Eielson_Appendix_AF_template_17_Jan_17.docx

DOCX document 74 KB Posted

Attached to
SOLICITATION Federal contract opportunity
Solicitation number
SPE60017R0533
Issued by
Defense Logistics Agency Energy

About this file

EIELSON AB, AK APPENDIX

View the file

Other files for this federal contract opportunity

Other files attached to SOLICITATION, newest first.
File Type Posted
Amend_0013.pdf PDF
SPE60017R05330012.pdf PDF
JBER_Appendix_AF_14_DEC_17.pdf PDF
Additional_Technical_Responses.pdf PDF
SPE60017R05330011.pdf PDF
Attachment_II_OSP_update.pdf PDF
Attachment_I-_Responses.pdf PDF
SPE60017R05330010.pdf PDF
SPE60017R05330009.pdf PDF
SPE60017R05330008.pdf PDF
Amendment7.pdf PDF
SPE60017R0533.pdf PDF
Attachment_V_Wage_Detemination_Elmendorf.pdf PDF
SPE60017R05330004.pdf PDF
Responses.pdf PDF
SF30_SPE60017R05330003.pdf PDF
Attachment_II_OSP.pdf PDF
Attachment_V_Wage_Determination.pdf PDF
Attachment_IV_PP_CONSENT_LETTER.pdf PDF
Final_Solicitation__.pdf PDF
Attachment_I_PWS_.pdf PDF
Attachment_VI_-_E_QAP's_.pdf PDF
Attachment_II_OSP.pdf PDF
Attachment_III_Contractor_Performance_Assessment_.pdf PDF
SF30_SPE60017R05330001.pdf PDF
Attachment_II_OFFEROR_SUBMISSION_PACKAGE.pdf PDF
Attachment_V_Wage_Determination.pdf PDF
Attachment_IV_PP_CONSENT_LETTER.pdf PDF
Attachment_VI_-_E_QAP's_.pdf PDF
Elmendorf_and_Eielson_SPE60017R0533.pdf PDF
Attachment_III_Contractor_Performance_Assessment_Qs.pdf PDF
Attachment_I_AF_Consolidated_PWS_-_as_of_9_Jun_17.pdf PDF
AF_Consolidated_PWS_-_as_of_9_Jun_17.docx DOCX document
JBER_Appendix_AF_19_Apr_17.docx DOCX document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EIELSON AIR BASE

APPENDIX AF

AIR FORCE INSTALLATION INFORMATION

I. INSTALLATION LISTING

1. Contracted Fuels Management Operations Services ^*:

Buckley AFB, CO
Kirtland AFB, NM
Schriever AFB, CO
Cape Canaveral AFS, FL
JB McGuire-Lakehurst, NJ (Lakehurst)
Sheppard AFB, TX
Cheyenne Mtn, CO
Laughlin AFB, TX
Tinker AFB, OK
Columbus AFB, MS
Malmstrom AFB, MT
Wright Patterson AFB, OH
Edwards AFB, CA
Maxwell AFB, AL
Vance AFB, OK
F.E. Warren AFB, WY
Patrick AFB, FL
Vandenburg AFB, CA
Gila Bend AAF, AZ
Peterson AFB, CO
Keesler AFB, MS
Randolph AFB, TX

2. Contracted Bulk Storage:

a. CONUS

Altus AFB OK
Hill AFB, UT*
Nellis AFB, NV
Barksdale AFB, LA
Holloman AFB, NM
Offutt AFB, NE*
Beale AFB, CA
Hurlburt Field, FL
Robins AFB, GA*
Cannon AFB, NM
JB McGuire-Lakehurst, NJ (McGuire)
Scott AFB, IL
Davis Monthan AFB, AZ
Langley AFB, VA
Seymour Johnson AFB, NC
Dover AFB, DE
Little Rock AFB, AR
Shaw AFB, SC
Dyess AFB, TX
Luke AFB, AZ
Travis AFB, CA
Eglin AFB, FL*
McConnell AFB, KS
Tyndall AFB, FL
Ellsworth AFB, SD
Minot AFB, ND
Whiteman AFB, MO
Fairchild AFB, WA
Moody AFB, GA
Grand Forks AFB, ND
Mountain Home AFB, ID

b. OCONUS

Anderson AFB, GU+
Aviano AB, IT*
Eielson AFB, AK
Incirlik, AB, TU *
Elmendorf AFB, AK
Lajes Field Azores *
Kadena AB, JA
RAF Lakenheath, UK *
Misawa AB, JA
RAF Mildenhall, UK *
Osan AB, RK
Ramstein AB, GE *

Spangdahlem AB, GE *

^ Note: FSC, Product Issues, Accounting/Auditability, Quality Surveillance/Lab, Cryogenics, and Retail Service Station at these locations are the Contractor’s responsibility.

* Note: PM at these locations is the government’s responsibility IAW C-5.3.2 + Note: PLDS at these locations is the Contractor’s responsibility IAW C-5.6.2

EIELSON AIR BASE

APPENDIX AF (cont’)

AIR FORCE INSTALLATION INFORMATION

II. INSTALLATION SPECIFIC INFORMATION

A. BASE

(1) INTRODUCTION

Eielson AFB supports up to 4 Red Flag exercises as well as Northern Edge, Valiant Shield, and Cope North exercises refueling different types of aircraft. The wing also has a Joint Mobility Complex which is utilized by Fort Wainwright to deploy it’s soldiers often times departing in rotators or commercial flights. Eielson AFB is capable of servicing transient aircraft. Home station aircraft include 21 F-16s and the 168th Air Refueling Wing’s KC-135s. It is also the future home of the F-35s.

APPENDIX AF (cont’)

AIR FORCE INSTALLATION INFORMATION

(2) HOURS OF OPERATION

Normal hours for fuels operations are identified below. Contractor must be capable of providing 24 hours x 7 days per week PWS coverage when required including for weather, natural disaster, exercise, or other contingency operations.

Operation
Mon-Fri
Sat-Sun
Holidays/After Hrs
Fuels Management
N/A
N/A
N/A
Accounting
N/A
N/A
N/A
Lab
N/A
N/A
N/A
Operations (FSC)
N/A
N/A
N/A
Operations (Distribution)
N/A
N/A
N/A
Operations (Bulk Storage)
*0700-2100
N/A
N/A
Operations (Cryogenics)
N/A
N/A
N/A

NOTE (1): If the holiday falls on Saturday—the previous Friday shall be observed as the holiday. If the holiday falls on Sunday—the next Monday shall be observed as the holiday.

Recognized holidays:

New Year’s Day: 1 January Martin Luther King’s Birthday: 3rd Monday in January President’s Day: 3rd Monday in February Memorial Day: Last Monday in May Independence Day: 4 July Labor Day: 1st Monday in September Columbus Day: 2nd Monday in October Veterans Day: 11 November Thanksgiving Day: 4th Thursday in November Christmas Day: 25 December

*NOTE (2): Fuels Operations shall operate during normal or required extended hours of operation and on observed holidays unless authorized to close by the Wing Commander or designee. If closed, standby personnel shall be identified to MOC and Security Forces and be available to respond within 1 hr.

(3) WORKLOAD INFORMATION

Base workload/requirements are provided below. Quantities and durations are estimates only and subject to variation. Variation does not directly correspond to additional requirement or staffing without validation and/or increase in normal hours of operation by the Contracting Officer.

Item

Average number of receipts per month, grade, quantity, normal shifts of receipts and mode of delivery
Bulk storage averages 4 JP-8 pipeline receipts per month for 360,000 gallons a receipt. DS1 on average, is received once per month for 10,000 gallons per receipt. JP-4 on average is received 2 times per year for 20,000 gallons (last received March 2016). The receipts are performed between 0530-1630.
Average duration of each receipt mode
JP-8 pipeline receipt is usually 11 hours
Number of trucks/railcars which can be offloaded simultaneously.
Rail Car Headers: 22 Total/7 In service
Number of trucks/railcars which can be on-loaded simultaneously (only use for bulk deliveries i.e. DFSP TO DFSP).
N/A
Can receipt/fill/transfer operations occur simultaneously?
YES
Do tank truck receipts require Contractor escort?
NO
Do barge receipts require Contractor booming? If not, who booms?
N/A
Base average annual jet fuel gallons issued
21,000,000
Average transfers (WEEKLY)
Quantity Avg: 120,000

Number of transfers: 4 Normal days and times for transfers: Mon-Fri 0800-1100 or 1300-1600

Average number of refuels per shift (DAILY)
N/A
Average number of fillstands per shift (DAILY)
Bulk: A- B- C-

Hydrants: N/A

Number of refuelers which can be filled simultaneously.
Bulk: 3

Hydrants: N/A

Number of hydrant outlets which can be operated simultaneously.
N/A
Number of hydrant outlets normally operated simultaneously per shift.
N/A
Number of refueling vehicles (R-11) normally operated simultaneously per shift.
N/A
Number of base organizational tanks supported.
N/A
Average Monthly organizational tank issues (servicing’s and quantity).
N/A
Average Monthly C-300 Fillstands
3
Describe current base provided grounds maintenance or describe Contractor’s responsibility (Grass and Snow)
CE provides grass cutting, weed eating, and vegetation control in grass/sidewalk areas. Contractor shall be responsible for all other vegetation control. CE provides snow removal for roads. Contractor will be responsible for all other snow removal.
Describe current base provided entomology/pest control services or describe Contactor’s responsibility
The base provides entomology/pest control services. Contractor will be responsible to identify issues and report as needed.
Number of oil/water separators within Contractors Area of Responsibility
0
Number of emergency generators for POL facilities within Contractors AOR
1 at E2, mobile generators will be provided by CE to E6 and E11
Average Annual Cryogenic Receipts Per Year (quantity and receipts)
N/A
Average Monthly Cryogenic Servicing’s Per Month (quantity and servicing’s)
N/A
Pre-Identified Confined Spaces*
None
How many times in the last year has the Contractor been called in outside of normal duty hours
0

Level of DLA Energy/USACE RM Provided (Quarterly, Semi-Annually, Annually) None

NOTES: * Confined Spaces shall be validated by Contractor through CE.

(4) BASE SPECIFIC REQUIREMENTS

Refinery needs 48 hours between receipts to refine next shipment.

(5) FACILITIES

The following on-site installation facilities may be used by the Contractor in performance of the PWS tasks. The facilities may be changed, by the local installation, from time to time to meet mission requirements. The Contractor will be notified prior to any change of location.

Facility Number
Bldg Number
Name/Area
Installed Equipment/Description
(I.e. Main office, Lab, Pumphouse 1, Bulk Storage, A Row Hydrants)
(I.e. generator, # pumps, # filter separators, # hydrant outlets, PRTs # fillstands, # receipt headers, # dispensers, etc.)
E-2
E-2 serves as the centralized location for Contractors. There are 2 JP-4 tanks, 2 Diesel tanks, 1x 4M gl JP8 tank, and 1x 672,000 gl JP8 tank.

Bldg 721 provides a bathroom, workshop, tool storage, etc.

E-6
E-6 contains 6x 1M gl JP8 tanks, 1x 4M gl tank, 2 De-icer tanks.

Bldg 831 provides a control room.

E-11
E-11 contains 5x 2M gl JP8 tanks and the alternate re-supply railcar receipt headers.

Bldg 838 provides a control room.

(6) PETROLEUM STORAGE TANKS

Facility Number
Tank

Number Function (Bulk/Hydrant/MSS) Safe Fill (gallons) Product Grade Type

UST/AST

Primary Receipt Mode
Alternate Receipt Mode
515
Bulk
JP-8
AST
Tank Car/5
Tank Car/5
522
Bulk
JP-8
AST
Pipeline
Tank Car
535
Bulk
JP-8
AST
Pipeline
Tank Car
536
Bulk
JP-8
AST
Pipeline
Tank Car
537
Bulk
JP-8
AST
Pipeline
Tank Car
538
Bulk
JP-8
AST
Pipeline
Tank Car
539
Bulk
JP-8
AST
Pipeline
Tank Car
540
Bulk
JP-8
AST
Pipeline
Tank Car
557
Bulk
JP-8
AST
Pipeline
Tank Car
558
Bulk
JP-8
AST
Pipeline
Tank Car
559
Bulk
JP-8
AST
Pipeline
Tank Car
560
Bulk
JP-8
AST
Pipeline
Tank Car
561
Bulk
JP-8
AST
Pipeline
Tank Car
562
Bulk
JP-8
AST
Pipeline
Tank Car/11
566
Bulk
JP-8
AST
Pipeline
Tank Car/1
555
Bulk
Low-Sulfur Diesel
AST
Tank Truck/2
Tank Car/2
556
Bulk
Low-Sulfur Diesel
AST
Tank Truck/2
Tank Car/2
68
Bulk
JP-4
AST
Tank Truck/1
N/A
69
Bulk
JP-4
AST
Tank Truck/1
N/A

(7) Cryogenic Storage Tanks

Facility Number
Tank

Number Safe Fill (gallons) Product Grade

N/A

(8) EQUIPMENT (EAID)

The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks. Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are listed on the Custodian Authorization/Custodian Receipt Listing (CA/CRL).

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION

N/A

(9) EQUIPMENT (NON-EAID)

The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks. Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are NOT listed on the CA/CRL.

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION

N/A

(10) INFORMATION TECHNOLOGY EQUIPMENT (ITEC)

The following on-site installation equipment may be used for the Contractor in performance of PWS tasks. The following ITEC is identified on the local installations Communications Squadron Asset Inventory Management (AIM) list under Account ####. Monitors are not tracked in AIM but are accountable.

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION

N/A

(11) ITEC (DLA-ENERGY)

The following on-site Defense Logistics Agency-Energy (DLA-Energy) ITEC may be used by the Contractor in performance of PWS tasks.

NOTE: the following computer will remain on the Flight’s account.

NOMENCLATURE
MANUFACTURER
NSN
PART/MODEL
SERIAL NO
PRICE
LOCATION
Desk Top Computer
Dell
Optiplex
C2BKJN1

(12) AUTOMATED INFORMATION TECHNOLOGY (AIT) EQUIPMENT

The following on-site Defense Logistics Agency-Energy (DLA-Energy) AIT may be used by the Contractor is performance of PWS tasks.

SYSTEM
DESCRIPTION
SERIAL NO
MODEL NO
MFR
LOCATION
ATG
JP-8 TANK 558
854
ENRAF
E-11 - 6261

JP-8 TANK 559

854
ENRAF
E-11 – 6261

JP-8 TANK 560

3500
BARTON
E-11 – 6261

JP-8 TANK 561

3500
BARTON
E-11 – 6261

JP-8 TANK 562

TLS-350
VEEDER ROOT
E-11 - 6261

JP-8 TANK 557

854
ENRAF
E-11 – 6261

JP-4 TANK 515

854
ENRAF
E-2 - 6225

DIESEL TANK 555

TLS-350
VEEDER ROOT
E-2 – 6225

DIESEL TANK 556

TLS-350
VEEDER ROOT
E-2 - 6225

JP-8 TANK 566

854
ENRAF
E-2 – 6225

JP-4 TANK 568

854
ENRAF
E-2 – 6225

JP-4 TANK 569

854
ENRAF
E-2 - 6225

JP-8 BREAKTOUT TANK

TLS-350
VEEDER ROOT
E-6 - 6248

JP-8 TANK 522

854
ENRAF
E-6 – 6248

JP-8 TANK 535

854
ENRAF
E-6 – 6248

JP-8 TANK 536

854
ENRAF
E-6 – 6248

JP-8 TANK 538

854
ENRAF
E-6 – 6248

JP-8 TANK 539

854
ENRAF
E-6 – 6248

JP-8 TANK 537

854
ENRAF
E-6 - 6248

JP-8 TANK 540

854
ENRAF
E-6 - 6248

JP-8 TANK 300

854
ENRAF
OSCAR - 1246

JP-8 TANK 400

854
ENRAF
OSCAR - 1246

JP-8 SOUTH RAMP PRT

854
ENRAF
SOUTH RAMP- 6166

JP-8 TANK 100

854
ENRAF
SOUTH RAMP- 6166

JP-8 TANK 200

854
ENRAF
SOUTH RAMP- 6166

JP-8 TANKER ROW PRT

TLS-350
VEEDER ROOT
TANKER ROW-1211

JP-8 TANK 600

854
ENRAF
TANKER ROW-1211

JP-8 TANK 500

854
ENRAF
TANKER ROW-1211

JP-8 OSCAR ROW PRT

854
ENRAF
OSCAR - 1246
Scully
JP-8 DCSI SCULLY
IC-OGV
INTELLITROL
E-2 – 6225

JP-8 DCSI SCULLY

IC-OGV
INTELLITROL
E-2 – 6225

JP-8 DCSI SCULLY

IC-OGV
INTELLITROL
E-2 - 6225

BREAKOUT TK DCSI SCULLY

IC-OGV
INTELLITROL
E-6 - 6248

JP-4 DCSI SCULLY

IC-OGV
INTELLITROL
E-2 - 6225

(13) LAND MOBILE RADIOS (LMR)

The following on-site installation LMRs may be used by the Contractor in performance of PWS tasks. The LMRs are identified on the local installations Communications Squadron Asset Inventory Management (AIM) list under Account ####.

NOTE: The below LMR’s will remain on the Flight’s account. The Contractor shall sign a hand receipt for the LMR’s upon Contract start. Serial numbers are subject to change.

DESCRIPTION
PART NO
SERIAL NO
LOC
See LMR memo
XTS 5000
320CDU8488
E-2
MOTOROLA
XTS 5000
320CDU8569
E-2

(14) VEHICLES

The following on-site installation vehicles may be used by the Contractor for performance of PWS tasks. This listing is subject to change as vehicles are replaced and/or added to/deleted from the fleet.

TYPE
REGISTRATION NO
NSN
FUEL GRADE DISPENSED

N/A

(15) Base Specific Additional Publications/Forms (addition to Appendix C)

PUBLICATION
TITLE

N/A

File details come from the government source that posted it. Updated .