JBER_Appendix_AF_19_Apr_17.docx

DOCX document 72 KB Posted

Attached to
SOLICITATION Federal contract opportunity
Solicitation number
SPE60017R0533
Issued by
Defense Logistics Agency Energy

About this file

JBER APPENDIX AF

View the file

Other files for this federal contract opportunity

Other files attached to SOLICITATION, newest first.
File Type Posted
Amend_0013.pdf PDF
JBER_Appendix_AF_14_DEC_17.pdf PDF
SPE60017R05330012.pdf PDF
Additional_Technical_Responses.pdf PDF
SPE60017R05330011.pdf PDF
Attachment_II_OSP_update.pdf PDF
Attachment_I-_Responses.pdf PDF
SPE60017R05330010.pdf PDF
SPE60017R05330009.pdf PDF
SPE60017R05330008.pdf PDF
Amendment7.pdf PDF
SPE60017R0533.pdf PDF
SPE60017R05330004.pdf PDF
Responses.pdf PDF
Attachment_V_Wage_Detemination_Elmendorf.pdf PDF
Attachment_II_OSP.pdf PDF
SF30_SPE60017R05330003.pdf PDF
Attachment_II_OSP.pdf PDF
Attachment_V_Wage_Determination.pdf PDF
Attachment_IV_PP_CONSENT_LETTER.pdf PDF
Final_Solicitation__.pdf PDF
Attachment_I_PWS_.pdf PDF
Attachment_VI_-_E_QAP's_.pdf PDF
Attachment_III_Contractor_Performance_Assessment_.pdf PDF
SF30_SPE60017R05330001.pdf PDF
Attachment_IV_PP_CONSENT_LETTER.pdf PDF
Attachment_VI_-_E_QAP's_.pdf PDF
Attachment_II_OFFEROR_SUBMISSION_PACKAGE.pdf PDF
Attachment_V_Wage_Determination.pdf PDF
Elmendorf_and_Eielson_SPE60017R0533.pdf PDF
Attachment_III_Contractor_Performance_Assessment_Qs.pdf PDF
Attachment_I_AF_Consolidated_PWS_-_as_of_9_Jun_17.pdf PDF
Eielson_Appendix_AF_template_17_Jan_17.docx DOCX document
AF_Consolidated_PWS_-_as_of_9_Jun_17.docx DOCX document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBER, AK

APPENDIX AF

AIR FORCE INSTALLATION INFORMATION

I. INSTALLATION LISTING

1. Contracted Fuels Management Operations Services ^*:

Buckley AFB, CO
Kirtland AFB, NM
Schriever AFB, CO
Cape Canaveral AFS, FL
JB McGuire-Lakehurst, NJ (Lakehurst)
Sheppard AFB, TX
Cheyenne Mtn, CO
Laughlin AFB, TX
Tinker AFB, OK
Columbus AFB, MS
Malmstrom AFB, MT
Wright Patterson AFB, OH
Edwards AFB, CA
Maxwell AFB, AL
Vance AFB, OK
F.E. Warren AFB, WY
Patrick AFB, FL
Vandenburg AFB, CA
Gila Bend AAF, AZ
Peterson AFB, CO
Keesler AFB, MS
Randolph AFB, TX

2. Contracted Bulk Storage:

a. CONUS

Altus AFB OK
Hill AFB, UT*
Nellis AFB, NV
Barksdale AFB, LA
Holloman AFB, NM
Offutt AFB, NE*
Beale AFB, CA
Hurlburt Field, FL
Robins AFB, GA*
Cannon AFB, NM
JB McGuire-Lakehurst, NJ (McGuire)
Scott AFB, IL
Davis Monthan AFB, AZ
Langley AFB, VA
Seymour Johnson AFB, NC
Dover AFB, DE
Little Rock AFB, AR
Shaw AFB, SC
Dyess AFB, TX
Luke AFB, AZ
Travis AFB, CA
Eglin AFB, FL*
McConnell AFB, KS
Tyndall AFB, FL*
Ellsworth AFB, SD
Minot AFB, ND
Whiteman AFB, MO
Fairchild AFB, WA
Moody AFB, GA
Grand Forks AFB, ND
Mountain Home AFB, ID

b. OCONUS

Anderson AFB, GU+
Aviano AB, IT*
Eielson AFB, AK
Incirlik, AB, TU *
Elmendorf AFB, AK
Lajes Field Azores *
Kadena AB, JA
RAF Lakenheath, UK *
Misawa AB, JA
RAF Mildenhall, UK *
Osan AB, RK
Ramstein AB, GE *

Spangdahlem AB, GE *

^ Note: FSC, Product Issues, Accounting/Auditability, Quality Surveillance/Lab, Cryogenics, and Retail Service Station at these locations are the Contractor’s responsibility.

* Note: PM at these locations is the government’s responsibility IAW C-5.3.2 + Note: PLDS at these locations is the Contractor’s responsibility IAW C-5.6.2

JBER, AK

APPENDIX AF (cont’)

AIR FORCE INSTALLATION INFORMATION

II. INSTALLATION SPECIFIC INFORMATION

A. BASE

(1) INTRODUCTION

JBER boasts 45 pieces of equipment for the receipt, transfer and issue of over 80 million gallons of jet fuel annually providing Top Cover for America. JBER POL is responsible for 13 facilities, 24 miles of pipeline, and 119 pits/outlets abroad 84,000 acres. These figures contribute to the success of all of our JBER mission partners, which include two flying Wings, one support Wing, two US Army Brigades and 55 tenant units

Due to JBER’s unique global positioning on the map and the ability to mobilize rapidly, JBER is able to support multiple Combatant Commanders’ Areas of Responsibility, which is extremely important to all facets of the Department of Defense mission. Both PACOM and NORTHCOM aerial coverage could not be executed without JBER POL. Some of JBER’s missions include, but not limited to are: Open Skies Treaty, 176th SAR, E-3 AWACS/C2, CAC (Combat Alert Cell), POTUS, Bi-annual Northern Edge Ex, Bi-annual Open House, 4x Red Flag Ex annually, AMC Hub.

APPENDIX AF (cont’)

AIR FORCE INSTALLATION INFORMATION

(2) HOURS OF OPERATION

Normal hours for fuels operations are identified below. Contractor must be capable of providing 24 hours x 7 days per week PWS coverage when required including for weather, natural disaster, exercise, or other contingency operations.

Operation
Mon-Fri
Sat-Sun
Holidays/After Hrs
Fuels Management
N/A
N/A
N/A
Accounting
N/A
N/A
N/A
Lab
N/A
N/A
N/A
Operations (FSC)
N/A
N/A
N/A
Operations (Distribution)
N/A
N/A
N/A
Operations (Bulk Storage)
*0700-2300
*0700-1600
N/A
Operations (Cryogenics)
N/A
N/A
N/A

NOTE (1): If the holiday falls on Saturday—the previous Friday shall be observed as the holiday. If the holiday falls on Sunday—the next Monday shall be observed as the holiday.

Recognized holidays:

New Year’s Day: 1 January Martin Luther King’s Birthday: 3rd Monday in January President’s Day: 3rd Monday in February Memorial Day: Last Monday in May Independence Day: 4 July Labor Day: 1st Monday in September Columbus Day: 2nd Monday in October Veterans Day: 11 November Thanksgiving Day: 4th Thursday in November Christmas Day: 25 December

*NOTE (2): Fuels Operations shall operate during normal or required extended hours of operation and on observed holidays unless authorized to close by the Wing Commander or designee. If closed, standby personnel shall be identified to MOC and Security Forces and be available to respond within 1 hr.

(3) WORKLOAD INFORMATION

Base workload/requirements are provided below. Quantities and durations are estimates only and subject to variation. Variation does not directly correspond to additional requirement or staffing without validation and/or increase in normal hours of operation by the Contracting Officer.

Item

Average number of receipts per month, grade, quantity, normal shifts of receipts and mode of delivery
5, JP8 800K pipeline

1, DS1 10K tank truck

Average duration of each receipt mode
Pipeline 8 hrs

Tank truck 1 hr

Number of trucks/railcars which can be offloaded simultaneously.
1
Number of trucks/railcars which can be on-loaded simultaneously (only use for bulk deliveries i.e. DFSP TO DFSP).
1
Can receipt/fill/transfer operations occur simultaneously?
Yes
Do tank truck receipts require Contractor escort?
Yes
Do barge receipts require Contractor booming? If not, who booms?
N/A
Base average annual jet fuel gallons issued
40M
Average transfers (WEEKLY)
Quantity Avg: 72K

Number of transfers:14 Normal days and times for transfers: M-F/0900-1100

Average number of refuels per shift (DAILY)
A- N/A B- N/A C- N/A
Average number of fillstands per shift (DAILY)
Bulk: A- 1 Weekly B- 1 Weekly C- N/A

Farms: A- 2 B -15 C - 2 Note: Data changes significantly during exercises

Number of refuelers which can be filled simultaneously.
Bulk: 1

Farms: 7

Number of hydrant outlets which can be operated simultaneously.
N/A
Number of hydrant outlets normally operated simultaneously per shift.
A- N/A B- N/A C- N/A
Number of refueling vehicles (R-11) normally operated simultaneously per shift.
A- N/A B- N/A C- N/A
Number of base organizational tanks supported.
N/A
Average Monthly organizational tank issues (servicing’s and quantity).
N/A
Average Monthly C-300 Fillstands
6
Describe current base provided grounds maintenance or describe Contractor’s responsibility (Grass and Snow)
See Comments in:

(4) Base Specific Requirements

Describe current base provided entomology/pest control services or describe Contactor’s responsibility
Base provided by 773 CES
Number of oil/water separators within Contractors Area of Responsibility
0
Number of emergency generators for POL facilities within Contractors AOR
1
Average Annual Cryogenic Receipts Per Year (quantity and receipts)
N/A
Average Monthly Cryogenic Servicing’s Per Month (quantity and servicing’s)
N/A
Pre-Identified Confined Spaces*
12
How many times in the last year has the Contractor been called in outside of normal duty hours
0

Level of DLA Energy/USACE RM Provided (Quarterly, Semi-Annually, Annually) Annual

NOTES: * Confined Spaces shall be validated by Contractor through CE.

(4) BASE SPECIFIC REQUIREMENTS

Provide any additional requirements not standard or applicable to all bases.

GRASS: The base provides mowing and weed eating 50 feet from infrastructures. The Contractor is responsible for inside of the 50 feet. Additionally, The Contractor shall be responsible for grass cutting inside of the receipt pipeline valve stations and extending out 10’ from fence line. All grass cutting shall be conducted IAW Facility Custodian guidelines.

SNOW/ICE: The Contractor shall be responsible for all snow and ice removal within their areas of control. The Contractor shall be responsible for snow removal on the receipt line access roadways. The Contractor shall also be responsible for snow removal at each receipt line valve station. The valve station snow removal shall include a walking path to and inside of the valve station fencing. The Contractor shall provide a vehicle(s) equipped with snow plow(s) capable of snow removal in heavy snow conditions. The Contractor shall also; at their own expense, purchase any other snow/ice removal equipment required to ensure snow/ice is removed in a timely manner. The Contractor shall ensure no delay in day to day operations and un-inhibited access for emergency situations.

LOWPOINTS: The Fuels Management Flight will be responsible for all receipt line low points extending from the base fence line to the Bulk Storage Yard fence line. Additionally, the Fuels Management Flight will manage all low points on transfer pipelines outside of the Bulk Storage fence line. The Contractor will be responsible for any low points within the bulk storage yard and Farms 3, 4 and 5.

Fuel Receipts: The Contractor shall inspect the receipt pipeline to include the pipeline itself, all valve stations, low points and high points. The Contractor shall do the inspection one time per receipt any time after the pipeline has been pressurized. The Contractor shall be responsible to inspect the pipeline from the base fence line to the Bulk Storage Yard. The Contractor shall notify the Fuel Service Center (FSC) once the inspection is completed. Additionally, the Contractor shall report any discrepancies immediately to the FSC. The FSC will report the discrepancies to responsible parties.

GASEOUS NITROGEN: The Contractor shall be responsible to order and replace ATG nitrogen bottles as required. The Contractor shall order the cylinders via a task order in iRAPT

EXERCISE SUPPORT: The Contractor shall provide 24-hour coverage Monday –Friday during exercises. The Contractor should expect five exercises per year.

FARM USAGE: The Contractor shall monitor all systems while in use IAW PWS required publications. Since Farm 3 does not have issue separators, the fuel will flow into the filter separators within Farm 4, and then proceed to the fillstands. If Farm 3 is being used to issue jet fuel to the fillstands, the Contractor may use the following guidance for system monitoring. The Contractor, at his option may elect to remain at Farm 3 while the pumps are in operation and monitor the filter house of Farm 4 IAW the following time requirements. Within 15 minutes of pump activation and hourly after (while in use), the Contractor shall check Farm 4 for leaks and check corrected DP’s to ensure elements are not ruptured or becoming clogged. If the Contractor elects to place a second person at Farm 4 during fillstand ops which utilize Farm 3, the Contractor shall follow established guidance’s listed in the PWS.

(5) FACILITIES

The following on-site installation facilities may be used by the Contractor in performance of the PWS tasks. The facilities may be changed, by the local installation, from time to time to meet mission requirements. The Contractor will be notified prior to any change of location.

Facility Number
Bldg Number
Name/Area
Installed Equipment/Description
18471
18471
Bulk Storage
Office Space/4 Pumps/3 Filter Separators/2 Micronic Pre-Filter/1 Generator/1 PRT/1 Fillstand/1 RTB Header
11567
11567
Farm 3 Operating Storage
3 Pumps/1 Filter Separator/1 RTB Header/1 Fillstand
11583
11583
Farm 4 Operating Storage
3 Pumps/2 Filter Separators/4 Fillstands
15699
15699
Farm 5 Operating Storage
4 Pumps/3 Filter Separators/3 Fillstands

(6) PETROLEUM STORAGE TANKS

Facility Number
Tank

Number Function (Bulk/Hydrant/MSS) Safe Fill (gallons) Product Grade Type

UST/AST

Primary Receipt Mode
Alternate Receipt Mode
18471
738
Bulk
3,135,825
JP8
AST
PIPELINE
N/A
18471
739
Bulk
3,144,299
JP8
AST
PIPELINE
N/A
18471
740
Bulk
3,143,968
JP8
AST
PIPELINE
N/A
18471
PRT
Bulk
1,451
JP8
UST
N/A
N/A
11567
42
Bulk
12,064
DS1
UST
TT
N/A
11567
43
Bulk
42,720
JP8
UST
PIPELINE
N/A
11567
44
Bulk
42,740
JP8
UST
PIPELINE
N/A
11567
45
Bulk
42,212
JP8
UST
PIPELINE
N/A
11583
46
Bulk
44,428
JP8
UST
PIPELINE
N/A
11583
47
Bulk
44,536
JP8
UST
PIPELINE
N/A
11583
48
Bulk
44,578
JP8
UST
PIPELINE
N/A
11583
PRT
Bulk
350
JP8
UST
N/A
N/A
15699
49
Bulk
43,529
JP8
UST
PIPELINE
N/A
15699
50
Bulk
43,952
JP8
UST
PIPELINE
N/A
15699
51
Bulk
38,517
JP8
UST
PIPELINE
N/A
15699
52
Bulk
38,391
JP8
UST
PIPELINE
N/A
15699
PRT
Bulk
500
JP8
UST
N/A
N/A

(7) Cryogenic Storage Tanks

Facility Number
Tank

Number Safe Fill (gallons) Product Grade

N/A

(8) EQUIPMENT (EAID)

The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks. Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are listed on the Custodian Authorization/Custodian Receipt Listing (CA/CRL).

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION

N/A

(9) EQUIPMENT (NON-EAID)

The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks. Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are NOT listed on the CA/CRL.

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION

N/A

(10) INFORMATION TECHNOLOGY EQUIPMENT (ITEC)

The following on-site installation equipment may be used for the Contractor in performance of PWS tasks. The following ITEC is identified on the local installations Communications Squadron Asset Inventory Management (AIM) list under Account ####. Monitors are not tracked in AIM but are accountable.

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION

N/A

(11) ITEC (DLA-ENERGY)

The following on-site Defense Logistics Agency-Energy (DLA-Energy) ITEC may be used by the Contractor in performance of PWS tasks. The below ITEC will remain on the Flight’s account. The Contractor shall sign a hand receipt for the items upon Contract start.

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION
DESKTOP CPU
DELL
N/A
N/A
33DDTK1
N/A
18471
DESKTOP CPU
DELL
N/A
N/A
HLNNJN1
N/A
18471

(12) AUTOMATED INFORMATION TECHNOLOGY (AIT) EQUIPMENT

The following on-site Defense Logistics Agency-Energy (DLA-Energy) AIT may be used by the Contractor is performance of PWS tasks.

SYSTEM
DESCRIPTION
SERIAL NO
MODEL NO
MFR
LOCATION

ATG

854055546
ENRAF 854
HONEYWELL
TK 738

ATG

854055447
ENRAF 854
HONEYWELL
TK 739

ATG

854055457
ENRAF 854
HONEYWELL
TK 740

ATG

N12229539205005
TLS 350
VEEDER ROOT
18471 PRT
ATG
TCU 2
1285
3512
ITT BARTON
11567
ATG
TCU 3
1285
3512
ITT BARTON
11567
ATG
TCU 4
1283
3513
ITT BARTON
11583
ATG
TCU 5
1287
3513
ITT BARTON
15699
ATG
TCU 1
1286
3513
ITT BARTON
15699

(13) LAND MOBILE RADIOS (LMR)

The following on-site installation LMRs may be used by the Contractor in performance of PWS tasks. The LMRs are identified on the local installations Communications Squadron Asset Inventory Management (AIM) list under Account 306A (673RD LRS ACCOUNT). The Contractor shall sign a hand receipt for radios received upon Contract start.

DESCRIPTION
PART NO
SERIAL NO
LOC
MOTOROLA HANDHELD RADIO
APX6000R
481CRX3556
18471
MOTOROLA HANDHELD RADIO
APX6000R
481CRX3557
18471

(14) VEHICLES

The following on-site installation vehicles may be used by the Contractor for performance of PWS tasks. This listing is subject to change as vehicles are replaced and/or added to/deleted from the fleet.

TYPE
REGISTRATION NO
NSN
FUEL GRADE DISPENSED

N/A

(15) Base Specific Additional Publications/Forms (addition to Appendix C)

PUBLICATION
TITLE

N/A

File details come from the government source that posted it. Updated .