SF30_SPE5B118Q00030002.pdf

PDF 77 KB Posted

Attached to
Crash Salvage Equipment
Solicitation number
SPE5B1-18-Q-0003
Issued by

About this file

Amendment 2 Questions/Answers

View the file

Other files

File Type Posted
Schedule_B.pdf PDF
SF30_SPE5B118Q00030005.pdf PDF
SF30_SPE5B118Q00030004.pdf PDF
SF30_SPE5B118Q00030003.pdf PDF
Amendment_0001.pdf PDF
SPE5B118Q0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

4. REQUISITION/PURCHASE REQ. NO.

See Block 14

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE5B1 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE5B118Q0003

X

2018 MAR 29

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA TROOP SUPPORT EUR&AF

MANNHEIMER STRASSE 218/219

D-D-67657 KAISERSLAUTERN

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 2 PAGES

SPE5B118Q0003 - 0002

The purpose of this amendment is to exchange information to interested parties for SPE5B1-18-Q-0003.

Questions & Answers

Question 1:

1. Line Number 0002: "Minimum Requirements" indicate the need for Nylon Round Sling with a capacity of 17,000 US pounds, but a Load Cell Indicator with a capacity of 5 US tons (10,000 US pounds).

2.. Line Number 0004: "Minimum Requirements" indicate the need for Nylon Round Sling with a capacity of 44,000 US pounds, but a Load Cell Indicator with a capacity of 12.5 US tons (25,000 US pounds).

As the kit hauling capacity will be based on the item with the lowest working load limit, can you confirm that there is no error in the designated requirements for these two items, or if either lower sling capacities or higher load cell capacities are required?

Answer: The Government confirms there is no error on the requirement. Please follow the requirements on the solicitation.

Question 2:

Line Number 0007 of this solicitation is a requirement for "Airlifting Bag Protective Case 44 Ton" and asks for a quantity of two (2). We have the following questions regarding this requirement:

1. Is each of these protective cases intended to hold fifteen (15) 44 ton capacity airbag elements?

2. If the answer to Question 1 is "no," please specify what each of these protective cases is intended to hold.

3. If the answer is to Question 2 is "yes," can you confirm that the customer has considered that such a case when loaded will be almost 70% bulkier and heavier than the already-large 26 ton airbag protective case, making it rather unwieldy?

4. If the answer to Question 3 is "no," please let us know if you wish to modify this requirement to specify a protective case for a lesser number of 44 ton capacity airbag elements (with a commensurate increase in the quantity of protective cases required).

Answer: The Government is aware of the size/weight of the cases requested and confirms there is no error on the requirement. Please follow the requirements on the solicitation.

Question 3:

The requirements for the “Airlifting Bag Protective Case 15T/26T/44T” state that they must be made of canvas material and must be weather resistant. Are you looking specifically for canvas material only or is a vendor allowed to make an offer for a material that has similar characteristics?

Answer: Please abide by the requirements of the solicitation which states, “Must be canvas material”.

File details come from the government source that posted it.