DD1155_redacted_SPE4A614D5430_14X0424.pdf
PDF 464 KB Posted
- Attached to
- NSN 3120-00-883-9725
- Solicitation number
- SPE4A614X0424
- Issued by
-
Defense Logistics Agency Aviation
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTINUED ON NEXT PAGE
CONTRACTOR IS CERTIFIED FOR EXPORT CONTROL WITH CERTIFICATION NUMBER 0049277, WITH AN EXPIRATION DATE OF 05/15/2018.
"Material Certifications shall be required for each component of the end item at time of inspection." (AMSC 1/G only)
Partial or early deliveries are authorized at no expense to the US Government.
Indefinite Delivery Purchase Order (IDPO) for a base term of three years plus an option term of two years (five year contract in total).
NSN 3120-00-883-9725
FOR INFORMATION PURPOSES ONLY:
The Guaranteed Minimum of 39 each is applicable to the base period only.
There is no guarantee that the Government will place any orders after the guaranteed minimum of base year of the contract/order.
The following quantities are applicable to both the base and option periods:
Minimum Delivery Order Quantity: 39 each Maximum Delivery Order Quantity: 77 each
**Maximum Contract Value: $150,000.00**
BASE PERIOD (YEARS 1-3)
YEAR 1:
YEAR 2:
YEAR 3: UNIT PRICE FOR BASE YEARS: $_14.20__________
OPTION PERIOD (YEARS 4-5)
YEAR 4:
YEAR 5: UNIT PRICE FOR OPTION YEARS: $_14.94__________
The required delivery is 180 days after receipt of order.
Supplies Inspection CAGE: 3L665 Packaging Inspection CAGE: 3L665
DCMA ADMINISTRATION OFFICE FOR CONTRACT ADMINISTRATION: S2101A
DCMA ADMINISTRATION OFFICE FOR SUPPLIES INSPECTION AND PACKAGING INSPECTION: S1701A
"Ship to" addresses will be identified on each individual delivery order.
All deliveries will be within the continental United States.
52.211-9G22 DLA AVIATION PALLETIZATION FOR MIL-STD-2073 IN ACCORDANCE WITH MD00100452 REVISION B (JUL 2008)
PAGE 2 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SPE4A6-14-D-5430
(a) Palletization.
(1) When the total number of containers going to the same destination is 250 pounds or greater (excluding pallet) or a volume of 20 cubic feet or greater, then palletization IAW MIL-STD-147 is required.
(2) When the total number of containers going to the same destination is less than 250 pounds (excluding pallet) and is less than 20 cubic feet, then palletization is not required IAW MIL-STD-147.
(3) Except as otherwise provided in this clause, shipping containers shall be palletized IAW the guidance cited in MIL-STD-147. Special palletization instructions may be further specified under other preparation for delivery instructions in this order/contract. In the case of any inconsistency between such special palletization instructions in the requirements cited in this clause, the special palletization instructions shall take precedence.
(4) Pallets required for use, shall comply with ANSI/MH1, Part No. MH1/9-02SW4048. This part number shall be used for Level A packaging when the total weight is less than 1500 lbs. evenly distributed. This part number shall be used for Level B packaging when the total weight is greater than 1500 lbs., but less than 3000 lbs. evenly distributed.
***NOTE***Use of nonstandard commercial pallets is forbidden unless cited in the contract/purchase order.
(i) The following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Non-Manufactured Wood Packaging Material (NMWPM) entering a European country or destined for a Container Consolidation Point (CCP) or an aerial or water port of embarkation: All wooden pallets and wood containers produced entirely or in part of non-manufactured softwood species shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) coniferous material and certified accordingly by an accredited agency recognized by the American Lumber Standards Committee (ALSC) in accordance with Non-manufactured Wood Packing Policy and Non-manufactured Wood Packing Enforcement Regulations both dated May 30, 2001. All wooden pallets and containers produced entirely of non-manufactured hardwood species shall be identified by a permanent marking of "NC," 1.25 inches or greater in height, accompanied by the CAGE code of the contracted manufacturer and the month and year of the contract. On pallets, the marking shall be applied to the stringer or block on opposite sides and ends of the pallet and be contrasting and clearly visible. On containers, the marking shall be applied on a side other than the top or bottom, contrasting and clearly visible.
(ii) Oak and chestnut wood shall be bark free and square edged so that none of the natural rounded surface tissues remain, or be bark free and have a moisture content no greater than 20%. The contractor is responsible for performing an inspection of each shipment to assure compliance with this requirement.
(5) Unless otherwise specified in the contract or purchase order hazardous material containers, except cylinders and 55 gallon drums (see paragraph 5(i) thru (iv), shall be palletized IAW Load Type VI of MIL-STD-147. Pallets used shall be as cited above. "Hazardous Material" for the purpose of this clause, means any material considered hazardous under the Department of Transportation Hazardous Material Regulations, 49 CFR 171-79, IATA, IACO, IMDG,unless otherwise specified.
***NOTE*** Shrink wrap is not authorized for use with Hazardous Materials.
(i) 55 gallon drums for domestic delivery shall be palletized 3 per pallet IAW with load type 3a bonding method G
PAGE 3 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
(stretch wrap) or 4 per pallet IAW load type VI of MIL-STD-147 (placing an inverted wood cap under and over the load secured by metal strapping).
(ii) 55 gallon drums for export delivery shall be palletized 4 per pallet IAW load type VI of MIL-STD-147 (placing an inverted wood cap under and over the load secured by metal strapping).
(iii) Cylinders for domestic delivery shall be palletized vertically IAW load type IX of MIL-STD-147 or horizontally using metal strapping IAW MIL-STD-147 bonding method D (figure 36) and notched wood spacers (storage aid #25, figure 50) to assure the stability of the load.
(iv) Cylinders for export delivery shall be Palletized (vertically) IAW load type IX of MIL-STD-147.
(6) The use of stretch-wrap, shrink film or nonmetallic strapping for bonding is not authorized for "Export Shipments".
(7) Stretch-wrap, when utilized, shall be accomplished mechanically with a (machine or hand held tool that based on the weight of items being palletized, maintains sufficient tension to assure secure bonding of the items to the pallet during transportation).
(8) Unless otherwise specified in the contract or Purchase Order, all polyethylene/plastic containers for domestic delivery with or without fiberboard over pack shall be palletized IAW load type 3a bonding method G (stretch wrap) or IAW Load "Type VI of MIL-STD-147 to ensure stacking support during transportation and storage. All polyethylene/plastic containers for export delivery with or without fiberboard over pack shall be palletized IAW Load Type VI of MIL-STD-147.
(b) Loading: Five-gallon tight head pails shall be loaded on pallets IAW Load Type III or IIIA of MIL-STD-147, except that a triple layer or course may be used for a total not to exceed 42 pails.
(c) Unitization: Supplies that do not lend themselves to the use of MIL-STD-147 palletization due to size, weight, configuration, etc. shall be unitized by securely blocking, bracing, or anchoring the load on a skid base or commercial type pallet in a manner that assures safe delivery.
PAGE 4 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SECTION B
SUPPLIES/SERVICES: 3120-00-883-9725
ITEM DESCRIPTION:
BEARING, PLAIN, SPHERICAL
52.246-11 Higher Level Contract Quality Requirement (Manufacturers)
FAR CLAUSE 52.246-11 APPLIES. AQUALITY MANAGEMENT PROGRAM MEETING THE
REQUIREMENTS OF ISO 9001:2008; A PROGRAM COMPARABLE TO ISO 9001:2008
(EXAMPLE SAE AS 9100),THE FOLLOWING TAILORED VERSION OF ISO 9001:2008;
OR A PROGRAM COMPARABLE TO THE TAILORED VERSION OF ISO 9001:2008
(EXAMPLE SAE AS9003) IS REQUIRED. IN THE TAILORED VERSION OF THE ISO
9001:2008, ANY REFERENCES WHICH CITE THE ENTIRE INTERNATIONAL STANDARD
AREINTERPRETED AS EXCLUSIONS TO THIS DOCUMENT.
DLA TAILORED HIGHER LEVEL QUALITY CLAUSE FROM ISO 9001:2008
4.1 General requirements,[excluding reference to 1.2 and excluding NOTE 3 c)]
4.2.1 General, [excluding subparagraph a)]
4.2.2 Quality manual, [excludingsubparagraph a)]
4.2.3 Control of documents
4.2.4 Control of records
5.1 Management commitment
5.3 Quality policy
6.2.2 Competence,training and awareness
6.4 Work environment
7.1 Planning of product realization, [excluding NOTE 2]
7.2.1 Determination ofrequirements related to the product
7.2.2 Review of requirements related to the product
7.2.3 Customer communication
7.3.7 Controlof design and development changes
7.4.1 Purchasing process
7.4.3 Verification of purchased product
7.5.1 Control of production andservice provision
7.5.3 Identification and traceability
7.5.4 Customer property
7.5.5 Preservation of product
7.6 Control ofmonitoring and measuring equipment
8.1 General, [excluding subparagraph b) and subparagraph c)]
8.2.2 Internal audit
8.2.4Monitoring and measurement of product
8.3 Control of nonconforming product
8.5.2 Corrective action
8.5.3 Preventive action
P/N:2-50218-3
ENGINEERING DATA REQUIREMENTS:
1. USE ASME Y14.5 IN LIEU OF 20Y201
2. USE ASME B46.1 IN LIEU OF MIL-STD 10
3. HEAT TREAT PER SAE-H-6875 IN LIEU OF HT-3.6.
4. NFS-70 IS NOT REQ'D. FINISH PER NOTE 3,4,6
5. PENETRANT INSPECT PER ASTM 1417,TYPE 1,
PAGE 5 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SUPPLY/SERVICE: 3120-00-883-9725 CONT'D
METHOD B OR C, LEVEL 3 OR 4 IN LIEU OF IT-32.2
WITH THE FOLLOWING ACCEPTANCE/REJECTION:
NO DEFECTS ALLOWED.
IDENTIFY TO:
MIL-STD-130N(1)DATED 16 NOV 2012.
IDENTIFICATION MARKING OF U.S. MILITARY PROPERTY
SAMPLING:
1. SAMPLING FOR INSPECTION AND TESTING SHALL BE IAWANSI/ASQ
Z1.4-2008, DATED JAN 1, 2008. ANY ALTERNATE PLAN MUST BE
APPROVED BY THE PCO. A SAMPLING PLAN THAT ACCEPTS ON ZERO
DEFECTS IS REQUIRED
2. ANY DEFECTIVE ITEM DISCOVERED DURING INSPECTION MAY BE CAUSE
FOR REJECTION OF THE ENTIRE CONTRACTQUANTITY.
GOVERNMENT FIRST ARTICLE:
Government First Article Preproduction approval required. Testing will be in accordance withapplicable drawings, specifications and/or Engineering instructions. The first article offered shall be manufactured at thefacilities in which production quantities are procured and produced under this contract. When submitting the first article(s) forgovernment testing, a copy of the contract and all applicable drawings, specifications, engineering instructions, certifications,and inspection sheets shall be provided. Upon receipt and evaluation of the test report from the responsible government testinglocation, the contracting officer will provide final notification to the manufacturer. Any questions or concerns regarding the first article test requirements must be submitted through the contracting officer.
Additional Wide Area Workflow (WAWF) instructions for government first article test CLIN: The contractor shall code the receiving report for government first article test CLIN in WAWFas Follows:
A: Inspection at origin (Source) - Enter the DCMA office DODAAC listed on page 1 of the contract.
B: Acceptance by other - Enter the issue by office DODAAC listed on page 1 of the contract.
C: Ship to code - Enter the DODAAC of the test facility listed for the government first article test CLIN in the contract (See FAR Clause 52.209-4).
FIRST ARTICLE TEST MARKING INSTRUCTIONS:
FAT sample(s) packaging shall be clearly marked "FIRST ARTICLE TEST EXHIBIT(S) DO NOT POST TO STOCK!!!" in largest font possiblewith contrasting color to the packaging. Marking shall be located adjacent to the Package Shipping Label side and on at least oneadditional side of the package.
PAGE 6 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
IAW BASIC DRAWING NR 76823 2-50218
REVISION NR F DTD 11/23/1965
PART PIECE NUMBER:2-50218-3
IAW REFERENCE DRAWING NR 76823 10Y201
REVISION NR 27 DTD 09/27/1985
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 76823IT-60
REVISION NR F DTD 12/20/2012
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 76823 NFS-70
REVISION NR G DTD 02/04/2005
PARTPIECE NUMBER:
IAW REFERENCE DRAWING NR 76823 NFS-70
REVISION NR G DTD 05/25/1973
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR13873 008839725-04265
REVISION NR DTD 09/21/2004
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 76823 HT-19
REVISION NR C DTD03/09/2005
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 76823 HT-19
REVISION NR C DTD 06/22/1989
PART PIECE NUMBER:
IAW REFERENCE DRAWING NR 76823 IT-60
REVISION NR F DTD 03/10/2005
PART PIECE NUMBER:
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 3120-00-883-9725 ** EA $ ** $ **
BEARING, PLAIN,
SPHERICAL
PRICING TERMS: Firm Fixed Price
BASE PERIOD.
SUPPLIES/SERVICES: 3120-00-883-9725
PAGE 7 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
Delivery CLIN Price (in days) .
0001 $ ** TO BE CITED ON EACH DELIVERY ORDER **
OPTION 01
SUPPLIES/SERVICES: 3120-00-883-9725
Delivery CLIN Price (in days) .
0001 $ ** TO BE CITED ON EACH DELIVERY ORDER **
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
FOB: DESTINATION DELIVERY DATE: ** TO BE CITED ON EACH DELIVERY ORDER **
PREP FOR DELIVERY:
PKGING DATA - MIL-STD-2073-1D, 15 DEC 1999
QUP = 001: PRES MTHD = ZZ: CLNG/DRY = X: PRESV MAT = XX:
WRAP MAT = XX: CUSH/DUNN MAT = XX: CUSH/DUNN THKNESS = X:
UNIT CONT = XX: OPI = M:
INTRMDTE CONT = XX: INTRMDTE CONT QTY = XXX:
PACK CODE = U:
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE: 51 -
PALLETIZATION SHALL BE INACCORDANCE WITH MD00100452 REV B
DATED 08183
Markings Paragraph When ASTM D3951, Commercial Packaging is specified, the following apply:
•,,All containers shall meet ASTM D4169, Standard Practice for Performance Testing of Shipping Containers andSystems.
•,,All Section D Packaging Clauses take precedence over ASTM D3951.
•,,In addition to requirements in MIL-STD-129P, allLabeling and Marking shall have a Method of Preservation of Commercial Pack applied to the MIL-STD-129 identification labels on all shipping containers, including the unit and intermediate levels. The Method of Preservation (M) of Commercial Pack (CP) shall beapplied to all labels and marking as “MCP.”
•,,For all shipments of packaged materiel to the Government, which includes either Depot (DLA-Direct) or DVD (Customer-Direct) shipments, both DoD linear and two-dimensional (2D) bar code markings are required inaccordance with MIL-STD-129. See DLAD 52.211-9010 for exceptions to the Military Shipment Label (MSL) requirement. When the MSLis required, the Transportation Control Number (TCN) is not an exception and must always be present. TCN construction is detailedin DTR 4500.9-R (Appendix L).
PAGE 8 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
•,,The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) as specified in the contract takeprecedence over ASTM D3951.
•,,Loose-fill cushioning and dunnage materials are prohibited in all shipments to DODcustomers.
•,,Unitization in accordance with MIL-STD-147, Palletized Unit Loads, is required for all shipments to the DODactivities.
ADDITIONAL INFORMATION
PRESERVATION, PACKAGING, PACKING, AND MARKING
REQUIREMENTS SHALL BE IN ACCORDANCEWITH
MIL-DTL-197L.
1. METHOD OF PRESERVATION SHALL BE DETERMINED BY
BEARING TYPE AND SIZE (REFER TO TABLE I).
2. PARAGRAPH 3.10.2,SELECTION OF UNIT
PRESERVATION, APPLIES. PROTECTIVE LUBRICANT OR
PRESERVATIVE COMPOUND SHALL BE DETERMINED
DEPENDANT UPON BEARINGTYPE AND CLOSURE IN
ACCORDANCE WITH PARAGRAPH 3.3.4 AND TABLE II.
FOR PRESERVATION PROCESS CONTROLS, DEPENDANT
UPON BEARING TYPE,CLOSURE, AND LUBRICANT,
PARAGRAPHS 3.4 THROUGH 3.9 APPLY.
3. PACKAGING PRECAUTIONARY MARKING REQUIREMENTS
OF PARAGRAPH 3.12.4APPLY.
4. CONTRACTOR'S PACKAGING FACILITY SHALL ADHERE
TO THE QUALITY ASSURANCE VERIFICATION
REQUIREMENTS AS CONTAINED WITHINSECTION 4 OF
MIL-DTL-197L.
...END OF SPECIAL PACKAGING INSTRUCTIONS...
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 1000020417 0001 N/A N/A N/A N/A
PAGE 9 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SECTION D - PACKAGING AND MARKING
252.211-7006 RADIO FREQUENCY IDENTIFICATION (SEP 2011) DFARS
(b)(1) Except as provided in paragraph (b)(2) of this clause, the Contractor shall affix passive RFID tags, at the case- and palletized-unit-load packaging levels, for shipments of items that—
(i) Are in any of the following classes of supply, as defined in DoD 4140.1-R, DoD Supply Chain Materiel Management Regulation, AP1.1.11:
(A) Subclass of Class I – Packaged operational rations.
(B) Class II – Clothing, individual equipment, tentage, organizational tool kits, hand tools, and administrative and housekeeping supplies and equipment.
(C) Class IIIP – Packaged petroleum, lubricants, oils, preservatives, chemicals, and additives.
(D) Class IV – Construction and barrier materials.
(E) Class VI – Personal demand items (non-military sales items).
(F) Subclass of Class VIII – Medical materials (excluding pharmaceuticals, biologicals, and reagents – suppliers should limit the mixing of excluded and non-excluded materials).
(G) Class IX – Repair parts and components including kits, assemblies and subassemblies, reparable and consumable items required for maintenance support of all equipment, excluding medical-peculiar repair parts; and
(ii) Are being shipped to one of the locations listed at http://www.acq.osd.mil/log/rfid/ or to—
(A) A location outside the contiguous United States when the shipment has been assigned Transportation Priority 1, or to—
(B) The following location(s) deemed necessary by the requiring activity:
Contract Line, Subline, or Exhibit Line Item Number
Location Name
City
State
DoDAAC
(2) The following are excluded from the requirements of paragraph (b)(1) of this clause:
(i) Shipments of bulk commodities.
(ii) Shipments to locations other than Defense Distribution Depots when the contract includes the clause at FAR 52.213-1, Fast Payment Procedures.
(c) The Contractor shall—
(1) Ensure that the data encoded on each passive RFID tag are globally unique (i.e., the tag ID is never repeated across two or more RFID tags and conforms to the requirements in paragraph (d) of this clause;
(2) Use passive tags that are readable; and
(3) Ensure that the passive tag is affixed at the appropriate location on the specific level of packaging, in accordance with MIL-STD-129 (Section 4.9.2) tag placement specifications.
(d) Data syntax and standards. The Contractor shall encode an approved RFID tag using the instructions provided in the EPC™ Tag Data Standards in effect at the time of contract award. The EPC™ Tag Data Standards are available at http://www.epcglobalinc.org/standards/.
(1) If the Contractor is an EPCglobal™ subscriber and possesses a unique EPC™ company prefix, the Contractor may use any of the identifiers and encoding instructions described in the most recent EPC™ Tag Data Standards document to encode tags.
(2) If the Contractor chooses to employ the DoD identifier, the Contractor shall use its previously assigned Commercial and Government Entity (CAGE) code and shall encode the tags in accordance with the tag identifier details located at http://www.acq.osd.mil/log/rfid/tag_data.htm. If the Contractor uses a third-party packaging house to encode its tags, the CAGE code of the third-party packaging house is acceptable.
(3) Regardless of the selected encoding scheme, the Contractor with which the Department holds the contract is responsible for ensuring that the tag ID encoded on each passive RFID tag is globally unique, per the requirements in paragraph (c)(1).
(e) Advance shipment notice. The Contractor shall use Wide Area WorkFlow (WAWF), as required by DFARS 252.232-7003, Electronic Submission of Payment Requests, to electronically submit advance shipment notice(s) with the RFID tag ID(s) (specified in paragraph
(d) of this clause) in advance of the shipment in accordance with the procedures at https://wawf.eb.mil/.
PAGE 10 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SPE4A6-14-D-5430
http://www.acq.osd.mil/log/rfid/ http://www.epcglobalinc.org/standards/ http://www.acq.osd.mil/log/rfid/tag_data.htm http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/%20https:/wawf.eb.mil/
(End of clause)
52.211-9010 SHIPPING LABEL REQUIREMENTS – MILITARY-STANDARD (MIL-STD) 129P (MAR 2012) DLAD
52.211-9010 SHIPPING LABEL REQUIREMENTS – MILITARY STANDARD (MIL-STD) 129P (NOV 2011), ALT I (AUG 2005)
DLAD
52.211-9033 PACKAGING AND MARKING REQUIREMENTS (APR 2008) DLAD
52.211-9095 PALLETIZATION OF SHIPMENTS (SEP 2012) DLAD
52.246-9062 REPACKAGING TO CORRECT PACKAGING DEFICIENCIES (SEP 2008) DLAD
52.247-9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM) (FEB 2007) DLAD
SECTION E - INSPECTION AND ACCEPTANCE
52.246-02 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (FEB 1999) FAR
The Contractor shall comply with the higher-level quality standard selected below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]
Title Number Date Tailoring
[] ISO 9001:2008
[Contracting Officer insert the title, number (if any), date, and tailoring (if any) of the higher-level quality standards.] (End of clause)
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008) DFARS
52.246-9003 MEASURING AND TEST EQUIPMENT (NOV 2011) DLAD
52.246-9008 INSPECTION AND ACCEPTANCE AT ORIGIN (NOV 2011) DLAD
(a) Inspection and Acceptance are at Origin.
(b) The point of acceptance will be the point of last inspection before shipment unless otherwise indicated by the offeror.
(c) The Offeror shall indicate below the location where supplies will be inspected:
Supplies:
Plant:
C.E. MACHINE CO. INC.
Commercial and Government Entity (CAGE) Code: 3L665 Street: 1741 S HOOVER CT City/State/Zip: WICHITA, KS 67209 Applicable to contract line-item(s) (CLIN(s):
ALL
(d) The Offeror shall indicate below the location where packaging will be inspected:
Packaging:
[ X ] Same as for supplies, or, Plant:
Cage Code:
PAGE 11 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
Street:
City/St/Zip:
Applicable to clin(s):
52.246-9019 MATERIAL AND INSPECTION REPORT (APR 2008) DLAD
SECTION F - DELIVERIES OR PERFORMANCE
52.211-16 VARIATION IN QUANTITY (APR 1984) FAR
(b) The permissible variation shall be limited to:
0 Percent increase 0 Percent decrease This increase or decrease shall apply to ALL CLINS .
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989) FAR
52.211-9020 TIME OF DELIVERY - ACCELERATED (JUN 2008) DLAD
52.211-9054 TIME OF DELIVERY – NEGOTIATED IQCs AND SIMPLIFIED ACQUISITIONS FOR IDPOs (NOV 2011) DLAD
(b) Delivery is required in accordance with the schedule set forth below.
WITHIN THE NUMBER OF DAYS STATED BELOW AFTER DATE OF DELIVERY ORDER
NSN(S) QUANTITY (PER
CALENDAR MONTH)
GOVERNMENT
REQUIRED
OFFEROR’S
PROPOSED
3120-00-883-9725 Up to 77 EACH each 180 DARO Each additional each (or less) ADD:
Up to each Each additional each (or less) ADD:
Up to each Each additional each (or less) ADD:
Up to each Each additional each (or less) ADD:
52.242-15 STOP-WORK ORDER (AUG 1989) FAR
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
52.247-34 F.O.B. DESTINATION (NOV 1991) FAR
52.247-48 F.O.B. DESTINATION - EVIDENCE OF SHIPMENT (FEB 1999) FAR
52.247-9016 F.O.B. DESTINATION CONTRACTOR TRANSSHIPMENT (NOV 2011) DLAD
52.247-9031 MANUFACTURER'S LOADING PRACTICES (NOV 2011) DLAD
52.247-9035 SHIPPING INSTRUCTIONS (DOMESTIC) (NOV 2011) DLAD
Mail instructions (not applicable to Army Post Office (APO) or Fleet Post Office (FPO) addresses):
(a) Route domestic shipments within mail limitations as follows based on the transportation priority (TP) reflected in the "mark for" data with each contract line item number (CLIN). Commercial small parcel carrier (e.g., United Parcel Service (UPS) or Federal Express) is an acceptable mode of shipment to domestic addresses.
PAGE 12 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
(1) Ship all NMCS, 777, and 999, regardless of TP or distance, by commercial small parcel carrier.
(2) Ship TP 1 and 2 (IPD 01-08) by priority mail or most economical comparable mode.
(3) Ship TP 3 (IPD 09-15) and all stock locations (not TP coded) by surface parcel post (Fourth Class) or most economical comparable mode.
(4) The cost of parcel post insurance will not be paid by the Government.
(b) Freight instructions (domestic).
(1) Ship all NMCS, 777, and 999, regardless of TP or distance by commercial small parcel carrier.
(2) For TP 1 and 2 (IPD 01-08) weighing under 250 pounds, use air freight and specify air on the invoice. Exceptions: if destination is within 600 miles of origin, use regular surface transportation.
(3) For all other freight shipments, contact the cognizant transportation officer for delivery and carrier routing instructions.
(4) Advance telephonic notice of delivery must be given by the carrier to the consignee's transportation officer (transport control/prelodge desk) at least 24 hours prior to delivery of freight shipments (other than small parcels). Bills of lading must be annotated to reflect this requirement. Addresses for direct shipments within the contiguous United States (CONUS) and Canada are shown "in the clear" with each individual CLIN on schedule continuation sheet(s) in each order. Addresses for stock shipments are shown with each individual CLIN on schedule continuation sheet(s) in each order.
(End of Clause)
52.247-9038 SHIPPING INSTRUCTION FOR DLA DIRECT ACQUISITIONS (NOV 2011) DLAD
52.247-9034 POINT OF CONTACT FOR TRANSPORTATION INSTRUCTIONS (JUN 2013) DLAD
SECTION H - SPECIAL CONTRACT REQUIREMENTS
52.246-9039 REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES (NOV 2011) DLAD
(a) The Contractor shall remove or obliterate from a rejected end item and its packing and packaging, any marking, symbol, or other representation that the end item or any part of it has been produced or manufactured for the United States Government. Removal or obliteration shall be accomplished prior to any donation, sale, or disposal in commercial channels. The Contractor, in making disposition in commercial channels of rejected supplies, is responsible for compliance with requirements of the Federal Trade Commission Act (15 United States Code (U.S.C.) 45 et seq.) and the Federal Food, Drug and Cosmetic Act (21 U.S.C. 301 et seq.), as well as other Federal or State laws and regulations promulgated pursuant thereto.
(b) Unless otherwise authorized by the Contracting Officer, the Contractor is responsible for removal or obliteration of government identifications within 72 hours of rejection of nonconforming supplies including supplies manufactured for the Government but not offered or supplies transferred from the Government's account to the cold storage Contractor's account at origin or destination. (For product rejected at destination and returned to the Contractor's plant, the 72 hour period starts with the time of Contractor receipt of returned product). After removal or obliteration is accomplished and prior to disposition, the Contractor must notify the Government inspector.
(End of Clause)
SECTION I - CONTRACT CLAUSES
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) DFARS
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013) DFARS
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUN 2013) FAR
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) DFARS
252.204-7004 ALTERNATE A, SYSTEM FOR AWRD MANAGEMENT (MAY 2013) DFARS
252.204-7012 SAFEGUARDING OF UNCLASSIFIED CONTROLLED TECHNICAL INFORMATION (NOV 2013) DFARS
52.209-06 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR SUSPENSION (AUG 2013) FAR
52.209-9020 FIRST ARTICLE TESTING REQUIREMENT – WAIVER APPROVED (SEP 2008) DLAD
PAGE 13 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008) FAR
252.211-7005 SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND STANDARDS (NOV 2005) DFARS
(4) If the proposed SPI process has been accepted at the facility at which it is proposed for use, but is not yet listed at the Internet site specified in paragraph (b) of this clause, submit documentation of Department of Defense acceptance of the SPI process.
(d) Absent a determination that an SPI process is not acceptable for this procurement, the Contractor shall use the following SPI processes in lieu of military or Federal specifications or standards:
(Offeror insert information for each SPI process) SPI Process:
Facility:
Military or Federal Specification or Standard:
Affected Contract Line Item Number, Subline Item Number, Component, or Element:
52.211-9002 PRIORITY RATING (NOV 2011) DLAD
52.211-9004 PRIORITY RATING FOR VARIOUS LONG-TERM CONTRACTS (NOV 2011) DLAD
52.211-9061 TIME OF DELIVERY (OVERLAPPING ORDERS) INDEFINITE DELIVERY CONTRACT (IDC) (NOV 2011) DLAD
The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NUMBER QUANTITY WITHIN DAYS AFTER DATE OF CONTRACT
0001 77 EACH 180
(Any balance shall be delivered at the rate of every days thereafter.)
In the event of overlapping orders, the contractor is not required to deliver any more than in any day period.
OFFEROR’S PROPSED DELIVERY SCHEDULE
ITEM NUMBER QUANTITY WITHIN DAYS AFTER DATE OF CONTRACT
(Any balance shall be delivered at the rate of every days thereafter) In the event of overlapping orders, the contractor is not required to deliver any more than in any day period.
(End of Clause)
52.213-9012 INDEFINITE DELIVERY PURCHASE ORDER (IDPO) - BILATERAL (SEP 2012) DLAD
(a) The contractor agrees that it will accept additional orders under the same terms and conditions specified in the order. This agreement becomes binding upon delivery of the initial order, which is the minimum quantity for this IDPO. The initial delivery order represents the minimum quantity for this IDPO, and the Government is under no obligation to place additional orders under this contract. The Government may place additional orders for a period of FIVE YEARS year(s) from the date of the basic order. All additional orders will reference the initial order. The aggregate value of all orders shall not exceed the simplified acquisition threshold.
Therefore, the maximum value under the IDPO is $150,000, or $6,500,000 for acquisitions conducted under Federal Acquisition Regulation (FAR) Subpart 13.5.
PAGE 14 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
(b) Evaluation of Quotes. If quotes include variable pricing based upon conditions such as quantity ranges, transportation zones, and/or option years, quotes will be evaluated by establishing an average unit price. The average unit price will be established for awards under $150,000, by adding all unit prices together, then dividing the sum by the number of unit prices. For acquisitions conducted under FAR Subpart 13.5 that exceed $150,000, quotes will be evaluated in accordance with
52.215-08 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997) FAR
52.216-19 ORDER LIMITATIONS (OCT 1995) FAR
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 39 EACH, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor—
(1) Any order for a single item in excess of 77 EACH ;
(2) Any order for a combination of items in excess of 77 EACH ; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d ) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 15 days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
52.216-22 INDEFINITE QUANTITY (OCT 1995) FAR
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period ; provided, that the Contractor shall not be required to make any deliveries under this contract after EXPIRATION DATE (End of clause)
252.216-7006 ORDERING (MAY 2011) DFARS
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from DATE OF AWARD through EXPIRATION DATE [insert dates].
52.216-9023 ADDITIONAL ORDERING LIMITATION (APR 2008) DLAD
52.216-9024 ADJUSTMENT TO ORDERING PERIOD (APR 2008) DLAD
(a) The ordering period established in FAR Clause 52.216-18 is based upon the assumption that an award will be made by 3/7/2014 .
The ordering period specified in 52.216-18 will be extended by the number of calendar days after the date that the contract is, in fact, awarded.
52.217-09 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) FAR
PAGE 15 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 [insert the period of time within which the Contracting Officer may exercise the option]; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days [60 days unless a different number of days is inserted] before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed FIVE YEARS (months) (years).
(End of clause)
52.219-06 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011) FAR
52.222-03 CONVICT LABOR (JUN 2003) FAR
52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES (DEC 2013) FAR
52.222-20 WALSH-HEALEY PUBLIC CONTRACTS ACT (OCT 2010) FAR
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999) FAR
52.222-26 EQUAL OPPORTUNITY (MAR 2007) FAR
52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010) FAR
52.222-50 COMBATTING TRAFFICKING IN PERSONS (FEB 2009) FAR
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008) FAR
52.232-01 PAYMENTS (APR 1984) FAR
52.232-08 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002) FAR
52.232-11 EXTRAS (APR 1984) FAR
52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986) FAR
52.232-25 PROMPT PAYMENT (OCT 2008) FAR
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006) DFARS
52.233-01 DISPUTES (JUL 2002) FAR
52.233-03 PROTEST AFTER AWARD (AUG 1996) FAR
52.233-04 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) FAR
52.243-01 CHANGES - FIXED PRICE (AUG 1987) FAR
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991) DFARS
52.244-06 SUBCONTRACTS FOR COMMERCIAL ITEMS (DEC 2013) FAR
52.246-17 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003) FAR
(b) Contractor’s obligations.
(1) Notwithstanding inspection and acceptance by the Government of supplies furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the Contractor warrants that for ONE YEAR FROM THE LAST DELIVERY UNDER THE CONTRACT [Contracting Officer shall state s pecific period of time after delivery , or the specified event whose occurrence will terminate the warranty period; e.g., the number of miles or hours of use, or combinations of any applicable events or periods of time]—
(c) Remedies available to the G overnment.
PAGE 16 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
(1) The Contracting Officer shall give written notice to the Contractor of any breach of warranties in paragraph (b)(1) of this clause within ONE YEAR FROM THE LAST DELIVERY UNDER THE CONTRACT [Contracting Officer shall insert specific period of time;
e.g., “45 days of the last deliver y under this contract,” or “45 days after discovery of the defect”].
52.246-9043 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NON-MANUFACTURERS) (NOV 2011) DLAD
52.246-9066 DOCUMENTATION OF TRACEABILITY (JAN 2009) DLAD
252.247-7023 TRANSPORATION OF SUPPLIES BY SEA (MAY 2002) DFARS
252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (MAY 2002), ALT III (MAY 2000) DFARS
52.248-01 VALUE ENGINEERING (OCT 2010) FAR
(3) The source of the savings (the instant contract, or concurrent and future contracts), as follows:
CONTRACTOR'S SHARE OF NET ACQUISITION SAVINGS (Figures in percent) Contract Type : ______________ __________________ Incentive (Voluntary) : ___________________ _________ Program Requirement (Mandatory) : _____ ___________ Instant Contract Rate Concurrent and Future Contract Rate : ________ __ _____ Instant Contract Rate : ________________ __________ _ Concurrent and Future Contract Rate : _ ______________
(m) Data. The Contractor may restrict the Government’s right to use any part of a VECP or the supporting data by marking the following legend on the affected parts:
These data, furnished under the Value Engineering clause of contract ________ ________ , shall not be disclosed outside the Government or duplicated, used, or disclosed, in whole or in part, for any purpose other than to evaluate a value engineering change proposal submitted under the clause .
52.249-01 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT FORM) (APR 1984) FAR
52.249-08 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984) FAR
52.252-02 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) FAR
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.dla.mil/Acquisition and http://farsite.hill.af.mil/ .
(End of Clause)
52.252-06 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) FAR
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any DoD FAR Supplement (DFARS) (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
(End of Clause)
52.253-01 COMPUTER GENERATED FORMS (JAN 1991) FAR
PAGE 17 OF 17 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
http://www.dla.mil/Acquisition http://farsite.hill.af.mil/
| 2014-03-07T11:59:16-0500 | |
| JUMP.BRANDON.M.1402174834 |
File details come from the government source that posted it. Updated .