SPE4A727Q0063.pdf
PDF 144 KB Posted
- Attached to
- PISTON, HYDRAULIC ACCU AND 2 MORE ITEMS
- Solicitation number
- SPE4A727Q0063
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Request for Quotations (RFQ) issued by the Defense Logistics Agency (DLA) Weapons Support for the procurement of piston hydraulic accumulators. The RFQ number is SPE4A7-27-Q-0063, issued on November 10, 2026, with quotations due by November 23, 2026. The requisition/purchase request number is 7013008789, and this is not a small business set-aside.
The primary requirement is for 65 units of COTS piston hydraulic accumulators (NSN 1650-01-116-3036), with delivery required 164 days after order (ADO) to DLA Distribution Cherry Point in North Carolina. Two additional line items include contractor first article testing (1 unit, 30 days ADO) and production lot testing (1 unit, 30 days ADO). The item is marked as a critical application item for Valcor Engineering Corporation (CAGE 96487, P/N 293965) and Sikorsky Aircraft Corporation (CAGE 78286, P/N 293965). Quality requirements include MIL-STD-1916 or ASQ H1331 sampling plans, inspection and acceptance at destination, and compliance with export control regulations (ITAR/EAR). The solicitation requires evaluation based on cost/price and past performance (SPRS assessments weighted most heavily), with these factors approximately equal in importance. Quotes must be submitted via the DLA Internet Bid Board System (DIBBS). Payment will be processed through Wide Area Workflow (WAWF), and standard FAR and DFARS clauses apply, including provisions for changes, termination for convenience, and Buy American compliance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
4. CERT.FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5. ISSUED BY
7. DELIVERY
9. DESTINATION
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5 ON OR
BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (See Continuation Sheets)
12. DISCOUNT FOR PROMPT PAYMENT
d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO SIGN
QUOTATION
16. SIGNER
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not useable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
SPE4A7-27-Q-0063
1. REQUEST NO.
2026 NOV 10
2. DATE ISSUED
7013008789
3. REQUISITION/PURCHASE REQUEST NO.
DO-C9
RATING
DLA WEAPONS SUPPORT
ASC SUPPLIER OPER AE AND AF DIV
6090 STRATHMORE ROAD
RICHMOND VA 23237
USA
Buyer: Destiny Stevenson DDS0146 Tel: 804-654-4854 Email: DESTINY.STEVENSON@DLA.MIL
SEE SCHEDULE
6. DELIVER BY (Date)
8. TO:
c. CITY
d. STATE
b. STREET ADDRESS
a. NAME OF CONSIGNEE
e. ZIP CODE
a. 10 CALENDAR DAYS
b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS
15. DATE OF QUOTATION
a. NAME (Type or Print)
AREA CODE
c. TITLE (Type or Print)d. CITY
c. COUNTY
b. STREET ADDRESS
e. STATE f. ZIP CODE
See Schedule
2026 NOV 23
NUMBER
FOB DESTINATION
OTHER
(See Schedule)
CAGE
b. TELEPHONE
See attached schedule to complete quote information.
Quoter must also complete the following:
a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .
b. Prices quoted are:
___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .
___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.
___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;
___ Customer ________________________.
___ Other (provide basis) ______________________________________ _______________________________________ .
c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .
d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.
e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:
f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 27 PAGES
SPE4A7-27-Q-0063
The following DLA Aviation Acquisition Notices are incorporated by reference. The full-text of the notices can be found at: https://www.dla.mil/Aviation/Business/PGNS/
PGN-13-01 Evaluation and Award for Simplified Acquisitions. (June 2018)
(b) Relative Important and Trade-offs. The Government will base the determination of best value on a comparative assessment of the quoters' prices, past performance, and the other evaluation factors identified elsewhere in this solicitation. The determination of best value also considers the relative importance of the evaluation factors. All evaluation factors, when combined, are:
[ ] significantly more important than cost or price.
As other evaluation factors become more equal, the evaluated cost or price becomes more important.
[X] approximately equal to cost or price; or
[ ] significantly less important than cost or price.
As the evaluated cost/price becomes more equal, relative importance of all other evaluation factors becomes more significant.
(e) Past Performance Evaluation Factors. The Government will use the past performance evaluation factors marked below in addition to cost or price and other evaluation factors specified in the solicitation. Unless indicated otherwise, past performance is significantly more important than other non-price factors. Within the past performance subfactors, SPRS assessments (as applicable) will be weighed most heavily. Historical quality history and delivery schedule compliance (not captured in SPRS) will be weighed more heavily than the remaining past performance subfactors. All other non-price evaluation factors specified in this solicitation weigh equally, unless otherwise indicated.
[X] SPRS Assessments (PROC NOTE L08) (EProcurement) [ ] PPIRS-RC Assessments [ ] Historical Quality (not captured in SPRS) [ ] Historical Delivery Schedule Compliance (not captured in SPRS) [ ] Other (specify):
(End of Notice)
PGN-13-05 Quote Submission Method (March 2017)
Quotes in response to this solicitation may be submitted by the following method(s) as indicated below:
__X__ Upload Proposals on the DLA Internet Bid Board System (DIBBS) at: https://www.dibbs.bsm.dla.mil/default.aspx
____Buyer’s Facsimile: _________________
____Buyer’s e-mail address: _________________
*Note: E-mailed RFQs must not exceed 15 MB. Proposals greater than 15 MB must be submitted using multiple emails.
(End of Notice)
PGN-13-06 All or None for Simplified Acquisitions (September 2019)
PGN-17-01 Quantity Option (June 2017)
PAGE 3 OF 27 PAGES
SPE4A7-27-Q-0063
SECTION B
SUPPLIES/SERVICES: 1650-01-116-3036
ITEM DESCRIPTION:
PISTON HYDRAULIC ACCUMULATOR
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE
SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE
ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE
APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON
REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)
RD002, COVERED DEFENSE INFORMATION APPLIES
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ001: TAILORED HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
(MANUFACTURERS AND NON-MANUFACTURERS)
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RQ032: EXPORT CONTROL OF TECHNICAL DATA
This item has technical data some or all of which is subject to export-control of either the International Traffic in Arms regulations (ITAR) or the Export Administration Regulations (EAR), and cannot be exported without prior authorization from either the Department of State or the Department of Commerce. Export includes disclosure of technical data to foreign persons and nationals whether located in the United States or abroad. This requirement applies equally to foreign national employees and U.S. companies and their foreign subsidiaries. DFARS 252.225-7048 is applicable to this data.
The Defense Logistics Agency (DLA) limits distribution of export-control technical data to DLA contractors that have an approved US/Canada Joint Certification Program (JCP) certification, have completed the Introduction to Proper Handling of DOD Export-Controlled Technical Data Training and the DLA Export-Controlled Technical Data Questionnaire (both are available at the web address given below), and have been approved by the DLA controlling authority to access the export-controlled data. Instructions for obtaining access to the export-controlled data can be found at:
https://www.dla.mil/Logistics-Operations/Enhanced-Validation/
To be eligible for award, offerors and any sources of supply proposed for use are required to have an approved JCP certification and have been approved by the DLA controlling authority to access export-controlled data managed by DLA. DLA will not delay award in order for an offeror or its supplier to apply for and receive approval by the DLA controlling authority to access the export-controlled data.
RT001: MEASURING AND TEST EQUIPMENT
RD005: Cybersecurity Maturity Model Certification (CMMC) Level 2 Certified Third-Party Assessment Organization (C3PAO)
RQ017: PHYSICAL IDENTIFICATION/BARE ITEM MARKING
PAGE 4 OF 27 PAGES
SPE4A7-27-Q-0063
SECTION B
SUPPLY/SERVICE: 1650-01-116-3036 CONT'D
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
CRITICAL APPLICATION ITEM
VALCOR ENGINEERING CORPORATION 96487 P/N 293965
SIKORSKY AIRCRAFT CORPORATION 78286 P/N 293965
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 1650-01-116-3036 65.000 EA $ ________________ $ ________________
PISTON,HYDRAULIC
ACCUMULATOR
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
FOB: ORIGIN DELIVERY DATE: 164 DAYS ADO
PREP FOR DELIVERY:
PKGING DATA - MIL-STD-2073-1E
QUP:001 PRES MTHD:41 CLNG/DRY:1 PRESV MAT:00
WRAP MAT:00 CUSH/DUNN MAT:NA CUSH/DUNN THKNESS:C
UNIT CONT:E5 OPI:M
INTRMDTE CONT:E5 INTRMDTE CONT QTY:AAA
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:00 -00 No special marking
PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING
REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
SW3113
DLA DISTRIBUTION CHERRY POINT
PHANTOM RD BLDG 147 BAY A
CHERRY POINT NC 28533-5040
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE C20 AND
CONTRACT
FREIGHT SHIPPING ADDRESS:
PAGE 5 OF 27 PAGES
SPE4A7-27-Q-0063
SECTION B
SUPPLY/SERVICE: 1650-01-116-3036 CONT'D
SW3113
DLA DISTRIBUTION CHERRY POINT
PHANTOM RD BLDG 147 BAY A
CHERRY POINT NC 28533-5040
US
Contractor First Article Test Contractor First Article Test – The number of units shown signifies the test requirement. See FAR clause 52.209-3 for the actual quantity required to be tested.
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS%
0002 0001 - S00000053 1.000 EA $ ________________ $ ________________
FOB: DELIVERY DATE: 30 DAYS ADO
PREP FOR DELIVERY:
Not Applicable
Production Lot Testing (Contractor)
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS%
0003 0001 - S00000062 1.000 EA $ ________________ $ ________________
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
FOB: ORIGIN DELIVERY DATE: 30 DAYS ADO
PREP FOR DELIVERY:
Not Applicable
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 7013008789 0001 N/A N/A N/A 02/13/2026
0002 N/A N/A N/A N/A N/A N/A
0003 N/A N/A N/A N/A N/A N/A
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 6 OF 27 PAGES
SPE4A7-27-Q-0063
SECTION C - SPECIFICATIONS/SOW/SOO/ORD
C04 UNUSED FORMER GOVERNMENT SURPLUS PROPERTY (SEP 2021)
To be considered for award, the offeror must complete and submit the following representation with their offer. Additional supporting documentation to demonstrate the surplus material offered was previously owned by the Government and meets solicitation requirements must be provided within 24 hours of request by the contracting officer.
(1) The material is new, unused, and not of such age or so deteriorated as to impair its usefulness or safety. Yes [ ] No [ ] The material conforms to the technical requirements cited in the solicitation (e.g., Commercial and Government Entity (CAGE) Code and part number, specification, etc.). Yes [ ] No [ ] The material conforms to the revision letter/number, if any is cited. Yes [ ] No [ ] Unknown [ ] If No, the revision does not affect form, fit, function, or interface. Yes[ ] No [ ] Unknown [ ] The material was manufactured by:
(Name):
(Address):
(2) The offeror currently possesses the material: Yes [ ] No [ ] If yes, the offeror purchased the material from a Government selling agency or other source. Yes [ ] No [ ] If yes, complete the following:
Government Selling Agency:
Contract Number:
Contract Date: (Month, Year):
Other Source:
Address:
Date Acquired: (Month/Year):
(3) The material has been altered or modified. Yes [ ] No [ ] If Yes, complete the following:
Name of the company that performed the alternation or modification Address:
Complete description of the alternations or modifications:
(4) The material has been reconditioned. Yes [ ] No [ ] If Yes, complete the following:
(i) The price offered includes the cost of reconditioning/refurbishment. Yes [ ] No [ ]
(ii) Name of the company that reconditioned that material
(iii) Description of any work done or to be done, including the components to be replaced and the applicable rebuild standard.
The material contains cure-dated components. Yes [ ] No [ ] If Yes, complete the following:
(i)The price includes replacement of cure-dated components. Yes [ ] No [ ]
(ii) Cure date:
(5) The material has data plates attached. Yes [ ] No [ ] If Yes, insert all information contained on the data plate:
(6)The offered material is in its original package. Yes [ ] No [ ] If Yes, complete the following:
Contract Number:
NSN:
CAGE Code:
Part Number:
Other Markings/Data:
(7)The offeror has supplied this same material (National Stock Number) to the Government before. Yes [ ] No [ ] If Yes, complete the following:
(i) The material being offered is from the same original Government contract number as that provided previously. Yes [ ] No [ ]
(ii) State below the Government Agency and contract number under which the material was previously provided:
Agency:
Contract Number:
(8)The material is manufactured in accordance with a specification or drawing. Yes [ ] No [ ] If Yes, complete the following:
(i) The specification/drawing is in the possession of the offeror. Yes [ ] No [ ]
(ii) The offeror has stated the applicable information below: Yes [ ] No [ ] Specification/Drawing Number:
Revision: (if any):
Date:
(9) The material has been inspected for correct part number and for absence of corrosion or any obvious defects. Yes [ ] No [ ] If Yes, complete the following:
(i) Material has been re-preserved. Yes [ ] No [ ]
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 7 OF 27 PAGES
SPE4A7-27-Q-0063
SECTION C - SPECIFICATIONS/SOW/SOO/ORD (CONTINUED)
(ii) Material has been repackaged. Yes [ ] No [ ]
(iii) Percentage of material that has been inspected is %; and/or
(iv) Number of items inspected is
(v) A written report was prepared. Yes [ ] No [ ] The offeror agrees that in the event of award and notwithstanding the provisions of the solicitation.
(i) Inspection and acceptance of the surplus material will be performed at source or destination subject to all applicable provisions for source or destination inspection.
The offeror will forward to the contracting officer one of the following, within 24 hours of request by the contracting officer to demonstrate that the material being offered was previously owned by the Government (offeror check which one applies):
[ ] For national or local sales, conducted by sealed bid, spot bid or auction methods, a solicitation/Invitation For Bid and corresponding DLA Disposition Services Form 1427, Notice of Award, Statement and Release Document.
[ ] For DLA Disposition Services Commercial Venture (CV) Sales, the shipment receipt/delivery pass document and invoices/receipts used by the original purchaser to resell the material.
[ ] When the above documents are not available, or if they do not identify the specific NSN being acquired, a copy or facsimile of all original package markings and data, including NSN, commercial and Government entity (CAGE) code and part number, and original contract number. (This information has already been provided in paragraph (6) of this procurement note. Yes [ ] No [ ] .)
[ ] When none of the above are available, other information to demonstrate that the offered material was previously owned by the Government. Describe:
This procurement note only applies to offers of Government surplus material. Offers of commercial surplus, manufacturer's overruns, residual inventory resulting from terminated Government contracts, and any other material that meets the technical requirements in the solicitation but was not previously owned by the Government will be evaluated in accordance with the DLAD procurement note L04, Offers for Part Numbered Items.
If requested by the contracting officer, the offeror shall furnish sample units, in the number specified, to the contracting officer or to another location specified by the contracting officer, within 10 days after the contracting officer's request. The samples will be furnished at no cost to the Government. All such samples not destroyed in evaluation will be returned at the offeror's expense. The samples will be evaluated for form, fit, and function with subassembly, assembly, or equipment with which the items are to be used. End items furnished under any contract award to the offeror furnishing the samples can include the returned samples, and all acceptable end items will have a configuration identical to the samples. If specific tests of the samples' performance are made by the Government, the offeror will be furnished the results of such tests prior to a contract being entered into. In addition to any other inspection examinations and tests required by the contract, the performance of the end items will be required to be as good as that of the samples submitted.
In the event of award, the contractor will be responsible for providing material that is in full compliance with all requirements in the contract or order. The surplus material to be furnished must meet the requirements of the current contract or order, whether or not the material met Government requirements in existence at the time the material was initially manufactured or sold to the Government. If higher-level contract quality requirements apply to the material being acquired, those requirements do not apply to surplus material furnished under this contract.
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (JUN 2023)
C01 SUPERSEDED PART NUMBERED ITEMS (FEB 2025)
C14 CORRECTION OF NONCONFORMING PACKAGING OR MARKING (MAY 2020)
C20 VENDOR SHIPMENT MODULE (VSM) (MAY 2026)
52.242-15 STOP-WORK ORDER (AUG 1989) FAR
252.244-7999 SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES (DEVIATION 2026-O0015) (FEB
2026) DFARS
52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT FORM) (APR 1984) FAR
52.213-4 TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS (NONCOMMERCIAL) (DEVIATION 2026-O0038) (FEB 2026)
FAR
C02 MANUFACTURING PHASE OUT OR DISCONTINUATION OF PRODUCTION, DIMINISHING SOURCES, AND OBSOLETE
MATERIALS OR COMPONENTS (DEC 2016)
C07 WARSTOPPER PROGRAM MATERIAL BUFFER AVAILABILITY (JAN 2021)
SECTION E - INSPECTION AND ACCEPTANCE
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 27 PAGES
SPE4A7-27-Q-0063
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
E01 SUPPLEMENTAL FIRST ARTICLE EXHIBIT DISPOSITION – CONTRACTOR MAINTAINED (MAY 2020)
E02 SUPPLEMENTAL FIRST ARTICLE EXHIBIT DISPOSITION – GOVERNMENT MAINTAINED (MAY 2020)
E09 CONTRACTOR FIRST ARTICLE TEST (FAT) INFORMATION (JUL 2022)
(1) For FAT requirements, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. Due to known systems limitations, solicitations may contain erroneous inspection, acceptance, and FOB points. This procurement note takes precedence over any conflicting terms.
(2) CONTRACTOR FAT DELIVERY SCHEDULE
(a) 30 Days: To Deliver FAT Report to the Government
(b) 30 Days: Government FAT Report Evaluation and Notification to Contractor
(c) 74 Days: To Deliver Final Production Quantity After Approval of FAT Report. If PLT applies, this line will be blank; the number of delivery days for final production quantity will appear in procurement note E03, Production Lot Testing - Contractor, or E04, Production Lot Testing - Government, as applicable
(d) 134 Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))
E07 EVALUATION FACTOR FOR ORIGIN INSPECTION (JAN 2018)
52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
52.246-17 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003) FAR
As prescribed in 46.710(a)(1), insert a clause substantially as follows:
(a) Definitions. As used in this clause.
“Acceptance” means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, ownership of existing supplies, or approves specific services as partial or complete performance of the contract.
“Supplies” means the end items furnished by the Contractor and related services required under this contract. The word does not include “data.”
(b) Contractor's obligations.
(1) Notwithstanding inspection and acceptance by the Government of supplies furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the Contractor warrants that for [Contracting Officer shall state specific period of time after delivery, or the specified event whose occurrence will terminate the warranty period; e.g., the number of miles or hours of use, or combinations of any applicable events or periods of time].
(i) All supplies furnished under this contract will be free from defects in material or workmanship and will conform with all requirements of this contract; and
(ii) The preservation, packaging, packing, and marking, and the preparation for, and method of, shipment of such supplies will conform with the requirements of this contract.
(2) When return, correction, or replacement is required, transportation charges and responsibility for the supplies while in transit shall be borne by the Contractor. However, the Contractor's liability for the transportation charges shall not exceed an amount equal to the cost of transportation by the usual commercial method of shipment between the place of delivery specified in this contract and the Contractor's plant, and return.
(3) Any supplies or parts thereof, corrected or furnished in replacement under this clause, shall also be subject to the terms of this clause to the same extent as supplies initially delivered. The warranty, with respect to supplies or parts thereof, shall be equal in duration to that in paragraph (b)(1) of this clause and shall run from the date of delivery of the corrected or replaced supplies.
(4) All implied warranties of merchantability and “fitness for a particular purpose” are excluded from any obligation contained in this contract.
(c) Remedies available to the Government.
(1) The Contracting Officer shall give written notice to the Contractor of any breach of warranties in paragraph (b)(1) of this clause within [Contracting Officer shall insert specific period of time; e.g., “45 days of the last delivery under this contract,” or “45 days after discovery of the defect”].
(2) Within a reasonable time after the notice, the Contracting Officer may either.
(i) Require, by written notice, the prompt correction or replacement of any supplies or parts thereof (including preservation, packaging, packing, and marking) that do not conform with the requirements of this contract within the meaning of paragraph (b)(1) of this clause; or
(ii) Retain such supplies and reduce the contract price by an amount equitable under the circumstances.
(3)(i) If the contract provides for inspection of supplies by sampling procedures, conformance of supplies or components subject to warranty action shall be determined by the applicable sampling procedures in the contract. The Contracting Officer.
(A) May, for sampling purposes, group any supplies delivered under this contract;
(B) Shall require the size of the sample to be that required by sampling procedures specified in the contract for the quantity of supplies on which warranty action is proposed;
(C) May project warranty sampling results over supplies in the same shipment or other supplies contained in other shipments even though all of such supplies are not present at the point of reinspection; provided, that the supplies remaining are reasonably representative of the quantity on which warranty action is proposed; and
(D) Need not use the same lot size as on original inspection or reconstitute the original inspection lots.
(ii) Within a reasonable time after notice of any breach of the warranties specified in paragraph (b)(1) of this clause, the Contracting Officer may exercise one or more of the following options:
(A) Require an equitable adjustment in the contract price for any group of supplies.
(B) Screen the supplies grouped for warranty action under this clause at the Contractor's expense and return all nonconforming supplies to the Contractor for correction or replacement.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 27 PAGES
SPE4A7-27-Q-0063
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
(C) Require the Contractor to screen the supplies at locations designated by the Government within the contiguous United States and to correct or replace all nonconforming supplies.
(D) Return the supplies grouped for warranty action under this clause to the Contractor (irrespective of the f.o.b. point or the point of acceptance) for screening and correction or replacement.
(4)(i) The Contracting Officer may, by contract or otherwise, correct or replace the nonconforming supplies with similar supplies from another source and charge to the Contractor the cost occasioned to the Government thereby if the Contractor.
(A) Fails to make redelivery of the corrected or replaced supplies within the time established for their return; or
(B) Fails either to accept return of the nonconforming supplies or fails to make progress after their return to correct or replace them so as to endanger performance of the delivery schedule, and in either of these circumstances does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure.
(ii) Instead of correction or replacement by the Government, the Contracting Officer may require an equitable adjustment of the contract price. In addition, if the Contractor fails to furnish timely disposition instructions, the Contracting Officer may dispose of the nonconforming supplies for the Contractor's account in a reasonable manner. The Government is entitled to reimbursement from the Contractor, or from the proceeds of such disposal, for the reasonable expenses of the care and disposition of the nonconforming supplies, as well as for excess costs incurred or to be incurred.
(5) The rights and remedies of the Government provided in this clause are in addition to and do not limit any rights afforded to the Government by any other clause of this contract.
(End of clause)
E08 FIRST ARTICLE TESTING REQUIREMENTS (MAR 2025)
(1) If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all costs and risk associated with completion of the FAT requirement in the production CLIN price.
(2) If there is a separate FAT CLIN, the offeror shall include all costs and risk associated with completion of the FAT requirement in the FAT CLIN price.
The unit of issue for the FAT CLIN, EACH, is equal to one First Article Test (1EA=1FAT). To receive payment for any costs associated with FAT, the offeror shall propose costs associated with FAT on a separate CLIN. The offeror shall base the production CLIN price solely on all costs associated with completion of the production units and shall exclude all FAT-related costs.
(3) The contracting officer will use the total award price in selecting the best value offer from among all eligible offerors. However, for an offeror to be eligible for award, the contracting officer must determine that the FAT CLIN price (unless FAT is waived) and the production CLIN price are fair and reasonable; and, if set-aside under FAR Part 19, a fair market price. The offeror shall not propose a FAT CLIN price that is materially unbalanced in relation to the production CLIN price. In the event an offeror receives a waiver of the FAT requirement, the contracting officer will deduct the FAT CLIN price for the waived source in determining the total award price.
(4)(a) Notwithstanding the conditions for waiving first article, the contracting officer may order an additional first article sample, or portion thereof, in writing if there is a --
(i) Major change to the technical data;
(ii) Lapse in production for a period in excess of 90 days; or
(iii) Change in the place of performance (manufacturing facility), manufacturing process,material used, drawing, specification or source of supply.
(b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the contractor shall notify the contracting officer; who will determine whether to order an additional first article sample or portion thereof and provide instructions concerning the submission, inspection, and notification of results. The contractor shall bear the costs of the additional first article testing resulting from any of the causes in paragraphs (4)(a)(i)-(iii) instituted by the contractor and not due to changes directed by the Government.
(5) Waivers. The offeror may submit a request for FAT waiver to the contracting officer, who may waive the FAT requirement when all of the following criteria apply:
(a) The offeror requesting waiver has successfully manufactured, delivered and the government accepted the item or a similar item. The offeror shall provide the following information and be prepared to provide documentary evidence upon the contracting officer's request:
(i) Contract number(s), date(s), and issuing Government agency or agencies.
(ii) Description of item previously furnished, identified by part number, type, model number and/or other identifying information. If the item previously furnished is similar but not identical to the item being acquired under the current buy, the offeror shall explain why manufacture of the item previously furnished is sufficient to demonstrate its ability to manufacture the item being acquired under the current buy without need for a first article test.
(iii) Engineering control document/change number of item previously furnished.
(b) There have been no changes to manufacturing processes, tooling, or place of performance.
(c) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements; or subcontractors used to manufacture the items successfully in the past).
(d) The offeror shall supply an item of the same design and manufactured by the same method at the same facilities as the item or similar item previously furnished and accepted under subparagraph (5)(a).
(6) Contractor-Performed FAT.
(a) The contractor shall test the quantities as outlined in paragraph (a) of FAR clause 52.209-3 as specified in the contract. The contractor shall submit reports in accordance with paragraph (b) of FAR clause 52.209-3, as supplemented in this procurement note.
(b] For test report preparation and delivery of contractor FAT, the contractor shall --
(i) Use the data item description DI-NDTI-80809B report format.
(ii)] Mark the test report with the following: “First article test report - Contract number:[ Award PIIN ] and lot/item number: [ 1650-011163036 ].
(iii) Sign the FAT Report, accompanied by the system of record receiving report (i.e, WAWF or] DD Form 250) and contractor confirmation that the same process and facilities used to manufacture the first article units will be used to manufacture the production units, to the contracting officer at the applicable address shown below:
(A) For awards issued by DLA Aviation; or DLA Troop Support Clothing and Textile (C&T), Medical Materiel, or Subsistence, submit the report to the procuring activity in Block 6 of the DD Form 1155, Block 7 of Standard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 27 PAGES
SPE4A7-27-Q-0063
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
(B) For awards issued by DLA Land (SPE7L), submit the report to the following address:
DLA Land - FLSEB ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-399, or email to: Land.FAT.Monitor@dla.mil.
(C) For awards issued by DLA Maritime (SPE7M), submit the report to the following address:
DLA Maritime - FMSE ATTN: FAT Monitor P. O. Box 3990 Columbus, OH 43218-3990, or email to: maritime.fat.monitor@dla.mil.
(D) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email the report to Construction and Equipment FAT Monitor at trpsptcandefatmonitor@dla.mil. If report exceeds email limitations, submit the report to the following address:
DLA Troop Support ATTN: First Article Testing Monitor Building 3, 700 Robbins Avenue Philadelphia, Pennsylvania 19111.
Preferred electronic submissions: Hardware FAT Monitor at DLAHardwareFATMonitor@dla.mil.
(7) The contractor shall --
(a) Provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3;
(b) Maintain and make available all records evidencing those details at the Government's request.
(c) At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to shipment to the Government, provide written notice to the contracting officer and to the cognizant DCMA Functional Specialist when full administration or Quality Support administration is delegated to DCMA.
(8) Government-performed FAT. The contractor shall --
(a) For delivery of separately priced Government first article samples for Government performed FAT ship the units and system of record receiving report (i.
e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of FAR clause 52.209-4.
(b) For delivery of Government first article samples that are not separately priced, ship the units with a commercial shipping document to the test facility.
(c) Prepare the shipping container(s) by marking the external packages in bold letters, “First Article Exhibits - Do Not Post to Stock," adjacent to the MIL- STD-129 (latest revision) identification markings.
(d) Use a hard copy of the system of record receiving report (i.e., WAWF DD Form 250), or commercial shipping document as a packing list, in accordance with DFARS Appendix F.
(e) Mark the exterior of the shipping container in accordance with MIL-STD-129 (latest revision), paragraph 5.11.
(f) In the interior package, include hard copies of the contract, test reports, material certifications/process operation sheets, drawings used to manufacture the units, and a pre-paid return label or shipping account for payment.
(g) Send units by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express).
(h) Send an email with subject titled “Notification of Test Exhibits [ N/A ]” to the corresponding address in (i) or (ii) below and to the contracting officer specified in the contract. In the email, provide the shipment date, contract/purchase order number, National Stock Number, means of transportation, tracking number, and summary of container contents. Attach a copy of the system of record receiving report (i.e., WAWF or DD Form 250) documenting the Government has performed the contract quality assurance within the system or record.
(i) DLA Land & Maritime - DSCCProdVerif@dla.mil
(ii) DLA Aviation - DSCR.Test & EvaluationOffice@dla.mil
(9) At its discretion, the Government may return FAT units to the contractor at no cost to the Government. The contractor shall submit the return address and pre-paid return label or shipping account for payment.
(10) If the Government disapproves or conditionally approves Government-performed FAT units, the Government will take action in accordance with FAR 52.209-4.
H07 SUPPLY ASSURANCE THROUGH MULTISOURCE CONTRACTING (SEP 2017)
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) FAR
As prescribed in 46.311, insert the following clause:
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Title Number Date Tailoring
[Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.]
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 27 PAGES
SPE4A7-27-Q-0063
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
(ii) Attention to such factors as organization, planning, work instruction, documentation control, and advanced metrology.
(End of Clause)
E05 PRODUCT VERIFICATION TESTING (MAY 2020)
(1) Product verification testing (PVT) under this procurement note will only apply when the contracting officer specifically invokes it in writing. The contracting officer may invoke PVT at or after contract award. If the contracting officer invokes PVT at contract award, the contract will explicitly state this testing requirement. If the contracting officer invokes PVT after contract award, the contracting officer shall notify the contractor and the cognizant DCMA ACO. The Government will perform PVT testing at a Government-designated testing laboratory.
(2) The contractor shall not ship or deliver any material until it receives notification of the acceptable PVT results, unless the contracting officer directs it to do so in writing The Government will provide the PVT results to the contractor within 20 business days after receipt at the Government testing facility, unless the Government specifies otherwise in writing.
(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3; and maintain and make available all records evidencing those details if requested by the Government. When the Government finds evidence of risk associated with the contractor's sampling process, the Government may witness and evaluate the contractors sampling process. The contractor shall randomly select samples from the production lot(s), unless the contracting officer specifies otherwise in writing. The contractor shall ship the selected PVT samples with a copy of the system of record receiving report (i.e., WAWF, DD Form 250, or commercial shipping document) and the contractor's signed DD Form 1222.
The contractor shall prepare the shipping container(s) by marking the external packages in bold letters, “Product Verification Test Samples - Do Not Post to Stock," Contract Number [ ] and Lot/Item Number [ ]” adjacent to the MIL-STD-129 (latest revision) identification markings. The contractor shall use a hard copy of the system of record receiving report as a packing list, in accordance with DFARS Appendix F. The contractor shall mark the exterior of the shipping container in accordance with MIL-STD129 (latest revision), paragraph 5.11. The contractor shall send samples by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). The contractor shall include the following in the interior package:
(a) Hard copies of the contract;
(b) Material certifications/process operation sheets; and
(c) Drawings used to manufacture the units and return shipping information.
(4) The Government will return samples that pass testing and are not destroyed during evaluation to the contractor at the Government's expense for the contractor to include as part of the total contract quantity to be delivered under the contract. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. If the Government does not return approved samples that pass testing to the contractor, the Government will consider those samples as part of the contract quantity for payment and delivery.
(5) If samples fail testing, the Government may reject the entire contract lot from which the contractor took the samples. The Government may, at its discretion, retain samples that fail testing without obligation to the contractor.
E06 INSPECTION AND ACCEPTANCE AT SOURCE (JUN 2018)
Inspection and acceptance are at source. The place of acceptance is the location where the Government conducts the last inspection before shipment, unless the contractor indicated a different physical location for acceptance below.
The contractor shall indicate the location where supplies will be inspected, if different from the production location:
Commercial and Government Entity (CAGE) code:
Address:
Applicable to contract line item numbers(s) (CLIN(s)):
The contractor shall indicate the location where packaging will be inspected, if different from the production location:
[ ] Same as for supplies OR CAGE code:
Address:
Applicable to CLIN(s):
The contractor shall indicate the location where supplies will be accepted, if different from the inspection location:
Commercial and Government Entity (CAGE) code:
Address:
Applicable to contract line item numbers(s) (CLIN(s)):
E03 PRODUCTION LOT TESTING --- CONTRACTOR (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. The contractor shall complete PLT on the production lot(s) after first article approval, if the contract requires first article testing. The contractor shall price the PLT CLIN to cover the cost of the final test report and any approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. The unit of issue for the PLT CLIN, EACH, is equal to one Production Lot Test (1EA=1PLT).
(2) For purposes of facilitating PLT, the engineering support activity and/or testing facility has authority to communicate and discuss clarifications directly with contractors. If the Government and/or the contractor identify changes to contract requirements, the contractor shall contact the post award contracting officer or contract administrator (see the “Issued By” blocks on the contract award or order) for written approval. The contractor shall not act on any revisions or other changes until the contracting officer issues a written modification approving the proposed revision(s)/change(s).
(3) The contractor shall provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.246-2 or 52.246-3, and maintain and make available all records evidencing those details if requested by the Government. At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to conducting the production lot test, the contractor shall provide written notice of the time and location of the test to the contracting officer and the cognizant DCMA functional specialist when full administration or quality support administration is delegated to DCMA, so the Government may witness sample selection and the test.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 27 PAGES
SPE4A7-27-Q-0063
SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED)
(4) Unless otherwise stated, the contractor shall select [1] samples at random from the production lot(s) produced. If the quantity stated in the previous sentence equals “ZZ,” the contractor shall use the appropriate sample size identified in the technical data package or applicable sample plan provided by the Government. If the contractor cannot determine the sample quantity, the contractor shall obtain written confirmation of the sample size from the contracting officer.
(5) The contractor shall perform all tests on the PLT samples needed to verify/validate the items meet the contract technical/quality requirements.
(6) If a PLT sample fails, the entire production lot from which the contractor took the sample fails. The contractor shall notify the contracting officer and propose corrective action, if appropriate.
(7) The contractor shall prepare and disseminate the PLT report and applicable traceability documentation as follows:
(a) Prepare the test report in accordance with data item description DI-NDTI-80809B, and mark the test report, “Production Lot Test Report, Contract Number [] and Lot/Item Number [].”
(b) Present the PLT report to the contracting officer for review.
(c) Include the following documentation with all shipments of PLT Reports:
(i) DD Form 1222 and system of record receiving report (i.e., WAWF or DD Form 250);
(ii) Copy of the contract/order;
(iii) Copy of all applicable test reports, showing actual results and tolerances specified in the technical data package;
(iv) Material and process certifications;
(v) Process operations and inspection method sheets;
(vi) Copies of drawings used to manufacture the PLT sample, with proper marking torestrict public disclosure (if desired) and from Government use other than for evaluation to the extent consistent with the Government's data rights under the contract; and
(vii) Documents required under a contract deliverables requirements list, if applicable.
(d) Submit all required documentation to the Government activity specified in the contract in time to allow for at least [15] calendar days for review of the PLT report, and for the contracting officer to provide written notification of approval/disapproval to the contractor.
(i) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email all required documentation to Construction and Equipment PLT Monitor at trpsptcandepltmonitor@dla.mil . If documentation files exceed email limitations, submit to the following address: DLA Troop Support, Attention:
Production Lot Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia, Pennsylvania 19111.
(e) For PLT, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination.
(f) Delivery.
(i) Ship test report to [DLAtesting@dla.mil].
(ii) Delivery Schedule Information:
(A) N/A Total Delivery Days for FAT (If Applicable)
(B) 30 Days: Completion of Production Units (to include PLT samples), PLT, and Submission of PLT Report
(C) 15 Days: Government PLT Report Evaluation and Notification to Contractor
(D) 30 Days: Delivery of final production quantity to Government
(E) 75 Total Delivery Days (Sum of paragraph (ii)(A) through (D) above
SECTION F - DELIVERIES OR PERFORMANCE
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS (APR 1984) FAR
SECTION G - CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (PRE-FILLED) (JAN 2023) DFARS As prescribed in 232.7004 (b), use the following clause:
(a) Definitions. As used in this clause - Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation System (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall -
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https:// wawf.eb.mil/.
(e) WAWF methods…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .