DLA AVIATION FORM P-53 FEB 2011 FOR OFFICIAL USE ONLY
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
1. Agency: DLA Contracting Activity: Aviation and Document Identification Number: SPE4A513R1143.
2. The action being approved is the acquisition of supplies/services on other than full and open competition basis.
3. The supplies/services required to meet the using activity’s needs are described as follows:
NSN AMC AMSC Nomenclature
EAD
Qty ADV
1660002885519 3 C CONTROL BOX,ELECTRI 59
6110009688284 3 C ELECTRICAL COMPONEN 5
6130011542984 3 Q POWER SUPPLY 7
6685219120457 3 Q TRANSMITTER,PRESSUR 108
1660003581539 3 D PROBE,TEMPERATURE S 52
6685003562540 3 D TRANSMITTER,TEMPERA 3
This acquisition:
[ ] will not include an option.
[ ] will include a ___% option for increased quantity. Total estimated dollar value of option quantity is [ X ] will include an option to extend the term of the contract for a period of 4 periods exercisable in increments of 1-year The maximum dollar value of all option periods is $
4. The statutory authority permitting other than full and open competition is:
[ X ] 10 U.S.C. 2304(c)(1) – Available from only one or a limited number of sources.
[ ] 10 U.S.C.2304(c)(2) – Unusual and Compelling Urgency.
a. Delivery in Days: _____________________
b. Current IPG1s in Units: ________________
c. Projected IPG1s in Units: _______________
d. Brief narrative supporting the situation and weapon system.
[ ] 10 U.S.C. 2304(c) - _____________________________.
5. The acquisition is restricted to the only source(s) of supply known to have the capability of furnishing the required supplies/services. Source(s) are: (Include CAGE code) 07217, CCC-Honeywell ASCa., Inc
The use of the authority cited in other than 10 U.S.C. 2304(c)(2) above is based on: (please select the appropriate AMC/AMSC for the NIINs being procured).
[ ] AMC 1. Suitable for competitive acquisition for the second or subsequent time.
[ ] AMC 2. Suitable for competitive acquisition for the first time.
[ X ] AMC 3. Acquire, for the second or subsequent time, directly from the manufacturer.
[ ] AMC 4. Acquire, for the first time, directly from the manufacturer.
[ ] AMC 5. Acquire directly from the sole source contractor, who is not the manufacturer
[ ] AMSC A. The Government’s right to use data in its possession is questionable. This code is under review and will be updated when the review is complete.
[ ] AMSC B. This must be acquired from a manufacturing source(s) specified on source control drawing.
[X ] AMSC C. This part required engineering source approval by the design control activity in order to maintain the quality of the part.
[ X ]AMSC D. The data needed to acquire this part is not economically available.
DLA AVIATION FORM P-53 FEB 2011 FOR OFFICIAL USE ONLY
[ ] AMSC H. The Government does not have sufficient accurate, or legible data to purchase this part from other than the current source. This code is under review and will be updated when the review is complete.
[ ] AMSC K. This part must be produced from class 1 castings under MIL-STD-2175.
[ ] AMSC L. The annual buy value of this part falls below the screening threshold established by DoD.
[ ] AMSC M. Manufacture of this part requires use of master or coordinated tooling.
[ ] AMSC N. Manufacturer of this part requires special test and/or inspection facilities to maintain function or system integrity.
[ ] AMSC P. The rights to use the data needed to purchase this part from additional source(s) are not owned by the Government and cannot be purchased, developed, or otherwise obtained.
[X ] AMSC Q. The Government does not have adequate data, lacks rights to data, or both. It is not economical to buy the data or rights to the data.
[ ] AMSC R. The Government does not own the data or rights to the data needed to purchase this part from another source. It is not economical to procure the data or rights to the data.
[ ] AMSC S. Acquisition of this item is restricted to Government approved source(s) because the item involves military sensitive technology.
[ ] AMSC U. The cost to the Government to breakout this part and acquire it competitively has been determined to exceed the projected savings over the life span of the part.
[ ] AMSC V. This part has been designated a high reliability part. Probability of failure would be unacceptable.
The engineering activity has determined that data to define and control reliability limits cannot be obtained.
[ ] AMSC Y. The design of this part is unstable. Engineering, manufacturing, or performance characteristics indicate that the required design objectives have not been achieved.
[ ] AMSC Z. This part is a commercial/no-developmental/off-the-shelf item.
[ ] The requisitioner has assigned a priority designator within Issue Priority Group (IPG) I.
[ ] The requisitioner has also cited an expedited handling signal of 999, N _, or E_ or an Office of the Secretary of Defense/Joint Chief of Staff project code beginning with a “9”.
[ ] Procurement from a specified source or agency is authorized by statute ______________ (list statute).
[ ] Other _____________________________________________________________________________.
6. Efforts to ensure that offers are solicited from as many sources as practicable are:
[ X ] The acquisition was synopsized on or about 28 Aug 13 and any firm requesting a solicitation copy will be provided one.
[ ] Manufacturers of similar products identified in the market survey will be solicited.
[ ] Dealers of the manufacturers will be solicited.
[ ] A synopsis exception cited in FAR 5.202 applies (Explain):
[ ] Other (Explain):
7. I hereby determine that the anticipated cost to the Government will be fair and reasonable. Price reasonableness will be determined upon price analysis. Current prices offered will also be compared to previous prices paid. A CCC endorsement is required.
8. A market survey as defined by FAR 10 [ ] was conducted, and firms indicating an interest in the acquisition will be solicited. Market research efforts include:
[ ] was not conducted due to the unusual and compelling urgency of the requirement.
[ X ] was not conducted due to: limited sources and technical data package not available. Item is not commercial.
It is anticipated that no other source other than CCC-Honeywell ASCa (CAGE 07217), the only known source capable of meeting this requirement, will be interested in this procurement. As a result, there is a high level of confidence that no other sources exist that can meet the government’s needs.
9. Additional facts supporting other than full and open competition are:
[ X ] Based upon the technical certification on file, technical data is not available and cannot be developed to permit full and open competition. The data presently available reflects the minimum needs of the Government.