SPE4A727Q0181.pdf
PDF 160 KB Posted
- Attached to
- PIN,BLADE,MAIN ROTO and 2 more items
- Solicitation number
- SPE4A727Q0181
- Issued by
-
Defense Logistics Agency Aviation
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
4. CERT.FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5. ISSUED BY
7. DELIVERY
9. DESTINATION
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5 ON OR
BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (See Continuation Sheets)
12. DISCOUNT FOR PROMPT PAYMENT
d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO SIGN
QUOTATION
16. SIGNER
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not useable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
SPE4A7-27-Q-0181
1. REQUEST NO.
2026 NOV 04
2. DATE ISSUED
7018673283
3. REQUISITION/PURCHASE REQUEST NO.
DO-C9
RATING
DLA WEAPONS SUPPORT
ASC SUPPLIER OPER AE AND AF DIV
6090 STRATHMORE ROAD
RICHMOND VA 23237
USA
Buyer: Latrice Brown GPP1694 Tel: 4457377049 Fax: (804) 279-3561 Email: LaTrice.Brown@dla.mil
200 DAYS ADO
6. DELIVER BY (Date)
8. TO:
c. CITY
d. STATE
b. STREET ADDRESS
a. NAME OF CONSIGNEE
e. ZIP CODE
a. 10 CALENDAR DAYS
b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS
15. DATE OF QUOTATION
a. NAME (Type or Print)
AREA CODE
c. TITLE (Type or Print)d. CITY
c. COUNTY
b. STREET ADDRESS
e. STATE f. ZIP CODE
See Schedule
2026 NOV 16
NUMBER
FOB DESTINATION
OTHER
(See Schedule)
CAGE
b. TELEPHONE
See attached schedule to complete quote information.
Quoter must also complete the following:
a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .
b. Prices quoted are:
___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .
___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.
___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;
___ Customer ________________________.
___ Other (provide basis) ______________________________________ _______________________________________ .
c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .
d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.
e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:
f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 30 PAGES
SPE4A7-27-Q-0181
THIS SOLICITATION IS BEING ISSUED UNDER SEPA AUTHORITY
The following DLA Aviation Notices are incorporated by reference. The full-text of the notices can be found at:
http://www.dla.mil/Aviation/Business/IndustryResources/DLAResourcesforSuppliers/PGNs.aspx
PGN-09-01 National Stock Number (NSN) Identification of First Article Testing (September 2016)
PGN-09-03 Clarification with Suppliers First Article Testing
PGN-13-04 Master Solicitation with Additional Clauses (March 2017)
PGN-13-05 Quote submission Method (March 2017)
PGN-13-06 All or None for Simplified Acquisitions (September 2019)
PGN-13-01 Evaluation and Award for Simplified Acquisitions.
(August 2024)
(a) AWARD. The Government intends to evaluate quotations. The award will be made to the quoter whose quote conforms to the terms and conditions of the solicitation and represents the best value to the Government. Therefore, award may be made to other than the lowest priced or the highest technically rated quote.
(b) Relative Important and Trade-offs. The Government will base the determination of best value on a comparative assessment of the quoters' prices, past performance, and the other evaluation factors identified elsewhere in this solicitation. The determination of best value also considers the relative importance of the evaluation factors. All evaluation factors, when combined, are:
[ ] significantly more important than cost or price.
As other evaluation factors become more equal, the evaluated cost or price becomes more important.
[X] approximately equal to cost or price; or
[ ] significantly less important than cost or price.
As the evaluated cost/price becomes more equal, relative importance of all other evaluation factors becomes more significant.
The final award decision may involve a trade-off among cost or price and the non-price factors. Factors that may be considered in the trade-off process include, but are not limited to:
· Item criticality and weapons system application
· Current inventory status
· Historical delivery or quality problems
· Concerns over limited supply sources and industrial base
· Benefits from obtaining new sources
(c) COST OR PRICE. The Government will evaluate the quoted cost or price. The Government will add any other cost or price evaluation factors identified elsewhere in this solicitation (e.g., Buy American Act or FOB Origin transportation costs) to arrive at the quoter's evaluated cost or price. The evaluated cost or price will be used in conjunction with the other non-price factors to determine the best value to the Government.
(d) PAST PERFORMANCE. Past performance includes, but is not limited to, the quoter's record of conforming to contract requirements and standards of good workmanship; adherence to contract schedules, including the administrative aspects of performance; the quoter's reputation for reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the quoter's business-like concern for the customer's interest.
(1) The Supplier Performance Risk System (SPRS) is the current term for past performance that is formerly known as Past Performance Information Retrieval System – Statistical Reporting (SPRS), as applicable, will be used to evaluate quality and past performance on DLA awards (refer to Procurement Note L08).
(e) Past Performance Evaluation Factors. The Government will use the past performance evaluation factors marked below in addition to cost or price and other evaluation factors specified in the solicitation. Unless indicated otherwise, past performance is significantly more important than other non-price factors. Within the past performance subfactors, SPRS assessments (as applicable) will be weighed most heavily. Historical quality history and delivery schedule compliance (not captured in SPRS) will be weighed more heavily than the remaining past performance subfactors. All other non-price evaluation factors specified in this solicitation weigh equally, unless otherwise indicated.
[X] SPRS Assessments (PROC NOTE L08) (EProcurement) [ ] PPIRS-RC Assessments [ ] Historical Quality (not captured in SPRS) [ ] Historical Delivery Schedule Compliance (not captured in SPRS) [ ] Other (specify):
PAGE 3 OF 30 PAGES
SPE4A7-27-Q-0181
PGN-13-01 (ALT I) Evaluation and Award for Simplified Acquisitions
(ALT I)
(March 2018)
(b) Non-Price Factors. Quoted delivery and past performance will be evaluated equally, unless indicated otherwise below.
( ) Quoted delivery is weighed more heavily than past performance.
( ) Past Performance is weighed more heavily than quoted delivery.
PAGE 4 OF 30 PAGES
SPE4A7-27-Q-0181
SECTION B
SUPPLIES/SERVICES: 1615-01-164-3917
ITEM DESCRIPTION:
PIN, BLADE, MAIN ROTOR
RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE
SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE
ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE
APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON
REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RD005: Cybersecurity Maturity Model Certification (CMMC) Level 2 Certified Third-Party Assessment Organization (C3PAO)
RD002, COVERED DEFENSE INFORMATION APPLIES
RD005: Cybersecurity Maturity Model Certification (CMMC) Level 2 Certified Third-Party Assessment Organization (C3PAO)
RQ017: PHYSICAL IDENTIFICATION/BARE ITEM MARKING
RQ039: Non-Tailored Higher-Level Quality Requirements (SAE AS9100) for Manufacturers and Non-Manufacturers
This item requires Item Unique Identification (IUID) in accordance with the enclosed/referenced IUID technical requirements and MIL-STD-130.
DFARS 252.211-7003 clause applies.
THIS IS AN ARMY IDENTIFIED CRITICAL SAFETY ITEM.
ALL REQUESTS FOR WAIVERS OR DEVIATIONS
CLASSIFIED AS CRITICAL, MAJOR, OR MINOR MUST BE
FORWARDED TO THE DSC CONTRACTING OFFICER FOR
REVIEW AND APPROVAL.
ALL ITEMS OF SUPPLY SHALL BE MARKED IAW
MIL-STD-129. IN ADDITION, EACH UNIT PACK WILL
BE MARKED WITH LOT AND SERIAL NUMBER (IF AVAILABLE),
CONTRACTOR'S CAGE CODE, ACTUAL MANUFACTURER'S
CAGE CODE AND PART NUMBER.
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
CONTRACTOR TO PROVIDE DA FORM 2410 WITH EACH ITEM
MANUFACTUTRED.ASCERTAIN THAT THE PART NUMBER ON THE ACTUAL PART MATCHES
THE PART NUMBER LISTED ON THE DA FORM 2410 TO INCLUDE ANY DASH NUMBERS
PAGE 5 OF 30 PAGES
SPE4A7-27-Q-0181
SECTION B
SUPPLY/SERVICE: 1615-01-164-3917 CONT'D
ON THE PART NUMBER.
CRITICAL APPLICATION ITEM
THE BOEING COMPANY 8V613 P/N 7-211411185-901
SPS TECHNOLOGIES LLC 97393 P/N SL54005-102
Critical Safety Item
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 1615-01-164-3917 2,008.000 EA $ ________________ $ ________________
PIN,BLADE,MAIN
ROTO
PRICING TERMS: Firm Fixed Price
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
FOB: ORIGIN DELIVERY DATE: 200 DAYS ADO
PREP FOR DELIVERY:
PKGING DATA - MIL-STD-2073-1E
QUP:001 PRES MTHD:33 CLNG/DRY:1 PRESV MAT:00
WRAP MAT:GB CUSH/DUNN MAT:NA CUSH/DUNN THKNESS:C
UNIT CONT:E5 OPI:M
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:00 -00 No special marking
PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING
REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
SW3222
DLA DISTRIBUTION CORPUS CHRISTI TX
DDCT-S 540 FIRST STREET SE
CORPUS CHRISTI TX 78419-5255
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE C20 AND
CONTRACT
FREIGHT SHIPPING ADDRESS:
PAGE 6 OF 30 PAGES
SPE4A7-27-Q-0181
SECTION B
SUPPLY/SERVICE: 1615-01-164-3917 CONT'D
SW3222
DLA DISTRIBUTION CORPUS CHRISTI TX
GPS USE 100 NAS DR PH 361 431 3728
540 FIRST STREET SE BLDG 1846
CORPUS CHRISTI TX 78419-5255
US
Contractor First Article Test Contractor First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-3 for the actual quantity required to be tested.
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS%
0002 0001 - S00000053 1.000 EA $ ________________ $ ________________
FOB: DELIVERY DATE: 200 DAYS ADO
PREP FOR DELIVERY:
Not Applicable
Production Lot Testing (Government)
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS%
0003 0001 - S00000061 1.000 EA $ ________________ $ ________________
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
FOB: ORIGIN DELIVERY DATE: 200 DAYS ADO
PREP FOR DELIVERY:
Not Applicable
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 7018673283 0001 N/A N/A N/A 01/14/2030
0002 N/A N/A N/A N/A N/A N/A
0003 N/A N/A N/A N/A N/A N/A
PAGE 7 OF 30 PAGES
SPE4A7-27-Q-0181
SECTION B
SUPPLY/SERVICE: 0001-S00000061 CONT'D
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 30 PAGES
SPE4A7-27-Q-0181
SECTION C - SPECIFICATIONS/SOW/SOO/ORD
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (JUN 2023)
SECTION E - INSPECTION AND ACCEPTANCE
E08 FIRST ARTICLE TESTING REQUIREMENTS (MAR 2025)
(1) If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all costs and risk associated with completion of the FAT requirement in the production CLIN price.
(2) If there is a separate FAT CLIN, the offeror shall include all costs and risk associated with completion of the FAT requirement in the FAT CLIN price.
The unit of issue for the FAT CLIN, EACH, is equal to one First Article Test (1EA=1FAT). To receive payment for any costs associated with FAT, the offeror shall propose costs associated with FAT on a separate CLIN. The offeror shall base the production CLIN price solely on all costs associated with completion of the production units and shall exclude all FAT-related costs.
(3) The contracting officer will use the total award price in selecting the best value offer from among all eligible offerors. However, for an offeror to be eligible for award, the contracting officer must determine that the FAT CLIN price (unless FAT is waived) and the production CLIN price are fair and reasonable; and, if set-aside under FAR Part 19, a fair market price. The offeror shall not propose a FAT CLIN price that is materially unbalanced in relation to the production CLIN price. In the event an offeror receives a waiver of the FAT requirement, the contracting officer will deduct the FAT CLIN price for the waived source in determining the total award price.
(4)(a) Notwithstanding the conditions for waiving first article, the contracting officer may order an additional first article sample, or portion thereof, in writing if there is a --
(i) Major change to the technical data;
(ii) Lapse in production for a period in excess of 90 days; or
(iii) Change in the place of performance (manufacturing facility), manufacturing process,material used, drawing, specification or source of supply.
(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the contractor shall notify the contracting officer; who will determine whether to order an additional first article sample or portion thereof and provide instructions concerning the submission, inspection, and notification of results. The contractor shall bear the costs of the additional first article testing resulting from any of the causes in paragraphs (4)(a)(i)-(iii) instituted by the contractor and not due to changes directed by the Government.
(5) Waivers. The offeror may submit a request for FAT waiver to the contracting officer, who may waive the FAT requirement when all of the following criteria apply:
(a) The offeror requesting waiver has successfully manufactured, delivered and the government accepted the item or a similar item. The offeror shall provide the following information and be prepared to provide documentary evidence upon the contracting officer's request:
(i) Contract number(s), date(s), and issuing Government agency or agencies.
(ii) Description of item previously furnished, identified by part number, type, model number and/or other identifying information. If the item previously furnished is similar but not identical to the item being acquired under the current buy, the offeror shall explain why manufacture of the item previously furnished is sufficient to demonstrate its ability to manufacture the item being acquired under the current buy without need for a first article test.
(iii) Engineering control document/change number of item previously furnished.
(b) There have been no changes to manufacturing processes, tooling, or place of performance.
(c) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements; or subcontractors used to manufacture the items successfully in the past).
(d) The offeror shall supply an item of the same design and manufactured by the same method at the same facilities as the item or similar item previously furnished and accepted under subparagraph (5)(a).
(6) Contractor-Performed FAT.
(a) The contractor shall test the quantities as outlined in paragraph (a) of FAR clause 52.209-3 as specified in the contract. The contractor shall submit reports in accordance with paragraph (b) of FAR clause 52.209-3, as supplemented in this procurement note.
(b] For test report preparation and delivery of contractor FAT, the contractor shall --
(i) Use the data item description DI-NDTI-80809B report format.
(ii)] Mark the test report with the following: “First article test report - Contract number:[ ] and lot/item number: [ ].
(iii) Sign the FAT Report, accompanied by the system of record receiving report (i.e, WAWF or] DD Form 250) and contractor confirmation that the same process and facilities used to manufacture the first article units will be used to manufacture the production units, to the contracting officer at the applicable address shown below:
(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing and Textile (C&T), Medical Materiel, or Subsistence, submit the report to the procuring activity in Block 6 of the DD Form 1155, Block 7 of Standard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.
(B) For awards issued by DLA Land (SPE7L), submit the report to the following address:
DLA Land - FLSEB ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-399, or email to: Land.FAT.Monitor@dla.mil.
(C) For awards issued by DLA Maritime (SPE7M), submit the report to the following address:
DLA Maritime - FMSE ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 30 PAGES
SPE4A7-27-Q-0181
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
(D) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email the report to Construction and Equipment FAT Monitor at trpsptcandefatmonitor@dla.mil. If report exceeds email limitations, submit the report to the following address:
DLA Troop Support ATTN: First Article Testing Monitor Building 3, 700 Robbins Avenue Philadelphia, Pennsylvania 19111.
Preferred electronic submissions: Hardware FAT Monitor at DLAHardwareFATMonitor@dla.mil.
(7) The contractor shall --
(a) Provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3;
(b) Maintain and make available all records evidencing those details at the Government's request.
(c) At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to shipment to the Government, provide written notice to the contracting officer and to the cognizant DCMA Functional Specialist when full administration or Quality Support administration is delegated to DCMA.
(8) Government-performed FAT. The contractor shall --
(a) For delivery of separately priced Government first article samples for Government performed FAT ship the units and system of record receiving report (i.
e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of FAR clause 52.209-4.
(b) For delivery of Government first article samples that are not separately priced, ship the units with a commercial shipping document to the test facility.
(c) Prepare the shipping container(s) by marking the external packages in bold letters, “First Article Exhibits - Do Not Post to Stock," adjacent to the MIL- STD-129 (latest revision) identification markings.
(d) Use a hard copy of the system of record receiving report (i.e., WAWF DD Form 250), or commercial shipping document as a packing list, in accordance with DFARS Appendix F.
(e) Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11.
(f) In the interior package, include hard copies of the contract, test reports, material certifications/process operation sheets, drawings used to manufacture the units, and a pre-paid return label or shipping account for payment.
(g) Send units by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express).
(h) Send an email with subject titled “Notification of Test Exhibits [ ]” to the corresponding address in (i) or (ii) below and to the contracting officer specified in the contract. In the email, provide the shipment date, contract/purchase order number, National Stock Number, means of transportation, tracking number, and summary of container contents. Attach a copy of the system of record receiving report (i.e., WAWF or DD Form 250) documenting the Government has performed the contract quality assurance within the system or record.
(i) DLA Land & Maritime - DSCCProdVerif@dla.mil
(ii) DLA Aviation - DSCR.Test & EvaluationOffice@dla.mil
(9) At its discretion, the Government may return FAT units to the contractor at no cost to the Government. The contractor shall submit the return address and pre-paid return label or shipping account for payment.
(10) If the Government disapproves or conditionally approves Government-performed FAT units, the Government will take action in accordance with FAR 52.209-4.
E09 CONTRACTOR FIRST ARTICLE TEST (FAT) INFORMATION (JUL 2022)
(1) For FAT requirements, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. Due to known systems limitations, solicitations may contain erroneous inspection, acceptance, and FOB points. This procurement note takes precedence over any conflicting terms.
(2) CONTRACTOR FAT DELIVERY SCHEDULE
(a) Days: To Deliver FAT Report to the Government
(b) Days: Government FAT Report Evaluation and Notification to Contractor
(c) Days: To Deliver Final Production Quantity After Approval of FAT Report. If PLT applies, this line will be blank; the number of delivery days for final production quantity will appear in procurement note E03, Production Lot Testing - Contractor, or E04, Production Lot Testing - Government, as applicable
(d) Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))
52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
E04 PRODUCTION LOT TESTING (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. The Government conducts PLT on the production lot(s) after first article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of any approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. The unit of issue for the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).
(2) For purposes of facilitating PLT, the engineering support activity and/or testing facility has authority to communicate and conduct clarifications directly with contractors. If this results in necessary changes to contract requirements, the contractor shall contact the post award contracting officer or contract administrator (see the “Issued By” blocks on the contract award or order) for written approval. The contractor shall not act on any revisions or other changes until the contracting officer issues a written modification approving the proposed revision(s)/ change(s).
(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3, and maintain and make available all records evidencing those details if requested by the Government. At least fourteen (14)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 30 PAGES
SPE4A7-27-Q-0181
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot for selection of PLT samples, the contractor shall provide written notice to the contracting officer (and the cognizant DCMA functional specialist when full administration or quality support administration is delegated to DCMA).
(4) Unless otherwise stated, the contractor shall select [ 1 ] samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals “ZZ,” the contractor shall use the appropriate sample size identified in the technical data package or applicable sample plan provided by the Government. If the contractor cannot determine the sample quantity, the contractor shall obtain written confirmation of the sample size from the contracting officer.
(5) If a PLT sample fails, the entire production lot from which the contractor took the sample fails. The contractor shall propose corrective action, if appropriate.
(6) The Government will return PLT samples to the contractor, with a copy of the test report, at contractor expense.
(7) The contractor shall prepare and disseminate the samples as follows:
(a) Ship the selected PLT samples by traceable means. [Mark the shipment “Production Lot Samples - Do Not Post To Stock,” Contract Number [ ] and Lot/Item Number [ ]”. Place a copy of the system of record receiving report (i.e., WAWF or DD Form 250) on the exterior of the shipping container in accordance with DFARS Appendix F. Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11.
(b) Include the following interior documentation:
(i) DD Form 1222 and system of record receiving report (i.e., WAWF or DD Form 250);
(ii) Copy of contract/order;
(iii) Copy of test reports, showing actual results and tolerances specified in the technical data package;
(iv) Material and process certifications;
(v) Process operations and inspection method sheets;
(vi) Copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor's responsibility);
(vii) Documents required under contract deliverables requirements list; and
(viii) A prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(8) At the time of shipment, the contractor shall sign and provide copies of the DD Form 1222, system of record receiving report (i.e., WAWF or DD Form 250), transportation tracking information, and information for return of the PLT samples to the contracting officer. The Government testing time will be [ ] calendar days for the test results to be provided to the contractor.
(9) For PLT, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination.
(10) Delivery.
(a) Ship samples to [ W31P0W ].
(b) Delivery Schedule Information:
(i) [ ] Total Delivery Days for FAT (If Applicable)
(ii) [ ] Days: Completion of Production Units (to include PLT samples), and Submission of samples for Government Testing
(iii) [ ] Days: Government PLT Report Evaluation and Notification to Contractor
(iv) [ ] Days: Delivery of final production quantity to Government
(v) [ ] Total Delivery Days (Sum of paragraph (10)b)(i) through (iv))
SECTION F - DELIVERIES OR PERFORMANCE
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
SECTION G - CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (PRE-FILLED) (JAN 2023) DFARS As prescribed in 232.7004 (b), use the following clause:
(a) Definitions. As used in this clause - Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
https://www.acquisition.gov/dfars/part-232-contract-financing
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 30 PAGES
SPE4A7-27-Q-0181
SECTION G - CONTRACT ADMINISTRATION DATA (CONTINUED)
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation System (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall -
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https:// wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items -
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
Invoice (stand-alone) and Receiving Report (stand-alone) or Invoice and Receiving Report (combination)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table *
Field Name in WAWF Data to be entered in WAWF Guidance
Pay Official DoDAAC See Block 12 (SF26), 15 (DD 1155), or 18a
(SF1449)
(If blank, see resulting award)
Issue By DoDAAC See Block 5 (SF26), 6 (DD 1155), or 9 (SF1449)
(If blank, see resulting award)
Admin DoDAAC See Block 6 (SF26), 7 (DD 1155), or 16 (SF1449)
(If blank, see resulting award)
Inspect By DoDAAC SEE SECTION B (If blank, see resulting award)
Ship To Code SEE SECTION B (If blank, see resulting award)
Ship From Code SEE SECTION B (If blank, see resulting award)
Mark For Code SEE SECTION B (If blank, see resulting award)
Service Approver (DoDAAC)
(If blank, see resulting award)
Service Acceptor (DoDAAC)
(If blank, see resulting award)
Accept at Other DoDAAC (If blank, see resulting award)
LPO DoDAAC (If blank, see resulting award)
DCAA Auditor DoDAAC (If blank, see resulting award) https://www.sam.gov https://wawf.eb.mil/ https://wawf.eb.mil/ https://wawf.eb.mil/
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 30 PAGES
SPE4A7-27-Q-0181
SECTION G - CONTRACT ADMINISTRATION DATA (CONTINUED)
Field Name in WAWF Data to be entered in WAWF Guidance
Other DoDAAC(s) (If blank, see resulting award)
(* Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (** Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
See administer listed on page 1
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of Clause)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H18 DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM (DPAS) (JUL 2026)
252.223-7001 HAZARD WARNING LABELS (DEC 1991) DFARS
(a) “Hazardous material,” as used in this clause, is defined in the Hazardous Material Identification and Material Safety Data clause of this contract.
(b) The Contractor shall label the item package (unit container) of any hazardous material to be delivered under this contract in accordance with the Hazard Communication Standard (29 CFR 1910.1200 et seq). The Standard requires that the hazard warning label conform to the requirements of the standard unless the material is otherwise subject to the labelling requirements of one of the following statutes:
(1) Federal Insecticide, Fungicide and Rodenticide Act;
(2) Federal Food, Drug and Cosmetics Act;
(3) Consumer Product Safety Act;
(4) Federal Hazardous Substances Act; or
(5) Federal Alcohol Administration Act.
(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be labelled in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.
MATERIAL
(If None, Insert “None.”) ACT
(d) The apparently successful Offeror agrees to submit, before award, a copy of the hazard warning label for all hazardous materials not listed in paragraph
(c) of this clause. The Offeror shall submit the label with the Material Safety Data Sheet being furnished under the Hazardous Material Identification and Material Safety Data clause of this contract.
(e) The Contractor shall also comply with MIL-STD-129, Marking for Shipment and Storage (including revisions adopted during the term of this contract).
(End of clause)
SECTION I - CONTRACT CLAUSES
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
FAR
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 30 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) DFARS
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) DFARS
52.204-13 SYSTEM FOR AWARD MANAGEMENT -- MAINTENANCE (DEVIATION 2026-O0038) (FEB 2026) FAR
52.204-13 SYSTEM FOR AWARD MANAGEMENT -- MAINTENANCE, ALT I (DEVIATION 2026-O0038) (FEB 2026) FAR
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0038) (FEB
2026) FAR
252.204-7004 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN 2023) DFARS
252.204-7014 LIMITATIONS ON THE USE OR DISCLOSURE OF INFORMATION BY LITIGATION SUPPORT CONTRACTORS (JAN
2023) DFARS
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (JAN 2023) DFARS
52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (DEVIATION 2026-O0038) (FEB 2026) FAR As prescribed in 9.308-1(a) and (b), insert the following clause:
[Contracting Officer inserts details]
(a) The Contractor shall test 1 unit(s) of Lot/Item 1615011643917 as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 200 calendar days from the date of this contract to DLATesting@dla.mil [insert address of the Government activity to receive the report] marked “FIRST ARTICLE TEST REPORT: Contract No. TBD, Lot/Item No. 1615011643917 ." Within 200 calendar days after the Government receives the test report, the Contracting Officer will notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval will state any further action required of the Contractor. A notice of disapproval will cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government will take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer will, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 30 PAGES
52.209-3 FIRST ARTICLE APPROVAL - CONTRACTOR TESTING (DEVIATION 2026-O0038) (FEB 2026), ALT I (JAN 1997) FAR
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED (DEVIATION 2026-O0038) (FEB 2026) FAR
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A COUNTRY
THAT IS A STATE SPONSOR OF TERRORISM (MAY 2019) DFARS
52.211-5 MATERIAL REQUIREMENTS (DEVIATION 2026-O0038) (FEB 2026) FAR
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (DEVIATION 2026-O0038) (FEB 2026) FAR
52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (DEVIATION 2026-O0038) (FEB 2026) FAR As prescribed in 19.101(a)(2)(iii)(A), insert the following clause:
(a) Definitions. As used in this clause -- Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern --
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.
(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts-
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.
(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition --
(1) Was set aside for small business and has a value above the simplified acquisition threshold;
(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or
(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [] is, [] is not a small business concern under NAICS Code assigned to contract number .
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause.] The Contractor represents that it [] is, [] is not, a small disadvantaged business concern as defined in 13 CFR 124.1001.
(3) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [] is, [] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity identifier of each party to the https://www.sba.gov/document/support--table-size-standards
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 30 PAGES
SPE4A7-27-Q-0181
SECTION I - CONTRACT CLAUSES (CONTINUED)
joint venture: .]
(4) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [] is, [] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity identifier of each party to the joint venture: .]
(5) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program. The Contractor represents that it [] is, [] is not an SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The Contractor shall enter the name and unique entity identifier of each party to the joint venture: .]
(6) HUBZone joint venture eligible under the HUBZone Program.[ Complete only if the offeror is a HUBZone small business concern. ] The offeror represents, as part of its offer, that it [] is, [] is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [ The Contractor shall enter the name and unique entity identifier of each party to the joint venture: . ] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [ Contractor to sign and date and insert authorized signer's name and title. ]
52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION, ALT I (DEVIATION 2026-O0038) (FEB 2026) FAR Alternate I. As prescribed in 19.101(a)(2)(iii)(B), substitute the following paragraph (g)(1) for paragraph (g)(1) of the basic clause:
(g)(1) The Contractor represents its small business size status for each one of the NAICS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .