SPE7L127Q0169.pdf

PDF 126 KB Posted

Attached to
LINE ASSY AND 1 MORE ITEM
Solicitation number
SPE7L127Q0169
Issued by

About this file

This is a Request for Quotations (RFQ) issued by the Defense Logistics Agency (DLA) Weapons Support Land Supply Chain for a line assembly component (NSN 4710-01-515-6623). The quotation deadline is December 1, 2026, with delivery required 440 days after award. The Government will conduct first article testing (FAT) at Hill Air Force Base, Utah, with testing to be completed within 120 days of receipt, Government evaluation within 90 days, and final production delivery within 230 days of FAT approval, totaling 440 days from contract award.

The procurement requires five units for production and one unit for Government-performed FAT, with inspection and acceptance at the origin and FOB point at origin. Key technical requirements include CMMC Level 2 certification, compliance with ISO 9001:2015 quality standards, export control restrictions for technical data, and adherence to multiple technical drawings and specifications referenced in the contract. The item is subject to a Northrop Grumman license agreement with data non-disclosure and destruction conditions. Quoters must complete certifications regarding hazardous materials (identified as "None"), provide pricing on a per-unit basis with optional prompt payment discounts, and submit responses using Wide Area Workflow (WAWF) payment processing. The contract includes standard FAR and DFARS clauses covering small business representations, Buy American requirements, cybersecurity prohibitions, and various compliance and safety requirements. The issuing office is located in Columbus, Ohio, with buyer Brandon Pesicek available at 614-692-1278.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

4. CERT.FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5. ISSUED BY

7. DELIVERY

9. DESTINATION

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5 ON OR

BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (See Continuation Sheets)

12. DISCOUNT FOR PROMPT PAYMENT

d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

14. SIGNATURE OF PERSON AUTHORIZED TO SIGN

QUOTATION

16. SIGNER

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not useable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

SPE7L1-27-Q-0169

1. REQUEST NO.

2026 NOV 06

2. DATE ISSUED

7007472827

3. REQUISITION/PURCHASE REQUEST NO.

DO-C9

RATING

DLA WEAPONS SUPPORT

LAND SUPPLY CHAIN

PO BOX 3990

COLUMBUS OH 43218-3990

USA

Buyer: Brandon Pesicek PLCL53W Tel: 614-692-1278 Email: Brandon.1.Pesicek@dla.mil

440 DAYS ADO

6. DELIVER BY (Date)

8. TO:

c. CITY

d. STATE

b. STREET ADDRESS

a. NAME OF CONSIGNEE

e. ZIP CODE

a. 10 CALENDAR DAYS

b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS

15. DATE OF QUOTATION

a. NAME (Type or Print)

AREA CODE

c. TITLE (Type or Print)d. CITY

c. COUNTY

b. STREET ADDRESS

e. STATE f. ZIP CODE

See Schedule

2026 DEC 01

NUMBER

FOB DESTINATION

OTHER

(See Schedule)

CAGE

b. TELEPHONE

See attached schedule to complete quote information.

Quoter must also complete the following:

a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .

b. Prices quoted are:

___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .

___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.

___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;

___ Customer ________________________.

___ Other (provide basis) ______________________________________ _______________________________________ .

c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .

d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.

e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:

f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 2 OF 23 PAGES

SPE7L1-27-Q-0169

E06 Inspection and Acceptance at Source (JUN 2018) Inspection and acceptance are at source. The place of acceptance is the location where the Government conducts the last inspection before shipment, unless the contractor indicated a different physical location for acceptance below.

The contractor shall indicate the location where supplies will be inspected, if different from the production location:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

The contractor shall indicate the location where packaging will be inspected, if different from the production location:

( ) Same as for supplies OR CAGE code:

Address:

Applicable to CLIN(s):

The contractor shall indicate the location where supplies will be accepted, if different from the inspection location:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

EVALUATION FACTORS FOR AWARD

Award will be made to the offeror(s) whose quote(s) conforms to the solicitation requirements and represents the best value to the Government. Past performance, offered delivery, and price will be evaluated when making a comparative assessment of quotes. An award may be made to other than the lowest priced, technically acceptable, responsible offeror(s).

52.209-4 First Article Approval - Government Testing, Alt I

52.209-4 First Article Approval - Government Testing

(a) The Contractor shall deliver 1 units(s) of Lot/Item 4710015156623 within 120 calendar days from the date of this contract to the Government at the below address for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

HILL AFB

809 MXSS/MXDEB

ATTN: FIRST ARTICLE TEST

BLDG 849

DEAR JOHN BAY

HILL AFB

UT

84056-5713

(b) Within 90 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

52.246-11 Higher-Level Contract Quality Requirement.

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2015

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph

(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

C20 Vendor Shipment Module (VSM) (JUN 2025)

DFARS 252.204-7016 Covered Defense Telecommunications Equipment or Services- Representation (DEC 2019) DFARS 252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services- Representation (MAY 2021) DFARS 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services (JAN 2023) 52.240-91 Security Prohibitions and Exclusions (FEB 2026)

E05 Product Verification Testing (MAY 2020)

(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the

PAGE 3 OF 23 PAGES

SPE7L1-27-Q-0169

contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.

(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing. The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.

(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor’s sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor’s signed DD Form 1222. The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, Product Verification Test Samples Do Not Post to Stock," Contract Number: contractor insert and Lot/Item Number: contractor insert adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD- 129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package:

(a) Hard copies of the contract;

(b) Material certifications/process operation sheets; and

(c) Drawings used to manufacture the units and return shipping information.

(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.

(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.

E08 First Article Testing Requirements (MAR 2025);

E10 Government First Article Test (FAT) Information (JUL 2022)

(1) For FAT requirements, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. Due to known systems limitations, solicitations may contain erroneous inspection, acceptance, and FOB points. This procurement note takes precedence over any conflicting terms.

(2) GOVERNMENT FAT DELIVERY SCHEDULE

(a) 120 Days: To Deliver FAT Units to the Government

(b) 90 Days: Government FAT Evaluation and Notification to Contractor

(c) 230 Days: To Deliver Final Production Quantity After Approval of FAT. If PLT applies, this line will be blank; the number of delivery days for final production quantity will appear in procurement note E03, Production Lot Testing - Contractor, or E04, Production Lot Testing - Government, as applicable

(d) 440 Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))

Delivery shall be offered in terms of a number of days after date of award. There will be no penalty for faster delivery and partial deliveries are acceptable at no additional cost to the government.

Expedited or Partial Shipments will be accepted as long as there is no additional charge to the Government.

FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015);

This solicitation is issued under the First Destination Transportation (FDT) program to reduce the cost of transportation through the use of Government-arranged transportation utilizing Government contracts and rates. If this award is for FMS or has an APO/FPO ship-to address, these instructions do not apply.

For FDT Program Transportation Requirements, see Procurement Note C16 First Destination Transportation (FDT) Program, Government-Arranged Transportation for Manual Awards, C17 First Destination Transportation (FDT) Program Shipments Originating from Outside the Contiguous United States, and Procurement Note C20 Vendor Shipment Module (VSM).

FIRST ARTICLE TESTING - GOVERNMENT

UCF SECTION E WAWF Instructions for Test NSN/Material S00000052 CLIN:

Place the following information in WAWF as follows:

Inspection: Origin Ship To (Lab DoDAAC): FB2029 Ship To (Lab Address):

HILL AFB

809 MXSS/MXDEB

ATTN: FIRST ARTICLE TEST

BLDG 849

DEAR JOHN BAY

PAGE 4 OF 23 PAGES

SPE7L1-27-Q-0169

HILL AFB

UT

84056-5713 Acceptance: Destination Issuing Activity DoDAAC: SPE7L1 FOB: Destination

THIS SOLICITATION INCORPORATES THE TERMS AND CONDITIONS SET FORTH IN THE REVISION OF THE DLA MASTER SOLICITATION FOR EPROCUREMENT AUTOMATED SIMPLIFIED ACQUISITIONS IN EFFECT ON THE SOLICITATION ISSUE DATE. ALL REVISIONS OF THE DLA MASTER SOLICITATION FOR EPROCUREMENT AUTOMATED SIMPLIFIED ACQUISITIONS CAN BE FOUND ON THE WEB AT: http://www.dla.mil/ HQ/Acquisition/Offers/eProcurement.aspx

NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM 331210 applies to this solicitation. See http://www.sba.gov/content/ table-small-business-size-standards for the corresponding small business size standard.

PRODUCTION FACILITY CHANGES

UCF SECTION F

UCF SECTION F PRODUCTION FACILITY CHANGES

(a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided:

(1) Performance by small business or in labor surplus areas as required by the contract will not be changed;

(2) The change will not cause a delay in delivery or necessitate a change in the purchase description;

(3) The free on board (f.o.b.) point is not changed; and

(4) Each request is supported by a price reduction of 250.00 to cover the Government administrative costs to process the change.

(b) The Government reserves the right to deny approval even if these four elements are met.

(End of Text)

PAGE 5 OF 23 PAGES

SPE7L1-27-Q-0169

SECTION B

SUPPLIES/SERVICES: 4710-01-515-6623

ITEM DESCRIPTION:

LINE ASSY.

RD005: Cybersecurity Maturity Model Certification (CMMC) Level 2 Certified Third-Party Assessment Organization (C3PAO)

RD002, COVERED DEFENSE INFORMATION APPLIES

RQ032: EXPORT CONTROL OF TECHNICAL DATA

This item has technical data some or all of which is subject to export-control of either the International Traffic in Arms regulations (ITAR) or the Export Administration Regulations (EAR), and cannot be exported without prior authorization from either the Department of State or the Department of Commerce. Export includes disclosure of technical data to foreign persons and nationals whether located in the United States or abroad. This requirement applies equally to foreign national employees and U.S. companies and their foreign subsidiaries. DFARS 252.225-7048 is applicable to this data.

The Defense Logistics Agency (DLA) limits distribution of export-control technical data to DLA contractors that have an approved US/Canada Joint Certification Program (JCP) certification, have completed the Introduction to Proper Handling of DOD Export-Controlled Technical Data Training and the DLA Export-Controlled Technical Data Questionnaire (both are available at the web address given below), and have been approved by the DLA controlling authority to access the export-controlled data. Instructions for obtaining access to the export-controlled data can be found at:

https://www.dla.mil/Logistics-Operations/Enhanced-Validation/

To be eligible for award, offerors and any sources of supply proposed for use are required to have an approved JCP certification and have been approved by the DLA controlling authority to access export-controlled data managed by DLA. DLA will not delay award in order for an offeror or its supplier to apply for and receive approval by the DLA controlling authority to access the export-controlled data.

RQ042: Non-Tailored Higher-Level Quality Requirements (ISO 9001:2015) for Manufacturers and Non-Manufacturers

RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS

(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE

DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB

AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx

FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE

SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE

ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE

APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON

REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT

RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES

CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE

USED NOR INCORPORATED IN ANY ITEMS TO BE

DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION

SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT

DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.

SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR

APPROVAL UNLESS THEY ARE AUTHORIZED BY THE

SPECIFICATION REQUIREMENTS.

RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL

PAGE 6 OF 23 PAGES

SPE7L1-27-Q-0169

SECTION B

SUPPLY/SERVICE: 4710-01-515-6623 CONT'D

REQUEST FOR VARIANCE (DEVIATION OR WAIVER)

RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN

SAMPLING:

THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ

H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE

SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,

STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR

AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF

VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED

ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE

SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER

MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR

PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT

SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT

UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.

A NORTHROP GRUMMAN LICENSE AGREEMENT 14 RESTRICTED TECHNICAL DATA

PACKAGE EXISTS FOR THIS ITEM. DATA NON-DISCLOSURE AND DATA DESTRUCTION

CONDITIONS APPLY. VENDORS MUST COMPLETE AND RETURN THE FORMS LOCATED IN

THE "14 NORTHROP GRUMMAN CORP

T-38, F-5" LICENSE AGREEMENT FOLDER AVAILABLE AT

https://tdmt.dla.mil/TDMT/Client

GOVNERMENT FIRST ARTICLE TEST NOTES APPLY: SPECIAL

REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

ARE REQUIRED:

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract.

A certification to this effect must accompany each First Article which is offered. "Performance or other characteristics which the First Articles must meet are in conformance with all drawings, mylars, and form, fit, and function.

The detailed technical requirements for First Article approval tests are contained in mylars and drawings. The government reserves the right to test to any spec. in the contract.

Vendor will normally be allowed only one attempt to receive full or conditional approval. Failure to receive approval of "First Article Inspection" will, at the discretion of the Government, result in termination of the contract. It may also result in the subsequent removal of the vendor as an approved source.

All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column. Materials utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.

Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

ENGINEERING NOTES APPLY:

4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF

THE DATA INDICATED. THE SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO

INDICATED.

5. MARKING AND IDENTIFICATION REQUIREMENTS ARE AS FOLLOWS:

USE MIL-STD-130 IN LIEU OF IM-8 INK STAMP PART NUMBER, DESIGN ACTIVITY

CAGE CODE, AND SUPPLIER CAGE CODE WHERE PRACTICAL, LOCATE INK STAMPED

PAGE 7 OF 23 PAGES

SPE7L1-27-Q-0169

SECTION B

SUPPLY/SERVICE: 4710-01-515-6623 CONT'D

MARKINGS IN AREAS VISIBLE AFTER INSTALLATION OF PART WHERE PRACTICAL,

INK STAMPED CHARACTERS SHALL BE A MINIMUM OF 0.157 INCHES IN HEIGHT.

6. SURFACE ROUGHNESS PER ASME B46.1 IN LIEU OF MIL-STD-10.

7. FOR THE PURPOSES OF INTERPRETING NFS-70, THIS PART IS TO BE

CONSIDERED AN INTERNAL PART IN THE PERSONNEL COMPARTMENT.

DRAWING NOTES APPLY:

DRAWING NFS-70 (NGLA) NOTE W/EO 05A0455-H

DRAWING MA-32.3 (NGLA) NOTE W/EO 05C1141-H

DRAWING MA-40 (NGLA) NOTE W/EO 05C1052

DRAWING MA-32 (NGLA) NOTE W/EO 05C0531-H

CRITICAL APPLICATION ITEM

TDP Rev A Gen 1

IAW BASIC DRAWING NR 76823 2-13300-9

REVISION NR A DTD 10/04/1965

PART PIECE NUMBER: 2-13300-9

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 76823 MA-40

REVISION NR G DTD 07/15/1975

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 76823 MA-32

REVISION NR G DTD 08/10/1973

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 76823 FP-153

REVISION NR B DTD 12/20/2012

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 76823 MA-32.3

REVISION NR G DTD 12/23/1983

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 76823 NFS-70

REVISION NR G DTD 05/25/1973

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 76823 MA-32

REVISION NR G DTD 02/07/2005

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 76823 IM-3

REVISION NR P DTD 03/25/2005

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 76823 IM-3

REVISION NR P DTD 08/19/1983

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 76823 MA-32.3

REVISION NR G DTD 02/22/2005

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 76823 MA-40

REVISION NR G DTD 03/09/2005

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 76823 2-13300-9

REVISION NR Y DTD 07/11/1980

PART PIECE NUMBER:

TDP Rev A Gen 1

IAW REFERENCE DRAWING NR 13873 015156623-12061

REVISION NR DTD 09/12/2011

PAGE 8 OF 23 PAGES

SPE7L1-27-Q-0169

SECTION B

SUPPLY/SERVICE: 4710-01-515-6623 CONT'D

PART PIECE NUMBER:

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.

https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0001 4710-01-515-6623 5.000 EA $ ________________ $ ________________

LINE ASSY

QTY VARIANCE: PLUS 0% MINUS 0%

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: ORIGIN DELIVERY DATE: 440 DAYS ADO

PREP FOR DELIVERY:

PKGING DATA-QUP:001

WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.

All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951.

Mark and label all packaging and packing in accordance with MIL-STD-129.

The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order.

PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING

REQUIREMENTS FOR PROCUREMENT

PARCEL POST ADDRESS:

W62G2T

W1A8 DLA DIST SAN JOAQUIN

25600 S CHRISMAN RD

REC WHSE 57

TRACY CA 95304-5000

US

FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE C20 AND

CONTRACT

FREIGHT SHIPPING ADDRESS:

W62G2T

W1A8 DLA DIST SAN JOAQUIN

25600 S CHRISMAN ROAD

25600 S CHRISMAN RD REC WHSE 57

TRACY CA 95304-5000

US

Government First Article Test Government First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-4 for the actual quantity required to be tested.

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.

PAGE 9 OF 23 PAGES

SPE7L1-27-Q-0169

SECTION B

SUPPLY/SERVICE: 0001-S00000052 CONT'D

https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0002 0001 - S00000052 1.000 EA $ ________________ $ ________________

FOB: DELIVERY DATE: 440 DAYS ADO

PREP FOR DELIVERY:

Not Applicable

GOVT USE

External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .

0001 7007472827 0001 N/A N/A N/A 03/19/2025

0002 N/A N/A N/A N/A N/A N/A

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 23 PAGES

SPE7L1-27-Q-0169

SECTION E - INSPECTION AND ACCEPTANCE

E08 FIRST ARTICLE TESTING REQUIREMENTS (MAR 2025)

(1) If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all costs and risk associated with completion of the FAT requirement in the production CLIN price.

(2) If there is a separate FAT CLIN, the offeror shall include all costs and risk associated with completion of the FAT requirement in the FAT CLIN price.

The unit of issue for the FAT CLIN, EACH, is equal to one First Article Test (1EA=1FAT). To receive payment for any costs associated with FAT, the offeror shall propose costs associated with FAT on a separate CLIN. The offeror shall base the production CLIN price solely on all costs associated with completion of the production units and shall exclude all FAT-related costs.

(3) The contracting officer will use the total award price in selecting the best value offer from among all eligible offerors. However, for an offeror to be eligible for award, the contracting officer must determine that the FAT CLIN price (unless FAT is waived) and the production CLIN price are fair and reasonable; and, if set-aside under FAR Part 19, a fair market price. The offeror shall not propose a FAT CLIN price that is materially unbalanced in relation to the production CLIN price. In the event an offeror receives a waiver of the FAT requirement, the contracting officer will deduct the FAT CLIN price for the waived source in determining the total award price.

(4)(a) Notwithstanding the conditions for waiving first article, the contracting officer may order an additional first article sample, or portion thereof, in writing if there is a --

(i) Major change to the technical data;

(ii) Lapse in production for a period in excess of 90 days; or

(iii) Change in the place of performance (manufacturing facility), manufacturing process,material used, drawing, specification or source of supply.

(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the contractor shall notify the contracting officer; who will determine whether to order an additional first article sample or portion thereof and provide instructions concerning the submission, inspection, and notification of results. The contractor shall bear the costs of the additional first article testing resulting from any of the causes in paragraphs (4)(a)(i)-(iii) instituted by the contractor and not due to changes directed by the Government.

(5) Waivers. The offeror may submit a request for FAT waiver to the contracting officer, who may waive the FAT requirement when all of the following criteria apply:

(a) The offeror requesting waiver has successfully manufactured, delivered and the government accepted the item or a similar item. The offeror shall provide the following information and be prepared to provide documentary evidence upon the contracting officer's request:

(i) Contract number(s), date(s), and issuing Government agency or agencies.

(ii) Description of item previously furnished, identified by part number, type, model number and/or other identifying information. If the item previously furnished is similar but not identical to the item being acquired under the current buy, the offeror shall explain why manufacture of the item previously furnished is sufficient to demonstrate its ability to manufacture the item being acquired under the current buy without need for a first article test.

(iii) Engineering control document/change number of item previously furnished.

(b) There have been no changes to manufacturing processes, tooling, or place of performance.

(c) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements; or subcontractors used to manufacture the items successfully in the past).

(d) The offeror shall supply an item of the same design and manufactured by the same method at the same facilities as the item or similar item previously furnished and accepted under subparagraph (5)(a).

(6) Contractor-Performed FAT.

(a) The contractor shall test the quantities as outlined in paragraph (a) of FAR clause 52.209-3 as specified in the contract. The contractor shall submit reports in accordance with paragraph (b) of FAR clause 52.209-3, as supplemented in this procurement note.

(b] For test report preparation and delivery of contractor FAT, the contractor shall --

(i) Use the data item description DI-NDTI-80809B report format.

(ii)] Mark the test report with the following: “First article test report - Contract number:[ ] and lot/item number: [ ].

(iii) Sign the FAT Report, accompanied by the system of record receiving report (i.e, WAWF or] DD Form 250) and contractor confirmation that the same process and facilities used to manufacture the first article units will be used to manufacture the production units, to the contracting officer at the applicable address shown below:

(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing and Textile (C&T), Medical Materiel, or Subsistence, submit the report to the procuring activity in Block 6 of the DD Form 1155, Block 7 of Standard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.

(B) For awards issued by DLA Land (SPE7L), submit the report to the following address:

DLA Land - FLSEB ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-399, or email to: Land.FAT.Monitor@dla.mil.

(C) For awards issued by DLA Maritime (SPE7M), submit the report to the following address:

DLA Maritime - FMSE ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.

(D) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email the report to Construction and Equipment FAT Monitor at trpsptcandefatmonitor@dla.mil. If report exceeds email limitations, submit the report to the following address:

DLA Troop Support ATTN: First Article Testing Monitor Building 3, CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 23 PAGES

SPE7L1-27-Q-0169

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

700 Robbins Avenue Philadelphia, Pennsylvania 19111.

Preferred electronic submissions: Hardware FAT Monitor at DLAHardwareFATMonitor@dla.mil.

(7) The contractor shall --

(a) Provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3;

(b) Maintain and make available all records evidencing those details at the Government's request.

(c) At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to shipment to the Government, provide written notice to the contracting officer and to the cognizant DCMA Functional Specialist when full administration or Quality Support administration is delegated to DCMA.

(8) Government-performed FAT. The contractor shall --

(a) For delivery of separately priced Government first article samples for Government performed FAT ship the units and system of record receiving report (i.

e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of FAR clause 52.209-4.

(b) For delivery of Government first article samples that are not separately priced, ship the units with a commercial shipping document to the test facility.

(c) Prepare the shipping container(s) by marking the external packages in bold letters, “First Article Exhibits - Do Not Post to Stock," adjacent to the MIL- STD-129 (latest revision) identification markings.

(d) Use a hard copy of the system of record receiving report (i.e., WAWF DD Form 250), or commercial shipping document as a packing list, in accordance with DFARS Appendix F.

(e) Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11.

(f) In the interior package, include hard copies of the contract, test reports, material certifications/process operation sheets, drawings used to manufacture the units, and a pre-paid return label or shipping account for payment.

(g) Send units by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express).

(h) Send an email with subject titled “Notification of Test Exhibits [ ]” to the corresponding address in (i) or (ii) below and to the contracting officer specified in the contract. In the email, provide the shipment date, contract/purchase order number, National Stock Number, means of transportation, tracking number, and summary of container contents. Attach a copy of the system of record receiving report (i.e., WAWF or DD Form 250) documenting the Government has performed the contract quality assurance within the system or record.

(i) DLA Land & Maritime - DSCCProdVerif@dla.mil

(ii) DLA Aviation - DSCR.Test & EvaluationOffice@dla.mil

(9) At its discretion, the Government may return FAT units to the contractor at no cost to the Government. The contractor shall submit the return address and pre-paid return label or shipping account for payment.

(10) If the Government disapproves or conditionally approves Government-performed FAT units, the Government will take action in accordance with FAR 52.209-4.

E10 GOVERNMENT FIRST ARTICLE TEST (FAT) INFORMATION (JUL 2022)

(1) For FAT requirements, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. Due to known systems limitations, solicitations may contain erroneous inspection, acceptance, and FOB points. This procurement note takes precedence over any conflicting terms.

(2) GOVERNMENT FAT DELIVERY SCHEDULE

(a) Days: To Deliver FAT Units to the Government

(b) Days: Government FAT Evaluation and Notification to Contractor

(c) Days: To Deliver Final Production Quantity After Approval of FAT. If PLT applies, this line will be blank; the number of delivery days for final production quantity will appear in procurement note E03, Production Lot Testing - Contractor, or E04, Production Lot Testing - Government, as applicable]

(d) Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c)).

52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR

E06 INSPECTION AND ACCEPTANCE AT SOURCE (JUN 2018)

Inspection and acceptance are at source. The place of acceptance is the location where the Government conducts the last inspection before shipment, unless the contractor indicated a different physical location for acceptance below.

The contractor shall indicate the location where supplies will be inspected, if different from the production location:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

The contractor shall indicate the location where packaging will be inspected, if different from the production location:

[ ] Same as for supplies OR CAGE code:

Address:

Applicable to CLIN(s):

The contractor shall indicate the location where supplies will be accepted, if different from the inspection location:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 23 PAGES

SPE7L1-27-Q-0169

SECTION F - DELIVERIES OR PERFORMANCE (CONTINUED)

SECTION F - DELIVERIES OR PERFORMANCE

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR

SECTION G - CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (PRE-FILLED) (JAN 2023) DFARS As prescribed in 232.7004 (b), use the following clause:

(a) Definitions. As used in this clause - Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation System (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall -

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https:// wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items -

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

Invoice (stand-alone) and Receiving Report (stand-alone) or Invoice and Receiving Report (combination)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table *

Field Name in WAWF Data to be entered in WAWF Guidance

Pay Official DoDAAC See Block 12 (SF26), 15 (DD 1155), or 18a

(SF1449)

(If blank, see resulting award)

Issue By DoDAAC See Block 5 (SF26), 6 (DD 1155), or 9 (SF1449)

(If blank, see resulting award)

Admin DoDAAC See Block 6 (SF26), 7 (DD 1155), or 16 (SF1449)

(If blank, see resulting award)

Inspect By DoDAAC SEE SECTION B (If blank, see resulting award)

Ship To Code SEE SECTION B (If blank, see resulting award) https://www.acquisition.gov/dfars/part-232-contract-financing https://www.sam.gov https://wawf.eb.mil/ https://wawf.eb.mil/ https://wawf.eb.mil/

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 23 PAGES

SPE7L1-27-Q-0169

SECTION G - CONTRACT ADMINISTRATION DATA (CONTINUED)

Field Name in WAWF Data to be entered in WAWF Guidance

Ship From Code SEE SECTION B (If blank, see resulting award)

Mark For Code SEE SECTION B (If blank, see resulting award)

Service Approver (DoDAAC)

(If blank, see resulting award)

Service Acceptor (DoDAAC)

(If blank, see resulting award)

Accept at Other DoDAAC (If blank, see resulting award)

LPO DoDAAC (If blank, see resulting award)

DCAA Auditor DoDAAC (If blank, see resulting award)

Other DoDAAC(s) (If blank, see resulting award)

(* Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (** Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

See administer listed on page 1

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of Clause)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H07 SUPPLY ASSURANCE THROUGH MULTISOURCE CONTRACTING (SEP 2017)

252.223-7001 HAZARD WARNING LABELS (DEC 1991) DFARS

(a) “Hazardous material,” as used in this clause, is defined in the Hazardous Material Identification and Material Safety Data clause of this contract.

(b) The Contractor shall label the item package (unit container) of any hazardous material to be delivered under this contract in accordance with the Hazard Communication Standard (29 CFR 1910.1200 et seq). The Standard requires that the hazard warning label conform to the requirements of the standard unless the material is otherwise subject to the labelling requirements of one of the following statutes:

(1) Federal Insecticide, Fungicide and Rodenticide Act;

(2) Federal Food, Drug and Cosmetics Act;

(3) Consumer Product Safety Act;

(4) Federal Hazardous Substances Act; or

(5) Federal Alcohol Administration Act.

(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be labelled in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.

MATERIAL

(If None, Insert “None.”) ACT

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 23 PAGES

SPE7L1-27-Q-0169

SECTION H - SPECIAL CONTRACT REQUIREMENTS (CONTINUED)

(d) The apparently successful Offeror agrees to submit, before award, a copy of the hazard warning label for all hazardous materials not listed in paragraph

(c) of this clause. The Offeror shall submit the label with the Material Safety Data Sheet being furnished under the Hazardous Material Identification and Material Safety Data clause of this contract.

(e) The Contractor shall also comply with MIL-STD-129, Marking for Shipment and Storage (including revisions adopted during the term of this contract).

(End of clause)

SECTION I - CONTRACT CLAUSES

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)

FAR

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) DFARS

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) DFARS

52.204-13 SYSTEM FOR AWARD MANAGEMENT -- MAINTENANCE (DEVIATION 2026-O0038) (FEB 2026) FAR

52.204-13 SYSTEM FOR AWARD MANAGEMENT -- MAINTENANCE, ALT I (DEVIATION 2026-O0038) (FEB 2026) FAR

252.204-7004 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN 2023) DFARS

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (JAN 2023) DFARS

52.209-4 FIRST ARTICLE APPROVAL - GOVERNMENT TESTING (DEVIATION 2026-O0038) (FEB 2026) FAR As prescribed in 9.308-2 (a) and (b), insert the following clause:

[Contracting Officer inserts details]

(a) The Contractor shall deliver 1 unit(s) of Lot/Item 4710-015156623 within calendar days from the date of this contract to the Government at HILL AFB 809 MXSS/MXDEB ATTN: FIRST ARTICLE TEST BLDG 849 DEAR JOHN BAY HILL AFB UT 84056-5713 [insert name and address of the testing facility] for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. This contract elsewhere specifies the characteristics that the first article must meet and the testing requirements.

(b) Within calendar days after the Government receives the first article, the Contracting Officer will notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval will state any further action required of the Contractor. A notice of disapproval will cite reasons for the disapproval.

(c) If the Government disapproves the first article, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time the Government specifies. The Government will act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor will have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor --

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer will, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates, the contract price, or both, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 23 PAGES

SECTION I - CONTRACT CLAUSES (CONTINUED)

52.209-4 FIRST ARTICLE APPROVAL - GOVERNMENT TESTING (DEVIATION 2026-O0038) (FEB 2026), ALT I (JAN 1997) FAR

52.211-5 MATERIAL REQUIREMENTS (DEVIATION 2026-O0038) (FEB 2026) FAR

52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (DEVIATION 2026-O0038) (FEB 2026) FAR As prescribed in 19.101(a)(2)(iii)(A), insert the following clause:

(a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .