL BE ATTACHED BY THE BUYER.

THE TECHNICAL DOCUMENTS FOR THIS SOLICITATION MUST BE DOWNLOADED AND REVIEWED PRIOR TO SUBMISSION OF QUOTES/OFFERS. A

POST AWARD SURVEY MAY BE REQUIRED FOR UNDERSTANDING OF THE REQUIREMENTS.

CLIN (CDRL) 0002 – S00000053 – CONTRACTOR FIRST ARTICLE TESTING (KFAT)

CLIN (CDRL) 0003 – S00000046 – PRODUCTION TEST & INSPECTION REPORT (PTI)

CLIN (CDRL) 0004 – S00000046 – CERTIFICATE OF QUALITY COMPLIANCE (COQC)

***PLEASE READ SOLICITATION IN ITS ENTIRETY***

COC IS NOT AUTHORIZED FOR ALL CAI ALRE ITEMS

GOVERNMENT SURPLUS IS NOT ACCEPTABLE FOR ALL CAI ALRE ITEMS

THE FOLLOWING PROVISIONS/CLAUSES APPLY TO THIS SOLICITATION:

DLAD PROCUREMENT NOTES INCORPORATED BY REFERENCE

This solicitation incorporates one or more DLAD Procurement Notes by reference, with the same force and effect as if they were given in full text. The full text of a DLAD Procurement Note may be accessed electronically at http://www.

dla.mil/HQ/Acquisition/Offers/eProcurement.aspx and via 'References' on the DIBBS homepage.

(End of Text)

UCF SECTION F – TIME OF DELIVERY FIXED QUANTITY

Doesn’t apply to Partial Set-asides

(a) Offers in response to this solicitation will be evaluated as specified in the solicitation. Delivery shall be offered in terms of a number of days after date of award. The number of delivery days required in this solicitation is calculated based on the Government’s planned need and customer requirements. Unless delivery is identified elsewhere in the solicitation as an evaluation factor, Offerors are encouraged to conform their delivery terms as closely as possible to the delivery days required, and there will be no evaluation preference, or penalty for faster delivery.

Offering a greater number of delivery days than the required delivery schedule may result in the offer not being considered, however the Government reserves the right to consider offered delivery times that exceed the number of delivery days required by the Government. Delivery is required by the Government in accordance with the following schedule:

Required delivery schedule:

CLIN 0001 PRODUCTION EA 600 DAYS ADO

CLIN 0002 CONTRACTOR FAT (KFAT) 1 REPORT 350 DAYS ADO

PAGE 3 OF 27 PAGES

SPE7M2-27-Q-0080

CLIN 0003 PRODUCTION TEST AND INSPECTION (PTI) 600 DAYS ADO

CLIN 0004 CERTIFICATE OF QUALITY COMPLIANCE (COQC) 600 DAYS ADO

(b) The Government may elect to consider for award only those offers that comply with the required delivery schedule but reserves the right to consider offered delivery times that exceed the number of delivery days required by the Government. The Offeror may propose an alternative delivery schedule below. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

Offeror's proposed delivery schedule:

CLIN 0001 PRODUCTION EA: ____________ DAYS ADO

CLIN 0002 CONTRACTOR FAT (KFAT) 1 REPORT: _______________ DAYS ADO

CLIN 0003 PRODUCTION TEST AND INSPECTION (PTI): _______________ DAYS ADO

CLIN 0004 CERTIFICATE OF QUALITY COMPLIANCE (COQC): ____________ DAYS ADO

(c) The Government will mail, or otherwise furnish to, the Offeror an award or notice of award not later than the day the award is dated. Therefore, the Offeror shall compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the award or notice of award by adding: five calendar days for delivery of the award through the ordinary mails, or one working day if the solicitation states that the award or notice of award will be transmitted electronically. (The term "working day" excludes weekends and United States (U.S.) Federal holidays.)

(End of Text)

SOURCES THAT ARE NOT APPROVED FOR THIS NSN ARE REQUIRED TO SUBMIT A FULL SOURCE APPROVAL REQUEST (SAR) TO DSCC BY THE CLOSING DATE OF THIS SOLICITATION. DUE TO THE CRITICALITY AND TIME REQUIRED FOR THE ESA EVALUATION OF ALTERNATE OFFERS, IT MAY NOT BE POSSIBLE TO CONSIDER ALTERNATE OFFERS FOR CURRENT AWARD, BUT THOSE MEETING EVALUATION CRITERIA WILL BE CONSIDERED FOR FUTURE PROCUREMENTS IF APPROVED BY THE ESA AFTER SAR EVALUATION.

TRACEBILITY TO APPROVED SOURCES LISTED IN THIS SOLICITATION AND AUTHORIZED OEM DISTRIBUTOR DESIGNATION IS REQUIRED FOR

ALL CAI PURCHASES.

FIRST ARTICLE RECOMMENDATIONS WILL BE EMAILED TO THE POST AWARD ADMINISTRATOR

Upon approval of the FAT the following applies - Disposition of First Article Test Unit: Include as Part of the Production Quantity - Total Production Quantity = XX EA. Vendor is hereby directed that the approved First Article Test Unit is to be maintained throughout the production process as a manufacturing exhibit, and shall only be included in the final shipment.

NOTE:

THIS SOLICITATION INCORPORATES THE TERMS AND CONDITIONS SET FORTH IN THE REVISION OF THE DLA MASTER SOLICITATION FOR EPROCUREMENT AUTOMATED SIMPLIFIED ACQUISITIONS IN EFFECT ON THE SOLICITATION ISSUE DATE. ALL REVISIONS OF THE DLA MASTER SOLICITATION FOR EPROCUREMENT AUTOMATED SIMPLIFIED ACQUISITIONS CAN BE FOUND ON THE WEB AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx

Master Solicitation (may still select clauses)

UCF SECTION M – REQUIREMENTS FOR QUANTITY INCREMENTS OR RANGES

Offers are requested for increments or ranges of quantities as listed in the schedule of supplies or services. The awarded quantity, or quantities in the case of multiple items, will be based on the requirements of the Government and the combination of price and quantity per item that is most advantageous to the Government. The quantity awarded may fall anywhere within any range.

An offer that only contains prices for quantities other that those quantities indicated in the schedule of supplies or services may be precluded from consideration for award if the Contracting Officer elects to make an award without discussion of proposals.

The unit price applicable to the entire award quantity shall be the unit price offered for the quantity range in which the award quantity falls; If an offer specifies the same price for all quantity ranges of an item, the offer may include a statement in the schedule of supplies or services that the unit price applies to all quantity ranges of that item. If an offer specifies different prices for a quantity range of an item, the offer must show a unit price in each quantity range column in the schedule of supplies or services.

If this solicitation includes an option provision, option prices must be included for each increment.

PAGE 4 OF 27 PAGES

SPE7M2-27-Q-0080

(End of Text)

THE TOTAL QUANTITY OF THE PROCUREMENT IS 30 EA. PRICING FOR THE FOLLOWING INCREMENTAL QUANTITIES IS REQUESTED:

1 - 30: __________ 31 - 60: __________ 61 - 90: __________

PAGE 5 OF 27 PAGES

SPE7M2-27-Q-0080

SECTION B

SUPPLIES/SERVICES: 1720-00-885-9392

ITEM DESCRIPTION:

GUIDE, LAUNCHING SHUTTLE

82N CAI ALRE

RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS

(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE

DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB

AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx

FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE

SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE

ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE

APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON

REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)

RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT

Certificate of Quality Compliance (CoQC) Contract Data Requirements Lists (CDRLs), DD Form 1423s, apply to this procurement. Review the Technical Data Package (TDP) for additional information. If CDRL-COQCCDRLs is missing from DLA Technical Data Management Transformation (TDMT) they can also be viewed in the DLA MASTER LIST OF

TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx

RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS

(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE

DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB

AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx

FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE

SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE

ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE

APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON

REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

The following Contract Data Requirements Lists (CDRLs), DD Form 1423s, apply to this procurement. Review the Technical Data Package (TDP) for additional information.

-First Article Testing Report -Production Test and Inspection Report -Certificate of Quality Compliance

RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN

RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES

RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL

REQUEST FOR VARIANCE (DEVIATION OR WAIVER)

NOTE: THIS IS A RESTRICTED SOURCE ITEM AND

REQUIRES ENGINEERING SOURCE APPROVAL BY THE

GOVERNMENT DESIGN CONTROL ACTIVITY.

CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE

USED NOR INCORPORATED IN ANY ITEMS TO BE

DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION

SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT

DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.

SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR

APPROVAL UNLESS THEY ARE AUTHORIZED BY THE

SPECIFICATION REQUIREMENTS.

PAGE 6 OF 27 PAGES

SPE7M2-27-Q-0080

SECTION B

SUPPLY/SERVICE: 1720-00-885-9392 CONT'D

MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL

NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT

CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED

UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY

USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED

INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;

AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.

PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS

CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN

A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR

MERCURY COMPOUND. (IAW NAVSEA 5100-003D).

THIS MATERIAL MUST MEET NAVAIR AIRCRAFT LAUNCH &

RECOVERY EQUIPMENT TRACEABILITY REQUIREMENTS. BARE

ITEM MARKINGS SHALL BE IAW THE TECHNICAL DATA

DRAWINGS PROVIDED.

BARE ITEM MATERIAL SHALL BE MARKED WITH CONTRACT

NUMBER, NAWC CAGE, AND PART NUMBER UNLESS OTHERWISE

SPECIFICIED ON ASSOCIATED DRAWING. IF A CONFLICT

EXISTS WITH MARKING REQUIREMENTS OF THIS 82N ALRE/SE

ITEM, THE ASSOCIATED DRAWING REQUIREMENTS SHALL APPLY.

The Government Procuring Activity has determined that Surplus is not Acceptable for this NSN.

(End of TQ Requirement)

RQ032: EXPORT CONTROL OF TECHNICAL DATA

This item has technical data some or all of which is subject to export-control of either the International Traffic in Arms regulations (ITAR) or the Export Administration Regulations (EAR), and cannot be exported without prior authorization from either the Department of State or the Department of Commerce. Export includes disclosure of technical data to foreign persons and nationals whether located in the United States or abroad. This requirement applies equally to foreign national employees and U.S. companies and their foreign subsidiaries. DFARS 252.225-7048 is applicable to this data.

The Defense Logistics Agency (DLA) limits distribution of export-control technical data to DLA contractors that have an approved US/Canada Joint Certification Program (JCP) certification, have completed the Introduction to Proper Handling of DOD Export-Controlled Technical Data Training and the DLA Export-Controlled Technical Data Questionnaire (both are available at the web address given below), and have been approved by the DLA controlling authority to access the export-controlled data. Instructions for obtaining access to the export-controlled data can be found at:

https://www.dla.mil/Logistics-Operations/Enhanced-Validation/

To be eligible for award, offerors and any sources of supply proposed for use are required to have an approved JCP certification and have been approved by the DLA controlling authority to access export-controlled data managed by DLA. DLA will not delay award in order for an offeror or its supplier to apply for and receive approval by the DLA controlling authority to access the export-controlled data.

RD002, COVERED DEFENSE INFORMATION APPLIES

AIRCRAFT LAUNCH AND RECOVERY EQUIPMENT (ALRE) CRITICAL APPLICATION ITEM

SOURCE APPROVAL - TO BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION, AN

OFFEROR MUST BE AN APPROVED SOURCE OR PROVIDE THE PRODUCT OF AN APPROVED

SOURCE AS DETERMINED BY THE ENGINEERING SUPPORT ACTIVITY, NAVAL AIR

WARFARE CENTER (NAWC) AIRCRAFT DIVISION LAKEHURST. THE CRITERIA AND

PROCEDURES FOR SOURCE APPROVAL ARE CONTAINED IN PART I OF THE NAVAL

INVENTORY CONTROL POINT (NAVICP) PHILADELPHIA BROCHURE ENTITLED "SOURCE

APPROVAL INFORMATION BROCHURE FOR SPARES". THE LATEST VERSION OF THIS

BROCHURE MAY BE OBTAINED BY ACCESSING NAVICP'S WEBSITE:

HTTPS://WWW.NAVSUP.NAVY.MIL, OUR TEAM, NAVICP, BUSINESS OPPORTUNITIES,

COMMODITIES, SOURCE APPROVAL REQUEST (SAR) BROCHURE SPARES

TO ASSIST IN THE DETERMINATION OF SOURCE APPROVAL, THE OFFEROR MAY BE

REQUIRED TO SUBMIT TO A SURVEY PRIOR TO AWARD IN WHICH NAWC LAKEHURST

MAY PARTICIPATE.

IN ADDITION, THE OFFEROR MUST PROVIDE THE FOLLOWING INFORMATION, WHICH

MAY BE CONSIDERED IN DETERMINING WHETHER THE OFFEROR IS AN APPROVED

PAGE 7 OF 27 PAGES

SPE7M2-27-Q-0080

SECTION B

SUPPLY/SERVICE: 1720-00-885-9392 CONT'D

SOURCE:

(1) A SOURCE APPROVAL LETTER FROM NAVICP'S ENGINEERING AND PRODUCT

SUPPORT DIRECTORATE; OR;

(2) OTHER EVIDENCE INDICATING THAT THE OFFEROR MEETS THE SOURCE APPROVAL

CRITERIA.

ALL REQUESTS FOR WAIVERS OR DEVIATIONS CLASSIFIED AS CRITICAL, MAJOR, OR

MINOR MUST BE FORWARDED TO THE DSC CONTRACTING OFFICER FOR REVIEW AND

APPROVAL.

ALL ITEMS OF SUPPLY SHALL BE MARKED IAW MIL-STD-129. IN ADDITION, EACH

UNIT PACK WILL BE MARKED WITH LOT AND SERIAL NUMBER (IF AVAILABLE),

CONTRACTOR'S CAGE CODE, ACTUAL MANUFACTURER'S CAGE CODE AND PART NUMBER.

(February 2016)

RD005: Cybersecurity Maturity Model Certification (CMMC) Level 2 Certified Third-Party Assessment Organization (C3PAO) RQ040: Non-Destructive Testing (NDT) Accreditation Requirements

RQ039: Non-Tailored Higher-Level Quality Requirements (SAE AS9100) for Manufacturers and Non-Manufacturers

CRITICAL APPLICATION ITEM

G. S. E. DYNAMICS, INC. 29183 P/N 408297-1

APEX MANUFACTURING COMPANY, INC. 2V343 P/N 408297-1

U.S.A. SPARES INC. 1UF60 P/N 408297-1

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 80020 MPR1021

REVISION NR B DTD 09/01/1989

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 80020 408297

REVISION NR L DTD 09/19/2012

PART PIECE NUMBER: 408297-1

TDP Rev A Gen 1

IAW REFERENCE QAP 16236 SQAP008859392CFAT

REVISION NR A DTD 01/27/2026

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE QAP 16236 SQAP008859392QA

REVISION NR A DTD 01/27/2026

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 16236 CN008859392

REVISION NR B DTD 01/27/2026

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE QAP 16236 CDRLS008859392-26008

REVISION NR DTD 01/08/2026

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE NON GOVT STD SAE AMS5643W

REVISION NR W DTD 12/01/2021

PART PIECE NUMBER:

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.

https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK

PAGE 8 OF 27 PAGES

SPE7M2-27-Q-0080

SUPPLY/SERVICE: 1720-00-885-9392 CONT'D

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0001 1720-00-885-9392 30.000 EA $ ________________ $ ________________

GUIDE,LAUNCHING

SHU

PRICING TERMS: Firm Fixed Price

QTY VARIANCE: PLUS 0% MINUS 0%

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: ORIGIN DELIVERY DATE: 600 DAYS ADO

PREP FOR DELIVERY:

PKGING DATA - MIL-STD-2073-1E

QUP:001 PRES MTHD:41 CLNG/DRY:1 PRESV MAT:00

WRAP MAT:EA CUSH/DUNN MAT:NA CUSH/DUNN THKNESS:C

UNIT CONT:E5 OPI:M

INTRMDTE CONT:D3 INTRMDTE CONT QTY:AAA

PACK CODE:U

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE:ZZ -ZZ Special Requirements

PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING

REQUIREMENTS FOR PROCUREMENT

EACH UNIT PACKAGE WILL BE MARKED WITH THE NSN,

CONTRACT NUMBER, LOT NUMBER, CONTRACTOR CAGE

CODE, MANUFACTURER CAGE CODE, AND PART NUMBER.

PARCEL POST ADDRESS:

W25G1U

W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2083 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND PA 17070-5002

US

FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE C20 AND

CONTRACT

FREIGHT SHIPPING ADDRESS:

W25G1U

W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2083 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND PA 17070-5002

US

Contractor First Article Test Contractor First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-3 for the actual quantity required to be tested.

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS%

PAGE 9 OF 27 PAGES

SPE7M2-27-Q-0080

SUPPLY/SERVICE: 0001-S00000053 CONT'D

0002 0001 - S00000053 1.000 EA $ ________________ $ ________________

FOB: DELIVERY DATE: 350 DAYS ADO

PREP FOR DELIVERY:

Not Applicable

Miscellaneous

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS%

0003 0001 - S00000046 1.000 EA $ ________________ $ ________________

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: ORIGIN DELIVERY DATE: 600 DAYS ADO

PREP FOR DELIVERY:

Miscellaneous

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS%

0004 0001 - S00000046 1.000 EA $ ________________ $ ________________

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: ORIGIN DELIVERY DATE: 600 DAYS ADO

PREP FOR DELIVERY:

Not Applicable

PAGE 10 OF 27 PAGES

SPE7M2-27-Q-0080

SUPPLY/SERVICE: 0001-S00000046 CONT'D

GOVT USE

External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .

0001 7018271551 0001 N/A N/A N/A 09/24/2028

0002 N/A N/A N/A N/A N/A N/A

0003 N/A N/A N/A N/A 9999 N/A

0004 N/A N/A N/A N/A 9999 N/A

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 27 PAGES

SECTION C - SPECIFICATIONS/SOW/SOO/ORD

C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (JUN 2023)

SECTION E - INSPECTION AND ACCEPTANCE

E08 FIRST ARTICLE TESTING REQUIREMENTS (MAR 2025)

(1) If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all costs and risk associated with completion of the FAT requirement in the production CLIN price.

(2) If there is a separate FAT CLIN, the offeror shall include all costs and risk associated with completion of the FAT requirement in the FAT CLIN price.

The unit of issue for the FAT CLIN, EACH, is equal to one First Article Test (1EA=1FAT). To receive payment for any costs associated with FAT, the offeror shall propose costs associated with FAT on a separate CLIN. The offeror shall base the production CLIN price solely on all costs associated with completion of the production units and shall exclude all FAT-related costs.

(3) The contracting officer will use the total award price in selecting the best value offer from among all eligible offerors. However, for an offeror to be eligible for award, the contracting officer must determine that the FAT CLIN price (unless FAT is waived) and the production CLIN price are fair and reasonable; and, if set-aside under FAR Part 19, a fair market price. The offeror shall not propose a FAT CLIN price that is materially unbalanced in relation to the production CLIN price. In the event an offeror receives a waiver of the FAT requirement, the contracting officer will deduct the FAT CLIN price for the waived source in determining the total award price.

(4)(a) Notwithstanding the conditions for waiving first article, the contracting officer may order an additional first article sample, or portion thereof, in writing if there is a --

(i) Major change to the technical data;

(ii) Lapse in production for a period in excess of 90 days; or

(iii) Change in the place of performance (manufacturing facility), manufacturing process,material used, drawing, specification or source of supply.

(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the contractor shall notify the contracting officer; who will determine whether to order an additional first article sample or portion thereof and provide instructions concerning the submission, inspection, and notification of results. The contractor shall bear the costs of the additional first article testing resulting from any of the causes in paragraphs (4)(a)(i)-(iii) instituted by the contractor and not due to changes directed by the Government.

(5) Waivers. The offeror may submit a request for FAT waiver to the contracting officer, who may waive the FAT requirement when all of the following criteria apply:

(a) The offeror requesting waiver has successfully manufactured, delivered and the government accepted the item or a similar item. The offeror shall provide the following information and be prepared to provide documentary evidence upon the contracting officer's request:

(i) Contract number(s), date(s), and issuing Government agency or agencies.

(ii) Description of item previously furnished, identified by part number, type, model number and/or other identifying information. If the item previously furnished is similar but not identical to the item being acquired under the current buy, the offeror shall explain why manufacture of the item previously furnished is sufficient to demonstrate its ability to manufacture the item being acquired under the current buy without need for a first article test.

(iii) Engineering control document/change number of item previously furnished.

(b) There have been no changes to manufacturing processes, tooling, or place of performance.

(c) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements; or subcontractors used to manufacture the items successfully in the past).

(d) The offeror shall supply an item of the same design and manufactured by the same method at the same facilities as the item or similar item previously furnished and accepted under subparagraph (5)(a).

(6) Contractor-Performed FAT.

(a) The contractor shall test the quantities as outlined in paragraph (a) of FAR clause 52.209-3 as specified in the contract. The contractor shall submit reports in accordance with paragraph (b) of FAR clause 52.209-3, as supplemented in this procurement note.

(b] For test report preparation and delivery of contractor FAT, the contractor shall --

(i) Use the data item description DI-NDTI-80809B report format.

(ii)] Mark the test report with the following: “First article test report - Contract number:[ ] and lot/item number: [ ].

(iii) Sign the FAT Report, accompanied by the system of record receiving report (i.e, WAWF or] DD Form 250) and contractor confirmation that the same process and facilities used to manufacture the first article units will be used to manufacture the production units, to the contracting officer at the applicable address shown below:

(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing and Textile (C&T), Medical Materiel, or Subsistence, submit the report to the procuring activity in Block 6 of the DD Form 1155, Block 7 of Standard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.

(B) For awards issued by DLA Land (SPE7L), submit the report to the following address:

DLA Land - FLSEB ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-399, or email to: Land.FAT.Monitor@dla.mil.

(C) For awards issued by DLA Maritime (SPE7M), submit the report to the following address:

DLA Maritime - FMSE ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 27 PAGES

SPE7M2-27-Q-0080

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

(D) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email the report to Construction and Equipment FAT Monitor at trpsptcandefatmonitor@dla.mil. If report exceeds email limitations, submit the report to the following address:

DLA Troop Support ATTN: First Article Testing Monitor Building 3, 700 Robbins Avenue Philadelphia, Pennsylvania 19111.

Preferred electronic submissions: Hardware FAT Monitor at DLAHardwareFATMonitor@dla.mil.

(7) The contractor shall --

(a) Provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3;

(b) Maintain and make available all records evidencing those details at the Government's request.

(c) At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to shipment to the Government, provide written notice to the contracting officer and to the cognizant DCMA Functional Specialist when full administration or Quality Support administration is delegated to DCMA.

(8) Government-performed FAT. The contractor shall --

(a) For delivery of separately priced Government first article samples for Government performed FAT ship the units and system of record receiving report (i.

e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of FAR clause 52.209-4.

(b) For delivery of Government first article samples that are not separately priced, ship the units with a commercial shipping document to the test facility.

(c) Prepare the shipping container(s) by marking the external packages in bold letters, “First Article Exhibits - Do Not Post to Stock," adjacent to the MIL- STD-129 (latest revision) identification markings.

(d) Use a hard copy of the system of record receiving report (i.e., WAWF DD Form 250), or commercial shipping document as a packing list, in accordance with DFARS Appendix F.

(e) Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11.

(f) In the interior package, include hard copies of the contract, test reports, material certifications/process operation sheets, drawings used to manufacture the units, and a pre-paid return label or shipping account for payment.

(g) Send units by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express).

(h) Send an email with subject titled “Notification of Test Exhibits [ ]” to the corresponding address in (i) or (ii) below and to the contracting officer specified in the contract. In the email, provide the shipment date, contract/purchase order number, National Stock Number, means of transportation, tracking number, and summary of container contents. Attach a copy of the system of record receiving report (i.e., WAWF or DD Form 250) documenting the Government has performed the contract quality assurance within the system or record.

(i) DLA Land & Maritime - DSCCProdVerif@dla.mil

(ii) DLA Aviation - DSCR.Test & EvaluationOffice@dla.mil

(9) At its discretion, the Government may return FAT units to the contractor at no cost to the Government. The contractor shall submit the return address and pre-paid return label or shipping account for payment.

(10) If the Government disapproves or conditionally approves Government-performed FAT units, the Government will take action in accordance with FAR 52.209-4.

E09 CONTRACTOR FIRST ARTICLE TEST (FAT) INFORMATION (JUL 2022)

(1) For FAT requirements, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. Due to known systems limitations, solicitations may contain erroneous inspection, acceptance, and FOB points. This procurement note takes precedence over any conflicting terms.

(2) CONTRACTOR FAT DELIVERY SCHEDULE

(a) Days: To Deliver FAT Report to the Government

(b) Days: Government FAT Report Evaluation and Notification to Contractor

(c) Days: To Deliver Final Production Quantity After Approval of FAT Report. If PLT applies, this line will be blank; the number of delivery days for final production quantity will appear in procurement note E03, Production Lot Testing - Contractor, or E04, Production Lot Testing - Government, as applicable

(d) Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))

52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) FAR

As prescribed in 46.311, insert the following clause:

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

Title Number Date Tailoring

[Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.]

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 27 PAGES

SPE7M2-27-Q-0080

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instruction, documentation control, and advanced metrology.

(End of Clause)

E05 PRODUCT VERIFICATION TESTING (MAY 2020)

(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.

(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.

(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor's sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor's signed DD Form 1222.

The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, “Product Verification Test Samples - Do Not Post to Stock," Contract Number [ ] and Lot/Item Number [ ]” adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package:

(a) Hard copies of the contract;

(b) Material certifications/process operation sheets; and

(c) Drawings used to manufacture the units and return shipping information.

(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.

(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.

E06 INSPECTION AND ACCEPTANCE AT SOURCE (JUN 2018)

Inspection and acceptance are at source. The place of acceptance is the location where the Government conducts the last inspection before shipment, unless the contractor indicated a different physical location for acceptance below.

The contractor shall indicate the location where supplies will be inspected, if different from the production location:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

The contractor shall indicate the location where packaging will be inspected, if different from the production location:

[ ] Same as for supplies OR CAGE code:

Address:

Applicable to CLIN(s):

The contractor shall indicate the location where supplies will be accepted, if different from the inspection location:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

SECTION F - DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989) FAR

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR

SECTION G - CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (PRE-FILLED) (JAN 2023) DFARS As prescribed in 232.7004 (b), use the following clause:

https://www.acquisition.gov/dfars/part-232-contract-financing

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 27 PAGES

SPE7M2-27-Q-0080

SECTION G - CONTRACT ADMINISTRATION DATA (CONTINUED)

(a) Definitions. As used in this clause - Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation System (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall -

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https:// wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items -

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

Invoice (stand-alone) and Receiving Report (stand-alone) or Invoice and Receiving Report (combination)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table *

Field Name in WAWF Data to be entered in WAWF Guidance

Pay Official DoDAAC See Block 12 (SF26), 15 (DD 1155), or 18a

(SF1449)

(If blank, see resulting award)

Issue By DoDAAC See Block 5 (SF26), 6 (DD 1155), or 9 (SF1449)

(If blank, see resulting award)

Admin DoDAAC See Block 6 (SF26), 7 (DD 1155), or 16 (SF1449)

(If blank, see resulting award)

Inspect By DoDAAC SEE SECTION B (If blank, see resulting award)

Ship To Code SEE SECTION B (If blank, see resulting award)

Ship From Code SEE SECTION B (If blank, see resulting award)

Mark For Code SEE SECTION B (If blank, see resulting award)

Service Approver (DoDAAC)

(If blank, see resulting award)

Service Acceptor (DoDAAC)

(If blank, see resulting award)

Accept at Other DoDAAC (If blank, see resulting award) https://www.sam.gov https://wawf.eb.mil/ https://wawf.eb.mil/ https://wawf.eb.mil/

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 27 PAGES

SPE7M2-27-Q-0080

SECTION G - CONTRACT ADMINISTRATION DATA (CONTINUED)

Field Name in WAWF Data to be entered in WAWF Guidance

LPO DoDAAC (If blank, see resulting award)

DCAA Auditor DoDAAC (If blank, see resulting award)

Other DoDAAC(s) (If blank, see resulting award)

(* Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (** Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

See administer listed on page 1

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of Clause)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H18 DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM (DPAS) (JUL 2026)

SECTION I - CONTRACT CLAUSES

52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) DFARS

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) DFARS

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0038) (FEB

2026) FAR

252.204-7004 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN 2023) DFARS

252.204-7014 LIMITATIONS ON THE USE OR DISCLOSURE OF INFORMATION BY LITIGATION SUPPORT CONTRACTORS (JAN

2023) DFARS

52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (DEVIATION 2026-O0038) (FEB 2026) FAR As prescribed in 9.308-1(a) and (b), insert the following clause:

[Contracting Officer inserts details]

(a) The Contractor shall test 1 unit(s) of Lot/Item as specified in this contract. At least 10 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within 350 calendar days from the date of this contract to 1 COPY OF THE FIRST ARTICLE REPORT IS TO BE PROVIDED THE POST AWARD ADMINISTRATOR IN BLOCK 6 OF THE CONTRACT. [insert address of the Government activity to receive the report] marked “FIRST ARTICLE TEST REPORT: Contract No. , Lot/Item No. ." Within 60 calendar days after the Government

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 16 OF 27 PAGES

SPE7M2-27-Q-0080

SECTION I - CONTRACT CLAUSES (CONTINUED)

receives the test report, the Contracting Officer will notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article.

The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval will state any further action required of the Contractor. A notice of disapproval will cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government will take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer will, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(End of clause)

52.209-3 FIRST ARTICLE APPROVAL - CONTRACTOR TESTING (DEVIATION 2026-O0038) (FEB 2026), ALT I (JAN 1997) FAR

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED (DEVIATION…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .