REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
4. CERT.FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5. ISSUED BY
7. DELIVERY
9. DESTINATION
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5 ON OR
BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (See Continuation Sheets)
12. DISCOUNT FOR PROMPT PAYMENT
d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO SIGN
QUOTATION
16. SIGNER
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not useable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
SPE7M1-27-Q-0136
1. REQUEST NO.
2026 OCT 29
2. DATE ISSUED
7017696845
3. REQUISITION/PURCHASE REQUEST NO. RATING
DLA WEAPONS SUPPORT
MARITIME SUPPLY CHAIN
PO BOX 3990
COLUMBUS OH 43218-3990
USA
Buyer: Thomas Reckart PMCM63Y Tel: 6146923131 Email: THOMAS.RECKART@DLA.MIL
100 DAYS ADO
6. DELIVER BY (Date)
8. TO:
c. CITY
d. STATE
b. STREET ADDRESS
a. NAME OF CONSIGNEE
e. ZIP CODE
a. 10 CALENDAR DAYS
b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS
15. DATE OF QUOTATION
a. NAME (Type or Print)
AREA CODE
c. TITLE (Type or Print)d. CITY
c. COUNTY
b. STREET ADDRESS
e. STATE f. ZIP CODE
See Schedule
2026 NOV 06
NUMBER
FOB DESTINATION
OTHER
(See Schedule)
CAGE
b. TELEPHONE
See attached schedule to complete quote information.
Quoter must also complete the following:
a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .
b. Prices quoted are:
___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .
___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.
___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;
___ Customer ________________________.
___ Other (provide basis) ______________________________________ _______________________________________ .
c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .
d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.
e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:
f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 27 PAGES
SPE7M1-27-Q-0136
***THE FOLLOWING CLASS DEVIATION SUPERSEDES ANY PRIOR VERSION OF DFARS CLAUSE 252.204-7012.***
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (MAY 2024) (DEVIATION 2024-O0013
REVISION 1)
(a) Definitions. As used in this clause Adequate security means protective measures that are commensurate with the consequences and probability of loss, misuse, or unauthorized access to, or modification of information. Compromise means disclosure of information to unauthorized persons, or a violation of the security policy of a system, in which unauthorized intentional or unintentional disclosure, modification, destruction, or loss of an object, or the copying of information to unauthorized media may have occurred. Contractor attributional/proprietary information means information that identifies the contractor(s), whether directly or indirectly, by the grouping of information that can be traced back to the contractor(s) (e.g., program description, facility locations), personally identifiable information, as well as trade secrets, commercial or financial information, or other commercially sensitive information that is not customarily shared outside of the company. Controlled technical information means technical information with military or space application that is subject to controls on the access, use, reproduction, modification, performance, display, release, disclosure, or dissemination. Controlled technical information would meet the criteria, if disseminated, for distribution statements B through F using the criteria set forth in DoD Instruction 5230.24, Distribution Statements on Technical Documents. The term does not include information that is lawfully publicly available without restrictions. Covered contractor information system means an unclassified information system that is owned, or operated by or for, a contractor and that processes, stores, or transmits covered defense information. Covered defense information means unclassified controlled technical information or other information, as described in the Registry at http://www.archives.gov/cui/registry/category-list.html, that requires safeguarding or dissemination controls pursuant to and consistent with law, regulations, and Governmentwide policies, and is
(1) Marked or otherwise identified in the contract, task order, or delivery order and provided to the contractor by or on behalf of DoD in support of the performance of the contract; or
(2) Collected, developed, received, transmitted, used, or stored by or on behalf of the contractor in support of the performance of the contract. Cyber incident means actions taken through the use of computer networks that result in a compromise or an actual or potentially adverse effect on an information system and/or the information residing therein. Forensic analysis means the practice of gathering, retaining, and analyzing computer-related data for investigative purposes in a manner that maintains the integrity of the data. Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information. Malicious software means computer software or firmware intended to perform an unauthorized process that will have adverse impact on the confidentiality, integrity, or availability of an information system.
This definition includes a virus, worm, Trojan horse, or other code-based entity that infects a host, as well as spyware and some forms of adware. Media means physical devices or writing surfaces including, but is not limited to, magnetic tapes, optical disks, magnetic disks, large-scale integration memory chips, and printouts onto which covered defense information is recorded, stored, or printed within a covered contractor information system. Operationally critical support means supplies or services designated by the Government as critical for airlift, sealift, intermodal transportation services, or logistical support that is essential to the mobilization, deployment, or sustainment of the Armed Forces in a contingency operation. Rapidly report means within 72 hours of discovery of any cyber incident.
Technical information means technical data or computer software, as those terms are defined in the clause at DFARS 252.227-7013, Rights in Technical DataOther Than Commercial Products and Commercial Services, regardless of whether or not the clause is incorporated in this solicitation or contract. Examples of technical information include research and engineering data, engineering drawings, and associated lists, specifications, standards, process sheets, manuals, technical reports, technical orders, catalog-item identifications, data sets, studies and analyses and related information, and computer software executable code and source code.
(b) Adequate security. The Contractor shall provide adequate security on all covered contractor information systems.
To provide adequate security, the Contractor shall implement, at a minimum, the following information security protections:
(1) For covered contractor information systems that are part of an Information Technology (IT) service or system operated on behalf of the Government, the following security requirements apply:
(i) Cloud computing services shall be subject to the security requirements specified in the clause 252.239-7010, Cloud Computing Services, of this contract.
(ii) Any other such IT service or system (i.e., other than cloud computing) shall be subject to the security requirements specified elsewhere in this contract.
(2) For covered contractor information systems that are not part of an IT service or system operated on behalf of the Government and therefore are not subject to the security requirement specified at paragraph (b)(1) of this clause, the following security requirements apply:
(i) Except as provided in paragraph (b)(2)(ii) of this clause, the covered contractor information system shall be subject to the security requirements in National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations, Revision 2 (available via the internet at http://dx.doi.org/10.6028/NIST.SP.800-171). https://nvlpubs.nist.gov/nistpubs/ SpecialPublications/NIST.SP.800-171r2.pdf).
(ii)(A) The Contractor shall implement NIST SP 800-171, as soon as practical, but not later than December 31, 2017.
For all contracts awarded prior to October 1, 2017, the Contractor shall notify the DoD Chief Information Officer (CIO), via email at osd.dibcsia@mail.mil, within 30 days of contract award, of any security requirements specified by NIST SP 800-171 not implemented at the time of contract award. (B) The Contractor shall submit requests to vary from NIST SP 800-171 in writing to the Contracting Officer, for consideration by the DoD CIO. The Contractor need not implement any security requirement adjudicated by an authorized representative of the DoD CIO to be nonapplicable or to have an alternative, but equally effective, security measure that may be implemented in its place. If the DoD CIO has previously adjudicated the contractor’s requests indicating that a requirement is not applicable or that an alternative security measure is equally effective, a copy of that approval shall be provided to the Contracting Officer when requesting its recognition under this contract. (D) If the Contractor intends to use an external cloud service provider to store, process, or transmit any covered defense information in performance of this contract, the Contractor shall require and ensure that the cloud service provider meets security requirements equivalent to those established by the Government for the Federal Risk and Authorization Management Program (FedRAMP) Moderate baseline (https://www.fedramp.gov/resources/documents/) (https://www.fedramp.gov/documents-templates/) and that the cloud service provider complies with requirements in paragraphs through (g) of this clause for cyber incident reporting, malicious software, media preservation and protection, access to additional information and equipment necessary for
PAGE 3 OF 27 PAGES
SPE7M1-27-Q-0136
forensic analysis, and cyber incident damage assessment. (3) Apply other information systems security measures when the Contractor reasonably determines that information systems security measures, in addition to those identified in paragraphs (b)(1) and (2) of this clause, may be required to provide adequate security in a dynamic environment or to accommodate special circumstances (e.g., medical devices) and any individual, isolated, or temporary deficiencies based on an assessed risk or vulnerability. These measures may be addressed in a system security plan.
Cyber incident reporting requirement.
(1) When the Contractor discovers a cyber incident that affects a covered contractor information system or the covered defense information residing therein, or that affects the contractor’s ability to perform the requirements of the contract that are designated as operationally critical support and identified in the contract, the Contractor shall
(i) Conduct a review for evidence of compromise of covered defense information, including, but not limited to, identifying compromised computers, servers, specific data, and user accounts. This review shall also include analyzing covered contractor information system(s) that were part of the cyber incident, as well as other information systems on the Contractor’s network(s), that may have been accessed as a result of the incident in order to identify compromised covered defense information, or that affect the Contractor’s ability to provide operationally critical support; and
(ii) Rapidly report cyber incidents to DoD at https://dibnet.dod.mil.
(2) Cyber incident report. The cyber incident report shall be treated as information created by or for DoD and shall include, at a minimum, the required elements at https://dibnet.dod.mil.
(3) Medium assurance certificate requirement. In order to report cyber incidents in accordance with this clause, the Contractor or subcontractor shall have or acquire a DoD-approved medium assurance certificate to report cyber incidents. For information on obtaining a DoD-approved medium assurance certificate, see https://public.cyber.mil/ eca/.
(d) Malicious software. When the Contractor or subcontractors discover and isolate malicious software in connection with a reported cyber incident, submit the malicious software to DoD Cyber Crime Center (DC3) in accordance with instructions provided by DC3 or the Contracting Officer. Do not send the malicious software to the Contracting Officer.
Media preservation and protection. When a Contractor discovers a cyber incident has occurred, the Contractor shall preserve and protect images of all known affected information systems identified in paragraph (1)(i) of this clause and all relevant monitoring/packet capture data for at least 90 days from the submission of the cyber incident report to allow DoD to request the media or decline interest.
(f) Access to additional information or equipment necessary for forensic analysis. Upon request by DoD, the Contractor shall provide DoD with access to additional information equipment that is necessary to conduct a forensic analysis.
(g) Cyber incident damage assessment activities. If DoD elects to conduct a damage assessment, the Contracting Officer will request that the Contractor provide all of the damage assessment information gathered in accordance with paragraph of this clause.
(h) DoD safeguarding and use of contractor attributional/proprietary information. The Government shall protect against the unauthorized use or release of information obtained from the contractor (or derived from information obtained from the contractor) under this clause that includes contractor attributional/proprietary information, including such information submitted in accordance with paragraph . To the maximum extent practicable, the Contractor shall identify and mark attributional/proprietary information. In making an authorized release of such information, the Government will implement appropriate procedures to minimize the contractor attributional/proprietary information that is included in such authorized release, seeking to include only that information that is necessary for the authorized purpose(s) for which the information is being released.
(i) Use and release of contractor attributional/proprietary information not created by or for DoD. Information that is obtained from the contractor (or derived from information obtained from the contractor) under this clause that is not created by or for DoD is authorized to be released outside of DoD
(1) To entities with missions that may be affected by such information;
(2) To entities that may be called upon to assist in the diagnosis, detection, or mitigation of cyber incidents;
(3) To Government entities that conduct counterintelligence or law enforcement investigations;
(4) For national security purposes, including cyber situational awareness and defense purposes (including with Defense Industrial Base (DIB) participants in the program at 32 CFR part 236); or
(5) To a support services contractor (recipient) that is directly supporting Government activities under a contract that includes the clause at 252.204-7009, Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information.
(j) Use and release of contractor attributional/proprietary information created by or for DoD. Information that is obtained from the contractor (or derived from information obtained from the contractor) under this clause that is created by or for DoD (including the information submitted pursuant to paragraph of this clause) is authorized to be used and released outside of DoD for purposes and activities authorized by paragraph (i) of this clause, and for any other lawful Government purpose or activity, subject to all applicable statutory, regulatory, and policy based restrictions on the Government’s use and release of such information.
(k) The Contractor shall conduct activities under this clause in accordance with applicable laws and regulations on the interception, monitoring, access, use, and disclosure of electronic communications and data.
(l) Other safeguarding or reporting requirements. The safeguarding and cyber incident reporting required by this clause in no way abrogates the Contractor’s responsibility for other safeguarding or cyber incident reporting pertaining to its unclassified information systems as required by other applicable clauses of this contract, or as a result of other applicable U.S. Government statutory or regulatory requirements.
(m) Subcontracts. The Contractor shall
(1) Include this clause, including this paragraph (m), in subcontracts, or similar contractual instruments, for operationally critical support, or for which subcontract performance will involve covered defense information, including subcontracts for commercial products or commercial services, without alteration, except to identify the parties. The Contractor shall determine if the information required for subcontractor performance retains its identity as covered defense information and will require protection under this clause, and, if necessary, consult with the Contracting Officer; and
(2) Require subcontractors to
(i) Notify the prime Contractor (or next higher-tier subcontractor) when submitting a request to vary from a NIST SP 800-171 security requirement to the Contracting Officer, in accordance with paragraph (b)(2)(ii)(B) of this clause;
and
PAGE 4 OF 27 PAGES
SPE7M1-27-Q-0136
(ii) Provide the incident report number, automatically assigned by DoD, to the prime Contractor (or next higher-tier subcontractor) as soon as practicable, when reporting a cyber incident to DoD as required in paragraph of this clause.
-End of Clause
E06 Inspection and Acceptance at Source (JUN 2018) Inspection and acceptance are at source. The place of acceptance is the location where the Government conducts the last inspection before shipment, unless the contractor indicated a different physical location for acceptance below.
The contractor shall indicate the location where supplies will be inspected, if different from the production location:
Commercial and Government Entity (CAGE) code:
Address:
Applicable to contract line item numbers(s) (CLIN(s)):
The contractor shall indicate the location where packaging will be inspected, if different from the production location:
( ) Same as for supplies OR CAGE code:
Address:
Applicable to CLIN(s):
The contractor shall indicate the location where supplies will be accepted, if different from the inspection location:
Commercial and Government Entity (CAGE) code:
Address:
Applicable to contract line item numbers(s) (CLIN(s)):
EVALUATION FACTORS FOR AWARD
Award will be made to the offeror(s) whose quote(s) conforms to the solicitation requirements and represents the best value to the Government. Past performance, offered delivery, and price will be evaluated when making a comparative assessment of quotes. An award may be made to other than the lowest priced, technically acceptable, responsible offeror(s).
C20 Vendor Shipment Module (VSM) (JUN 2025)
DFARS 252.204-7016 Covered Defense Telecommunications Equipment or Services- Representation (DEC 2019) DFARS 252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services- Representation (MAY 2021) DFARS 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services (JAN 2023) 52.240-91 Security Prohibitions and Exclusions (FEB 2026)
E05 Product Verification Testing (MAY 2020)
(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.
(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing. The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.
(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor’s sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor’s signed DD Form 1222. The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, Product Verification Test Samples Do Not Post to Stock," Contract Number: contractor insert and Lot/Item Number: contractor insert adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD- 129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package:
(a) Hard copies of the contract;
(b) Material certifications/process operation sheets; and
(c) Drawings used to manufacture the units and return shipping information.
(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.
(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.
PAGE 5 OF 27 PAGES
SPE7M1-27-Q-0136
E08 First Article Testing Requirements (MAR 2025);
E09 Contractor First Article Test (FAT) Information (JUL 2022)
(1) For FAT requirements, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. Due to known systems limitations, solicitations may contain erroneous inspection, acceptance, and FOB points. This procurement note takes precedence over any conflicting terms.
(2) CONTRACTOR FAT DELIVERY SCHEDULE
(a) 160 Days: To Deliver FAT Report to the Government
(b) 30 Days: Government FAT Report Evaluation and Notification to Contractor
(c) 503 Days: To Deliver Final Production Quantity After Approval of FAT Report. If PLT applies, this line will be blank; the number of delivery days for final production quantity will appear in procurement note E03, Production Lot Testing - Contractor, or E04, Production Lot Testing - Government, as applicable
(d) 693 Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))
Delivery shall be offered in terms of a number of days after date of award. There will be no penalty for faster delivery and partial deliveries are acceptable at no additional cost to the government.
Expedited or Partial Shipments will be accepted as long as there is no additional charge to the Government.
FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015);
FAR 52.209-3 First Article Approval - Contractor Testing, ALT I
FAR 52.209-3 First Article Approval - Contractor Testing
(a) The Contractor shall test 2 unit(s) of Lot/Item 4320006799159 as specified in this contract. At least 14 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 160 calendar days from the date of this contract to:
DLA MARITIME - FMSE
ATTN: FAT Monitor P.O.Box 3990 Columbus, OH 43218-3990 Or email: maritime.fat.monitor@dla.mil
Marked FIRST ARTICLE TEST REPORT: Contract No. SEE AWARD, Lot/Item No. 4320006799159.
Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
FAR 52.222-37, Employment Reports on Veterans
This solicitation is issued under the First Destination Transportation (FDT) program to reduce the cost of transportation through the use of Government-arranged transportation utilizing Government contracts and rates. If this award is for FMS or has an APO/FPO ship-to address, these instructions do not apply.
For FDT Program Transportation Requirements, see Procurement Note C16 First Destination Transportation (FDT) Program, Government-Arranged Transportation for Manual Awards, C17 First Destination Transportation (FDT) Program Shipments Originating from Outside the Contiguous United States, and Procurement Note C20 Vendor Shipment Module (VSM).
FIRST ARTICLE TESTING - CONTRACTOR
UCF SECTION E WAWF Instructions for Test NSN/Material S00000053 CLIN:
Place the following information in WAWF as follows:
Inspection: Origin Ship To (Issuing Activity DoDAAC): SPE7M1 Ship To (Address):
DLA MARITIME - FMSE
ATTN: FAT Monitor P.O.Box 3990 Columbus, OH 43218-3990 Or email: maritime.fat.monitor@dla.mil (Issuing Activity DoDAAC): SPE7M1 FOB: Destination
PAGE 6 OF 27 PAGES
SPE7M1-27-Q-0136
THIS SOLICITATION INCORPORATES THE TERMS AND CONDITIONS SET FORTH IN THE REVISION OF THE DLA MASTER SOLICITATION FOR EPROCUREMENT AUTOMATED SIMPLIFIED ACQUISITIONS IN EFFECT ON THE SOLICITATION ISSUE DATE. ALL REVISIONS OF THE DLA MASTER SOLICITATION FOR EPROCUREMENT AUTOMATED SIMPLIFIED ACQUISITIONS CAN BE FOUND ON THE WEB AT: http://www.dla.mil/ HQ/Acquisition/Offers/eProcurement.aspx
NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM 333991 applies to this solicitation. See http://www.sba.gov/content/ table-small-business-size-standards for the corresponding small business size standard.
PRODUCTION FACILITY CHANGES
UCF SECTION F
UCF SECTION F PRODUCTION FACILITY CHANGES
(a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided:
(1) Performance by small business or in labor surplus areas as required by the contract will not be changed;
(2) The change will not cause a delay in delivery or necessitate a change in the purchase description;
(3) The free on board (f.o.b.) point is not changed; and
(4) Each request is supported by a price reduction of 250.00 to cover the Government administrative costs to process the change.
(b) The Government reserves the right to deny approval even if these four elements are met.
(End of Text)
PAGE 7 OF 27 PAGES
SPE7M1-27-Q-0136
SECTION B
SUPPLIES/SERVICES: 4320-00-679-9159
ITEM DESCRIPTION:
PUMP, ROTARY.
RD005: Cybersecurity Maturity Model Certification (CMMC) Level 2 Certified Third-Party Assessment Organization (C3PAO)
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE
SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE
ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE
APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON
REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RD002, COVERED DEFENSE INFORMATION APPLIES
RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ016: COMPONENT QUALIFIED PRODUCTS LISTS (QPL)/QUALIFIED MANUFACTURERS
LISTS (QML). THIS ITEM CONTAINS ONE OR MORE COMPONENTS DEFINED BY A
SPECIFICATION(S) WITH AN ASSOCIATED QUALIFIED PRODUCTS LIST (QPL) OR
QUALIFIED MANUFACTURERS LIST (QML). QUALIFICATION REQUIREMENTS IN
PROCUREMENT NOTE H02 "COMPONENT QUALIFIED PRODUCTS LIST (QPL)/QUALIFIED
MANUFACTURERS LIST (QML)" APPLY.
RQ032: EXPORT CONTROL OF TECHNICAL DATA
This item has technical data some or all of which is subject to export-control of either the International Traffic in Arms regulations (ITAR) or the Export Administration Regulations (EAR), and cannot be exported without prior authorization from either the Department of State or the Department of Commerce. Export includes disclosure of technical data to foreign persons and nationals whether located in the United States or abroad. This requirement applies equally to foreign national employees and U.S. companies and their foreign subsidiaries. DFARS 252.225-7048 is applicable to this data.
The Defense Logistics Agency (DLA) limits distribution of export-control technical data to DLA contractors that have an approved US/Canada Joint Certification Program (JCP) certification, have completed the Introduction to Proper Handling of DOD Export-Controlled Technical Data Training and the DLA Export-Controlled Technical Data Questionnaire (both are available at the web address given below), and have been approved by the DLA controlling authority to access the export-controlled data. Instructions for obtaining access to the export-controlled data can be found at:
https://www.dla.mil/Logistics-Operations/Enhanced-Validation/
To be eligible for award, offerors and any sources of supply proposed for use are required to have an approved JCP certification and have been approved by the DLA controlling authority to access export-controlled data managed by DLA. DLA will not delay award in order for an offeror or its supplier to apply for and receive approval by the DLA controlling authority to access the export-controlled data.
RQ042: Non-Tailored Higher-Level Quality Requirements (ISO 9001:2015)
PAGE 8 OF 27 PAGES
SPE7M1-27-Q-0136
SECTION B
SUPPLY/SERVICE: 4320-00-679-9159 CONT'D
for Manufacturers and Non-Manufacturers
Casting/forging may be required to manufacture this NSN and tooling is typically involved. The government may not have this special tooling.
For sourcing, tooling, materials or other information, please submit a Casting and Forging Assistance Request at either https://www.dla.mil/Aviation/Offers/Engineering/Forging-and-Casting/ or Land & Maritime Supply Chains DSCC.cast.forge@dla.mil.
FULL AND OPEN COMPETITION APPLY
PROCESS PROCEDURES AND OR WORKMANSHIP
SPECIMENS REQUIRED BY MILITARY SPECIFICATION (S)
APPLICABLE TO THIS CONTRACT WILL BE APPROVED
BY THE ACTIVITY RESPONSIBLE FOR THE
ADMINISTRATION OF THE CONTRACT. POSTAWARD
PREPRODUCTION APPROVAL VERIFYING THE
REQUIREMENTS OF MIL-DTL-16232 IS REQUIRED.
NOTICE TO BUYER: INCLUDE DPACS CLAUSE
I09D07-DELEGATION OF AUTHORITY FOR FIRST ARTICLE
APPROVAL (DSCC 52.209-9C12) ON AWARDS FOR THIS
NSN TO ANY VENDOR THAT WILL BE REQUIRED TO PERFORM
CONTRACTOR FIRST ARTICLE TESTING.
"REFERENCE MATERIAL-INCLUDES HANDBOOKS,
MANUALS, PRICE LISTS, REGISTRIES, DIRECTORIES,
BOOKS, ETC."
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPECIFICATION REQUIREMENTS.
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
EXCEPTION TO TOP DRWG: NOTE 11 SHOULD READ "...QAR 10861448"
TDP Rev A Gen 1
IAW BASIC DRAWING NR 19207 10861448
REVISION NR P DTD 01/01/1999
PART PIECE NUMBER:
TDP Rev A Gen 1
IAW REFERENCE DRAWING NR 19207 10927467
REVISION NR B DTD 04/26/1964
PART PIECE NUMBER:
TDP Rev A Gen 1
IAW REFERENCE QAP 19207 10861448
REVISION NR M DTD 04/03/1996
PART PIECE NUMBER:
TDP Rev A Gen 1
IAW REFERENCE DRAWING NR 19207 10861448
PAGE 9 OF 27 PAGES
SPE7M1-27-Q-0136
SECTION B
SUPPLY/SERVICE: 4320-00-679-9159 CONT'D
REVISION NR DTD 07/22/2025
PART PIECE NUMBER:
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 4320-00-679-9159 558.000 EA $ ________________ $ ________________
PUMP,ROTARY
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
FOB: ORIGIN DELIVERY DATE: 100 DAYS ADO
PREP FOR DELIVERY:
PKGING DATA-QUP:001
WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951.
Mark and label all packaging and packing in accordance with MIL-STD-129.
The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order.
PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING
REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE C20 AND
CONTRACT
FREIGHT SHIPPING ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
Contractor First Article Test Contractor First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-3 for the actual quantity required to be tested.
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the
PAGE 10 OF 27 PAGES
SPE7M1-27-Q-0136
SECTION B
SUPPLY/SERVICE: 0001-S00000053 CONT'D
corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0002 0001 - S00000053 1.000 EA $ ________________ $ ________________
FOB: DELIVERY DATE: 100 DAYS ADO
PREP FOR DELIVERY:
Not Applicable
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 7017696845 0001 N/A N/A N/A 05/23/2028
0002 N/A N/A N/A N/A N/A N/A
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 27 PAGES
SPE7M1-27-Q-0136
SECTION C - SPECIFICATIONS/SOW/SOO/ORD
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (JUN 2023)
SECTION E - INSPECTION AND ACCEPTANCE
E08 FIRST ARTICLE TESTING REQUIREMENTS (MAR 2025)
(1) If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all costs and risk associated with completion of the FAT requirement in the production CLIN price.
(2) If there is a separate FAT CLIN, the offeror shall include all costs and risk associated with completion of the FAT requirement in the FAT CLIN price.
The unit of issue for the FAT CLIN, EACH, is equal to one First Article Test (1EA=1FAT). To receive payment for any costs associated with FAT, the offeror shall propose costs associated with FAT on a separate CLIN. The offeror shall base the production CLIN price solely on all costs associated with completion of the production units and shall exclude all FAT-related costs.
(3) The contracting officer will use the total award price in selecting the best value offer from among all eligible offerors. However, for an offeror to be eligible for award, the contracting officer must determine that the FAT CLIN price (unless FAT is waived) and the production CLIN price are fair and reasonable; and, if set-aside under FAR Part 19, a fair market price. The offeror shall not propose a FAT CLIN price that is materially unbalanced in relation to the production CLIN price. In the event an offeror receives a waiver of the FAT requirement, the contracting officer will deduct the FAT CLIN price for the waived source in determining the total award price.
(4)(a) Notwithstanding the conditions for waiving first article, the contracting officer may order an additional first article sample, or portion thereof, in writing if there is a --
(i) Major change to the technical data;
(ii) Lapse in production for a period in excess of 90 days; or
(iii) Change in the place of performance (manufacturing facility), manufacturing process,material used, drawing, specification or source of supply.
(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the contractor shall notify the contracting officer; who will determine whether to order an additional first article sample or portion thereof and provide instructions concerning the submission, inspection, and notification of results. The contractor shall bear the costs of the additional first article testing resulting from any of the causes in paragraphs (4)(a)(i)-(iii) instituted by the contractor and not due to changes directed by the Government.
(5) Waivers. The offeror may submit a request for FAT waiver to the contracting officer, who may waive the FAT requirement when all of the following criteria apply:
(a) The offeror requesting waiver has successfully manufactured, delivered and the government accepted the item or a similar item. The offeror shall provide the following information and be prepared to provide documentary evidence upon the contracting officer's request:
(i) Contract number(s), date(s), and issuing Government agency or agencies.
(ii) Description of item previously furnished, identified by part number, type, model number and/or other identifying information. If the item previously furnished is similar but not identical to the item being acquired under the current buy, the offeror shall explain why manufacture of the item previously furnished is sufficient to demonstrate its ability to manufacture the item being acquired under the current buy without need for a first article test.
(iii) Engineering control document/change number of item previously furnished.
(b) There have been no changes to manufacturing processes, tooling, or place of performance.
(c) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements; or subcontractors used to manufacture the items successfully in the past).
(d) The offeror shall supply an item of the same design and manufactured by the same method at the same facilities as the item or similar item previously furnished and accepted under subparagraph (5)(a).
(6) Contractor-Performed FAT.
(a) The contractor shall test the quantities as outlined in paragraph (a) of FAR clause 52.209-3 as specified in the contract. The contractor shall submit reports in accordance with paragraph (b) of FAR clause 52.209-3, as supplemented in this procurement note.
(b] For test report preparation and delivery of contractor FAT, the contractor shall --
(i) Use the data item description DI-NDTI-80809B report format.
(ii)] Mark the test report with the following: “First article test report - Contract number:[ ] and lot/item number: [ ].
(iii) Sign the FAT Report, accompanied by the system of record receiving report (i.e, WAWF or] DD Form 250) and contractor confirmation that the same process and facilities used to manufacture the first article units will be used to manufacture the production units, to the contracting officer at the applicable address shown below:
(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing and Textile (C&T), Medical Materiel, or Subsistence, submit the report to the procuring activity in Block 6 of the DD Form 1155, Block 7 of Standard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.
(B) For awards issued by DLA Land (SPE7L), submit the report to the following address:
DLA Land - FLSEB ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-399, or email to: Land.FAT.Monitor@dla.mil.
(C) For awards issued by DLA Maritime (SPE7M), submit the report to the following address:
DLA Maritime - FMSE ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 27 PAGES
SPE7M1-27-Q-0136
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
(D) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email the report to Construction and Equipment FAT Monitor at trpsptcandefatmonitor@dla.mil. If report exceeds email limitations, submit the report to the following address:
DLA Troop Support ATTN: First Article Testing Monitor Building 3, 700 Robbins Avenue Philadelphia, Pennsylvania 19111.
Preferred electronic submissions: Hardware FAT Monitor at DLAHardwareFATMonitor@dla.mil.
(7) The contractor shall --
(a) Provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3;
(b) Maintain and make available all records evidencing those details at the Government's request.
(c) At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to shipment to the Government, provide written notice to the contracting officer and to the cognizant DCMA Functional Specialist when full administration or Quality Support administration is delegated to DCMA.
(8) Government-performed FAT. The contractor shall --
(a) For delivery of separately priced Government first article samples for Government performed FAT ship the units and system of record receiving report (i.
e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of FAR clause 52.209-4.
(b) For delivery of Government first article samples that are not separately priced, ship the units with a commercial shipping document to the test facility.
(c) Prepare the shipping container(s) by marking the external packages in bold letters, “First Article Exhibits - Do Not Post to Stock," adjacent to the MIL- STD-129 (latest revision) identification markings.
(d) Use a hard copy of the system of record receiving report (i.e., WAWF DD Form 250), or commercial shipping document as a packing list, in accordance with DFARS Appendix F.
(e) Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11.
(f) In the interior package, include hard copies of the contract, test reports, material certifications/process operation sheets, drawings used to manufacture the units, and a pre-paid return label or shipping account for payment.
(g) Send units by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express).
(h) Send an email with subject titled “Notification of Test Exhibits [ ]” to the corresponding address in (i) or (ii) below and to the contracting officer specified in the contract. In the email, provide the shipment date, contract/purchase order number, National Stock Number, means of transportation, tracking number, and summary of container contents. Attach a copy of the system of record receiving report (i.e., WAWF or DD Form 250) documenting the Government has performed the contract quality assurance within the system or record.
(i) DLA Land & Maritime - DSCCProdVerif@dla.mil
(ii) DLA Aviation - DSCR.Test & EvaluationOffice@dla.mil
(9) At its discretion, the Government may return FAT units to the contractor at no cost to the Government. The contractor shall submit the return address and pre-paid return label or shipping account for payment.
(10) If the Government disapproves or conditionally approves Government-performed FAT units, the Government will take action in accordance with FAR 52.209-4.
E01 SUPPLEMENTAL FIRST ARTICLE EXHIBIT DISPOSITION – CONTRACTOR MAINTAINED (MAY 2020)
E09 CONTRACTOR FIRST ARTICLE TEST (FAT) INFORMATION (JUL 2022)
(1) For FAT requirements, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. Due to known systems limitations, solicitations may contain erroneous inspection, acceptance, and FOB points. This procurement note takes precedence over any conflicting terms.
(2) CONTRACTOR FAT DELIVERY SCHEDULE
(a) Days: To Deliver FAT Report to the Government
(b) Days: Government FAT Report Evaluation and Notification to Contractor
(c) Days: To Deliver Final Production Quantity After Approval of FAT Report. If PLT applies, this line will be blank; the number of delivery days for final production quantity will appear in procurement note E03, Production Lot Testing - Contractor, or E04, Production Lot Testing - Government, as applicable
(d) Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))
52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
E06 INSPECTION AND ACCEPTANCE AT SOURCE (JUN 2018)
Inspection and acceptance are at source. The place of acceptance is the location where the Government conducts the last inspection before shipment, unless the contractor indicated a different physical location for acceptance below.
The contractor shall indicate the location where supplies will be inspected, if different from the production location:
Commercial and Government Entity (CAGE) code:
Address:
Applicable to contract line item numbers(s) (CLIN(s)):
The contractor shall indicate the location where packaging will be inspected, if different from the production location:
[ ] Same as for supplies OR CAGE code:
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 27 PAGES
SPE7M1-27-Q-0136
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
Address:
Applicable to CLIN(s):
The contractor shall indicate the location where supplies will be accepted, if different from the inspection location:
Commercial and Government Entity (CAGE) code:
Address:
Applicable to contract line item numbers(s) (CLIN(s)):
SECTION F - DELIVERIES OR PERFORMANCE
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
SECTION G - CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (PRE-FILLED) (JAN 2023) DFARS As prescribed in 232.7004 (b), use the following clause:
(a) Definitions. As used in this clause - Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely…