This solicitation seeks products and services for a new conveyor system and paint booth/oven doors. The Defense Logistics Agency Aviation is soliciting proposals for the installation of a new conveyor system and replacement of paint booth/oven doors at VIBB 19-40-1003. Responses are due by the date specified in the attached solicitation document. The solicitation includes specifications for the conveyor system and doors. It also contains information on the response requirements, evaluation criteria, and basis for award. The selected contractor will be responsible for installation of the new conveyor system and replacement of existing paint booth/oven doors.

View the file

Other files

File Type Posted
SPE4A822Q0030 Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS TO OFFERORS

1.0 General: The following instructions are a guide to facilitate the preparation and submittal of the Offeror’s quote for this solicitation. Non-conformance with any instructions provided below may result in the quote being determined unacceptable. The quote should contain sufficient information to enable the evaluators to determine that the Offeror understands each requirement.

1.1 Objective: The intent of this Lowest Price Technically Acceptable (LPTA) source selection process is for the Government to make an award to the Offeror who provides the best value to the Government based on the results of the evaluation as described in Section 3. The Government intends to award without discussion or negotiation based on offeror’s quote received in response to the Request for Quotation (RFQ). Discussions, if necessary, will be conducted after technical review is completed. Discussions will not be held with unacceptable Offerors.

1.2 Quote Format: Quotes not structured in accordance with the following instructions may be considered incomplete, may not be evaluated, and may be returned at the Offeror’s expense.

Each page containing proprietary information should be so marked. Furthermore, each page should include the following in the footer, “SOURCE SELECTION INFORMATION—SEE FAR 2.101 AND 3.104--FOR OFFICIAL USE ONLY.” Quotes shall be submitted in the following format:

*Note: If offers are submitted electronically, only ONE copy of the unpriced RFQ and unpriced technical data is required.

2.0 Preparation & Content: The information is expected to be simple and economical, clear, legible, specific, and complete as described in the instructions. Furthermore, it should contain

Quote Requirement Format Number of copies

I Completed RFQ with All Pricing Hard copy/electronic copy, original 1

II Completed RFQ without Pricing Hard copy (1) /electronic copy (1), original 2*

III Technical Compliance & Descriptive Literature Hard copy (1) /electronic copy (1); both unpriced 2*

IV

Past Performance Questionnaire and list of five recent contracts

Hard Copy/electronic copy list of five recent contracts and list of companies to whom Past Performance Questionnaire were provided to include contact information

V Price Support (Other Than Certified Cost & Price Data)

Hard copy/electronic copy of Commercial price list and two invoices reflecting sales of same/similar items to other commercial customers (Refer to FAR 52.215- 5-20 & 52.215-21 incorporated into solicitation)

VI

Subcontracting Plan (required for quotes $750K and above from large business

Hard copy/electronic copy; Refer to FAR 52.219-9 1

RFQ: SPE4A8-22-Q-0030 ATTACHMENT "A"

only pertinent information presented in a logical and coherent manner to provide a straightforward and concise description of the technical data and ability to perform. Offerors shall assume the Government has no prior knowledge of their facilities or experience and will base its evaluation on the information presented in the quote. All packages (electronic or hard copy) should be clearly labeled on the front cover of each section to identify the Offeror’s name, solicitation number, and title (i.e., Technical Compliance, Copy 1). The use of three-ring binders, spiral-bound booklets or elaborate formats is discouraged.

2.1 Completed RFQ: All Offerors are required to return a complete, signed copy of the Government’s RFQ, technical quote, and completed supporting documents* by the closing date and time listed in the solicitation. The offeror may submit their proposal utilizing one of the methods listed below:

A. DLA Internet Bid Board System (DIBBS) Offers may be submitted directly to the solicitation via DIBBS with priced proposals, unpriced proposals, other supporting documentation, and technical documents as separate attachments. Offers submitted via DIBBS may be found online at https://www.dibbs.bsm.dla.mil/default.aspx.

B. Mail Service (UPS, FEDEX, ETC.)

Offers may be submitted by mail. Offers may be mailed to ATTN: Stacey Thomas/BLDG 32L DLA Aviation, Mail Room Building 210, 8000 Jefferson Davis Highway, Richmond, VA 23297-5166.

C. Email Offers may be submitted by email with priced proposals, unpriced proposals, and technical documents as separate attachments. Offers submitted via email may be sent to Stacey.1.Thomas@dla.mil.

*Note: An exception may be made for the Past Performance Questionnaire because it must be submitted by a third party and is outside of the direct control of the offeror.

2.2 Summary Sheet: A summary sheet or cover letter identifying any exceptions taken to the RFQ terms and conditions is required. Offerors are cautioned that any noncompliance with the terms and conditions of the RFQ may cause their quote to be determined unacceptable.

2.3 Technical Quote: The quote shall be clear, concise, and include sufficient detail for effective evaluation and not simply rephrase or restate the Government’s requirements. The quote should provide convincing rationale and demonstrate the Offeror's detailed approach to meeting the requirements. Technical quotes must include the following:

2.3.1 Descriptive Literature – IPE

The technical requirements of the Purchase Description, Salient Characteristics or Statement of Work shall be addressed as follows:

A. "Descriptive literature" means information (e.g., cuts, illustrations, drawings, and original manufacturers' brochures) that is submitted as part of a quote.

Descriptive literature is required to establish, for the purpose of evaluation and award, details of the product quoted that are specified elsewhere in the solicitation and pertain to significant elements such as (1) design; (2) materials;

(3) components; (4) performance characteristics; and (5) methods of manufacture, assembly, construction, or operation. The term includes information required to determine the technical acceptability of the quoted product; it does not include other information used in determining the responsibility of a prospective contractor or for operating or maintaining equipment.

B. Data displaying more than one model or size shall be clearly marked to indicate the specific item being quoted.

C. Quotes which do not present sufficient information to permit complete technical evaluation by the Government may not be considered for award.

2.3.2 Indication of Compliance or Exception to Technical Requirements

(COMPLIANCE STATEMENT)

The identical numerical sequence stated in the attached technical scope of work/product description must be used in the compliance statement. Each paragraph of the scope of work/ product description must clearly indicate a response with one of the following statements:

A. EXCEEDS - Where the offeror surpasses the requirement, a narrative description shall be provided.

B. COMPLY - Where the offeror meets the requirement the compliance statement should reflect comply. No narrative is required to be provided unless requested.

C. EXCEPTION TO - Where the offeror takes exception to the requirement, a narrative description shall be provided.

Offerors who do not provide sufficient technical data for evaluation (by the methods noted above); may be rejected without further consideration. The supplying of standard commercial literature shall not be construed as compliance unless it is complete in all details as to permit a technical evaluation in accordance with these instructions. Descriptive literature shall be written in English and all dimensions, capacities, and ratings given in the US system of measurements.

Information submitted other than as herein described will not be translated or converted by the Government to determine product conformance or acceptability.

2.4 Past Performance Data: Past performance shall be used as an evaluation factor within the Lowest Price Technically Acceptable (LPTA) process. The Government intends to collect and evaluate prior contract performance data to assess each Offeror’s ability to supply the products and services required and the quality of the manufacturer’s product quoted for this procurement.

The Government may use any and all past performance data at its disposal in evaluating an Offeror’s demonstrated record of performance. This may include review of contracts issued by any branch of the federal government, whether manual or electronic, past or present, and any commercial contracts identified by the Offeror.

The information provided is considered sensitive and shall not be released to the Offeror. All information is subject to verification by the Government during the evaluation. The Government reserves the right to contact the Government or commercial points of contacts identified, or contacts for other contracts performed, for the purpose of verifying information concerning past performance and/or to obtain additional information.

Evaluation of the past performance surveys received will occur in accordance with Past Performance as addressed in section 3.0.2.

The government will use any and all past performance data at its disposal in evaluating the quality of the product quoted to determine the best value. Data collected from government or commercial sources on previously supplied same/similar manufacturing machines can be used to determine the product quoted is not satisfactory and determined not to be the best value.

3.0 Source Selection Process: Offers shall be evaluated utilizing the Lowest Price Technically Acceptable (LPTA) source selection process. This process determines the best value to the Government to be the lowest priced quote that is determined acceptable in all non-price factors, which consists of technical and past performance. Quotes that are determined acceptable for both the technical and past performance factors will be determined technically acceptable quote.

Value is not recognized from a quote that exceeds the Government’s technical or performance requirements.

3.0.1. Technical Review Rating. The technical review determines whether the offer will satisfy the Government’s requirements. All responsive Offerors will have their non-priced technical quotes evaluated to determine if they demonstrate a thorough knowledge and understanding of the technical requirements, as well as provide a sound, compliant approach to executing all areas of performance. The following ratings will be used:

Technical Rating Description

Acceptable Quote clearly meets the minimum requirements of the solicitation.

Unacceptable Quote does not clearly meet the minimum requirements of the solicitation.

3.0.2 Past Performance, Experience, and Quality Rating. Offers will be evaluated based on past performance, experience, and the quality of the product. Past performance describes how well contractors executed what was promised in a quote and the quality of the product quoted. Experience reflects whether contractors have performed similar work before. This part of the evaluation process enables the Government to assess the competence of an Offeror to supply the required products and services based on a demonstrated record of past performance.

The following ratings will be used:

*Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror will not be evaluated favorably or unfavorably on past performance.

Therefore, the offeror shall be determined to have unknown past performance.

In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

There are two aspects to the past performance evaluation. The first is to evaluate whether the offeror’s present/past performance is relevant or not relevant to the effort to be acquired. The second aspect of the past performance evaluation is to determine how well the contractor performed on the contracts. Each aspect will be evaluated on an Acceptable/Unacceptable basis to determine an overall past performance rating.

The Government will utilize any data available, including information on total equipment effectiveness matters such as availability, performance, and quality, when evaluating past performance.

In order to collect adequate and relevant past performance information on the Offeror’s ability to supply the product/service, a Past Performance Questionnaire (PPQ) is included as an attachment to the RFQ for use in determining how well the prospective Offeror performed for another business. The prospective Offeror should annotate its company name at the top of the form, then send a copy to at least five businesses for which it has

Past Performance Rating Description

Acceptable

Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown*.

Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

previously (or currently) provided same or similar products or services. The completed evaluation forms must be returned from the third party directly to the Contracting Officer.

Completed forms received from the Offeror will not be accepted.

If past performance information has been provided on a solicitation within the last six months for the same or similar item, provide that Purchase Request Number with your offer and request that the Past Performance Questionnaire’s be utilized for this solicitation.

3.0.3 Price Reasonableness/Support. All responsive, technically acceptable (based on technical and past performance evaluation ratings) quotes will be evaluated for Price Reasonableness. Unrealistically low proposed prices, initially or subsequently, may be grounds for eliminating a quote from competition either on the basis that the Offeror does not understand the requirements or that the Offeror has submitted an unrealistic quote.

Price Reasonableness will be evaluated as described below:

A. Reasonableness: Adequate price competition is expected to support the determination of reasonableness. Price or cost analysis techniques may be used to further validate price reasonableness. If adequate price competition is not obtained or if price reasonableness cannot be determined using price analysis of Government obtained information, additional information will be required to support the proposed price.

B. Support: A quantity of two (2) Commercial invoices reflecting the same/similar item has been sold to other commercial customers is requested to be provided with quote.

DLA AVIATION QUALITY ASSURANCE PROVISION (QAP) 208 April 2015

1. MANDATORY CONTRACTOR INSPECTION SYSTEM:

The inspection system identified in FAR clause 52.246-2, Inspection of Supplies - Fixed Price, applies. This inspection system shall, as a minimum, encompass all tests and examinations specified in paragraph 3 below. Records of all these examinations and tests shall be maintained by the contractor for a period of at least two years after final contract delivery.

2. CALIBRATION REQUIREMENTS:

Contractor's inspection and test equipment utilized in determining conformity of supplies with contract requirements shall have a current valid calibration traceable to the National Institute of Standards and Technology (NIST). This calibration is to have been performed within the established calibration intervals, not to exceed 12 months, unless the contractor maintains sufficient documented records proving continuing accuracy and control throughout the established interval.

NOTE: Contractor shall establish a calibration system in accordance with the edition of ANSI/NCSL Z540.3, dated 2006-08-03. NOTE: ISO 10012 dated 2003-04-15 shall be implemented for foreign Supplies.

3. INSPECTION AND TEST:

a. The contractor is responsible for the performance of all inspections and tests specified in the contract. Prior to the item being offered to the Government for acceptance, the contractor shall assure that the item conforms to all contract requirements.

Inspection and testing shall consist of all requirements as specified, visual examination for appearance, workmanship, completeness and maintainability of all specified systems, accessories, markings and safety devices. The Government reserves the right to ensure that the inspections/tests performed by the contractor are fully adequate to assure the item(s) conform to all requirements and specifications of the contract.

b. Components and Materials: The contractor is responsible for ensuring that all components and materials used are manufactured, examined and tested in accordance with specified technical requirements.

c. Visual Examination of the End Item: The completed end item shall be examined for defects in construction, design, workmanship, SPE4A8-22-Q-0030 ATTACHMENT "B" and finish to determine compliance with specified requirements. Any departure from a specified requirement shall be classified as a defect. Any defect shall be cause for rejection of the entire quantity.

d. End Item Tests: Failure of an item to pass any test shall be cause for rejection of the entire shipment quantity. When applicable, the contractor shall perform reassembly of the item(s) and repeat all testing for final acceptance at destination.

4. INSPECTION/ACCEPTANCE

a. Inspection and Acceptance at Destination: DLA AVIATION may provide a Quality Assurance Specialist for the purpose of all inspections and acceptance of the item(s) at destination.

b. Contractor Notification Requirements: DLA AVIATION request fifteen (15) business days advance notification of the projected date the item(s) will be ready for final acceptance and testing and three

(3) days advance notice if the item(s) will not be ready as projected. NOTE: All federal holidays and weekends are excluded as business days.

c. Government Procurement Quality Assurance Assignment: The DLA AVIATION Quality Assurance Office shall be responsible for administration of all Procurement Quality.

Inspection/Acceptance: Destination

SPE4A8-22-Q-0030 ATTACHMENT "B"

VIBB 19-40-1003

8 November 2021

PURCHASE DESCRIPTION FOR THE ACQUISITION OF A

NEW CONVEYOR SYSTEM AND PAINT BOOTH/OVEN DOORS

SCOPE.

Scope. The content of this specification describes the minimum requirements for a new conveyor system and paint booth / oven doors. The project location is at Marine Depot

Maintenance Command-Production Plant Barstow (MDMC-PPB) located at Yermo Annex of Marine Corps Logistics Base, Barstow, CA. The new conveyor system shall integrate into the existing painting operations within building 634 and is intended to increase the productivity of the existing paint and corrosion control activity. The paint booth and oven doors are to be replaced including the pneumatic operators. It shall be the responsibility of the Contractor to remove and dispose of existing monorail system, old paint bay and oven doors, scrap metals and all other trash and debris generated under this contract off site and off base in accordance with state and local regulations. Unless otherwise specified, throughout this document “System” will refer to conveyor system and paint booth and oven doors. The Contractor shall furnish all materials, labor and equipment necessary to perform the work required and to provide a complete and usable end product as described. The project duration shall not exceed 180 days after award.

APPLICABLE DOCUMENTS.

General . The documents listed in this section are cited in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3 and 4 of this specification, whether or not they are listed

2.2 Government Documents.

2.2.1 Specifications, Standards, and Handbooks. The following specifications, standards and handbooks from a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the solicitation or contract.

STANDARDS – FEDERAL

FED-STD-H28B: Screw Thread Standards for Federal Service (2019 Ed.)

U.S Department of Labor, Occupational Safety and Health Administration

(OSHA)

29 CFR 1910: General Industry, OSHA Safety and Health Standards (2017 Ed.)

(Application for copies should be addressed to the OSHA Publications

Superintendent of Documents P.O. Box 37535 Washington, D.C. 20013-7535)

SPE4A8-22-Q-0030 ATTACHMENT "C"

2.2.2 Other Government Documents, Drawings, and Publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.

LOCAL FACILITY DOCUMENTS

Attachment A: Paint Booth Monorail Layout

Attachment B: Paint Drying Rail Drawing Package

Attachment C: Production Plant Barstow access requirements, safety requirements and hours of work

Attachment D: MDMC PPB Sliding Metal Doors Specifications

Attachment E: MDMC PPC Oven and Monorail Photographs

2.3 Non-Government Publications, Specifications, Standards, and Handbooks. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.

National Fire Protection Association (NFPA)

NFPA 33: Spray Application for Using Flammable or Combustible Materials

(Applications for copies should be addressed to the National Fire Protection

Association, ATTN: Support Services, 11 Tracy Drive, Avon, MA 02322)

2015 International Existing Building Code (IEBC)

International Mechanical Code (IMC)

Order of Precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulation unless a specific exemption has been obtained.

REQUIREMENTS.

Design. The item offered shall be new and a current commercially available model. A current model is defined as the manufacturer’s currently produced model which, on the date this solicitation is issued, has been designed, engineered, sold or is being offered for sale through advertisements or manufacturer’s published catalogue or brochures. Products such as a prototype unit, pre-production model, or experimental unit do not qualify as meeting the requirements specified herein. The systems shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts subject to wear, breakage or distortion shall be accessible for adjustment, replacement, and repair.

Controls. All electrical, mechanical, hydraulic, and pneumatic operating controls shall be located convenient to the operator's work station(s).

Safety and Health Requirements. All machine parts, components, mechanisms, and assemblies furnished on the machine, whether or not specifically required herein, shall comply with all of the requirements of OSHA 29 CFR 1910.

Mercury Restriction. The machine shall not contain mercury or mercury compounds nor be exposed to free mercury during manufacture with the exception of fluorescent lighting where required.

Asbestos Restriction. Asbestos and materials containing asbestos shall not be used on or in the machine.

Lead. Lead and materials containing lead shall not be used on or in the machine with the exception to radiation cladding and lead solder in circuits.

Use of Polychlorinated Biphenyl (PCB). The use of polychlorinated biphenyl

(PCB) on or in the equipment is prohibited.

Environmental Protection. The system is to be installed at a facility which is within the Mojave Desert Air Quality Management District. Under the operating, service, transportation, and storage conditions described herein, the system shall not emit materials hazardous to the ecological system as prohibited by Federal, state, or local statutes in effect at the point of installation.

Lubrication. Means shall be provided to ensure adequate lubrication (oil, grease, coolant, etc.) For all moving parts,all oil holes, grease fittings, and filler caps shall be easily accessible.

Replacement Parts. All parts subject to replacement shall be manufactured to definite dimensions and tolerances. Replacement parts shall be interchangeable without requiring modification. Replacement parts are those that are subject to wear or failure such as gears, bearings, shafts, feed screws, drive belts, pumps, and seals. Electrical replacement parts shall include but not be limited to, motors, relays, fuses, switches, magnetics, pushbuttons, light bulbs, braking mechanisms, and solid-state devices. Tooling and accessories normally supplied as standard items shall also be considered replacement parts.

Construction. The system shall be constructed of parts that are new, without defects, and free of repairs. The structure shall withstand all forces encountered during operation of the machine to its maximum rating and capacity without distortion.

Fastening Devices. All screws, pins, bolts, and other fasteners shall be installed to prevent unintentional loosening. Fastening devices subject to removal or adjustment shall not be permanently installed.

Threads. All threaded parts used on the machine and its related attachments and accessories shall conform to FED-STD-H28B and the applicable “Detailed Standard” section referenced therein.

Surfaces. All surfaces shall be clean and free of harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. The condition and finish of all surfaces shall be in accordance with the manufacturer's commercial practice.

Welding, Brazing, or Soldering. Welding, brazing, or soldering shall be employed only where specified in the original design. None of these operations shall be employed as a repair measure for any defective part.

Painting. The contractor shall paint areas of work to match existing surfaces, to conform to the existing paint and blend to match existing work area. All new work shall be painted in accordance with manufacturer’s commercial practice. All paint shall be of the lead free type.

Workmanship. Workmanship of the machine shall meet all requirements specified herein and shall be of a quality equal to that prevailing among manufacturers producing equipment of the type covered by this purchase description.

Components. The machine shall consist of not less than the following components:

Monorail Conveyor System. The conveyor system shall be built in accordance with

Attachment A. The contractor shall modify the plenums and ducts, necessary to accommodate the new monorail configuration in accordance with 2015 International

Existing Building Code (IEBC).

Conveyor Rails. The new conveyor rail system shall fully replace the existing KBK system and provide the same functionality with increased capacity within the drying ovens. The design shall increase the oven’s capacity to allow for an additional six (6) drying rails to be supported in each oven, making each oven’s total capacity nine (9) drying rails.

Conveyor Rail Support. The existing conveyor rail support structure is engineered to support a minimum of 2,000 lbs. All modifications made to the conveyor rail support structure shall meet the existing 2,000 lbs.

requirement.

Track Trolley. The new system shall be provided with 72 new track trollies. The new track trollies provided shall provide the same functionality as the existing KBK conveyor system.

Suspension Cables. The new system shall be provided with 72 new suspension cables. The cables shall be corrosion resistant wire rope with terminations at each end. The Trolley and Suspension Cable assembles shall demonstrate the ability to support 660 lbs. suspended from a single load point.

Drying Rails. The system shall be provided with twelve (12) new drying rails in accordance with Attachment B.

3.3.1.6 Drying Rail Hangers. The drying rails shall have eight (8) adjustable, swiveling hooks for hanging parts. See attachment B.

Track Switches. The new track switches shall have four (4) manually operated track switches without actuator for the ovens, and two (2) shall be pneumatic switches operated on the pneumatic controls. Manual track switches shall be designed not to create a hazard for the operator. Contractor shall determine the location of the switches based on overall design.

Paint Bay and Oven Doors . The contractor shall supply and install six (6) pairs of new sliding doors and pneumatic operators. The new doors are to replace the existing doors on the “SBS Model #16 Parts Paint Oven” paint bay and drying oven. The doors are arranged such that two doors make up one complete door assembly. The door halves shall slide open using new pneumatic actuators. The doors shall be actuated by the existing switches activated manually by the operator from either side of the door. The doors shall be of double wall construction and accommodate new monorailing. The doors shall be constructed and sealed in accordance with NFPA 33.

Doors and Openings Modifications. The contractor shall modify the existing doors, openings and headers necessary to accommodate the new monorail configuration.

Standard Tooling and Equipment. All standard tooling and equipment required for proper operation of the system (such as special tools needed for maintenance) shall be furnished. A list of these items shall be furnished at time of proposal.

Marking on Instruments, Control Panels, and Plates. All words on plates shall be in the English language. Characters shall be engraved, etched, embossed, or stamped in boldface on a contrasting background. All plates shall be corrosion resistant.

Nameplate. A nameplate shall be permanently and securely attached to the system

The nameplate shall contain the information listed below. If the machine is a special model, the model designation shall include the model number of the basic standard machine and a suffix identified in the manufacturer's permanent records.

Nomenclature

Manufacturer’s Name

Manufacturer’s Model Designation

Manufacturer’s Serial Number

Power Input (Volts, Total Amps, Phase, Frequency)

Contract Number

Date of Manufacture

Technical Data. Two (2) hard copies and one (1) electronic copy(s) of technical data shall be provided with the system. Technical data shall contain technical information, specifications, instructions for the operation, maintenance of the system and recommended spare parts list. All copies of technical data shall be legible and written in the English language.

Plan of Action and Milestones (POA&M). The contractor shall provide a POA&M to identify contractor performance dates of all major events from contract award to completion of all contract requirements. The initial POA&M shall be delivered thirty (30) calendar days After Contract Award (ACA). The milestones shall be prepared using a recognized project management technique (preferably Microsoft Project). The Government and the contractor shall review the report on a monthly basis. The contractor shall notify the Government prior to making any changes to the POA&M. All changes to the POA&M shall be approved in advance by the Government. The POA&M shall detail such items as engineering, procurement of major hardware, assembly, operational debug, factory acceptance, shipment, installation, training, and final acceptance test.

Installation. The contractor shall install the new system and required equipment in accordance with manufacturer’s recommendations and instructions, see Attachment E for reference of existing equipment. The existing rail system, old paint bay / oven doors and all trash and debris generated under this contract shall be the responsibility of the Contractor to remove from the job site and dispose of offsite and off base in accordance with state and local regulations. The contractor is responsible for delivery of the equipment, including freight costs, packaging, unloading, and safe storage. The contractor is responsible for any equipment or tools required to complete the project, including but not limited to: man-lifts, forklifts, other lifting equipment, cranes, or other equipment and for the security of the equipment while on site. The contractor shall plan and perform work to minimize the impact on MDMC operations, refer to Attachment C.

Paint Bay Doors. The New Paint Bay / Oven Doors shall be installed on the existing paint bay structure. The new doors shall be manufactured in accordance with Attachment

D, and shall operate without binding or rubbing.

Monorail Conveyor System. The New Monorail Conveyor System shall provide all the same functionality as the existing KBK system, but with increased capacity. The new rail system shall be installed at the same height as the existing system and shall be leveled so as to prevent the trolleys from rolling once released by the operator. The contractor is responsible for any reinforcements or other structural changes to the existing facility that are necessary for installation the system.

Paint Booth and Oven Modifications. Paint Booth Intake/Exhaust plenums shall be modified using equivalent to accommodate unobstructed carrier movement through the transitions. Both drying oven air supply ducts will be modified with equivalent materials to allow for unobstructed carrier movement through the transitions. Both Drying ovens shall be re-balanced to the extent of existing capacities to ensure the uniform and consistent air flow throughout the workspace in accordance with International Mechanical Code (IMC).

Training. After satisfactory completion of acceptance testing of the system, the services of a qualified representative(s), who is an American citizen of good standing and repute and proficient in the English language, shall be provided for specialized training to familiarize Government personnel with the equipment and to help ensure reliable performance and maximum service life, during normal usage. The training shall be for five

(5) operators. The manufacturer’s standard training shall be performed at the government facility during normal business hours (6:30 am to 4:00 pm Monday through Friday) The training duration shall be no less than two (2) consecutive days. The course shall utilize as-built drawings and manuals provided under this contract and shall include hands-on training as required. All printed training aids shall be supplied for this course, be in the

English language, and become the property of the Government.

QUALITY ASSURANCE.

Responsibility for Inspection. The contractor shall be responsible for the performance of all inspection requirements specified herein and in accordance with the attached Quality

Assurance Provision (QAP). The Government reserves the right to witness any inspections set forth in the purchase description where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.

Responsibility for Compliance. All items must meet all requirements of sections 3 and 4.

Classification of Inspections. The inspection requirements specified herein are classified as follows:

a. Final Inspection/Acceptance test (Destination) (see 4.3).

Final Inspection/Acceptance Test (Destination). Final Inspection and acceptance test shall be performed on the system to ensure conformance with this purchase description.

The acceptance test shall be performed only after the system is installed at its final location.

Examination. The equipment shall be examined for design, dimensions, construction, materials, components, electrical equipment and workmanship to determine compliance with the requirements of this specification.

Tests. Unless otherwise specified within this document, all programs, instruments, materials, material handling equipment, qualified personnel, and tools required to perform and evaluate the tests shall be furnished by the contractor. All measurement tools and indicating devices shall be calibrated in accordance with the attached QAP.

Paint Bay Door Test. Tests shall be conducted to ensure the Paint Bay Door operate smoothly without binding or rubbing.

Monorail Conveyor System Test. The new Monorail Conveyor system shall be tested for smoothness of operation and for the operation of all track switches. The Trollies shall not roll along the rails after being released by the operator.

INSTALLATION RESPONSIBILITIES

Government Contractor

☐ ☒ a. Provide equipment foundation in accordance with the

Manufacturer’s design requirements

☐ ☒ b. Furnish labor and material handling equipment for off-loading and placing item on foundation

☐ ☒ c. Provide and install anchor bolts and nuts

☐ ☒ d. Set and rough level the equipment on its foundation

☐ ☒ e. Level and align equipment

☐ ☒ f. Connect equipment to the provided utilities hook-up

☐ ☒ g. Provide all necessary tools, gages, and instrumentation necessary to perform the required tests

☐ ☒ h. Provide and charge all systems with fluids in accordance with manufacturer's instructions

☐ ☒ i. Material for performance testing at Government facility

☐ ☒ j. Material for performance testing at Contractor's facility

☐ ☒ k. Material handling, Rigging equipment and Qualified

Personnel for performance testing

☐ ☒ l. will connect utilities to the equipment based on site drawings.

GOVERNMENT RESPONSIBILITIES

☒ Provide utilities hook-up within 20 feet of the equipment

☒ Assign one mechanic (mechanical/hydraulic) and one maintenance mechanic

(electrical/electronic) to provide information and any additional materials for the contractor's representative during installation, verification, and initial start-up of the equipment.

☒ No work shall be performed by customer personnel when the contractor's representative is not in the immediate work area during installation, verification, and initial start-up of the equipment.

MDMC PPB SLIDING METAL DOORS SPECIFICATIONS

09/21

PART 1 GENERAL

1.1 SYSTEM DESCRIPTION

Provide pneumatically operated, zinc-coated, sliding doors for drying ovens. Provide each door complete with operating devices, hardware, and accessories.

PART 2 PRODUCTS

2.1 SLIDING DOORS

Provide sliding doors of the following type:

2.1.1 Insulated

Non-labeled insulated doors shall be flush panel consisting of fiberglass insulation core covered on both faces with a bonded zinc-coated steel sheet not lighter than 14 gauge. Design doors to provide for normal operating range of 140°F. Doors shall be fabricated using a single panel.

2.2 OPERATION

Doors shall be center-parting on level tracks and designed to normally remain in the closed position. Doors shall be manually operated by the existing door levers mounted in the paint booths. All safeties and interlocks for the door operation are existing.

2.2.1 Pneumatic Operators

Provide heavy duty industrial type operator, designed to operate the door at minimum of 1 ft per second with air pressure of 40 psi. The operator shall open, close, start, and stop the door smoothly. Controlers are existing and to remain.

2.3 HARDWARE

Design tracks, roller assemblies, and installation hardware to support a dead load equal to 1.5 times the weight of the door and attached hardware without deformation that would interfere with the operation of the door.

Provide ball or roller bearing wheels or rollers with case hardened races on all devices incorporating wheels or rollers. Attach hardware using zinc plated through bolts, nut plates, or similar devices to ensure adequate fastener strength.

2.4 SAFETY DEVICE

Safety devices are existing and to remain.

2.5 ACCESSORIES

SPE4A8-22-Q-0030 ATTACHMENT "D"

2.5.1 Track Hood

Track hood shall be zinc-coated steel not lighter than 14 gauge.

2.5.2 Top Guide Rollers

Provide top guide rollers of the horizontal type as indicated. Provide rollers of steel and sized for load conditions. Rollers shall have permanently lubricated anti-friction bearings. Construct assemblies allowing removal. Construct top roller assemblies to transmit the load from the door to the building structure.

2.5.3 Track Cleaners

Provide door leaves with sweeps to clear debris from the rail head and wheel flange grooves as the leaf is moved.

2.6 FINISH

2.6.1 Steel Surfaces of Doors

Provide galvanized coating conforming to ASTM A653/A653M or ASTM A924/A924M, coating designation G90, for steel sheets on all steel surfaces of doors, after first applying a shop-primed finish.

PART 3 EXECUTION

3.1 TESTING

Test doors in the presence of a representative of the door manufacturer and the Contracting Officer. Testing shall consist of [10] complete opening and closing cycles for each pair of doors. Doors shall function properly, and operation of doors shall be smooth.

-- End of Section --

SPE4A8-22-Q-0030 ATTACHMENT "D"

SPE4A8-22-Q-0030 ATTACHMENT "E"

Paint Booth

Drying Oven

Paint Booth

Drying Oven

No. 10

No. 9

No. 8

No. 7

S

S

S

S

S

S

SPE4A5-22-Q-0030 ATTACHMENT "E"

No. 7

S

No. 9

S

SPE4A8-22-Q-0030 ATTACHMENT "F"

4 3

11 5

8 7

PHOTO LOCATIONS

PH

O

TO

PH

O

TO

PHOTO 3

PHOTO 4

PHOTO 5

PHOTO 6

PHOTO 7

PHOTO 8

PHOTO 9

PHOTO 10

PHOTO 11

PHOTO 12

5.002

CL

ITEM NO.3 REMOVED FROM RIGHT SIDE

VIEW FOR CLARITY PURPOSES

TYP.

TYP.

3/8

A

DETAIL A

SCALE 1 : 1.5

NOTES:

INTERPRET DRAWING IN ACCORDANCE WITH STANDARDS PRESCRIBED BY ASME Y14.1001.

WELD IN ACCORDANCE WITH AWS D1.1 USING GAS METAL ARC WELDING (GMAW) OR SHIELDED METAL ARC WELDING (SMAW);2.

FILLER METAL SHALL BE ER70S-6 IN ACCORDANCE WITH ANSI/AWS A5.18 OR E7018-1 IN ACCORDANCE WITH ANSI/AWS A5.1 CLEAN WORK AS REQUIRED: DEBURR ALL SHARP EDGES AND REMOVE WELD SPATTER TO MEET ACCEPTABLE TRADE STANDARDS.3.

TYPICAL

3/8

REVISIONS

ZONE REV. DESCRIPTION DATE APPROVED

ITEM NO. CAGE CODE PART NUMBER DESCRIPTION QTY.

1 33SR4 2018B0002 COMPONENT RAIL TUBE 1

2 33SR4 2018B0003 SUSPENSION BRACKET 2

3 33SR4 2018B0004 TUBE HANDLE 2

4 33SR4 2018B0006 SLIDE TUBE ASSEMBLY 8

5 33SR4 2018B0005 HANGER 8

6 2018B0010 1/2"-20 UNF, GRADE 8 HEX NUT 8

7 2018B0009 1/2" OVERSIZED SPLIT LOCK WASHER 8

D

C

B

AA

B

C

D

12345678

8 7 6 5 4 3 2 1

E

F

E

F

RE

V

B0

C om po ne nt

R ai l A ss em bl y D

SHEET 1 OF 1

UNLESS OTHERWISE SPECIFIED:

SCALE: 1:8 WEIGHT:

REVDWG. NO.

D

SIZE

TITLE:

NAME DATE

COMMENTS:

Q.A.

APPROVED BY:

ENG BY:

CHECKED BY:

DRAWN BY:

FINISH

MATERIAL

INTERPRET GEOMETRIC

TOLERANCING PER ASME Y14.5 M

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL

ANGULAR: BEND .5

ONE PLACE DECIMAL .1

TWO PLACE DECIMAL .01

THREE PLACE DECIMAL .003

APPLICATION

USED FORNEXT ASSY

PROPRIETARY AND CONFIDENTIAL

CAD MAINTAINED CHANGES

SHALL BE INCORPORATED BY

THE DESIGN ACTIVITY

SOLIDWORKS 2012

CAGE

33SR4 2018B0001

DEPARTMENT OF THE NAVY

UNITED STATES MARINE CORPSSGL

SGL

RJP

BJS

01/18/18

01/18/18

01/18/18

01/18/18

RAIL ASSEMBLY,

COMPONENT

FINAL

SPE4A8-22-Q-0030

ATTACHMENT "G"

.13

45.00°

96.00

CHAMFER X2

3.502.75

ISOMETRIC VIEW FOR

REFERENCE ONLY

NOTES:

INTERPRET DRAWING IN ACCORDANCE WITH STANDARDS PRESCRIBED BY ASME Y14.1001.

CLEAN WORK AS REQUIRED: DEBURR ALL SHARP EDGES TO MEET ACCEPTABLE TRADE STANDARDS.2.

MATERIAL SPECIFICATION: 1018 STEEL, ROUND MECHANICAL TUBING, 3-1/2" INCH OUTSIDE DIAMETER WITH 3/8" INCH WALL THICKNESS3.

REVISIONS

ZONE REV. DESCRIPTION DATE APPROVED

D

C

B

AA

B

C

D

12345678

8 7 6 5 4 3 2 1

E

F

E

F

RE

V

B0

C om po ne nt

R ai l T ub e D

SHEET 1 OF 1

UNLESS OTHERWISE SPECIFIED:

SCALE: 1:8 WEIGHT:

REVDWG. NO.

D

SIZE

TITLE:

NAME DATE

COMMENTS:

Q.A.

APPROVED BY:

ENG BY:

CHECKED BY:

DRAWN BY:

FINISH

MATERIAL

INTERPRET GEOMETRIC

TOLERANCING PER ASME Y14.5 M

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL

ANGULAR: BEND .5

ONE PLACE DECIMAL .1

TWO PLACE DECIMAL .01

THREE PLACE DECIMAL .003

APPLICATION

USED FORNEXT ASSY

PROPRIETARY AND CONFIDENTIAL

CAD MAINTAINED CHANGES

SHALL BE INCORPORATED BY

THE DESIGN ACTIVITY

SOLIDWORKS 2012

CAGE

33SR4 2018B0002

DEPARTMENT OF THE NAVY

UNITED STATES MARINE CORPSSGL

SGL

RJP

BJS

01/18/18

01/18/18

01/18/18

01/18/18

RAIL, TUBE,

COMPONENT

2018B0001 1018 STEEL

SPE4A8-22-Q-0030

90.00°

0.13 CHAMFER X2

R.25

45.00°

3.02 2.40

6.10

.63

ISOMETRIC VIEW FOR

REFERENCE ONLY

NOTES:

INTERPRET DRAWING IN ACCORDANCE WITH STANDARDS PRESCRIBED BY ASME Y14.1001.

CLEAN WORK AS REQUIRED: DEBURR ALL SHARP EDGES TO MEET ACCEPTABLE TRADE STANDARDS.2.

MATERIAL SPECIFICATION: 1018 OR 1020 STEEL, ROUND BAR, 5/8" INCH DIAMETER.3.

REVISIONS

ZONE REV. DESCRIPTION DATE APPROVED

D

C

B

AA

B

C

D

12345678

8 7 6 5 4 3 2 1

E

F

E

F

RE

V

B0

Su sp en sio n

Br ac ke t

D

SHEET 1 OF 1

UNLESS OTHERWISE SPECIFIED:

SCALE: 2:1 WEIGHT:

REVDWG. NO.

D

SIZE

TITLE:

NAME DATE

COMMENTS:

Q.A.

APPROVED BY:

ENG BY:

CHECKED BY:

DRAWN BY:

FINISH

MATERIAL

INTERPRET GEOMETRIC

TOLERANCING PER ASME Y14.5 M

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL

ANGULAR: BEND .5

ONE PLACE DECIMAL .1

TWO PLACE DECIMAL .01

THREE PLACE DECIMAL .003

APPLICATION

USED FORNEXT ASSY

PROPRIETARY AND CONFIDENTIAL

CAD MAINTAINED CHANGES

SHALL BE INCORPORATED BY

THE DESIGN ACTIVITY

SOLIDWORKS 2012

CAGE

33SR4 2018B0003

DEPARTMENT OF THE NAVY

UNITED STATES MARINE CORPSSGL

SGL

RJP

BJS

01/18/18

01/18/18

01/18/18

01/18/18

BRACKET,

SUSPENSION

2018B0001 STEEL

SPE4A8-22-Q-0030

2.632.00

6.00

45.00°

0.13 CHAMFER

R.25

.63

7.25

ISOMETRIC VIEW FOR

REFERENCE ONLY

NOTES:

INTERPRET DRAWING IN ACCORDANCE WITH STANDARDS PRESCRIBED BY ASME Y14.1001.

CLEAN WORK AS REQUIRED: DEBURR ALL SHARP EDGES TO MEET ACCEPTABLE TRADE STANDARDS.2.

MATERIAL SPECIFICATION: 1018 OR 1020 STEEL, ROUND BAR, 5/8" INCH DIAMETER.3.

REVISIONS

ZONE REV. DESCRIPTION DATE APPROVED

D

C

B

AA

B

C

D

12345678

8 7 6 5 4 3 2 1

E

F

E

F

RE

V

B0

Tu be H an dl e D

SHEET 1 OF 1

UNLESS OTHERWISE SPECIFIED:

SCALE: 2:1 WEIGHT:

REVDWG. NO.

D

SIZE

TITLE:

NAME DATE

COMMENTS:

Q.A.

APPROVED BY:

ENG BY:

CHECKED BY:

DRAWN BY:

FINISH

MATERIAL

INTERPRET GEOMETRIC

TOLERANCING PER ASME Y14.5 M

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL

ANGULAR: BEND .5

ONE PLACE DECIMAL .1

TWO PLACE DECIMAL .01

THREE PLACE DECIMAL .003

APPLICATION

USED FORNEXT ASSY

PROPRIETARY AND CONFIDENTIAL

CAD MAINTAINED CHANGES

SHALL BE INCORPORATED BY

THE DESIGN ACTIVITY

SOLIDWORKS 2012

CAGE

33SR4 2018B0004

DEPARTMENT OF THE NAVY

UNITED STATES MARINE CORPSSGL

SGL

RJP

BJS

01/18/18

01/18/18

01/18/18

01/18/18 HANDLE

2018B0001 STEEL

SPE4A8-22-Q-0030

1.13

.38

0.13 CHAMFER45.00°

R1.13

.63

.49

.75

6.63

2.88

1/2"-20 UNF

ISOMETRIC VIEW FOR

REFERENCE ONLY

NOTES:

INTERPRET DRAWING IN ACCORDANCE WITH STANDARDS PRESCRIBED BY ASME Y14.1001.

CLEAN WORK AS REQUIRED: DEBURR ALL SHARP EDGES TO MEET ACCEPTABLE TRADE STANDARDS.2.

MATERIAL SPECIFICATION: 1018 OR 1020 STEEL, ROUND BAR, 5/8" INCH DIAMETER.3.

REVISIONS

ZONE REV. DESCRIPTION DATE APPROVED

D

C

B

AA

B

C

D

12345678

8 7 6 5 4 3 2 1

E

F

E

F

RE

V

B0

Ha ng er

D

SHEET 1 OF 1

UNLESS OTHERWISE SPECIFIED:

SCALE: 1:1 WEIGHT:

REVDWG. NO.

D

SIZE

TITLE:

NAME DATE

COMMENTS:

Q.A.

APPROVED BY:

ENG BY:

CHECKED BY:

DRAWN BY:

FINISH

MATERIAL

INTERPRET GEOMETRIC

TOLERANCING PER ASME Y14.5 M

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL

ANGULAR: BEND .5

ONE PLACE DECIMAL .1

TWO PLACE DECIMAL .01

THREE PLACE DECIMAL .003

APPLICATION

USED FORNEXT ASSY

PROPRIETARY AND CONFIDENTIAL

CAD MAINTAINED CHANGES

SHALL BE INCORPORATED BY

THE DESIGN ACTIVITY

SOLIDWORKS 2012

CAGE

33SR4 2018B0005

DEPARTMENT OF THE NAVY

UNITED STATES MARINE CORPSSGL

SGL

RJP

BJS

01/18/18

01/18/18

01/18/18

01/18/18 HANGER

2018B0001 STEEL

SPE4A8-22-Q-0030

1.00

5.63

.50 .50

ISOMETRIC VIEW FOR

REFERENCE ONLY

NOTES:

INTERPRET DRAWING IN ACCORDANCE WITH STANDARDS PRESCRIBED BY ASME Y14.1001.

WELD IN ACCORDANCE WITH AWS D1.1 USING GAS METAL ARC WELDING (GMAW) OR SHIELDED METAL ARC WELDING (SMAW);2.

FILLER METAL SHALL BE ER70S-6 IN ACCORDANCE WITH ANSI/AWS A5.18 OR E7018-1 IN ACCORDANCE WITH ANSI/AWS A5.1 CLEAN WORK AS REQUIRED: DEBURR ALL SHARP EDGES AND REMOVE WELD SPATTER TO MEET ACCEPTABLE TRADE STANDARDS.3.

TYPICAL

REVISIONS

ZONE REV. DESCRIPTION DATE APPROVED

ITEM NO. CAGE CODE PART NUMBER DESCRIPTION QTY.

1 33SR4 2018B0008 HANGER BRACKET 1

2 33SR4 2018B0007 SLIDE TUBE 1

D

C

B

AA

B

C

D

12345678

8 7 6 5 4 3 2 1

E

F

E

F

RE

V

B0

Sli de T ub e

A ss em bl y D

SHEET 1 OF 1

UNLESS OTHERWISE SPECIFIED:

SCALE: 1:1 WEIGHT:

REVDWG. NO.

D

SIZE

TITLE:

NAME DATE

COMMENTS:

Q.A.

APPROVED BY:

ENG BY:

CHECKED BY:

DRAWN BY:

FINISH

MATERIAL

INTERPRET GEOMETRIC

TOLERANCING PER ASME Y14.5 M

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL

ANGULAR: BEND .5

ONE PLACE DECIMAL .1

TWO PLACE DECIMAL .01

THREE PLACE DECIMAL .003

APPLICATION

USED FORNEXT ASSY

PROPRIETARY AND CONFIDENTIAL

CAD MAINTAINED CHANGES

SHALL BE INCORPORATED BY

THE DESIGN ACTIVITY

SOLIDWORKS 2012

CAGE

33SR4 2018B0006

DEPARTMENT OF THE NAVY

UNITED STATES MARINE CORPSSGL

SGL

RJP

BJS

01/18/18

01/18/18

01/18/18

01/18/18

SLIDE TUBE,

ASSEMBLY

2018B0001

SPE4A8-22-Q-0030

4.38 3.63

3.00

45.00°

0.13 CHAMFER X2

NOTES:

INTERPRET DRAWING IN ACCORDANCE WITH STANDARDS PRESCRIBED BY ASME Y14.1001.

CLEAN WORK AS REQUIRED: DEBURR ALL SHARP EDGES TO MEET ACCEPTABLE TRADE STANDARDS.2.

MATERIAL SPECIFICATION: 1018 STEEL, ROUND MECHANICAL TUBING, 4-3/8" INCH OUTSIDE DIAMETER WITH 3/8" INCH WALL THICKNESS3.

TYP.

ISOMETRIC VIEW FOR

REFERENCE ONLY

REVISIONS

ZONE REV. DESCRIPTION DATE APPROVED

D

C

B

AA

B

C

D

12345678

8 7 6 5 4 3 2 1

E

F

E

F

RE

V

B0

Sli de T ub e

D

SHEET 1 OF 1

UNLESS OTHERWISE SPECIFIED:

SCALE: 1:1 WEIGHT:

REVDWG. NO.

D

SIZE

TITLE:

NAME DATE

COMMENTS:

Q.A.

APPROVED BY:

ENG BY:

CHECKED BY:

DRAWN BY:

FINISH

MATERIAL

INTERPRET GEOMETRIC

TOLERANCING PER ASME Y14.5 M

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL

ANGULAR: BEND .5

ONE PLACE DECIMAL .1

TWO PLACE DECIMAL .01

THREE PLACE DECIMAL .003

APPLICATION

USED FORNEXT ASSY

PROPRIETARY AND CONFIDENTIAL

CAD MAINTAINED CHANGES

SHALL BE INCORPORATED BY

THE DESIGN ACTIVITY

SOLIDWORKS 2012

CAGE

33SR4 2018B0007

DEPARTMENT OF THE NAVY

UNITED STATES MARINE CORPSSGL

SGL

RJP

BJS

01/18/18

01/18/18

01/18/18

01/18/18 SLIDE TUBE

2018B0001 1018 STEEL

SPE4A8-22-Q-0030

3.03

.25

107.72° R.25

3.51

.56

2.00

1.76

2.00

1.87

1.00

NOTES:

INTERPRET DRAWING IN ACCORDANCE WITH STANDARDS PRESCRIBED BY ASME Y14.1001.

CLEAN WORK AS REQUIRED: DEBURR ALL SHARP EDGES TO MEET ACCEPTABLE TRADE STANDARDS.2.

MATERIAL SPECIFICATION: 1018 - 1020 STEEL OR ASTM A36 STRUCTURAL STEEL3.

TYPICAL TYPICAL

ISOMETRIC VIEW FOR

REFERENCE ONLY

THICK

REVISIONS

ZONE REV. DESCRIPTION DATE APPROVED

D

C

B

AA

B

C

D

12345678

8 7 6 5 4 3 2 1

E

F

E

F

RE

V

B0

Ha ng er

B ra ck et

D

SHEET 1 OF 1

UNLESS OTHERWISE SPECIFIED:

SCALE: 2:1 WEIGHT:

REVDWG. NO.

D

SIZE

TITLE:

NAME DATE

COMMENTS:

Q.A.

APPROVED BY:

ENG BY:

CHECKED BY:

DRAWN BY:

FINISH

MATERIAL

INTERPRET GEOMETRIC

TOLERANCING PER ASME Y14.5 M

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .