REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

4. CERT.FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5. ISSUED BY

7. DELIVERY

9. DESTINATION

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5 ON OR

BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (See Continuation Sheets)

12. DISCOUNT FOR PROMPT PAYMENT

d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

14. SIGNATURE OF PERSON AUTHORIZED TO SIGN

QUOTATION

16. SIGNER

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not useable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

SPE7L7-27-Q-0124

1. REQUEST NO.

2026 OCT 23

2. DATE ISSUED

7017983420

3. REQUISITION/PURCHASE REQUEST NO.

DO-C9

RATING

DLA WEAPONS SUPPORT

LAND SUPPLIER OPNS BATTERIES/TIRES

P O BOX 3990

COLUMBUS OH 43218-3990

USA

Buyer: Tiffany Merritt PLCL61G Tel: 614 693 2846 Email: TIFFANY.MERRITT@DLA.MIL

SEE SCHEDULE

6. DELIVER BY (Date)

8. TO:

c. CITY

d. STATE

b. STREET ADDRESS

a. NAME OF CONSIGNEE

e. ZIP CODE

a. 10 CALENDAR DAYS

b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS

15. DATE OF QUOTATION

a. NAME (Type or Print)

AREA CODE

c. TITLE (Type or Print)d. CITY

c. COUNTY

b. STREET ADDRESS

e. STATE f. ZIP CODE

See Schedule

2026 OCT 30

NUMBER

FOB DESTINATION

OTHER

(See Schedule)

CAGE

b. TELEPHONE

See attached schedule to complete quote information.

Quoter must also complete the following:

a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .

b. Prices quoted are:

___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .

___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.

___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;

___ Customer ________________________.

___ Other (provide basis) ______________________________________ _______________________________________ .

c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .

d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.

e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:

f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 2 OF 29 PAGES

SPE7L7-27-Q-0124

F.O.B. Destination Inspection and Acceptance: Origin

This Solicitation Incorporates the Terms and Conditions set forth in the DLA Master Solicitation. Clauses applicable to this solicitation are incorporated in the in the DLA Master Solicitation. The DLAD Procurement Notes are incorporated by reference, with the same force and effect as if they were in full text. The full text of the DLA Master Solicitation and DLAD Procurement Notes may be accessed electronically at https://www.dla.mil/HQ/Acquisition/ Offers/eProcurement.aspx and via 'References' on the DIBBS homepage.

MATERIAL COST REDUCTION - To ensure DLA continues delivering products and services at the most economical cost, DLA Land and Maritime has initiated a Material Cost Reduction Initiative. To support this initiative, please be advised, the Government is seeking to reduce material pricing by as much as 10% per NSN on this solicitation. Please consider the Government's objective when supplying your company's offer.

Procurements that are over 10k will include the applicable Buy American or Free Trade Agreement Clauses in the awarded contract. Applicable clauses are found in DFARS 252.225

Offerors are encouraged to submit price break information (not Auto IDC) with their quotes. Solicitations which are manually evaluated and awarded at increased quantities may be awarded based on the price break information submitted with the offeror's original quotation without further solicitation or discussion.

If you anticipate quoting on a solicitation after the closing date, please submit a DIBBS quote with a bid type of “No Bid” and place an anticipated quote date or the reason you are not willing to quote. This does not prevent you from submitting an actual quote on DIBBS at a later date. It will overlay your previous no quote. This informs buyers of your intention to quote and prevents multiple calls for updates and cancelling of requirements assumed to be non-procurable due to no quotes/sources. The submission of an anticipated quote date does not preclude DLA from making an award to another acceptable timely offer.

THE OFFEROR, BY SUBMISSION OF ITS QUOTATION, REPRESENTS IT WILL NOT PROVIDE COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES TO THE GOVERNMENT IN THE PERFORMANCE OF ANY AWARD RESULTING FROM THIS SOLICITATION, IN ACCORDANCE WITH PARAGRAPH (d)OF THE CLAUSE AT FAR 52.204-24, REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT, OR IN ACCORDANCE WITH ITS EXISTING REPRESENTATION IN PARAGRAPH (c) OF THE PROVISION AT DFARS 252.204-7016, COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES – REPRESENTATION.

EVALUATION FACTORS FOR AWARD: Award will be made to the offeror(s) whose quote(s) conforms to the solicitation requirements and represents the best value to the Government. Past performance, offered delivery and price will be evaluated when making a comparative assessment of quotes. An award may be made to other than the lowest priced, technically acceptable, responsible offeror(s).

Contractors shall not provide parts and supplies made using additive manufacturing (AM), unless AM is specifically authorized in the solicitation/contract. See procurement note L31.

FDT Program, Government-Arranged Transportation MAY be implemented in the resulting Contract if the Contracting Officer deems it to be required. If/when applicable, DLAD Procurement Note C16, or DLAD Procurement Note C17, and/or DLAD Procurement Note C20 will be added to the resulting Contract.

L&M Proc Note 209-9053 FIRST ARTICLE TESTING - CONTRACTOR (MAY 2020) L&M Proc Note 246.9062 FAT/PLT Information Sheet

FAT/PLT Information:

Waived Sources: CFAT 7X634

CFAT

# of days after date of award, FAT report is due: 180 # of days after receipt of FAT report, Government review is completed: 30 # of days after approval of FAT report, production is due: 30 Units Tested: 2 Disposition of test units: Disposition of FAT Samples - two samples of each battery shall be retained at the contractor's facility for use as a reference by the QAR. All remaining FAT samples shall be disposed of IAW applicable state and local regulations for battery disposals.

All samples provided for Government First Article testing are in addition to and shall not be considered part of the contractual quantity.

DCMA Delegation: NO

CFAT Test Location:

DLA Land – FLSEB Attn: FAT Monitor PO BOX 3990, Columbus, Ohio 43218-3990 Email: Land.FAT.Monitor@DLA.mil

DODAAC: SPE7L1

CPLT

# of days after date of award, PLT report is due: 30

PAGE 3 OF 29 PAGES

SPE7L7-27-Q-0124

# of days after receipt of PLT report, Government review is completed: 30 # of days after approval of PLT report, production is due: 30 Units Tested: 2 Disposition of test units: two samples of each battery shall be retained at the contractor's facility for use as a reference by the QAR. All remaining FAT samples shall be disposed of IAW applicable state and local regulations for battery disposals.

All samples provided for Government First Article testing are in addition to and shall not be considered part of the contractual quantity.

DCMA Delegation: NO

CPLT Test Location:

DLA Land – FLSEB Attn: FAT Monitor PO BOX 3990, Columbus, Ohio 43218-3990 Email: Land.FAT.Monitor@DLA.mil

DODAAC: SPE7L1

FAR Clause 52.224-1 - Privacy Act Notification.

FAR Clause 52.224-2 - Privacy Act.

DFARS Clause 252.204-7012 - Safeguarding Covered Defense Information and Cyber Incident Reporting.

DFARS 252.213-7000 - Notice to Prospective Suppliers on Use of Supplier Performance Risk System in Past Performance Evaluations.

DFARS Clause 252.227-7025 - Limitations on the Use or Disclosure of Government-Furnished Information Marked with Restrictive Legends.

DLAD Procurement Note L08 - Use of Supplier Performance Risk System (SPRS) in Past Performance Evaluations (JUN 2020)

The Awarded Contract is for an Item(s) that are Identified as HAZARDOUS MATERIAL.

FAR 52.223-3, Hazardous Material Identification and Material Safety Data.

“See attached SDS”; For 6135014475082” DFARS 252.223-7001 - Hazard Warning Labels

PAGE 4 OF 29 PAGES

SPE7L7-27-Q-0124

SECTION B

SUPPLIES/SERVICES: 6135-01-447-5082

ITEM DESCRIPTION:

BATTERY,NONRECHARGE

Approved source: FAT Waived Cage: 7X634 Part number: BA-5567A/U

Production Lot Testing- -Number of samples based on Lot size: (each) 0-500 = 13 501-3200 = 20 3201 & higher = 32

CPLT Test Report Location:

DLA Land – FLSEB Attn: FAT Monitor PO BOX 3990, Columbus, Ohio 43218-3990 Email: Land.FAT.Monitor@DLA.mil

DODAAC: SPE7L1

RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT

RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS

(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE

DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB

AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx

FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE

SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE

ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE

APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON

REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES

Chemistry: Lithium Shelf life: Type II, 60 months

SAMPLING:

THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ

H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE

SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,

STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR

AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF

VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED

ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE

SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER

MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR

PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT

SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT

UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.

RQ017: PHYSICAL IDENTIFICATION/BARE ITEM MARKING

NOTE: THIS IS A RESTRICTED SOURCE ITEM AND

REQUIRES ENGINEERING SOURCE APPROVAL BY THE

GOVERNMENT DESIGN CONTROL ACTIVITY.

RQ034: HAZARDOUS COMMUNICATION STANDARD NOTICE

MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL

NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT

CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED

UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY

PAGE 5 OF 29 PAGES

SPE7L7-27-Q-0124

SECTION B

SUPPLY/SERVICE: 6135-01-447-5082 CONT'D

USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED

INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;

AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.

PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS

CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN

A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR

MERCURY COMPOUND. (IAW NAVSEA 5100-003D).

RS062: Shelf life requirement RS001 for a TYPE 2 (CODE 9) item with a shelf life of 60 month (extendable) applies to this item.

SAFT AMERICA INC 7X634 P/N BA-5567A/U

SAFT F6177 P/N BA-5567A/U

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.

https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0001 6135-01-447-5082 1,030.000 PG $ ________________ $ ________________

BATTERY

,NONRECHARGEABLE

PRICING TERMS: Firm Fixed Price

QTY VARIANCE: PLUS 0% MINUS 0%

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: DESTINATION DELIVERY DATE: 240 DAYS ADO

PREP FOR DELIVERY:

PKGING DATA - MIL-STD-2073-1E

QUP:001 PRES MTHD:HM CLNG/DRY:Z PRESV MAT:ZZ

WRAP MAT:ZZ CUSH/DUNN MAT:ZZ CUSH/DUNN THKNESS:Z

UNIT CONT:ZZ OPI:M

INTRMDTE CONT:ZZ INTRMDTE CONT QTY:ZZZ

PACK CODE:U

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE:33 -33 Type II, shelf life

PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING

REQUIREMENTS FOR PROCUREMENT

Unit of issue is PG. PG = 012.

IP025: PACKAGING, MARKING, AND SHIPPING OF HAZARDOUS MATERIALS

IF THE MATERIAL IS NOT CONSIDERED HAZARDOUS, IN ACCORDANCE WITH

FED-STD-313, THE MATERIAL SHALL BE COMMERCIALLY PACKAGED IN ACCORDANCE

WITH ASTM D3951.

Shelf life Type II, 60 months RS062: Shelf life requirement RS001 for a TYPE 2 (CODE 9) item with a shelf life of 60 month (extendable) applies to this item.

PARCEL POST ADDRESS:

PAGE 6 OF 29 PAGES

SPE7L7-27-Q-0124

SUPPLY/SERVICE: 6135-01-447-5082 CONT'D

SW3119

DLA DISTRIBUTION WARNER ROBINS

455 BYRON STREET

BLDG 376

ROBINS A F B GA 31098-1887

US

FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE C20 AND

CONTRACT

FREIGHT SHIPPING ADDRESS:

SW3119

DLA DISTRIBUTION WARNER ROBINS

455 BYRON STREET BLDG 376

ROBINS A F B GA 31098-1887

US

Contractor First Article Test Contractor First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-3 for the actual quantity required to be tested.

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS%

0002 0001 - S00000053 1.000 EA $ ________________ $ ________________

PRICING TERMS: Firm Fixed Price

FOB: DELIVERY DATE: 180 DAYS ADO

PREP FOR DELIVERY:

Not Applicable

Production Lot Testing (Contractor)

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS%

0003 0001 - S00000062 1.000 EA $ ________________ $ ________________

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: DESTINATION DELIVERY DATE: 30 DAYS ADO

PREP FOR DELIVERY:

Not Applicable

PAGE 7 OF 29 PAGES

SPE7L7-27-Q-0124

SUPPLY/SERVICE: 0001-S00000062 CONT'D

GOVT USE

External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .

0001 7017983420 0001 N/A N/A N/A 11/08/2027

0002 N/A N/A N/A N/A N/A N/A

0003 N/A N/A N/A N/A N/A N/A

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 29 PAGES

SECTION C - SPECIFICATIONS/SOW/SOO/ORD

C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (JUN 2023)

C01 SUPERSEDED PART NUMBERED ITEMS (FEB 2025)

C14 CORRECTION OF NONCONFORMING PACKAGING OR MARKING (MAY 2020)

C21 SHIPPING INSTRUCTION REQUEST (SIR) (MAY 2026)

C02 MANUFACTURING PHASE OUT OR DISCONTINUATION OF PRODUCTION, DIMINISHING SOURCES, AND OBSOLETE

MATERIALS OR COMPONENTS (DEC 2016)

SECTION E - INSPECTION AND ACCEPTANCE

E08 FIRST ARTICLE TESTING REQUIREMENTS (MAR 2025)

(1) If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all costs and risk associated with completion of the FAT requirement in the production CLIN price.

(2) If there is a separate FAT CLIN, the offeror shall include all costs and risk associated with completion of the FAT requirement in the FAT CLIN price.

The unit of issue for the FAT CLIN, EACH, is equal to one First Article Test (1EA=1FAT). To receive payment for any costs associated with FAT, the offeror shall propose costs associated with FAT on a separate CLIN. The offeror shall base the production CLIN price solely on all costs associated with completion of the production units and shall exclude all FAT-related costs.

(3) The contracting officer will use the total award price in selecting the best value offer from among all eligible offerors. However, for an offeror to be eligible for award, the contracting officer must determine that the FAT CLIN price (unless FAT is waived) and the production CLIN price are fair and reasonable; and, if set-aside under FAR Part 19, a fair market price. The offeror shall not propose a FAT CLIN price that is materially unbalanced in relation to the production CLIN price. In the event an offeror receives a waiver of the FAT requirement, the contracting officer will deduct the FAT CLIN price for the waived source in determining the total award price.

(4)(a) Notwithstanding the conditions for waiving first article, the contracting officer may order an additional first article sample, or portion thereof, in writing if there is a --

(i) Major change to the technical data;

(ii) Lapse in production for a period in excess of 90 days; or

(iii) Change in the place of performance (manufacturing facility), manufacturing process,material used, drawing, specification or source of supply.

(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the contractor shall notify the contracting officer; who will determine whether to order an additional first article sample or portion thereof and provide instructions concerning the submission, inspection, and notification of results. The contractor shall bear the costs of the additional first article testing resulting from any of the causes in paragraphs (4)(a)(i)-(iii) instituted by the contractor and not due to changes directed by the Government.

(5) Waivers. The offeror may submit a request for FAT waiver to the contracting officer, who may waive the FAT requirement when all of the following criteria apply:

(a) The offeror requesting waiver has successfully manufactured, delivered and the government accepted the item or a similar item. The offeror shall provide the following information and be prepared to provide documentary evidence upon the contracting officer's request:

(i) Contract number(s), date(s), and issuing Government agency or agencies.

(ii) Description of item previously furnished, identified by part number, type, model number and/or other identifying information. If the item previously furnished is similar but not identical to the item being acquired under the current buy, the offeror shall explain why manufacture of the item previously furnished is sufficient to demonstrate its ability to manufacture the item being acquired under the current buy without need for a first article test.

(iii) Engineering control document/change number of item previously furnished.

(b) There have been no changes to manufacturing processes, tooling, or place of performance.

(c) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements; or subcontractors used to manufacture the items successfully in the past).

(d) The offeror shall supply an item of the same design and manufactured by the same method at the same facilities as the item or similar item previously furnished and accepted under subparagraph (5)(a).

(6) Contractor-Performed FAT.

(a) The contractor shall test the quantities as outlined in paragraph (a) of FAR clause 52.209-3 as specified in the contract. The contractor shall submit reports in accordance with paragraph (b) of FAR clause 52.209-3, as supplemented in this procurement note.

(b] For test report preparation and delivery of contractor FAT, the contractor shall --

(i) Use the data item description DI-NDTI-80809B report format.

(ii)] Mark the test report with the following: “First article test report - Contract number:[ see pages 2 & 3 ] and lot/item number: [ see pages 2 & 3 ].

(iii) Sign the FAT Report, accompanied by the system of record receiving report (i.e, WAWF or] DD Form 250) and contractor confirmation that the same process and facilities used to manufacture the first article units will be used to manufacture the production units, to the contracting officer at the applicable address shown below:

(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing and Textile (C&T), Medical Materiel, or Subsistence, submit the report to the

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 29 PAGES

SPE7L7-27-Q-0124

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

procuring activity in Block 6 of the DD Form 1155, Block 7 of Standard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.

(B) For awards issued by DLA Land (SPE7L), submit the report to the following address:

DLA Land - FLSEB ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-399, or email to: Land.FAT.Monitor@dla.mil.

(C) For awards issued by DLA Maritime (SPE7M), submit the report to the following address:

DLA Maritime - FMSE ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.

(D) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email the report to Construction and Equipment FAT Monitor at trpsptcandefatmonitor@dla.mil. If report exceeds email limitations, submit the report to the following address:

DLA Troop Support ATTN: First Article Testing Monitor Building 3, 700 Robbins Avenue Philadelphia, Pennsylvania 19111.

Preferred electronic submissions: Hardware FAT Monitor at DLAHardwareFATMonitor@dla.mil.

(7) The contractor shall --

(a) Provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3;

(b) Maintain and make available all records evidencing those details at the Government's request.

(c) At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to shipment to the Government, provide written notice to the contracting officer and to the cognizant DCMA Functional Specialist when full administration or Quality Support administration is delegated to DCMA.

(8) Government-performed FAT. The contractor shall --

(a) For delivery of separately priced Government first article samples for Government performed FAT ship the units and system of record receiving report (i.

e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of FAR clause 52.209-4.

(b) For delivery of Government first article samples that are not separately priced, ship the units with a commercial shipping document to the test facility.

(c) Prepare the shipping container(s) by marking the external packages in bold letters, “First Article Exhibits - Do Not Post to Stock," adjacent to the MIL- STD-129 (latest revision) identification markings.

(d) Use a hard copy of the system of record receiving report (i.e., WAWF DD Form 250), or commercial shipping document as a packing list, in accordance with DFARS Appendix F.

(e) Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11.

(f) In the interior package, include hard copies of the contract, test reports, material certifications/process operation sheets, drawings used to manufacture the units, and a pre-paid return label or shipping account for payment.

(g) Send units by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express).

(h) Send an email with subject titled “Notification of Test Exhibits [ see pages 2 & 3 ]” to the corresponding address in (i) or (ii) below and to the contracting officer specified in the contract. In the email, provide the shipment date, contract/purchase order number, National Stock Number, means of transportation, tracking number, and summary of container contents. Attach a copy of the system of record receiving report (i.e., WAWF or DD Form 250) documenting the Government has performed the contract quality assurance within the system or record.

(i) DLA Land & Maritime - DSCCProdVerif@dla.mil

(ii) DLA Aviation - DSCR.Test & EvaluationOffice@dla.mil

(9) At its discretion, the Government may return FAT units to the contractor at no cost to the Government. The contractor shall submit the return address and pre-paid return label or shipping account for payment.

(10) If the Government disapproves or conditionally approves Government-performed FAT units, the Government will take action in accordance with FAR 52.209-4.

E01 SUPPLEMENTAL FIRST ARTICLE EXHIBIT DISPOSITION – CONTRACTOR MAINTAINED (MAY 2020)

E10 GOVERNMENT FIRST ARTICLE TEST (FAT) INFORMATION (JUL 2022)

(1) For FAT requirements, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. Due to known systems limitations, solicitations may contain erroneous inspection, acceptance, and FOB points. This procurement note takes precedence over any conflicting terms.

(2) GOVERNMENT FAT DELIVERY SCHEDULE

(a) see pages 2 & 3 Days: To Deliver FAT Units to the Government

(b) see pages 2 & 3 Days: Government FAT Evaluation and Notification to Contractor

(c) see pages 2 & 3 Days: To Deliver Final Production Quantity After Approval of FAT. If PLT applies, this line will be blank; the number of delivery days for final production quantity will appear in procurement note E03, Production Lot Testing - Contractor, or E04, Production Lot Testing - Government, as applicable]

(d) see pages 2 & 3 Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c)).

52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 29 PAGES

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

52.246-15 CERTIFICATE OF CONFORMANCE (APR 1984) FAR

As prescribed in 46.315, insert the following clause in solicitations and contracts for supplies or services when the conditions in 46.504 apply:

(a) When authorized in writing by the cognizant Contract Administration Office (CAO), the Contractor shall ship with a Certificate of Conformance any supplies for which the contract would otherwise require inspection at source. In no case shall the Government's right to inspect supplies under the inspection provisions of this contract be prejudiced. Shipments of such supplies will not be made under this contract until use of the Certificate of Conformance has been authorized in writing by the CAO, or inspection and acceptance have occurred.

(b) The Contractor's signed certificate shall be attached to or included on the top copy of the inspection or receiving report distributed to the payment office or attached to the CAO copy when contract administration (Block 10 of the DD Form 250) is performed by the Defense Contract Administration Services. In addition, a copy of the signed certificate shall also be attached to or entered on copies of the inspection or receiving report accompanying the shipment.

(c) The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall in such event promptly replace, correct, or repair the rejected supplies or services at the Contractor's expense.

(d) The certificate shall read as follows:

“I certify that on , the furnished the supplies or services called for by Contract No. via on in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.”

Date of Execution:

Signature:

Title:

(End of clause)

E05 PRODUCT VERIFICATION TESTING (MAY 2020)

(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.

(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.

(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor's sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor's signed DD Form 1222.

The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, “Product Verification Test Samples - Do Not Post to Stock," Contract Number [ ] and Lot/Item Number [ ]” adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package:

(a) Hard copies of the contract;

(b) Material certifications/process operation sheets; and

(c) Drawings used to manufacture the units and return shipping information.

(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.

(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.

E06 INSPECTION AND ACCEPTANCE AT SOURCE (JUN 2018)

Inspection and acceptance are at source. The place of acceptance is the location where the Government conducts the last inspection before shipment, unless the contractor indicated a different physical location for acceptance below.

The contractor shall indicate the location where supplies will be inspected, if different from the production location:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

The contractor shall indicate the location where packaging will be inspected, if different from the production location:

[ ] Same as for supplies OR CAGE code:

Address:

Applicable to CLIN(s):

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 29 PAGES

SPE7L7-27-Q-0124

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

The contractor shall indicate the location where supplies will be accepted, if different from the inspection location:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

E03 PRODUCTION LOT TESTING --- CONTRACTOR (MAY 2020)

(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. The contractor shall complete PLT on the production lot(s) after first article approval, if the contract requires first article testing. The contractor shall price the PLT CLIN to cover the cost of the final test report and any approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. The unit of issue for the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).

(2) For purposes of facilitating PLT, the engineering support activity and/or testing facility has authority to communicate and discuss clarifications directly with contractors. If the Government and/or the contractor identify changes to contract requirements, the contractor shall contact the post award contracting officer or contract administrator (see the “Issued By” blocks on the contract award or order) for written approval. The contractor shall not act on any revisions or other changes until the contracting officer issues a written modification approving the proposed revision(s)/change(s).

(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3, and maintain and make available all records evidencing those details if requested by the Government. At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to conducting the production lot test, the contractor shall provide written notice of the time and location of the test to the contracting officer and the cognizant DCMA functional specialist when full administration or quality support administration is delegated to DCMA, so the Government may witness sample selection and the test.

(4) Unless otherwise stated, the contractor shall select [see pages 2 & 3] samples at random from the production lot(s) produced. If the quantity stated in the previous sentence equals “ZZ,” the contractor shall use the appropriate sample size identified in the technical data package or applicable sample plan provided by the Government. If the contractor cannot determine the sample quantity, the contractor shall obtain written confirmation of the sample size from the contracting officer.

(5) The contractor shall perform all tests on the PLT samples needed to verify/validate the items meet the contract technical/quality requirements.

(6) If a PLT sample fails, the entire production lot from which the contractor took the sample fails. The contractor shall notify the contracting officer and propose corrective action, if appropriate.

(7) The contractor shall prepare and disseminate the PLT report and applicable traceability documentation as follows:

(a) Prepare the test report in accordance with data item description DI-NDTI-80809B, and mark the test report, “Production Lot Test Report, Contract Number [] and Lot/Item Number [].”

(b) Present the PLT report to the contracting officer for review.

(c) Include the following documentation with all shipments of PLT Reports:

(i) DD Form 1222 and system of record receiving report (i.e., WAWF or DD Form 250);

(ii) Copy of the contract/order;

(iii) Copy of all applicable test reports, showing actual results and tolerances specified in the technical data package;

(iv) Material and process certifications;

(v) Process operations and inspection method sheets;

(vi) Copies of drawings used to manufacture the PLT sample, with proper marking torestrict public disclosure (if desired) and from Government use other than for evaluation to the extent consistent with the Government's data rights under the contract; and

(vii) Documents required under a contract deliverables requirements list, if applicable.

(d) Submit all required documentation to the Government activity specified in the contract in time to allow for at least [see pages 2 & 3] calendar days for review of the PLT report, and for the contracting officer to provide written notification of approval/disapproval to the contractor.

(i) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email all required documentation to Construction and Equipment PLT Monitor at trpsptcandepltmonitor@dla.mil . If documentation files exceed email limitations, submit to the following address: DLA Troop Support, Attention:

Production Lot Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia, Pennsylvania 19111.

(e) For PLT, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination.

(f) Delivery.

(i) Ship test report to [see pages 2 & 3].

(ii) Delivery Schedule Information:

(A) see pages 2 & 3 Total Delivery Days for FAT (If Applicable)

(B) see pages 2 & 3 Days: Completion of Production Units (to include PLT samples), PLT, and Submission of PLT Report

(C) see pages 2 & 3 Days: Government PLT Report Evaluation and Notification to Contractor

(D) see pages 2 & 3 Days: Delivery of final production quantity to Government

(E) see pages 2 & 3 Total Delivery Days (Sum of paragraph (ii)(A) through (D) above

SECTION F - DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989) FAR

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR

mailto:trpsptcandepltmonitor@dla.mil

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 29 PAGES

SPE7L7-27-Q-0124

SECTION F - DELIVERIES OR PERFORMANCE (CONTINUED)

52.247-34 F.O.B. DESTINATION (JAN 1991) FAR

52.247-52 CLEARANCE AND DOCUMENTATION REQUIREMENTS - SHIPMENTS TO DOD AIR OR WATER TERMINAL

TRANSSHIPMENT POINTS (DEVIATION 2026-O0038) (FEB 2006) FAR

SECTION G - CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (PRE-FILLED) (JAN 2023) DFARS As prescribed in 232.7004 (b), use the following clause:

(a) Definitions. As used in this clause - Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation System (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall -

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https:// wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items -

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

Invoice (stand-alone) and Receiving Report (stand-alone) or Invoice and Receiving Report (combination)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table *

Field Name in WAWF Data to be entered in WAWF Guidance

Pay Official DoDAAC See Block 12 (SF26), 15 (DD 1155), or 18a

(SF1449)

(If blank, see resulting award)

Issue By DoDAAC See Block 5 (SF26), 6 (DD 1155), or 9 (SF1449)

(If blank, see resulting award)

Admin DoDAAC See Block 6 (SF26), 7 (DD 1155), or 16 (SF1449)

(If blank, see resulting award)

Inspect By DoDAAC SEE SECTION B (If blank, see resulting award)

Ship To Code SEE SECTION B (If blank, see resulting award) https://www.acquisition.gov/dfars/part-232-contract-financing https://www.sam.gov https://wawf.eb.mil/ https://wawf.eb.mil/ https://wawf.eb.mil/

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 29 PAGES

SPE7L7-27-Q-0124

SECTION G - CONTRACT ADMINISTRATION DATA (CONTINUED)

Field Name in WAWF Data to be entered in WAWF Guidance

Ship From Code SEE SECTION B (If blank, see resulting award)

Mark For Code SEE SECTION B (If blank, see resulting award)

Service Approver (DoDAAC)

(If blank, see resulting award)

Service Acceptor (DoDAAC)

(If blank, see resulting award)

Accept at Other DoDAAC (If blank, see resulting award)

LPO DoDAAC (If blank, see resulting award)

DCAA Auditor DoDAAC (If blank, see resulting award)

Other DoDAAC(s) (If blank, see resulting award)

(* Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (** Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

See administer listed on page 1

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of Clause)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H18 DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM (DPAS) (JUL 2026)

252.223-7001 HAZARD WARNING LABELS (DEC 1991) DFARS

(a) “Hazardous material,” as used in this clause, is defined in the Hazardous Material Identification and Material Safety Data clause of this contract.

(b) The Contractor shall label the item package (unit container) of any hazardous material to be delivered under this contract in accordance with the Hazard Communication Standard (29 CFR 1910.1200 et seq). The Standard requires that the hazard warning label conform to the requirements of the standard unless the material is otherwise subject to the labelling requirements of one of the following statutes:

(1) Federal Insecticide, Fungicide and Rodenticide Act;

(2) Federal Food, Drug and Cosmetics Act;

(3) Consumer Product Safety Act;

(4) Federal Hazardous Substances Act; or

(5) Federal Alcohol Administration Act.

(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be labelled in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.

MATERIAL

(If None, Insert “None.”) ACT

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 29 PAGES

SPE7L7-27-Q-0124

SECTION H - SPECIAL CONTRACT REQUIREMENTS (CONTINUED)

(d) The apparently successful Offeror agrees to submit, before award, a copy of the hazard warning label for all hazardous materials not listed in paragraph

(c) of this clause. The Offeror shall submit the label with the Material Safety Data Sheet being furnished under the Hazardous Material Identification and Material Safety Data clause of this contract.

(e) The Contractor shall also comply with MIL-STD-129, Marking for Shipment and Storage (including revisions adopted during the term of this contract).

SECTION I - CONTRACT CLAUSES

52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)

FAR

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) DFARS

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) DFARS

52.204-13 SYSTEM FOR AWARD MANAGEMENT -- MAINTENANCE (DEVIATION 2026-O0038) (FEB 2026) FAR

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0038) (FEB

2026) FAR

252.204-7004 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN 2023) DFARS

252.204-7014 LIMITATIONS ON THE USE OR DISCLOSURE OF INFORMATION BY LITIGATION SUPPORT CONTRACTORS (JAN

2023) DFARS

52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (DEVIATION 2026-O0038) (FEB 2026) FAR As prescribed in 9.308-1(a) and (b), insert the following clause:

[Contracting Officer inserts details]

(a) The Contractor shall test unit(s) of Lot/Item as specified in this contract. At least calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within calendar days from the date of this contract to [insert address of the Government activity to receive the report] marked “FIRST ARTICLE TEST REPORT: Contract No. , Lot/Item No. ." Within calendar days after the Government receives the test report, the Contracting Officer will notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval will state any further action required of the Contractor. A notice of disapproval will cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government will take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .