SPE4A727Q0158.pdf

PDF 152 KB Posted

Attached to
BRACKET ASSEMBLY,EXTR and 3 more items
Solicitation number
SPE4A727Q0158
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

4. CERT.FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5. ISSUED BY

7. DELIVERY

9. DESTINATION

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5 ON OR

BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (See Continuation Sheets)

12. DISCOUNT FOR PROMPT PAYMENT

d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

14. SIGNATURE OF PERSON AUTHORIZED TO SIGN

QUOTATION

16. SIGNER

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not useable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

SPE4A7-27-Q-0158

1. REQUEST NO.

2026 OCT 29

2. DATE ISSUED

See Schedule

3. REQUISITION/PURCHASE REQUEST NO.

DO-C9

RATING

DLA WEAPONS SUPPORT

ASC SUPPLIER OPER AE AND AF DIV

6090 STRATHMORE ROAD

RICHMOND VA 23237

USA

Buyer: Grayson Andrews DGA0037 Tel: 0001 Email: GRAYSON.ANDREWS@DLA.MIL

SEE SCHEDULE

6. DELIVER BY (Date)

8. TO:

c. CITY

d. STATE

b. STREET ADDRESS

a. NAME OF CONSIGNEE

e. ZIP CODE

a. 10 CALENDAR DAYS

b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS

15. DATE OF QUOTATION

a. NAME (Type or Print)

AREA CODE

c. TITLE (Type or Print)d. CITY

c. COUNTY

b. STREET ADDRESS

e. STATE f. ZIP CODE

See Schedule

2026 NOV 13

NUMBER

FOB DESTINATION

OTHER

(See Schedule)

CAGE

b. TELEPHONE

See attached schedule to complete quote information.

Quoter must also complete the following:

a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .

b. Prices quoted are:

___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .

___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.

___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;

___ Customer ________________________.

___ Other (provide basis) ______________________________________ _______________________________________ .

c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .

d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.

e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:

f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 2 OF 29 PAGES

SPE4A7-27-Q-0158

The following DLA Aviation Acquisition Notices are incorporated by reference. The full-text of the notices can be found at: https://www.dla.mil/Aviation/Business/DAANS/

THIS IS A LIFE SUPPORT ITEM. SURPLUS MATERIAL WILL NOT BE CONSIDERED FOR AWARD.

PGN-13-01 Evaluation and Award for Simplified Acquisitions (August 2024)

(b) Relative Important and Trade-offs. The Government will base the determination of best value on a comparative assessment of the quoters' prices, past performance, and the other evaluation factors identified elsewhere in this solicitation. The determination of best value also considers the relative importance of the evaluation factors. All evaluation factors, when combined, are:

[ ] significantly more important than cost or price.

As other evaluation factors become more equal, the evaluated cost or price becomes more important.

[ ] approximately equal to cost or price; or [ ] significantly less important than cost or price.

As the evaluated cost/price becomes more equal, relative importance of all other evaluation factors becomes more significant.

(e) Past Performance Evaluation Factors. The Government will use the past performance evaluation factors marked below in addition to cost or price and other evaluation factors specified in the solicitation. Unless indicated otherwise, past performance is significantly more important than other non-price factors. Within the past performance subfactors, SPRS assessments (as applicable) will be weighed most heavily. Historical quality history and delivery schedule compliance (not captured in SPRS) will be weighed more heavily than the remaining past performance subfactors. All other non-price evaluation factors specified in this solicitation weigh equally, unless otherwise indicated.

[ ] SPRS Assessments (PROC NOTE L08) (EProcurement) [ ] PPIRS-RC Assessments [ ] Historical Quality (not captured in SPRS) [ ] Historical Delivery Schedule Compliance (not captured in SPRS) [ ] Other (specify):

PGN-13-01 (ALT I) Evaluation and Award for Simplified Acquisitions (March 2018)

(b) Non-Price Factors. Quoted delivery and past performance will be evaluated equally, unless indicated otherwise below.

( ) Quoted delivery is weighed more heavily than past performance.

( ) Past Performance is weighed more heavily than quoted delivery.

PGN-13-06 All or None for Simplified Acquisitions (September 2019)

PGN-09-06 Critical Safety Items (September 2016)

PGN-09-01 National Stock Number (NSN) Identification of First Article Testing (September 2016)

PGN-09-07 Disposition Instructions for Government First Article Test Exhibit(s) after Test Completion (December 2020)

EARLY DELIVERIES ARE ACCEPTABLE AT NO ADDITIONAL CHARGE TO THE GOVERNMENT

PAGE 3 OF 29 PAGES

SPE4A7-27-Q-0158

SECTION B

SUPPLIES/SERVICES: 1670-01-353-8424

ITEM DESCRIPTION:

BRACKET ASSEMBLY, EXTRACTION

RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS

(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE

DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB

AT:

http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx

FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE

SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE

ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE

APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON

REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.

RD002, COVERED DEFENSE INFORMATION APPLIES

RD004: Cybersecurity Maturity Model Certification (CMMC) Level 2 Self-Assessment

RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT

RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN

RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES

RQ017: PHYSICAL IDENTIFICATION/BARE ITEM MARKING

RQ039: Non-Tailored Higher-Level Quality Requirements (SAE AS9100) for Manufacturers and Non-Manufacturers

SPECIAL INSTRUCTIONS FOR PARACHUTES AND

PARACHUTE-RELATED EQUIPMENT:

CONTRACTORS ARE PERMITTED TO USE GOVERNMENT

APPROVED PARACHUTE INDUSTRY ASSOCIATION (PIA)

SPECIFICATIONS AND STANDARDS IN LIEU OF MILITARY

SPECIFICATIONS AND STANDARDS. GOVERNMENT

APPROVAL MEANS THE PIA DOCUMENT IS EITHER LISTED

IN THE CURRENT DODISS AS A REPLACEMENT OR, IN

CASES WHERE THE DODISS HAS NOT YET BEEN UPDATED<(>,<)>

THE PREPARING ACTIVITY FOR THE MILITARY DOCUMENT

HAS ISSUED AN INTERIM LETTER AUTHORIZING USE OF

THE PIA DOCUMENT. MATERIALS AND PROCESSES

DEFINED WITHIN PIA DOCUMENTS, BUT NOT CITED

WITHIN THE ENGINEERING DRAWING OR ASSOCIATED

WITH AN EXISTING MILITARY SPECIFICATION OR

STANDARD MUST RECEIVE APPROVAL FROM THE

CONTRACTING OFFICER PRIOR TO USE.

...END OF SPECIAL INSTRUCTIONS...

AVIATION LIFE SUPPORT PLT SAMPLES

PRODUCTION LOT SAMPLE TESTING REQUIRED, GOVERNMENT TESTING. THE

PRODUCTION LOT SAMPLE QUANTITY SHALL BE IN ACCORDANCE WITH ANSI/ASQC

Z1.4-2008, LEVEL S-2, Table II-A, SINGLE SAMPLING PLANS FOR NORMAL INSPECTION, NO AQL WILL BE USED (per Engineering Support Activity, ESA).

SELECTED AT RANDOM BY THE COGNIZANT GOVERNMENT REPRESENTATIVE. FOLLOW

E04 FOR SHIPPING INSTRUCTIONS.

THIS IS AN ARMY IDENTIFIED CRITICAL SAFETY ITEM.

ALL REQUESTS FOR WAIVERS OR DEVIATIONS

CLASSIFIED AS CRITICAL, MAJOR, OR MINOR MUST BE

FORWARDED TO THE DSC CONTRACTING OFFICER FOR

REVIEW AND APPROVAL.

ALL ITEMS OF SUPPLY SHALL BE MARKED IAW

MIL-STD-129. IN ADDITION, EACH UNIT PACK WILL

BE MARKED WITH LOT AND SERIAL NUMBER (IF AVAILABLE),

CONTRACTOR'S CAGE CODE, ACTUAL MANUFACTURER'S

CAGE CODE AND PART NUMBER.

PAGE 4 OF 29 PAGES

SPE4A7-27-Q-0158

SUPPLY/SERVICE: 1670-01-353-8424 CONT'D

NOTES:

1. AWARDEE MUST PROVIDE COMPLETED DD1222 FORM WITH EVERY ESA

(RE) SUBMISSION.

2. AWARDEE MUST ADHERE TO CURRENT TDP SPECIFICATION CONVERSION

TABLE & DEVIATION PACKET.

CRITICAL APPLICATION ITEM

TDP Rev B Gen 2

IAW BASIC DRAWING NR 81337 11-1-2780

REVISION NR U DTD 11/04/2000

PART PIECE NUMBER: 11-1-2780-11

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 81337 11-1-4110

REVISION NR C DTD 04/06/2021

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 81337 11-1-2868

REVISION NR H DTD 02/21/1997

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 81337 11-1-2869

REVISION NR K DTD 07/10/2006

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 81337 11-1-2870

REVISION NR R DTD 05/01/2002

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 81337 11-1-2871

REVISION NR J DTD 02/21/1997

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 81337 PL11-1-2871

REVISION NR B DTD 06/12/1996

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE QAP 13873 QAP-MLSE-AVNFAZ-12073

REVISION NR DTD 03/13/2012

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 81337 11-1-2780-11

REVISION NR DTD 05/06/2026

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE DRAWING NR 13873 EI-PARASPECCONV

REVISION NR DTD 06/23/2025

PART PIECE NUMBER:

TDP Rev B Gen 2

IAW REFERENCE QAP 81337 11-1-2780-11

REVISION NR DTD 01/21/2015

PART PIECE NUMBER:

Critical Safety Item

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.

https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK

PAGE 5 OF 29 PAGES

SPE4A7-27-Q-0158

SECTION B

SUPPLY/SERVICE: 1670-01-353-8424 CONT'D

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0001 1670-01-353-8424 319.000 EA $ ________________ $ ________________

BRACKET ASSEMBLY

,EXTRACTION

PRICING TERMS: Firm Fixed Price

QTY VARIANCE: PLUS 0% MINUS 0%

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: ORIGIN DELIVERY DATE: 373 DAYS ADO

PREP FOR DELIVERY:

PKGING DATA - MIL-STD-2073-1E

QUP:001 PRES MTHD:33 CLNG/DRY:1 PRESV MAT:00

WRAP MAT:00 CUSH/DUNN MAT:00 CUSH/DUNN THKNESS:0

UNIT CONT:E5 OPI:M

INTRMDTE CONT:E5 INTRMDTE CONT QTY:AAA

PACK CODE:U

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE:00 -00 No special marking

PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING

REQUIREMENTS FOR PROCUREMENT

PARCEL POST ADDRESS:

W25G1U

W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2083 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND PA 17070-5002

US

FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE C20 AND

CONTRACT

FREIGHT SHIPPING ADDRESS:

W25G1U

W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2083 NORMANDY DRIVE DOOR 113 TO 134

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0002 1670-01-353-8424 83.000 EA $ ________________ $ ________________

BRACKET ASSEMBLY

,EXTRACTION

QTY VARIANCE: PLUS 0% MINUS 0%

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: ORIGIN DELIVERY DATE: 373 DAYS ADO

PREP FOR DELIVERY:

PAGE 6 OF 29 PAGES

SPE4A7-27-Q-0158

SUPPLY/SERVICE: 1670-01-353-8424 CONT'D

PKGING DATA - MIL-STD-2073-1E

QUP:001 PRES MTHD:33 CLNG/DRY:1 PRESV MAT:00

WRAP MAT:00 CUSH/DUNN MAT:00 CUSH/DUNN THKNESS:0

UNIT CONT:E5 OPI:M

INTRMDTE CONT:E5 INTRMDTE CONT QTY:AAA

PACK CODE:U

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE:00 -00 No special marking

PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING

REQUIREMENTS FOR PROCUREMENT

PKGING DATA - MIL-STD-2073-1E

QUP:001 PRES MTHD:33 CLNG/DRY:1 PRESV MAT:00

WRAP MAT:00 CUSH/DUNN MAT:00 CUSH/DUNN THKNESS:0

UNIT CONT:E5 OPI:M

INTRMDTE CONT:E5 INTRMDTE CONT QTY:AAA

PACK CODE:U

MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.

SPECIAL MARKING CODE:00 -00 No special marking

PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING

REQUIREMENTS FOR PROCUREMENT

PARCEL POST ADDRESS:

W25G1U

W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2083 NORMANDY DRIVE DOOR 113 TO 134

FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE C20 AND

CONTRACT

FREIGHT SHIPPING ADDRESS:

W25G1U

W1A8 DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2083 NORMANDY DRIVE DOOR 113 TO 134

Government First Article Test Government First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-4 for the actual quantity required to be tested.

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS%

0003 0001 - S00000052 1.000 EA $ ________________ $ ________________

FOB: DELIVERY DATE: 60 DAYS ADO

PAGE 7 OF 29 PAGES

SPE4A7-27-Q-0158

SUPPLY/SERVICE: 0001-S00000052 CONT'D

Not Applicable

Production Lot Testing (Government)

DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS%

0004 0001 - S00000061 1.000 EA $ ________________ $ ________________

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: ORIGIN

FOB: ORIGIN DELIVERY DATE: 313 DAYS ADO

Not Applicable

GOVT USE

External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .

0001 7015212391 0001 N/A N/A N/A 07/16/2027

0002 7017571952 0001 N/A N/A N/A 03/13/2028

0003 N/A N/A N/A N/A N/A N/A

0004 N/A N/A N/A N/A N/A N/A

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 29 PAGES

SPE4A7-27-Q-0158

SECTION C - SPECIFICATIONS/SOW/SOO/ORD

C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (JUN 2023)

C14 CORRECTION OF NONCONFORMING PACKAGING OR MARKING (MAY 2020)

C02 MANUFACTURING PHASE OUT OR DISCONTINUATION OF PRODUCTION, DIMINISHING SOURCES, AND OBSOLETE

MATERIALS OR COMPONENTS (DEC 2016)

SECTION E - INSPECTION AND ACCEPTANCE

E08 FIRST ARTICLE TESTING REQUIREMENTS (MAR 2025)

(1) If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all costs and risk associated with completion of the FAT requirement in the production CLIN price.

(2) If there is a separate FAT CLIN, the offeror shall include all costs and risk associated with completion of the FAT requirement in the FAT CLIN price.

The unit of issue for the FAT CLIN, EACH, is equal to one First Article Test (1EA=1FAT). To receive payment for any costs associated with FAT, the offeror shall propose costs associated with FAT on a separate CLIN. The offeror shall base the production CLIN price solely on all costs associated with completion of the production units and shall exclude all FAT-related costs.

(3) The contracting officer will use the total award price in selecting the best value offer from among all eligible offerors. However, for an offeror to be eligible for award, the contracting officer must determine that the FAT CLIN price (unless FAT is waived) and the production CLIN price are fair and reasonable; and, if set-aside under FAR Part 19, a fair market price. The offeror shall not propose a FAT CLIN price that is materially unbalanced in relation to the production CLIN price. In the event an offeror receives a waiver of the FAT requirement, the contracting officer will deduct the FAT CLIN price for the waived source in determining the total award price.

(4)(a) Notwithstanding the conditions for waiving first article, the contracting officer may order an additional first article sample, or portion thereof, in writing if there is a --

(i) Major change to the technical data;

(ii) Lapse in production for a period in excess of 90 days; or

(iii) Change in the place of performance (manufacturing facility), manufacturing process,material used, drawing, specification or source of supply.

(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the contractor shall notify the contracting officer; who will determine whether to order an additional first article sample or portion thereof and provide instructions concerning the submission, inspection, and notification of results. The contractor shall bear the costs of the additional first article testing resulting from any of the causes in paragraphs (4)(a)(i)-(iii) instituted by the contractor and not due to changes directed by the Government.

(5) Waivers. The offeror may submit a request for FAT waiver to the contracting officer, who may waive the FAT requirement when all of the following criteria apply:

(a) The offeror requesting waiver has successfully manufactured, delivered and the government accepted the item or a similar item. The offeror shall provide the following information and be prepared to provide documentary evidence upon the contracting officer's request:

(i) Contract number(s), date(s), and issuing Government agency or agencies.

(ii) Description of item previously furnished, identified by part number, type, model number and/or other identifying information. If the item previously furnished is similar but not identical to the item being acquired under the current buy, the offeror shall explain why manufacture of the item previously furnished is sufficient to demonstrate its ability to manufacture the item being acquired under the current buy without need for a first article test.

(iii) Engineering control document/change number of item previously furnished.

(b) There have been no changes to manufacturing processes, tooling, or place of performance.

(c) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements; or subcontractors used to manufacture the items successfully in the past).

(d) The offeror shall supply an item of the same design and manufactured by the same method at the same facilities as the item or similar item previously furnished and accepted under subparagraph (5)(a).

(6) Contractor-Performed FAT.

(a) The contractor shall test the quantities as outlined in paragraph (a) of FAR clause 52.209-3 as specified in the contract. The contractor shall submit reports in accordance with paragraph (b) of FAR clause 52.209-3, as supplemented in this procurement note.

(b] For test report preparation and delivery of contractor FAT, the contractor shall --

(i) Use the data item description DI-NDTI-80809B report format.

(ii)] Mark the test report with the following: “First article test report - Contract number:[ SEE RESULTING AWARD ] and lot/item number: [ 0003 ].

(iii) Sign the FAT Report, accompanied by the system of record receiving report (i.e, WAWF or] DD Form 250) and contractor confirmation that the same process and facilities used to manufacture the first article units will be used to manufacture the production units, to the contracting officer at the applicable address shown below:

(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing and Textile (C&T), Medical Materiel, or Subsistence, submit the report to the procuring activity in Block 6 of the DD Form 1155, Block 7 of Standard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.

(B) For awards issued by DLA Land (SPE7L), submit the report to the following address:

DLA Land - FLSEB ATTN: FAT Monitor P. O. Box 3990

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 29 PAGES

SPE4A7-27-Q-0158

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

Columbus, OH 43218-399, or email to: Land.FAT.Monitor@dla.mil.

(C) For awards issued by DLA Maritime (SPE7M), submit the report to the following address:

DLA Maritime - FMSE ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.

(D) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email the report to Construction and Equipment FAT Monitor at trpsptcandefatmonitor@dla.mil. If report exceeds email limitations, submit the report to the following address:

DLA Troop Support ATTN: First Article Testing Monitor Building 3, 700 Robbins Avenue Philadelphia, Pennsylvania 19111.

Preferred electronic submissions: Hardware FAT Monitor at DLAHardwareFATMonitor@dla.mil.

(7) The contractor shall --

(a) Provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3;

(b) Maintain and make available all records evidencing those details at the Government's request.

(c) At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to shipment to the Government, provide written notice to the contracting officer and to the cognizant DCMA Functional Specialist when full administration or Quality Support administration is delegated to DCMA.

(8) Government-performed FAT. The contractor shall --

(a) For delivery of separately priced Government first article samples for Government performed FAT ship the units and system of record receiving report (i.

e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of FAR clause 52.209-4.

(b) For delivery of Government first article samples that are not separately priced, ship the units with a commercial shipping document to the test facility.

(c) Prepare the shipping container(s) by marking the external packages in bold letters, “First Article Exhibits - Do Not Post to Stock," adjacent to the MIL- STD-129 (latest revision) identification markings.

(d) Use a hard copy of the system of record receiving report (i.e., WAWF DD Form 250), or commercial shipping document as a packing list, in accordance with DFARS Appendix F.

(e) Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11.

(f) In the interior package, include hard copies of the contract, test reports, material certifications/process operation sheets, drawings used to manufacture the units, and a pre-paid return label or shipping account for payment.

(g) Send units by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express).

(h) Send an email with subject titled “Notification of Test Exhibits [ W56YHX ]” to the corresponding address in (i) or (ii) below and to the contracting officer specified in the contract. In the email, provide the shipment date, contract/purchase order number, National Stock Number, means of transportation, tracking number, and summary of container contents. Attach a copy of the system of record receiving report (i.e., WAWF or DD Form 250) documenting the Government has performed the contract quality assurance within the system or record.

(i) DLA Land & Maritime - DSCCProdVerif@dla.mil

(ii) DLA Aviation - DSCR.Test & EvaluationOffice@dla.mil

(9) At its discretion, the Government may return FAT units to the contractor at no cost to the Government. The contractor shall submit the return address and pre-paid return label or shipping account for payment.

(10) If the Government disapproves or conditionally approves Government-performed FAT units, the Government will take action in accordance with FAR 52.209-4.

E10 GOVERNMENT FIRST ARTICLE TEST (FAT) INFORMATION (JUL 2022)

(1) For FAT requirements, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. Due to known systems limitations, solicitations may contain erroneous inspection, acceptance, and FOB points. This procurement note takes precedence over any conflicting terms.

(2) GOVERNMENT FAT DELIVERY SCHEDULE

(a) 60 Days: To Deliver FAT Units to the Government

(b) 10 Days: Government FAT Evaluation and Notification to Contractor

(c) Days: To Deliver Final Production Quantity After Approval of FAT. If PLT applies, this line will be blank; the number of delivery days for final production quantity will appear in procurement note E03, Production Lot Testing - Contractor, or E04, Production Lot Testing - Government, as applicable]

(d) 70 Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c)).

E07 EVALUATION FACTOR FOR ORIGIN INSPECTION (JAN 2018)

52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) FAR

As prescribed in 46.311, insert the following clause:

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 29 PAGES

SPE4A7-27-Q-0158

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

Title Number Date Tailoring

SAE AS9100

[Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.]

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instruction, documentation control, and advanced metrology.

(End of Clause)

E05 PRODUCT VERIFICATION TESTING (MAY 2020)

(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.

(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.

(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor's sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor's signed DD Form 1222.

The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, “Product Verification Test Samples - Do Not Post to Stock," Contract Number [ ] and Lot/Item Number [ ]” adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package:

(a) Hard copies of the contract;

(b) Material certifications/process operation sheets; and

(c) Drawings used to manufacture the units and return shipping information.

(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.

(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.

E06 INSPECTION AND ACCEPTANCE AT SOURCE (JUN 2018)

Inspection and acceptance are at source. The place of acceptance is the location where the Government conducts the last inspection before shipment, unless the contractor indicated a different physical location for acceptance below.

The contractor shall indicate the location where supplies will be inspected, if different from the production location:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

The contractor shall indicate the location where packaging will be inspected, if different from the production location:

[ ] Same as for supplies OR CAGE code:

Address:

Applicable to CLIN(s):

The contractor shall indicate the location where supplies will be accepted, if different from the inspection location:

Commercial and Government Entity (CAGE) code:

Address:

Applicable to contract line item numbers(s) (CLIN(s)):

E04 PRODUCTION LOT TESTING (MAY 2020)

(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. The Government conducts PLT on the production lot(s) after first article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of any

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 29 PAGES

SPE4A7-27-Q-0158

SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)

approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. The unit of issue for the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).

(2) For purposes of facilitating PLT, the engineering support activity and/or testing facility has authority to communicate and conduct clarifications directly with contractors. If this results in necessary changes to contract requirements, the contractor shall contact the post award contracting officer or contract administrator (see the “Issued By” blocks on the contract award or order) for written approval. The contractor shall not act on any revisions or other changes until the contracting officer issues a written modification approving the proposed revision(s)/ change(s).

(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3, and maintain and make available all records evidencing those details if requested by the Government. At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot for selection of PLT samples, the contractor shall provide written notice to the contracting officer (and the cognizant DCMA functional specialist when full administration or quality support administration is delegated to DCMA).

(4) Unless otherwise stated, the contractor shall select [ ZZ ] samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals “ZZ,” the contractor shall use the appropriate sample size identified in the technical data package or applicable sample plan provided by the Government. If the contractor cannot determine the sample quantity, the contractor shall obtain written confirmation of the sample size from the contracting officer.

(5) If a PLT sample fails, the entire production lot from which the contractor took the sample fails. The contractor shall propose corrective action, if appropriate.

(6) The Government will return PLT samples to the contractor, with a copy of the test report, at contractor expense.

(7) The contractor shall prepare and disseminate the samples as follows:

(a) Ship the selected PLT samples by traceable means. [Mark the shipment “Production Lot Samples - Do Not Post To Stock,” Contract Number [ ] and Lot/Item Number [ ]”. Place a copy of the system of record receiving report (i.e., WAWF or DD Form 250) on the exterior of the shipping container in accordance with DFARS Appendix F. Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11.

(b) Include the following interior documentation:

(i) DD Form 1222 and system of record receiving report (i.e., WAWF or DD Form 250);

(ii) Copy of contract/order;

(iii) Copy of test reports, showing actual results and tolerances specified in the technical data package;

(iv) Material and process certifications;

(v) Process operations and inspection method sheets;

(vi) Copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor's responsibility);

(vii) Documents required under contract deliverables requirements list; and

(viii) A prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.

(8) At the time of shipment, the contractor shall sign and provide copies of the DD Form 1222, system of record receiving report (i.e., WAWF or DD Form 250), transportation tracking information, and information for return of the PLT samples to the contracting officer. The Government testing time will be [ 30 ] calendar days for the test results to be provided to the contractor.

(9) For PLT, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination.

(10) Delivery.

(a) Ship samples to [ W56YHX ].

(b) Delivery Schedule Information:

(i) [ 70 ] Total Delivery Days for FAT (If Applicable)

(ii) [ 243 ] Days: Completion of Production Units (to include PLT samples), and Submission of samples for Government Testing

(iii) [ 30 ] Days: Government PLT Report Evaluation and Notification to Contractor

(iv) [ 30 ] Days: Delivery of final production quantity to Government

(v) [ 373 ] Total Delivery Days (Sum of paragraph (10)b)(i) through (iv))

SECTION F - DELIVERIES OR PERFORMANCE

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 29 PAGES

SPE4A7-27-Q-0158

SECTION F - DELIVERIES OR PERFORMANCE (CONTINUED)

52.247-29 F.O.B. ORIGIN (FEB 2006) FAR

SECTION G - CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (PRE-FILLED) (JAN 2023) DFARS As prescribed in 232.7004 (b), use the following clause:

(a) Definitions. As used in this clause - Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation System (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall -

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https:// wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items -

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

Invoice (stand-alone) and Receiving Report (stand-alone) or Invoice and Receiving Report (combination)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table *

Field Name in WAWF Data to be entered in WAWF Guidance

Pay Official DoDAAC See Block 12 (SF26), 15 (DD 1155), or 18a

(SF1449)

(If blank, see resulting award)

Issue By DoDAAC See Block 5 (SF26), 6 (DD 1155), or 9 (SF1449)

(If blank, see resulting award)

Admin DoDAAC See Block 6 (SF26), 7 (DD 1155), or 16 (SF1449)

(If blank, see resulting award)

Inspect By DoDAAC SEE SECTION B (If blank, see resulting award)

Ship To Code SEE SECTION B (If blank, see resulting award)

Ship From Code SEE SECTION B (If blank, see resulting award)

Mark For Code SEE SECTION B https://www.acquisition.gov/dfars/part-232-contract-financing https://www.sam.gov https://wawf.eb.mil/ https://wawf.eb.mil/ https://wawf.eb.mil/

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 29 PAGES

SPE4A7-27-Q-0158

SECTION G - CONTRACT ADMINISTRATION DATA (CONTINUED)

Field Name in WAWF Data to be entered in WAWF Guidance

(If blank, see resulting award)Service Approver

(DoDAAC) (If blank, see resulting award) Service Acceptor

(DoDAAC) (If blank, see resulting award) Accept at Other DoDAAC (If blank, see resulting award) LPO DoDAAC (If blank, see resulting award) DCAA Auditor DoDAAC (If blank, see resulting award) Other DoDAAC(s) (If blank, see resulting award)

(* Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (** Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

See administer listed on page 1

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H04 SOURCING FOR CRITICAL SAFETY ITEMS (SEP 2016)

H18 DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM (DPAS) (JUL 2026)

SECTION I - CONTRACT CLAUSES

52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)

FAR

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) DFARS

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) DFARS

52.204-13 SYSTEM FOR AWARD MANAGEMENT -- MAINTENANCE (DEVIATION 2026-O0038) (FEB 2026) FAR

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0038) (FEB

2026) FAR

252.204-7004 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN 2023) DFARS

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 29 PAGES

SECTION I - CONTRACT CLAUSES (CONTINUED)

252.204-7014 LIMITATIONS ON THE USE OR DISCLOSURE OF INFORMATION BY LITIGATION SUPPORT CONTRACTORS (JAN

2023) DFARS

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (JAN 2023) DFARS

52.209-4 FIRST ARTICLE APPROVAL - GOVERNMENT TESTING (DEVIATION 2026-O0038) (FEB 2026) FAR As prescribed in 9.308-2 (a) and (b), insert the following clause:

[Contracting Officer inserts details]

(a) The Contractor shall deliver 1 unit(s) of Lot/Item 0003 within 60 calendar days from the date of this contract to the Government at NATICK MATERIALS TEST LAB W56YHX US ARMY DEVCOM SOLDIER CENTER AERIAL DELIVERY ENG SUPP TEAM ATTN: ANDY MELONI BLDG. 3 ROOM R219 15 General Greene Ave NATICK MA 01760 [insert name and address of the testing facility] for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. This contract elsewhere specifies the characteristics that the first article must meet and the testing requirements.

(b) Within 10 calendar days after the Government receives the first article, the Contracting Officer will notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval will state any further action required of the Contractor. A notice of disapproval will cite reasons for the disapproval.

(c) If the Government disapproves the first article, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time the Government specifies. The Government will act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor will have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor --

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer will, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates, the contract price, or both, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

(End of clause)

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED (DEVIATION 2026-O0038) (FEB 2026) FAR

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A COUNTRY

THAT IS A STATE SPONSOR OF TERRORISM (MAY 2019) DFARS

252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011) DFARS

As prescribed in 209.270-5, use the following clause:

(a) Definitions.

Aviation critical safety item means a part, an assembly, installation equipment, launch equipment, recovery equipment, or support equipment for an aircraft or aviation weapon system if the part, assembly, or equipment contains a characteristic any failure, malfunction, or absence of which could cause --

(i) A catastrophic or critical failure resulting in the loss of, or serious damage to, the aircraft or weapon system;

(ii) An unacceptable risk of personal injury or loss of life; or

(iii) An uncommanded engine shutdown that jeopardizes safety.

Design control activity. (i) With respect to an aviation critical safety item, means the systems command of a military department that is specifically responsible for ensuring the airworthiness of an aviation system or equipment, in which an aviation critical safety item is to be used; and

(ii) With respect to a ship critical safety item, means the systems command of a military department that is specifically responsible for ensuring the

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 29 PAGES

SPE4A7-27-Q-0158

SECTION I - CONTRACT CLAUSES (CONTINUED)

seaworthiness of a ship or ship equipment, in which a ship critical safety item is to be used.

Ship critical safety item means any ship part, assembly, or support equipment containing a characteristic, the failure, malfunction, or absence of which could cause --

(i) A catastrophic or critical failure resulting in loss of, or serious damage to, the ship; or

(ii) An unacceptable risk of personal injury or loss of life.

(b) Identification of critical safety items. One or more of the items being procured under this contract is an aviation or ship critical safety item. The following items have been designated aviation critical safety items or ship critical safety items by the designated design control activity:

1670-013538424 (Insert additional lines as necessary)

(c) Heightened quality assurance surveillance. Items designated in paragraph (b) of this clause are subject to heightened, risk-based surveillance by the designated quality assurance representative.

52.211-5 MATERIAL REQUIREMENTS (DEVIATION 2026-O0038) (FEB 2026) FAR

52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (DEVIATION 2026-O0038) (FEB 2026) FAR

52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES (DEVIATION 2026-O0038) (FEB 2026) FAR

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (DEVIATION 2026-O0038) (FEB 2026) FAR

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEVIATION 2026-O0038) (FEB 2026) FAR

52.222-37 EMPLOYMENT REPORTS ON VETERANS (DEVIATION 2026-O0038) (FEB 2026) FAR

52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (DEVIATION 2026-O0038) (FEB 2026) FAR

52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION 2026-O0040, REVISION 1) (APR 2026)

52.223-23…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .