SPE7L727Q0231.pdf

PDF 150 KB Posted

Attached to
RETICLE, OPTICAL INSTR AND 1 MORE ITEM
Solicitation number
SPE7L727Q0231
Issued by

About this file

This is a Request for Quotations (RFQ) issued by the Defense Logistics Agency (DLA) Land Supplier Operations for the procurement of optical reticles. The solicitation number is SPE7L7-27-Q-0231, issued on November 23, 2026, with quotations due by December 4, 2026. The contract is not a small business set-aside. The primary supply item is NSN 6650-01-714-8642 (Reticle, Optical Instrument), with a quantity of 24 units required. A second line item (0002) covers Production Lot Testing (Contractor) at 1 unit. Delivery is specified at 105 days after date of award for the main item and 50 days after award for the testing line item, with FOB origin and inspection/acceptance at origin. Pricing terms are firm fixed price with no quantity variance allowed.

The solicitation incorporates extensive quality assurance requirements including Initial Product Inspection (IPI), Production Lot Acceptance Testing (PLT) by contractor, and multiple technical data package references and drawings. Surface quality standards per MIL-PRF-13830B are required, with government-furnished property provided on loan to the contractor. The item is identified as a critical application item subject to export control under ITAR and EAR regulations; offerors must have approved JCP certification and DLA approval to access export-controlled data. Additional requirements include CMMC Level 2 certification, compliance with various DFARS clauses, packaging per MIL-STD-2073-1E and special instruction AM11785525, and delivery to DLA Distribution New Cumberland Facility. The contracting officer is Tiffany Merritt (PLCL61G), located at DLA Weapons Support in Columbus, Ohio.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

4. CERT.FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5. ISSUED BY

7. DELIVERY

9. DESTINATION

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5 ON OR

BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (See Continuation Sheets)

12. DISCOUNT FOR PROMPT PAYMENT

d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

14. SIGNATURE OF PERSON AUTHORIZED TO SIGN

QUOTATION

16. SIGNER

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not useable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

SPE7L7-27-Q-0231

1. REQUEST NO.

2026 NOV 23

2. DATE ISSUED

7018665365

3. REQUISITION/PURCHASE REQUEST NO.

DO-C9

RATING

DLA WEAPONS SUPPORT

LAND SUPPLIER OPNS BATTERIES/TIRES

P O BOX 3990

COLUMBUS OH 43218-3990

USA

Buyer: Tiffany Merritt PLCL61G Tel: 614 693 2846 Email: TIFFANY.MERRITT@DLA.MIL

SEE SCHEDULE

6. DELIVER BY (Date)

8. TO:

c. CITY

d. STATE

b. STREET ADDRESS

a. NAME OF CONSIGNEE

e. ZIP CODE

a. 10 CALENDAR DAYS

b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS

15. DATE OF QUOTATION

a. NAME (Type or Print)

AREA CODE

c. TITLE (Type or Print)d. CITY

c. COUNTY

b. STREET ADDRESS

e. STATE f. ZIP CODE

See Schedule

2026 DEC 04

NUMBER

FOB DESTINATION

OTHER

(See Schedule)

CAGE

b. TELEPHONE

See attached schedule to complete quote information.

Quoter must also complete the following:

a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .

b. Prices quoted are:

___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .

___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.

___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;

___ Customer ________________________.

___ Other (provide basis) ______________________________________ _______________________________________ .

c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .

d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.

e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:

f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 2 OF 30 PAGES

SPE7L7-27-Q-0231

EVALUATION FACTORS FOR AWARD

Award will be made to the offeror(s) whose quote(s) conforms to the solicitation requirements and represents the best value to the Government. Past performance, offered delivery, and price will be evaluated when making a comparative assessment of quotes. An award may be made to other than the lowest priced, technically acceptable, responsible offeror(s).

CPLT

# of days after date of award, PLT report is due: 50 days # of days after receipt of PLT report, Government review is completed: 30 days # of days after approval of PLT report, production is due: 25 days Total # of days: 105 days Units Tested 10 Disposition of test units: Accepted test units will be included in the contract delivery quantity DCMA Delegation: Y

CPLT Test Location:

DLA Land – FLSEB Attn: FAT Monitor PO BOX 3990, Columbus, Ohio 43218-3990 Email: Land.FAT.Monitor@DLA.mil

DODAAC: SPE7L1

Delivery shall be offered in terms of a number of days after date of award. There will be no penalty for faster delivery and partial deliveries are acceptable at no additional cost to the government.

Expedited or Partial Shipments will be accepted as long as there is no additional charge to the Government.

This solicitation is issued under the First Destination Transportation (FDT) program to reduce the cost of transportation through the use of Government-arranged transportation utilizing Government contracts and rates. If this award is for FMS or has an APO/FPO ship-to address, these instructions do not apply.

For FDT Program Transportation Requirements, see Procurement Note C16 First Destination Transportation (FDT) Program, Government-Arranged Transportation for Manual Awards, C17 First Destination Transportation (FDT) Program Shipments Originating from Outside the Contiguous United States, and Procurement Note C20 Vendor Shipment Module (VSM).

THIS SOLICITATION INCORPORATES THE TERMS AND CONDITIONS SET FORTH IN THE REVISION OF THE DLA MASTER SOLICITATION FOR EPROCUREMENT AUTOMATED SIMPLIFIED ACQUISITIONS IN EFFECT ON THE SOLICITATION ISSUE DATE. ALL REVISIONS OF THE DLA MASTER SOLICITATION FOR EPROCUREMENT AUTOMATED SIMPLIFIED ACQUISITIONS CAN BE FOUND ON THE WEB AT: http://www.dla.mil/ HQ/Acquisition/Offers/eProcurement.aspx

NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM 333310 applies to this solicitation. See http://www.sba.gov/content/ table-small-business-size-standards for the corresponding small business size standard.

PRODUCTION FACILITY CHANGES

UCF SECTION F

UCF SECTION F PRODUCTION FACILITY CHANGES

(a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided:

(1) Performance by small business or in labor surplus areas as required by the contract will not be changed;

(2) The change will not cause a delay in delivery or necessitate a change in the purchase description;

(3) The free on board (f.o.b.) point is not changed; and

(4) Each request is supported by a price reduction of 250.00 to cover the Government administrative costs to process the change.

(b) The Government reserves the right to deny approval even if these four elements are met.

(End of Text)

CPLT

# of days after date of award, PLT report is due: 50 days # of days after receipt of PLT report, Government review is completed: 30 days # of days after approval of PLT report, production is due: 25 days Total # of days: 105 days Units Tested 10 Disposition of test units ?

DCMA Delegation: Y

CPLT Test Location:

DLA Land – FLSEB Attn: FAT Monitor PO BOX 3990, Columbus, Ohio 43218-3990 Email: Land.FAT.Monitor@DLA.mil

DODAAC: SPE7L1

PAGE 3 OF 30 PAGES

SPE7L7-27-Q-0231

PAGE 4 OF 30 PAGES

SPE7L7-27-Q-0231

SECTION B

SUPPLIES/SERVICES: 6650-01-714-8642

ITEM DESCRIPTION:

RETICLE,OPTICAL INS

RD005: Cybersecurity Maturity Model Certification (CMMC) Level 2 Certified Third-Party Assessment Organization (C3PAO)

CONTRACT ADDENDUM

QUALITY ASSURANCE REQUIREMENTS

FCDD-ACE-QP 367 REQ Selection #1

INSPECTION AND ACCEPTANCE POINTS: ORIGIN

The Government's inspection of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility, or subcontractor's facility, where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: ORIGIN

a. NAME

b. CAGE

c. ADDRESS, CITY, STATE, ZIP

ACCEPTANCE POINT: ORIGIN

a. NAME

b. CAGE

c. ADDRESS, CITY, STATE, ZIP

FCDD-ACE-QP 367 REQ Selection #15

SURFACE QUALITY STANDARDS

a. Surface quality standards for optical elements (Scratch and Dig) per MIL-PRF-13830B, are required to perform acceptance inspection under this contract and are available as listed:

DRAWING: 7641866

REVISION: Any Rev – N thru U

QUANTITY: 01

COST ESTIMATE: $2000

EST WT: 5lbs.

The standards will be furnished to the Contractor on a loan basis for use on this contract. The standards shall not be used on other contracts unless written authorization is received from the Contracting Officer.

The Administering Contracting Officer (ACO) designated by the agency administering the contract, or the Contracting Officer (CO) if an ACO was not assigned shall submit the Contractor's request for equipment to US ARMY - FCDD-ACE-QEC, BLDG 92, Picatinny Arsenal, NJ 07806-5000.

Shipping costs shall be borne by the shipper.

Contact DLA GFP Office @ GFP dla.landandmaritime.gfpmanager@dla.mil

b. The contractor shall hereby indicate the facility to which this Government Furnished Property should be shipped:

c. Upon receipt, the Contractor should retain shipping containers for return of the standards. All costs of packing, packaging, shipping, and insurance shall be borne by the Contractor.

d. The Contractor shall be responsible for shipping the surface quality standards to the Government for certification at 12 month intervals.

Notification and shipping instructions shall be provided to the Contractor by US ARMY - FCDD-ACE-QEC, BLDG 92, Picatinny Arsenal, NJ 07806-5000. The notification shall include the standard's serial number and will be sent 30 days prior to the actual due date for certification.

e. Within 30 calendar days after completion of delivery of all items on this contract requiring scratch and digs, the Contractor shall assure that the Government owned standards referenced in paragraph a above are in the same condition as when received. Upon verification by a Government representative that the standards are undamaged. The Contractor shall prepare the standards for delivery in accordance with

PAGE 5 OF 30 PAGES

SPE7L7-27-Q-0231

SECTION B

SUPPLY/SERVICE: 6650-01-714-8642 CONT'D

best commercial practices. The Contractor shall ship the standards with a DD Form 1149 to US ARMY - FCDD-ACE-QEC, BLDG 92, Picatinny Arsenal, NJ 07806-5000.

FCDD-ACE-QP 367 REQ Selection #25

INITIAL PRODUCT INSPECTION (IPI),,,,,,,,,,,,

a. The Contractor shall perform an Initial Production Inspection, consisting of first piece inspection of the first 10 units selected from the initial production lot by the DCMA Quality Assurance Representative (QAR). The Contractor shall notify the Contracting Officer and the QAR at least 15 days in advance of conducting any IPI as described in this provision, in order to ensure the QAR witnesses the inspection. The Contractor shall inspect and document all dimensions with actual measurements. If the Contractor takes metric measurements, the Contractor shall provide standard measurements as well, and the QAR will verify both types. The Contractor shall also provide all certifications of materials and processes that are necessary to verify compliance of the tested units to drawing requirements. The Contractor shall review all IPI data with the QAR, and the QAR will then either approve or reject the IPI results by written notification to the Contractor, and concurrently provide a copy of the notification to both the Contracting Officer and his or her quality assurance point of contact. The written notification will include the Contractor’s name, the contract number, the tested item’s NSN(s) and part number(s), and, the item’s serial number(s)(if applicable). If the IPI is rejected, the Contractor shall repeat the inspection, or those portions of it specified by the QAR, until IPI is successfully completed.

b. The Contractor shall not proceed into full production until the QAR has approved IPI, and the Contracting Officer has been so notified.

The Contractor shall immediately inform the Contracting Officer, QAR, and quality assurance point of contact if any changes to production processes or suppliers are made subsequent to IPI. The Contractor shall maintain a copy of all IPI data for 3 years following the inspection, unless the parties otherwise agree. The Contracting Officer reserves the right to order an additional IPI whenever a post-IPI change by the Contractor, such as tooling, ECPs, or the incorporation of new vendor parts, might affect the item’s quality. For any such additional IPI ordered, the Contractor shall provide serial numbers (if applicable) for all items fabricated after the new process or new supplier was initiated. If serial numbers are not applicable, then, in order to identify the affected units, the Contractor shall document the date the new process began. The approval process for additional inspections shall be the same as approval for the initial IPI.

QA POC: Sean Jamieson Email: sean.e.jamieson.civ@army.mil Telephone: (520) 714-2549

FCDD-ACE-QP 367 REQ Selection #26

PRODUCTION LOT ACCEPTANCE TESTING (“E03” CONTRACTOR OR “E04” GOVERNMENT

FACILITY)

E03 Production Lot Testing – Contractor (MAY 2020)

(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. The contractor shall complete PLT on the production lot(s) after first article approval, if the contract requires first article testing. The contractor shall price the PLT CLIN to cover the cost of the final test report and any approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. The unit of issue for the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).

(2) For purposes of facilitating PLT, the engineering support activity and/or testing facility has authority to communicate and discuss clarifications directly with contractors. If the Government and/or the contractor identify changes to contract requirements, the contractor shall contact the post award contracting officer or contract administrator (see the “Issued By” blocks on the contract award or order) for written approval. The contractor shall not act on any revisions or other changes until the contracting officer issues a written modification approving the proposed revision(s)/change(s).

(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3, and maintain and make available all records evidencing those details if requested by the Government. At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to conducting the

PAGE 6 OF 30 PAGES

SPE7L7-27-Q-0231

SECTION B

SUPPLY/SERVICE: 6650-01-714-8642 CONT'D

production lot test, the contractor shall provide written notice of the time and location of the test to the contracting officer and the cognizant DCMA functional specialist when full administration or quality support administration is delegated to DCMA, so the Government may witness sample selection and the test.

(4) Unless otherwise stated, the contractor shall select [contracting officer shall insert number of samples identified in material master] samples at random from the production lot(s) produced. If the quantity stated in the previous sentence equals “ZZ,” the contractor shall use the appropriate sample size identified in the technical data package or applicable sample plan provided by the Government. If the contractor cannot determine the sample quantity, the contractor shall obtain written confirmation of the sample size from the contracting officer.

(5) The contractor shall perform all tests on the PLT samples needed to verify/validate the items meet the contract technical/quality requirements.

(6) If a PLT sample fails, the entire production lot from which the contractor took the sample fails. The contractor shall notify the contracting officer and propose corrective action, if appropriate.

(7) The contractor shall prepare and disseminate the PLT report and applicable traceability documentation as follows:

(a) Prepare the test report in accordance with data item description DI-NDTI-80809B, and mark the test report, “Production Lot Test Report, Contract Number [contractor insert] and Lot/Item Number [contractor insert].”

(b) Present the PLT report to the contracting officer for review.

(c) Include the following documentation with all shipments of PLT Reports:

(i) DD Form 1222 and system of record receiving report (i.e., WAWF or DD Form 250);

(ii) Copy of the contract/order;

(iii) Copy of all applicable test reports, showing actual results and tolerances specified in the technical data package;

(iv) Material and process certifications;

(v) Process operations and inspection method sheets;

(vi) Copies of drawings used to manufacture the PLT sample, with proper marking to restrict public disclosure (if desired) and from Government use other than for evaluation to the extent consistent with the Government’s data rights under the contract; and

(vii) Documents required under a contract deliverables requirements list, if applicable.

(d) Submit all required documentation to the Government activity specified in the contract in time to allow for at least [contracting officer shall insert number of days as shown in material master] calendar days for review of the PLT report, and for the contracting officer to provide written notification of approval/disapproval to the contractor.

(e) For PLT, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination.

(f) Delivery.

(i) Ship test report to [contracting officer insert address of the Government activity to receive the report].

(ii) Delivery Schedule Information:

(A) _____ Total Delivery Days for FAT (If Applicable)

(B) _____ Days: Completion of Production Units (to include PLT samples), PLT, and Submission of PLT Report

(C) _____ Days: Government PLT Report Evaluation and Notification to Contractor

(D) _____ Days: Delivery of final production quantity to Government

(E) _____ Total Delivery Days (Sum of paragraphs (ii)(A) through (D)) above

RQ032: EXPORT CONTROL OF TECHNICAL DATA

This item has technical data some or all of which is subject to export-control of either the International Traffic in Arms regulations (ITAR) or the Export Administration Regulations (EAR), and cannot be exported without prior authorization from either the Department of State or the Department of Commerce. Export includes disclosure of technical data to foreign persons and nationals whether located in the United States or abroad. This requirement applies equally to foreign national employees and U.S. companies and their foreign subsidiaries. DFARS 252.225-7048 is applicable to this data.

PAGE 7 OF 30 PAGES

SPE7L7-27-Q-0231

SUPPLY/SERVICE: 6650-01-714-8642 CONT'D

The Defense Logistics Agency (DLA) limits distribution of export-control technical data to DLA contractors that have an approved US/Canada Joint Certification Program (JCP) certification, have completed the Introduction to Proper Handling of DOD Export-Controlled Technical Data Training and the DLA Export-Controlled Technical Data Questionnaire (both are available at the web address given below), and have been approved by the DLA controlling authority to access the export-controlled data. Instructions for obtaining access to the export-controlled data can be found at:

https://www.dla.mil/Logistics-Operations/Enhanced-Validation/

To be eligible for award, offerors and any sources of supply proposed for use are required to have an approved JCP certification and have been approved by the DLA controlling authority to access export-controlled data managed by DLA. DLA will not delay award in order for an offeror or its supplier to apply for and receive approval by the DLA controlling authority to access the export-controlled data.

RD002, COVERED DEFENSE INFORMATION APPLIES

RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS

(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE

DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB

AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx

FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE

SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE

ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE

APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON

REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT

RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES

RQ016: COMPONENT QUALIFIED PRODUCTS LISTS (QPL)/QUALIFIED MANUFACTURERS

LISTS (QML). THIS ITEM CONTAINS ONE OR MORE COMPONENTS DEFINED BY A

SPECIFICATION(S) WITH AN ASSOCIATED QUALIFIED PRODUCTS LIST (QPL) OR

QUALIFIED MANUFACTURERS LIST (QML). QUALIFICATION REQUIREMENTS IN

PROCUREMENT NOTE H02 "COMPONENT QUALIFIED PRODUCTS LIST (QPL)/QUALIFIED

MANUFACTURERS LIST (QML)" APPLY.

RQ001: TAILORED HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS

(MANUFACTURERS AND NON-MANUFACTURERS)

RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN

RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL

REQUEST FOR VARIANCE (DEVIATION OR WAIVER)

RQ017: PHYSICAL IDENTIFICATION/BARE ITEM MARKING

SAMPLING:

THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ

PAGE 8 OF 30 PAGES

SPE7L7-27-Q-0231

SECTION B

SUPPLY/SERVICE: 6650-01-714-8642 CONT'D

H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE

SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,

STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR

AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF

VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED

ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE

SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER

MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR

PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT

SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT

UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.

SUPPLEMENTARY QUALITY ASSURANCE PROVISIONS

(SQAP) OR QUALITY ASSURANCE PROVISIONS (QAP)

CRITICAL APPLICATION ITEM

TDP Rev B Gen 2

IAW BASIC DRAWING NR 19200 11785525

REVISION NR L DTD 05/08/2024

PART PIECE NUMBER: 11785525-4

TDP Rev B Gen 2

IAW REFERENCE QAP 19200 11785525

REVISION NR B DTD 05/30/2007

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 19200 7680606

REVISION NR AB DTD 04/19/2017

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 19200 12579607

REVISION NR E DTD 02/18/2026

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 19200 7641866

REVISION NR V DTD 04/19/2017

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 19200 11785525

REVISION NR A DTD 07/15/2025

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR MIL-DTL-53039

REVISION NR F DTD 09/06/2022

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 19200 11785525-4

REVISION NR DTD 07/02/2025

PART PIECE NUMBER:

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.

https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0001 6650-01-714-8642 24.000 EA $ ________________ $ ________________

RETICLE,OPTICAL

INSTRUMENT

PAGE 9 OF 30 PAGES

SPE7L7-27-Q-0231

SECTION B

SUPPLY/SERVICE: 6650-01-714-8642 CONT'D

PRICING TERMS: Firm Fixed Price

QTY VARIANCE: PLUS 0% MINUS 0%

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: ORIGIN DELIVERY DATE: 105 DAYS ADO

PREP FOR DELIVERY:

PKGING DATA - MIL-STD-2073-1E

QUP:001 PRES MTHD:ZZ CLNG/DRY:Z PRESV MAT:ZZ

WRAP MAT:ZZ CUSH/DUNN MAT:ZZ CUSH/DUNN THKNESS:Z

UNIT CONT:ZZ OPI:A

INTRMDTE CONT:ZZ INTRMDTE CONT QTY:ZZZ

PACK CODE:U

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE:ZZ -ZZ Special Requirements

PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING

REQUIREMENTS FOR PROCUREMENT

PRESERVATION, PACKAGING, AND PACKING SHALL BE IN

ACCORDANCE WITH SPECIAL PACKAGING INSTRUCTION

(SPI) AM11785525, REVISION A, DATED 07/15/2025

PARCEL POST ADDRESS:

W25G1U

W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2083 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND PA 17070-5002

US

FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE C20 AND

CONTRACT

FREIGHT SHIPPING ADDRESS:

W25G1U

W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2083 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND PA 17070-5002

US

Production Lot Testing (Contractor)

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.

https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0002 0001 - S00000062 1.000 EA $ ________________ $ ________________

PRICING TERMS: Firm Fixed Price

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

PAGE 10 OF 30 PAGES

SPE7L7-27-Q-0231

SUPPLY/SERVICE: 0001-S00000062 CONT'D

FOB: ORIGIN DELIVERY DATE: 50 DAYS ADO

PREP FOR DELIVERY:

Not Applicable

GOVT USE

External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .

0001 7018665365 0001 N/A N/A N/A 10/31/2027

0002 N/A N/A N/A N/A N/A N/A

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 30 PAGES

SPE7L7-27-Q-0231

SECTION C - SPECIFICATIONS/SOW/SOO/ORD

C04 UNUSED FORMER GOVERNMENT SURPLUS PROPERTY (SEP 2021)

To be considered for award, the offeror must complete and submit the following representation with their offer. Additional supporting documentation to demonstrate the surplus material offered was previously owned by the Government and meets solicitation requirements must be provided within 24 hours of request by the contracting officer.

(1) The material is new, unused, and not of such age or so deteriorated as to impair its usefulness or safety. Yes [ ] No [ ] The material conforms to the technical requirements cited in the solicitation (e.g., Commercial and Government Entity (CAGE) Code and part number, specification, etc.). Yes [ ] No [ ] The material conforms to the revision letter/number, if any is cited. Yes [ ] No [ ] Unknown [ ] If No, the revision does not affect form, fit, function, or interface. Yes[ ] No [ ] Unknown [ ] The material was manufactured by:

(Name):

(Address):

(2) The offeror currently possesses the material: Yes [ ] No [ ] If yes, the offeror purchased the material from a Government selling agency or other source. Yes [ ] No [ ] If yes, complete the following:

Government Selling Agency:

Contract Number:

Contract Date: (Month, Year):

Other Source:

Address:

Date Acquired: (Month/Year):

(3) The material has been altered or modified. Yes [ ] No [ ] If Yes, complete the following:

Name of the company that performed the alternation or modification Address:

Complete description of the alternations or modifications:

(4) The material has been reconditioned. Yes [ ] No [ ] If Yes, complete the following:

(i) The price offered includes the cost of reconditioning/refurbishment. Yes [ ] No [ ]

(ii) Name of the company that reconditioned that material

(iii) Description of any work done or to be done, including the components to be replaced and the applicable rebuild standard.

The material contains cure-dated components. Yes [ ] No [ ] If Yes, complete the following:

(i)The price includes replacement of cure-dated components. Yes [ ] No [ ]

(ii) Cure date:

(5) The material has data plates attached. Yes [ ] No [ ] If Yes, insert all information contained on the data plate:

(6)The offered material is in its original package. Yes [ ] No [ ] If Yes, complete the following:

Contract Number:

NSN:

CAGE Code:

Part Number:

Other Markings/Data:

(7)The offeror has supplied this same material (National Stock Number) to the Government before. Yes [ ] No [ ] If Yes, complete the following:

(i) The material being offered is from the same original Government contract number as that provided previously. Yes [ ] No [ ]

(ii) State below the Government Agency and contract number under which the material was previously provided:

Agency:

Contract Number:

(8)The material is manufactured in accordance with a specification or drawing. Yes [ ] No [ ] If Yes, complete the following:

(i) The specification/drawing is in the possession of the offeror. Yes [ ] No [ ]

(ii) The offeror has stated the applicable information below: Yes [ ] No [ ] Specification/Drawing Number:

Revision: (if any):

Date:

(9) The material has been inspected for correct part number and for absence of corrosion or any obvious defects. Yes [ ] No [ ] If Yes, complete the following:

(i) Material has been re-preserved. Yes [ ] No [ ]

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 30 PAGES

SPE7L7-27-Q-0231

SECTION C - SPECIFICATIONS/SOW/SOO/ORD (CONTINUED)

(ii) Material has been repackaged. Yes [ ] No [ ]

(iii) Percentage of material that has been inspected is %; and/or

(iv) Number of items inspected is

(v) A written report was prepared. Yes [ ] No [ ] The offeror agrees that in the event of award and notwithstanding the provisions of the solicitation.

(i) Inspection and acceptance of the surplus material will be performed at source or destination subject to all applicable provisions for source or destination inspection.

The offeror will forward to the contracting officer one of the following, within 24 hours of request by the contracting officer to demonstrate that the material being offered was previously owned by the Government (offeror check which one applies):

[ ] For national or local sales, conducted by sealed bid, spot bid or auction methods, a solicitation/Invitation For Bid and corresponding DLA Disposition Services Form 1427, Notice of Award, Statement and Release Document.

[ ] For DLA Disposition Services Commercial Venture (CV) Sales, the shipment receipt/delivery pass document and invoices/receipts used by the original purchaser to resell the material.

[ ] When the above documents are not available, or if they do not identify the specific NSN being acquired, a copy or facsimile of all original package markings and data, including NSN, commercial and Government entity (CAGE) code and part number, and original contract number. (This information has already been provided in paragraph (6) of this procurement note. Yes [ ] No [ ] .)

[ ] When none of the above are available, other information to demonstrate that the offered material was previously owned by the Government. Describe:

This procurement note only applies to offers of Government surplus material. Offers of commercial surplus, manufacturer's overruns, residual inventory resulting from terminated Government contracts, and any other material that meets the technical requirements in the solicitation but was not previously owned by the Government will be evaluated in accordance with the DLAD procurement note L04, Offers for Part Numbered Items.

If requested by the contracting officer, the offeror shall furnish sample units, in the number specified, to the contracting officer or to another location specified by the contracting officer, within 10 days after the contracting officer's request. The samples will be furnished at no cost to the Government. All such samples not destroyed in evaluation will be returned at the offeror's expense. The samples will be evaluated for form, fit, and function with subassembly, assembly, or equipment with which the items are to be used. End items furnished under any contract award to the offeror furnishing the samples can include the returned samples, and all acceptable end items will have a configuration identical to the samples. If specific tests of the samples' performance are made by the Government, the offeror will be furnished the results of such tests prior to a contract being entered into. In addition to any other inspection examinations and tests required by the contract, the performance of the end items will be required to be as good as that of the samples submitted.

In the event of award, the contractor will be responsible for providing material that is in full compliance with all requirements in the contract or order. The surplus material to be furnished must meet the requirements of the current contract or order, whether or not the material met Government requirements in existence at the time the material was initially manufactured or sold to the Government. If higher-level contract quality requirements apply to the material being acquired, those requirements do not apply to surplus material furnished under this contract.

C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (JUN 2023)

C14 CORRECTION OF NONCONFORMING PACKAGING OR MARKING (MAY 2020)

C21 SHIPPING INSTRUCTION REQUEST (SIR) (MAY 2026)

SECTION E - INSPECTION AND ACCEPTANCE

52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) FAR

As prescribed in 46.311, insert the following clause:

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

Title Number Date Tailoring

[Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.]

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instruction, documentation control, and advanced metrology.

(End of Clause)

52.246-15 CERTIFICATE OF CONFORMANCE (APR 1984) FAR

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 30 PAGES

SPE7L7-27-Q-0231

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

As prescribed in 46.315, insert the following clause in solicitations and contracts for supplies or services when the conditions in 46.504 apply:

(a) When authorized in writing by the cognizant Contract Administration Office (CAO), the Contractor shall ship with a Certificate of Conformance any supplies for which the contract would otherwise require inspection at source. In no case shall the Government's right to inspect supplies under the inspection provisions of this contract be prejudiced. Shipments of such supplies will not be made under this contract until use of the Certificate of Conformance has been authorized in writing by the CAO, or inspection and acceptance have occurred.

(b) The Contractor's signed certificate shall be attached to or included on the top copy of the inspection or receiving report distributed to the payment office or attached to the CAO copy when contract administration (Block 10 of the DD Form 250) is performed by the Defense Contract Administration Services. In addition, a copy of the signed certificate shall also be attached to or entered on copies of the inspection or receiving report accompanying the shipment.

(c) The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall in such event promptly replace, correct, or repair the rejected supplies or services at the Contractor's expense.

(d) The certificate shall read as follows:

“I certify that on , the furnished the supplies or services called for by Contract No. via on in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.”

Date of Execution:

Signature:

Title:

(End of clause)

E05 PRODUCT VERIFICATION TESTING (MAY 2020)

(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.

(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.

(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor's sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor's signed DD Form 1222.

The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, “Product Verification Test Samples - Do Not Post to Stock," Contract Number [ ] and Lot/Item Number [ ]” adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package:

(a) Hard copies of the contract;

(b) Material certifications/process operation sheets; and

(c) Drawings used to manufacture the units and return shipping information.

(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.

(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.

E06 INSPECTION AND ACCEPTANCE AT SOURCE (JUN 2018)

Inspection and acceptance are at source. The place of acceptance is the location where the Government conducts the last inspection before shipment, unless the contractor indicated a different physical location for acceptance below.

The contractor shall indicate the location where supplies will be inspected, if different from the production location:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

The contractor shall indicate the location where packaging will be inspected, if different from the production location:

[ ] Same as for supplies OR CAGE code:

Address:

Applicable to CLIN(s):

The contractor shall indicate the location where supplies will be accepted, if different from the inspection location:

Commercial and Government Entity (CAGE) code:

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 30 PAGES

SPE7L7-27-Q-0231

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

E03 PRODUCTION LOT TESTING --- CONTRACTOR (MAY 2020)

(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. The contractor shall complete PLT on the production lot(s) after first article approval, if the contract requires first article testing. The contractor shall price the PLT CLIN to cover the cost of the final test report and any approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. The unit of issue for the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).

(2) For purposes of facilitating PLT, the engineering support activity and/or testing facility has authority to communicate and discuss clarifications directly with contractors. If the Government and/or the contractor identify changes to contract requirements, the contractor shall contact the post award contracting officer or contract administrator (see the “Issued By” blocks on the contract award or order) for written approval. The contractor shall not act on any revisions or other changes until the contracting officer issues a written modification approving the proposed revision(s)/change(s).

(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3, and maintain and make available all records evidencing those details if requested by the Government. At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to conducting the production lot test, the contractor shall provide written notice of the time and location of the test to the contracting officer and the cognizant DCMA functional specialist when full administration or quality support administration is delegated to DCMA, so the Government may witness sample selection and the test.

(4) Unless otherwise stated, the contractor shall select [see page 2] samples at random from the production lot(s) produced. If the quantity stated in the previous sentence equals “ZZ,” the contractor shall use the appropriate sample size identified in the technical data package or applicable sample plan provided by the Government. If the contractor cannot determine the sample quantity, the contractor shall obtain written confirmation of the sample size from the contracting officer.

(5) The contractor shall perform all tests on the PLT samples needed to verify/validate the items meet the contract technical/quality requirements.

(6) If a PLT sample fails, the entire production lot from which the contractor took the sample fails. The contractor shall notify the contracting officer and propose corrective action, if appropriate.

(7) The contractor shall prepare and disseminate the PLT report and applicable traceability documentation as follows:

(a) Prepare the test report in accordance with data item description DI-NDTI-80809B, and mark the test report, “Production Lot Test Report, Contract Number [] and Lot/Item Number [].”

(b) Present the PLT report to the contracting officer for review.

(c) Include the following documentation with all shipments of PLT Reports:

(i) DD Form 1222 and system of record receiving report (i.e., WAWF or DD Form 250);

(ii) Copy of the contract/order;

(iii) Copy of all applicable test reports, showing actual results and tolerances specified in the technical data package;

(iv) Material and process certifications;

(v) Process operations and inspection method sheets;

(vi) Copies of drawings used to manufacture the PLT sample, with proper marking torestrict public disclosure (if desired) and from Government use other than for evaluation to the extent consistent with the Government's data rights under the contract; and

(vii) Documents required under a contract deliverables requirements list, if applicable.

(d) Submit all required documentation to the Government activity specified in the contract in time to allow for at least [see page 2] calendar days for review of the PLT report, and for the contracting officer to provide written notification of approval/disapproval to the contractor.

(i) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email all required documentation to Construction and Equipment PLT Monitor at trpsptcandepltmonitor@dla.mil . If documentation files exceed email limitations, submit to the following address: DLA Troop Support, Attention:

Production Lot Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia, Pennsylvania 19111.

(e) For PLT, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination.

(f) Delivery.

(i) Ship test report to [see page 2].

(ii) Delivery Schedule Information:

(A) Total Delivery Days for FAT (If Applicable)

(B) see page 2 Days: Completion of Production Units (to include PLT samples), PLT, and Submission of PLT Report

(C) see page 2 Days: Government PLT Report Evaluation and Notification to Contractor

(D) see page 2 Days: Delivery of final production quantity to Government

(E) see page 2 Total Delivery Days (Sum of paragraph (ii)(A) through (D) above

SECTION F - DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989) FAR

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR

52.247-29 F.O.B. ORIGIN (FEB 2006) FAR

mailto:trpsptcandepltmonitor@dla.mil

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 30 PAGES

SPE7L7-27-Q-0231

SECTION F - DELIVERIES OR PERFORMANCE (CONTINUED)

52.247-52 CLEARANCE AND DOCUMENTATION REQUIREMENTS - SHIPMENTS TO DOD AIR OR WATER TERMINAL

TRANSSHIPMENT POINTS (DEVIATION 2026-O0038) (FEB 2006) FAR

SECTION G - CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (PRE-FILLED) (JAN 2023) DFARS As prescribed in 232.7004 (b), use the following clause:

(a) Definitions. As used in this clause - Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation System (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall -

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https:// wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items -

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

Invoice (stand-alone) and Receiving Report (stand-alone) or Invoice and Receiving Report (combination)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table *

Field Name in WAWF Data to be entered in WAWF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .