SPE1C127Q0206.pdf
PDF 139 KB Posted
- Attached to
- NEEDLE, SAILMAKER'S AND 1 MORE ITEM
- Solicitation number
- SPE1C127Q0206
About this file
This is a Request for Quotations (RFQ) issued by DLA Troop Support for sailmaker's needles. The solicitation RFQ SPE1C1-27-Q-0206 was issued on November 19, 2026, with quotations due by December 3, 2026. The requirement is for 160 packages (80 packages per line item, with two line items) of NSN 8315-00-163-1545 sailmaker's needles, each package containing 25 needles. Delivery is required 120 days after order (ADO) to Arizona Industries for the Blind in Phoenix, Arizona, with delivery dates of September 15, 2026, for the first line item and March 17, 2027, for the second line item. FOB is destination, and pricing terms are firm fixed price with a quantity variance of plus or minus 2 percent.
The supplies must conform to Commercial Item Description A-A-55306 for sailmaker's needles, made of forged or cast steel with an overall length of 3.75 inches and triangular point configuration. Test reports and component certifications are required in accordance with the DLA Troop Support Clothing & Textiles Additional Quality Assurance Requirements (Revision 1, August 2021), or a Certificate of Compliance may be submitted if the total contract cost does not exceed $100,000, subject to contracting officer approval. Packaging must comply with MIL-STD-2073-1E standards and include proper marking per MIL-STD-129R with Change 3. The contract will utilize Wide Area WorkFlow (WAWF) for payment processing. The solicitation is not a small business set-aside and incorporates numerous FAR and DFARS clauses addressing compliance, representations, certifications, and standard contract administration requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATIONS THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
4. CERT.FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5. ISSUED BY
7. DELIVERY
9. DESTINATION
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5 ON OR
BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (See Continuation Sheets)
12. DISCOUNT FOR PROMPT PAYMENT
d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO SIGN
QUOTATION
16. SIGNER
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not useable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
SPE1C1-27-Q-0206
1. REQUEST NO.
2026 NOV 19
2. DATE ISSUED
7016074214
3. REQUISITION/PURCHASE REQUEST NO.
DO-C9
RATING
DLA TROOP SUPPORT
C AND T SUPPLY CHAIN
700 ROBBINS AVENUE
PHILADELPHIA PA 19111-5096
USA
Buyer: Linda Cioppapape PLCL56S Tel: 610 858 5023 Fax: 215-737-5226 Email: LINDA.CIOPPA-PAPE@DLA.MIL
120 DAYS ADO
6. DELIVER BY (Date)
8. TO:
c. CITY
d. STATE
b. STREET ADDRESS
a. NAME OF CONSIGNEE
e. ZIP CODE
a. 10 CALENDAR DAYS
b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS
15. DATE OF QUOTATION
a. NAME (Type or Print)
AREA CODE
c. TITLE (Type or Print)d. CITY
c. COUNTY
b. STREET ADDRESS
e. STATE f. ZIP CODE
See Schedule
2026 DEC 03
NUMBER
FOB DESTINATION
OTHER
(See Schedule)
CAGE
b. TELEPHONE
See attached schedule to complete quote information.
Quoter must also complete the following:
a. Quotation is valid for 90 days from date specified in Block 10 above unless otherwise indicated: _____________ .
b. Prices quoted are:
___ Contained in Commercial Catalog or Published Price List No. ___________________ dated _______________ page __________ .
___ Contained in Internal Price List No. _______________dated ____________________, which may be examined at our facility.
___ Commercial sales of comparable quantities: Quantity ____________ ; Price _____________;
___ Customer ________________________.
___ Other (provide basis) ______________________________________ _______________________________________ .
c. FOB Point: ____ Destination ____ Origin Shipping Point (City, State) _________________________________________ .
d. If delivery period shown in Block 6 is unacceptable, provide best possible delivery: _________________________________.
e. Remittance Address (Name, Street, City, State, ZIP): Same as Block 13 unless otherwise indicated below:
f. Vendor FAX Number: ____________________ Vendor Toll-Free Number: ____________________ Vendor E-mail: ______________________________
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION B
SUPPLIES/SERVICES: PGC: 11898
ITEM DESCRIPTION:
PR: 7016074214
NSN/MATERIAL:8315001631545
ITEM DESCRIPTION
NEEDLE,SAILMAKER'S
NEEDLE,UPHOLSTERER'S
RA001: THIS DOCUMENTINCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTERLIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FORSIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE
SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FORLARGE
ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE
APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATESA FOLLOW-ON
REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
INDIVIDUAL NSN DATA
NSN 8315-00-163-1545; PGC11898
ITEM NAME:,,NEEDLE,UPHOLSTERER'S
PART NUMBER: ,,A-A-55306
CAGE CODE: ,,58536
Shall be in accordance with (IAW) Commercial Item Description(CID) A-A-55306, NEEDLE,SAILMAKER’S dated 29 January 1997.
For use by sailmakers for sewing and repairing canvas.
Material:Forged or cast steel Standard Needle Industry Size Number: 10 Overall Length: 3.75 inches ± 0.19 (3/16) inches;
3.56 inches minimumto 3.94 inches maximum Shape: Triangular point and straight shank Procurement Group Code (PGC): 11898 Unit of issue is a PACKAGE(PG) containing 25 EACH (EA).
1 PG = 25 EA
TEST REPORTS AND COMPONENT CERTIFICATIONS IN ACCORDANCE WITH Revision 1 of the DLATROOP SUPPORT CLOTHING & TEXTILES ADDITIONAL QUALITY ASSURANCE REQUIREMENTS dated August 2021 ARE REQUIRED WITH ALLCONTRACT
COMPONENT LOTS.
*Please note a Certificate of Compliance (CoC) may be submitted in lieu of physical testing and thecertified test reports, provided the total cost of the contract does not exceed $100,000 (per page 14/45 of the DLA Troop SupportAdditional Quality Assurance Requirements dated August 2021)* **Please note, however, use of the CoC in lieu of submittingthe certified test reports, is subject to approval by the Contracting Officer identified on the solicitation, purchase order, and/or the contract.**
SOURCES OF COMPONENT MATERIALS SHALL BE IDENTIFIED<(>,<)>
INCLUDING APPLICABLE SPECIFICATIONS, AND SHALL NOT
BECHANGED THROUGHOUT THE LIFE OF THE CONTRACT
WITHOUT REQUEST AND APPROVAL BY THE DLA TROOP
SUPPORT CONTRACTING OFFICER THROUGHMODIFICATION
TO THE CONTRACT.
RESPONSIBILITY OF INSPECTION. THE CONTRACTOR IS
RESPONSIBLE FOR THE PERFORMANCE OF ALLINSPECTION<(>,<)>
EXAMINATION, AND TEST REQUIREMENTS SPECIFIED
HEREIN AND IN THE SITED SPECIFICATIONS AND CONTRACT.
THE GOVERNMENTRESERVES THE RIGHT TO PERFORM ANY
OF THE INSPECTIONS, EXAMINATIONS AND TESTS AS
DEEMED NECESSARY TO ENSURE SUPPLIES ANDSERVICES
CONFORM TO PRESCRIBED REQUIREMENTS.
PAGE 3 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION B
SUPPLY/SERVICE: PGC: 11898 CONT'D
RT001: MEASURING AND TEST EQUIPMENT
LIST OF DOCUMENTS, EXHIBITS, AND OTHERATTACHMENTS
a. This solicitation/award consists of the following documents, exhibits, and other attachments
b. DLA Troop SupportClothing & Textiles Additional Quality Assurance Requirements Revision 1 dated August 2021, which has superseded DLA Troop SupportClothing and Textiles Additional Quality Assurance Requirements dated October 2018.
52.246-15 CERTIFICATE OFCONFORMANCE
Identification of Testing Sites. Unless the contract mandates a Government laboratory be used to conduct testing, theprime contractor shall identify all testing sites that will perform any test required by the terms of the contract, including enditem testing.
Any laboratory proposed by the contractor is subject to the approval of the contracting officer. Testing facilitiesshall be subject to on-site witnessing of testing by the Government. The use of a laboratory previously approved by the Governmentis not a guarantee that testing will be performed properly, nor does it relieve a contractor from the contractual obligation topresent conforming supplies accompanied by true, accurate, and valid test results.
Certification of Testing Sites. The primecontractor shall identify a technical point of contact for the testing site and provide current contact information. The primecontractor should alert the technical point of contact that the certification process has begun. A current ISO 17025 accreditationwhose scope encompasses the contractual testing or equivalent will be accepted. When a testing site and its contact information areprovided to DLA Contracting and the DLA Product Specialist, the product specialist will initiate a request for the DLA Product TestCenter (DLA-PTC) to certify the lab. This request will be managed via an internal DLA Troop Support process.
In the absence of anappropriate ISO 17025 accreditation, the DLA-PTC will compare all required testing in the contract to the commercial lab capability. If the testing facility is new and/or unknown to the DLA-PTC, a lab certification survey (DLA Form 6005) will be provided forsubmission.
If the DLA-PTC has a lab survey on file that is less than 3 years old, that survey will be used for the initialevaluation. The DLA-PTC may ask for additional information or clarifications. If the laboratory survey on file is over 3 years old,a new form will be sent out for the testing facility to fill out. During a contract, the laboratory may be asked to fill out another lab survey when the original survey becomes older than 3 years.
Note: The Qualified Laboratories List (QLL) previously maintainedby DPSC has been canceled. No testing facility should refer to their previously issued QLL number.
Approval. If the testingfacility and its named subcontractors meet the capability of the required testing, the DLA-PTC will notify the DLA Troop SupportProduct Specialist. Once approved by contracting, the testing facility becomes the Place of Performance and is placed inthe contract.
Disapproval. If a testing facility does not meet the testing capability as per the specifications, the primecontractor is asked to submit another laboratory, and the process starts anew.
Note: DLA will require a total of 45 calendar daysfrom the date of the receipt of the request to add a certified testing location to the date the requestor (contractor) is provided a decision of the laboratory certification.
For more details on the lab certification process, reference Revision 1 of the DLA TroopSupport Additional Quality Assurance Requirements dated August 2021, which is incorporated by reference into thiscontract.
3/31/2026
CRITICAL APPLICATION ITEM
IAW BASIC CID A-A-55306
REVISION NR DTD 01/29/1997
PART PIECE NUMBER:
IAW REFERENCEDRAWING NR 14153 C&T-ADDITQAR
REVISION NR 1 DTD 08/01/2021
PART PIECE NUMBER:
IAW REFERENCE SPEC NR MIL-DTL-15011K(2) NOT 1
REVISION NR 2 DTD 04/29/2025
PART PIECE NUMBER:
IAW REFERENCE STD NR MIL-STD-129R(3)
PAGE 4 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION B
SUPPLY/SERVICE: PGC: 11898 CONT'D
REVISION NR R DTD 02/25/2023
PART PIECE NUMBER:
IAWREFERENCE STD NR MIL-STD-147F NOT 1
REVISION NR F DTD 09/05/2024
PART PIECE NUMBER:
IAW REFERENCE STD NR MIL-STD-1916 NOT 2
REVISION NR DTD 06/05/2014
PART PIECE NUMBER:
IAW REFERENCE STD NR MIL-STD-2073-1E(4) NOT 1
REVISION NR E DTD 06/27/2024
PART PIECENUMBER:
IAW REFERENCE UNK FED-STD-123J
REVISION NR J DTD 05/19/2021
PART PIECE NUMBER:
IAW REFERENCE NON GOVT STD ASQ Z1.4 (R2018)
REVISION NR DTD 01/01/2003
PART PIECE NUMBER:
IAW REFERENCE STD NR MIL-STD-3064 NOT 1
REVISION NR DTD 04/04/2024
PART PIECENUMBER:
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine thecorresponding ANSI X12 unit ofissue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments%2FDLMS% 2FeApplications%2FLogDataAdmin%2FUnit_of_Issue_and_Purchase_Unit.xlsx&wdOrigin=BROWSELINK
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 8315-00-163-1545 80.000 PG $ ________________ $ ________________
NEEDLE,SAILMAKER'S
PRICING TERMS: Firm Fixed Price
QTY VARIANCE: PLUS 2% MINUS 2%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
FOB: DESTINATION DELIVERY DATE: 120 DAYS ADO
PREP FOR DELIVERY:
PKGING DATA - MIL-STD-2073-1E
QUP:001 PRES MTHD:10 CLNG/DRY:0 PRESV MAT:00
WRAP MAT:00 CUSH/DUNN MAT:AD CUSH/DUNNTHKNESS:A
UNIT CONT:A2 OPI:O
PACK CODE:7 PACKING LEVEL: B
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:00 -00 No special marking
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
INSPECTION AND ACCEPTANCE AT DESTINATION.
SECTION D- PACKAGING AND MARKING
ALL WOOD PACKAGING MATERIAL (WPM) USED MUST MEET
REQUIREMENTS OF INTERNATIONAL STANDARDS FOR PHYTOSANITARYMEASURES
(ISPM) 15, "GUIDELINES FOR REGULATING WOOD PACKAGING MATERIALS IN
INTERNATIONAL TRADE." DOD SHIPMENTS INSIDE AND OUTSIDE OF THE UNITED
STATES MUST MEET ISPM 15 WHENEVER WPM IS USED TO SHIP DOD CARGO.
ALL WPM SHALL COMPLY WITH THE OFFICIAL QUALITY CONTROL PROGRAM FOR HEAT
PAGE 5 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION B
SUPPLY/SERVICE: PGC: 11898 CONT'D
TREATMENT (HT) OR KILN DRIED HEAT TREATMENT (KD HT) IN ACCORDANCE WITH
AMERICAN LUMBER STANDARDCOMMITTEE<(>,<)>
INCORPORATED (ALSC) WOOD PACKAGING MATERIAL PROGRAM AND WPM ENFORCEMENT
REGULATIONS (SEEHTTP://WWW.ALSC.ORG/).
ALL WPM SHALL INCLUDE CERTIFICATION/QUALITY MARKINGS IN
ACCORDANCE WITH THE ALSC STANDARD. MARKINGS SHALL BE PLACED IN AN
UNOBSTRUCTED AREA THAT WILL BE READILY VISIBLE TO
INSPECTORS. PALLET MARKINGS SHALL BE APPLIED TO THE STRINGER ORBLOCK ON
DIAGONALLY OPPOSITE SIDES OF THE PALLET AND BE
CONTRASTING AND CLEARLY VISIBLE. ALL CONTAINERS SHALL BE
MARKED ON A SIDEOTHER THAN THE TOP OR BOTTOM, CONTRASTING
AND CLEARLY VISIBLE. ALL DUNNAGE USED IN CONFIGURING AND/OR
SECURING THE LOAD SHALL ALSOCOMPLY WITH ISPM 15 AND BE MARKED WITH AN
ASLC APPROVED DUNNAGE STAMP.
THE OVERALL PACKAGING AND PRESERVATION, IF APPLICABLE, SHALL CONFORM TO
MIL-STD-2073-1E (WITH CHANGE 4 DATED 22 APRIL 2019) STANDARD PRACTICE
FOR MILITARY PACKAGING FOR SHIPMENTS TO THEDEPARTMENT OF DEFENSE.
UNIT CONTAINER:
EACH PACKAGE OF NEEDLES SHALL BE INDIVIDUALLY PACKAGED IN ANY BAG USED
BY THEVENDOR.
INTERMEDIATE CONTAINER: NOT REQUIRED; THE USE OF INTERMEDIATE PACKAGING
IS ENCOURAGED PARTICULARLY WHEN SUCH USE ENHANCESHANDLING AND STORAGE.
IF USED, VENDOR SHALL USE ANY SUITABLE FIBER BOX INCLUDED IN TABLE J-VII
OF MIL-STD-2073-1E CHANGE 4 (PDFPages 185/214) MAY BE USED (SEE ALSO J.4.9.1).
EXTERIOR CONTAINER: SHALL BE STYLE: REGULAR SLOTTED BOX (RSC)<(>,<)>
TYPE:CORRUGATED FIBERBOARD (CF), VARIETY DOUBLEWALL FIBERBOARD (DW),
CLASS: DOMESTIC, GRADE: 275 WITH A SINGLE WALL LINER OR DW ECT GRADE 48,
MADE TO THE REQUIREMENTS OF ASTM D5118M, STANDARD PRACTICE FOR
FABRICATION OF FIBERBOARD SHIPPING BOXES TO INSURE MEETINGTHE
REQUIREMENTS OF A PACK THAT WILL SUPPORT
RE-TRANSPORT, STORAGE, STACKING, ETC.
THE PACKAGING CONTAINER SHALL BE SUFFICIENT TOPROVIDE PROTECTION DURING
TRANSPORT AND STORAGE AND ARRIVE AT DESTINATION IN THE SAME CONDITION AS
ORIGIN.
PACKAGED COMPONENTS SHALL BE BULK PACKAGED IN A
THAT WILL SUPPORT RE-TRANSPORT, STORAGE, STACKING, ETC.
REFERENCE ASTM INTERNATIONAL DESIGNATION D1974M(STANDARD PRACTICE FOR
METHODS OF CLOSING, SEALING, AND REINFORCING FIBERBOARD BOXES, WHICH
DESCRIBES SEVERAL METHODS FOR CLOSING,SEALING, AND REINFORCING
FIBERBOARD (SOLID AND CORRUGATED) SHIPPING BOXES USED FOR SHIPMENT.
A PRESSURE SENSITIVE IDENTIFICATIONLABEL SHALL ATTACH TO
EACH PACKAGING BOX OF THE COMPONENT.
THE PACKAGING CONTAINER SHALL BE SUFFICIENT TO PROVIDE PROTECTIONDURING
TRANSPORT AND STORAGE AND ARRIVE AT DESTINATION IN THE SAME CONDITION AS
ORIGIN.
SURFACE OF THE PALLET. WHEN SPECIFIEDPALLETIZATION IS REQUIRED,
COMPONENTS SHALL BE PALLETIZED ON A FOUR-WAY ENTRY PALLET IN ACCORDANCE
WITH LOAD TYPE I OR IA,AS
APPLICABLE, OF MIL-STD-147E, CHANGE 2 DATED 27 JUNE 2019.
PALLETIZATION. Palletization shall be in accordance RP001, Section3.
THE PALLETIZED LOAD SHALL BE BONDED USING APPROVED
COMMERCIAL BONDING MATERIALS. PALLET LOADS SHALL
CONTAIN THE SAME NUMBER OFCARTONS, OF IDENTICAL
QUANTITIES, OF ONE NSN, TO THE MAXIMUM EXTENT
POSSIBLE.
PALLET LOADS CONTAINING MORE THAN ONE NSN SHALL
BECLEARLY MARKED TO LIST ALL THE NSN'S CONTAINED
IN THE LOAD. NO CARTON SHALL HAVE MORE THAN ONE NSN.
AT THE END OF A SIZE RUN, NOMORE THAN ONE CARTON
PER NSN MAY BE SHORT OR OVER THE SPECIFIED QUANTITY.
SAID CARTON SHALL BE CLEARLY MARKED "SHORT"
OR"OVER".
PAGE 6 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION B
SUPPLY/SERVICE: PGC: 11898 CONT'D
All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-129R, with Change 3 dated 25February 2023.
IN ADDITION TO SPECIAL MARKING REQUIRED<(>,<)>
INTERIOR (UNIT) PACKS, INTERMEDIATE CONTAINERS<(>,<)>
SHIPPINGCONTAINERS AND PALLETIZED UNIT LOADS
SHALL BE MARKED FOR SHIPMENT, STOWAGE, AND STORAGE IN ACCORDANCE WITH
MIL-STD-129R CHANGE 3DATED 25 FEBRUARY 2023.
GUIDANCE FOR THE REQUIRED IDENTIFICATION TEXT MARKINGS OF THE UNIT,
INTERMEDIATE, AND EXTERIOR CONTAINERSARE FOUND ON PAGES 24 TO 28 WITHIN
MIL-STD-129R WITH CHANGE 3 DATED 25 FEBRUARY 2023.
Lot number as an identification text marking is required on all unit packs and intermediate containers.<(>,<)> The shipment number and container number are required on allexterior containers, palletized unit loads, and unpacked items. See MIL-STD-129R with Change 3, 5.1.2. f.(3) for moredetails.
11/7/2023
PARCEL POST ADDRESS:
UY8615
ARIZONA INDUSTRIES FOR THE BLIND
515 N 51ST AVENUE NUMBER 130 DOCK 1
PHOENIX AZ 85043
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE C20 AND
CONTRACT
FREIGHT SHIPPING ADDRESS:
UY8615
ARIZONA INDUSTRIES FOR THE BLIND
515 N 51ST AVENUE NUMBER 130 DOCK 1
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0002 8315-00-163-1545 80.000 PG $ ________________ $ ________________
NEEDLE,SAILMAKER'S
PRICING TERMS: Firm Fixed Price
QTY VARIANCE: PLUS 2% MINUS 2%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
FOB: DESTINATION DELIVERY DATE: 120 DAYS ADO
PREP FOR DELIVERY:
PKGING DATA - MIL-STD-2073-1E
QUP:001 PRES MTHD:10 CLNG/DRY:0 PRESV MAT:00
WRAP MAT:00 CUSH/DUNN MAT:AD CUSH/DUNNTHKNESS:A
UNIT CONT:A2 OPI:O
PACK CODE:7 PACKING LEVEL: B
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:00 -00 No special marking
PAGE 7 OF 26 PAGES
SPE1C1-27-Q-0206
SUPPLY/SERVICE: PGC: 11898 CONT'D
INSPECTION AND ACCEPTANCE AT DESTINATION.
SECTION D- PACKAGING AND MARKING
REQUIREMENTS OF INTERNATIONAL STANDARDS FOR PHYTOSANITARYMEASURES
(ISPM) 15, "GUIDELINES FOR REGULATING WOOD PACKAGING MATERIALS IN
INTERNATIONAL TRADE." DOD SHIPMENTS INSIDE AND OUTSIDE OF THE UNITED
STATES MUST MEET ISPM 15 WHENEVER WPM IS USED TO SHIP DOD CARGO.
ALL WPM SHALL COMPLY WITH THE OFFICIAL QUALITY CONTROL PROGRAM FOR HEAT
TREATMENT (HT) OR KILN DRIED HEAT TREATMENT (KD HT) IN ACCORDANCE WITH
AMERICAN LUMBER STANDARDCOMMITTEE<(>,<)>
INCORPORATED (ALSC) WOOD PACKAGING MATERIAL PROGRAM AND WPM ENFORCEMENT
REGULATIONS (SEEHTTP://WWW.ALSC.ORG/).
ALL WPM SHALL INCLUDE CERTIFICATION/QUALITY MARKINGS IN
ACCORDANCE WITH THE ALSC STANDARD. MARKINGS SHALL BE PLACED IN AN
UNOBSTRUCTED AREA THAT WILL BE READILY VISIBLE TO
INSPECTORS. PALLET MARKINGS SHALL BE APPLIED TO THE STRINGER ORBLOCK ON
DIAGONALLY OPPOSITE SIDES OF THE PALLET AND BE
CONTRASTING AND CLEARLY VISIBLE. ALL CONTAINERS SHALL BE
MARKED ON A SIDEOTHER THAN THE TOP OR BOTTOM, CONTRASTING
AND CLEARLY VISIBLE. ALL DUNNAGE USED IN CONFIGURING AND/OR
SECURING THE LOAD SHALL ALSOCOMPLY WITH ISPM 15 AND BE MARKED WITH AN
ASLC APPROVED DUNNAGE STAMP.
THE OVERALL PACKAGING AND PRESERVATION, IF APPLICABLE, SHALL CONFORM TO
MIL-STD-2073-1E (WITH CHANGE 4 DATED 22 APRIL 2019) STANDARD PRACTICE
FOR MILITARY PACKAGING FOR SHIPMENTS TO THEDEPARTMENT OF DEFENSE.
UNIT CONTAINER:
EACH PACKAGE OF NEEDLES SHALL BE INDIVIDUALLY PACKAGED IN ANY BAG USED
BY THEVENDOR.
INTERMEDIATE CONTAINER: NOT REQUIRED; THE USE OF INTERMEDIATE PACKAGING
IS ENCOURAGED PARTICULARLY WHEN SUCH USE ENHANCESHANDLING AND STORAGE.
IF USED, VENDOR SHALL USE ANY SUITABLE FIBER BOX INCLUDED IN TABLE J-VII
OF MIL-STD-2073-1E CHANGE 4 (PDFPages 185/214) MAY BE USED (SEE ALSO J.4.9.1).
EXTERIOR CONTAINER: SHALL BE STYLE: REGULAR SLOTTED BOX (RSC)<(>,<)>
TYPE:CORRUGATED FIBERBOARD (CF), VARIETY DOUBLEWALL FIBERBOARD (DW),
CLASS: DOMESTIC, GRADE: 275 WITH A SINGLE WALL LINER OR DW ECT GRADE 48,
MADE TO THE REQUIREMENTS OF ASTM D5118M, STANDARD PRACTICE FOR
FABRICATION OF FIBERBOARD SHIPPING BOXES TO INSURE MEETINGTHE
REQUIREMENTS OF A PACK THAT WILL SUPPORT
RE-TRANSPORT, STORAGE, STACKING, ETC.
THE PACKAGING CONTAINER SHALL BE SUFFICIENT TOPROVIDE PROTECTION DURING
TRANSPORT AND STORAGE AND ARRIVE AT DESTINATION IN THE SAME CONDITION AS
ORIGIN.
PACKAGED COMPONENTS SHALL BE BULK PACKAGED IN A
THAT WILL SUPPORT RE-TRANSPORT, STORAGE, STACKING, ETC.
REFERENCE ASTM INTERNATIONAL DESIGNATION D1974M(STANDARD PRACTICE FOR
METHODS OF CLOSING, SEALING, AND REINFORCING FIBERBOARD BOXES, WHICH
DESCRIBES SEVERAL METHODS FOR CLOSING,SEALING, AND REINFORCING
FIBERBOARD (SOLID AND CORRUGATED) SHIPPING BOXES USED FOR SHIPMENT.
A PRESSURE SENSITIVE IDENTIFICATIONLABEL SHALL ATTACH TO
EACH PACKAGING BOX OF THE COMPONENT.
THE PACKAGING CONTAINER SHALL BE SUFFICIENT TO PROVIDE PROTECTIONDURING
TRANSPORT AND STORAGE AND ARRIVE AT DESTINATION IN THE SAME CONDITION AS
ORIGIN.
SURFACE OF THE PALLET. WHEN SPECIFIEDPALLETIZATION IS REQUIRED,
COMPONENTS SHALL BE PALLETIZED ON A FOUR-WAY ENTRY PALLET IN ACCORDANCE
WITH LOAD TYPE I OR IA,AS
APPLICABLE, OF MIL-STD-147E, CHANGE 2 DATED 27 JUNE 2019.
PALLETIZATION. Palletization shall be in accordance RP001, Section3.
THE PALLETIZED LOAD SHALL BE BONDED USING APPROVED
PAGE 8 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION B
SUPPLY/SERVICE: PGC: 11898 CONT'D
COMMERCIAL BONDING MATERIALS. PALLET LOADS SHALL
CONTAIN THE SAME NUMBER OFCARTONS, OF IDENTICAL
QUANTITIES, OF ONE NSN, TO THE MAXIMUM EXTENT
POSSIBLE.
PALLET LOADS CONTAINING MORE THAN ONE NSN SHALL
BECLEARLY MARKED TO LIST ALL THE NSN'S CONTAINED
IN THE LOAD. NO CARTON SHALL HAVE MORE THAN ONE NSN.
AT THE END OF A SIZE RUN, NOMORE THAN ONE CARTON
PER NSN MAY BE SHORT OR OVER THE SPECIFIED QUANTITY.
SAID CARTON SHALL BE CLEARLY MARKED "SHORT"
OR"OVER".
All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-129R, with Change 3 dated 25February 2023.
IN ADDITION TO SPECIAL MARKING REQUIRED<(>,<)>
INTERIOR (UNIT) PACKS, INTERMEDIATE CONTAINERS<(>,<)>
SHIPPINGCONTAINERS AND PALLETIZED UNIT LOADS
SHALL BE MARKED FOR SHIPMENT, STOWAGE, AND STORAGE IN ACCORDANCE WITH
MIL-STD-129R CHANGE 3DATED 25 FEBRUARY 2023.
GUIDANCE FOR THE REQUIRED IDENTIFICATION TEXT MARKINGS OF THE UNIT,
INTERMEDIATE, AND EXTERIOR CONTAINERSARE FOUND ON PAGES 24 TO 28 WITHIN
MIL-STD-129R WITH CHANGE 3 DATED 25 FEBRUARY 2023.
Lot number as an identification text marking is required on all unit packs and intermediate containers.<(>,<)> The shipment number and container number are required on allexterior containers, palletized unit loads, and unpacked items. See MIL-STD-129R with Change 3, 5.1.2. f.(3) for moredetails.
11/7/2023
PKGING DATA - MIL-STD-2073-1E
QUP:001 PRES MTHD:10 CLNG/DRY:0 PRESV MAT:00
WRAP MAT:00 CUSH/DUNN MAT:ADCUSH/DUNN THKNESS:A
UNIT CONT:A2 OPI:O
PACK CODE:7 PACKING LEVEL: B
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIALMARKING CODE:00 -00 No special marking
INSPECTION AND ACCEPTANCE ATDESTINATION.
SECTION D - PACKAGING AND MARKING
REQUIREMENTS OF INTERNATIONALSTANDARDS FOR PHYTOSANITARY MEASURES
(ISPM) 15, "GUIDELINES FOR REGULATING WOOD PACKAGING MATERIALS IN
INTERNATIONAL TRADE." DODSHIPMENTS INSIDE AND OUTSIDE OF THE UNITED
STATES MUST MEET ISPM 15 WHENEVER WPM IS USED TO SHIP DOD CARGO.
ALL WPM SHALL COMPLYWITH THE OFFICIAL QUALITY CONTROL PROGRAM FOR HEAT
TREATMENT (HT) OR KILN DRIED HEAT TREATMENT (KD HT) IN ACCORDANCE WITH
AMERICANLUMBER STANDARD COMMITTEE<(>,<)>
INCORPORATED (ALSC) WOOD PACKAGING MATERIAL PROGRAM AND WPM ENFORCEMENT
REGULATIONS (SEEHTTP://WWW.ALSC.ORG/).
ALL WPM SHALL INCLUDE CERTIFICATION/QUALITY MARKINGS IN
ACCORDANCE WITH THE ALSC STANDARD. MARKINGS SHALL BE PLACED IN AN
UNOBSTRUCTED AREA THAT WILL BE READILY VISIBLE TO
INSPECTORS. PALLET MARKINGS SHALL BE APPLIED TO THE STRINGER ORBLOCK ON
DIAGONALLY OPPOSITE SIDES OF THE PALLET AND BE
CONTRASTING AND CLEARLY VISIBLE. ALL CONTAINERS SHALL BE
MARKED ON A SIDEOTHER THAN THE TOP OR BOTTOM, CONTRASTING
AND CLEARLY VISIBLE. ALL DUNNAGE USED IN CONFIGURING AND/OR
SECURING THE LOAD SHALL ALSOCOMPLY WITH ISPM 15 AND BE MARKED WITH AN
ASLC APPROVED DUNNAGE STAMP.
THE OVERALL PACKAGING AND PRESERVATION, IF APPLICABLE, SHALL CONFORM TO
MIL-STD-2073-1E (WITH CHANGE 4 DATED 22 APRIL 2019) STANDARD PRACTICE
FOR MILITARY PACKAGING FOR SHIPMENTS TO THEDEPARTMENT OF DEFENSE.
PAGE 9 OF 26 PAGES
SPE1C1-27-Q-0206
UNIT CONTAINER:
EACH PACKAGE OF NEEDLES SHALL BE INDIVIDUALLY PACKAGED IN ANY BAG USED
BY THEVENDOR.
INTERMEDIATE CONTAINER: NOT REQUIRED; THE USE OF INTERMEDIATE PACKAGING
IS ENCOURAGED PARTICULARLY WHEN SUCH USE ENHANCESHANDLING AND STORAGE.
IF USED, VENDOR SHALL USE ANY SUITABLE FIBER BOX INCLUDED IN TABLE J-VII
OF MIL-STD-2073-1E CHANGE 4 (PDFPages 185/214) MAY BE USED (SEE ALSO J.4.9.1).
EXTERIOR CONTAINER: SHALL BE STYLE: REGULAR SLOTTED BOX (RSC)<(>,<)>
TYPE:CORRUGATED FIBERBOARD (CF), VARIETY DOUBLEWALL FIBERBOARD (DW),
CLASS: DOMESTIC, GRADE: 275 WITH A SINGLE WALL LINER OR DW ECT GRADE 48,
MADE TO THE REQUIREMENTS OF ASTM D5118M, STANDARD PRACTICE FOR
FABRICATION OF FIBERBOARD SHIPPING BOXES TO INSURE MEETINGTHE
REQUIREMENTS OF A PACK THAT WILL SUPPORT
RE-TRANSPORT, STORAGE, STACKING, ETC.
THE PACKAGING CONTAINER SHALL BE SUFFICIENT TOPROVIDE PROTECTION DURING
TRANSPORT AND STORAGE AND ARRIVE AT DESTINATION IN THE SAME CONDITION AS
ORIGIN.
PACKAGED COMPONENTS SHALL BE BULK PACKAGED IN A
THAT WILL SUPPORT RE-TRANSPORT, STORAGE, STACKING, ETC.
REFERENCE ASTM INTERNATIONAL DESIGNATION D1974M(STANDARD PRACTICE FOR
METHODS OF CLOSING, SEALING, AND REINFORCING FIBERBOARD BOXES, WHICH
DESCRIBES SEVERAL METHODS FOR CLOSING,SEALING, AND REINFORCING
FIBERBOARD (SOLID AND CORRUGATED) SHIPPING BOXES USED FOR SHIPMENT.
A PRESSURE SENSITIVE IDENTIFICATIONLABEL SHALL ATTACH TO
EACH PACKAGING BOX OF THE COMPONENT.
THE PACKAGING CONTAINER SHALL BE SUFFICIENT TO PROVIDE PROTECTIONDURING
TRANSPORT AND STORAGE AND ARRIVE AT DESTINATION IN THE SAME CONDITION AS
ORIGIN.
SURFACE OF THE PALLET. WHEN SPECIFIEDPALLETIZATION IS REQUIRED,
COMPONENTS SHALL BE PALLETIZED ON A FOUR-WAY ENTRY PALLET IN ACCORDANCE
WITH LOAD TYPE I OR IA,AS
APPLICABLE, OF MIL-STD-147E, CHANGE 2 DATED 27 JUNE 2019.
PALLETIZATION. Palletization shall be in accordance RP001, Section3.
THE PALLETIZED LOAD SHALL BE BONDED USING APPROVED
COMMERCIAL BONDING MATERIALS. PALLET LOADS SHALL
CONTAIN THE SAME NUMBER OFCARTONS, OF IDENTICAL
QUANTITIES, OF ONE NSN, TO THE MAXIMUM EXTENT
POSSIBLE.
PALLET LOADS CONTAINING MORE THAN ONE NSN SHALL
BECLEARLY MARKED TO LIST ALL THE NSN'S CONTAINED
IN THE LOAD. NO CARTON SHALL HAVE MORE THAN ONE NSN.
AT THE END OF A SIZE RUN, NOMORE THAN ONE CARTON
PER NSN MAY BE SHORT OR OVER THE SPECIFIED QUANTITY.
SAID CARTON SHALL BE CLEARLY MARKED "SHORT"
OR"OVER".
All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-129R, with Change 3 dated 25February 2023.
IN ADDITION TO SPECIAL MARKING REQUIRED<(>,<)>
INTERIOR (UNIT) PACKS, INTERMEDIATE CONTAINERS<(>,<)>
SHIPPINGCONTAINERS AND PALLETIZED UNIT LOADS
SHALL BE MARKED FOR SHIPMENT, STOWAGE, AND STORAGE IN ACCORDANCE WITH
MIL-STD-129R CHANGE 3DATED 25 FEBRUARY 2023.
GUIDANCE FOR THE REQUIRED IDENTIFICATION TEXT MARKINGS OF THE UNIT,
INTERMEDIATE, AND EXTERIOR CONTAINERSARE FOUND ON PAGES 24 TO 28 WITHIN
MIL-STD-129R WITH CHANGE 3 DATED 25 FEBRUARY 2023.
Lot number as an identification text marking is required on all unit packs and intermediate containers.<(>,<)> The shipment number and container number are required on allexterior containers, palletized unit loads, and unpacked items. See MIL-STD-129R with Change 3, 5.1.2. f.(3) for moredetails.
PAGE 10 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION B
11/7/2023
PARCEL POST ADDRESS:
UY8615
ARIZONA INDUSTRIES FOR THE BLIND
515 N 51ST AVENUE NUMBER 130 DOCK 1
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE C20 AND
CONTRACT
FREIGHT SHIPPING ADDRESS:
UY8615
ARIZONA INDUSTRIES FOR THE BLIND
515 N 51ST AVENUE NUMBER 130 DOCK 1
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 7016074214 0001 N/A N/A N/A 09/15/2026
0002 7016074214 0002 N/A N/A N/A 03/17/2027
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION C - SPECIFICATIONS/SOW/SOO/ORD
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (JUN 2023)
SECTION E - INSPECTION AND ACCEPTANCE
52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
SECTION F - DELIVERIES OR PERFORMANCE
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
52.247-34 F.O.B. DESTINATION (JAN 1991) FAR
SECTION G - CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (PRE-FILLED) (JAN 2023) DFARS As prescribed in 232.7004 (b), use the following clause:
(a) Definitions. As used in this clause - Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation System (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall -
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https:// wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items -
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
Invoice (stand-alone) and Receiving Report (stand-alone) or Invoice and Receiving Report (combination)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table *
Field Name in WAWF Data to be entered in WAWF Guidance https://www.acquisition.gov/dfars/part-232-contract-financing https://www.sam.gov https://wawf.eb.mil/ https://wawf.eb.mil/ https://wawf.eb.mil/
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION G - CONTRACT ADMINISTRATION DATA (CONTINUED)
Field Name in WAWF Data to be entered in WAWF Guidance
Pay Official DoDAAC See Block 12 (SF26), 15 (DD 1155), or 18a
(SF1449)
(If blank, see resulting award)
Issue By DoDAAC See Block 5 (SF26), 6 (DD 1155), or 9 (SF1449)
(If blank, see resulting award)
Admin DoDAAC See Block 6 (SF26), 7 (DD 1155), or 16 (SF1449)
(If blank, see resulting award)
Inspect By DoDAAC SEE SECTION B (If blank, see resulting award)
Ship To Code SEE SECTION B (If blank, see resulting award)
Ship From Code SEE SECTION B (If blank, see resulting award)
Mark For Code SEE SECTION B (If blank, see resulting award)
Service Approver (DoDAAC)
(If blank, see resulting award)
Service Acceptor (DoDAAC)
(If blank, see resulting award)
Accept at Other DoDAAC (If blank, see resulting award)
LPO DoDAAC (If blank, see resulting award)
DCAA Auditor DoDAAC (If blank, see resulting award)
Other DoDAAC(s) (If blank, see resulting award)
(* Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (** Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
See administer listed on page 1
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of Clause)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H18 DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM (DPAS) (JUL 2026)
SECTION I - CONTRACT CLAUSES
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
FAR
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION I - CONTRACT CLAUSES (CONTINUED)
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) DFARS
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) DFARS
52.204-13 SYSTEM FOR AWARD MANAGEMENT -- MAINTENANCE (DEVIATION 2026-O0038) (FEB 2026) FAR
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0038) (FEB
2026) FAR
252.204-7004 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN 2023) DFARS
252.204-7014 LIMITATIONS ON THE USE OR DISCLOSURE OF INFORMATION BY LITIGATION SUPPORT CONTRACTORS (JAN
2023) DFARS
52.211-5 MATERIAL REQUIREMENTS (DEVIATION 2026-O0038) (FEB 2026) FAR
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (DEVIATION 2026-O0038) (FEB 2026) FAR
52.216-24 LIMITATION OF GOVERNMENT LIABILITY (APR 1984) FAR
As prescribed in 16.603-4(b)(2), insert the following clause in solicitations and contracts when a letter contract is contemplated:
(a) In performing this contract, the Contractor is not authorized to make expenditures or incur obligations exceeding dollars.
(b) The maximum amount for which the Government shall be liable if this contract is terminated is dollars.
(End of clause)
52.213-4 TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS (NONCOMMERCIAL) (DEVIATION 2026-O0038) (FEB 2026)
52.215-6 PLACE OF PERFORMANCE (DEVIATION 2026-O0038) (FEB 2026) FAR
As prescribed in 15.110(f), insert the following provision:
Place of Performance (Deviation Date)
(a) The offeror or respondent, in the performance of any contract resulting from this request for proposals, □ intends, □ does not intend [check applicable block] to use one or more plants or facilities located at a different address from the address of the offeror or respondent as indicated in this proposal or response to request for information.
(b) If the offeror or respondent checks "intends" in paragraph (a) of this provision, it shall insert in the following spaces the required information:
Place of Performance (Street Address, City, State, County, ZIP Code)
Name and Address of Owner and Operator of the Plant or Facility if Other than Offeror or Respondent
(End of Provision)
52.222-37 EMPLOYMENT REPORTS ON VETERANS (DEVIATION 2026-O0038) (FEB 2026) FAR
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (DEVIATION 2026-O0038) (FEB 2026) FAR
52.223-23 SUSTAINABLE PRODUCTS (DEVIATION 2026-O0038) (FEB 2026) FAR
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2016_6.html
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 26 PAGES
SPE1C1-27-Q-0206
252.223-7009 PROHIBITION OF PROCUMENT OF FLOURINATED AQUEOUS FILM-FORMING FOAM FIRE-FIGHTING AGENT FOR
USE ON MILITARY INSTALLATIONS (MAR 2024) FAR
252.225-7006 ACQUISITION OF THE AMERICAN FLAG (DEC 2022) DFARS
252.225-7013 DUTY-FREE ENTRY (OCT 2025) DFARS
252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013) DFARS
52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (MAY 2024) FAR
52.232-1 PAYMENTS (APR 1984) FAR
52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002) FAR
52.232-11 EXTRAS (APR 1984) FAR
52.232-25 PROMPT PAYMENT (JAN 2017) FAR
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR AWARD MANAGEMENT (OCT 2018) FAR
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (MAR 2023) FAR
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018) DFARS
52.233-1 DISPUTES (MAY 2014) FAR
52.233-3 PROTEST AFTER AWARD (DEVIATION 2026-O0038) (FEB 2026) FAR
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) FAR
52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (DEVIATION 2026-O0038) (FEB 2026) FAR
52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS, ALT I (DEVIATION 2026-O0038) (FEB 2026) FAR Alternate I As prescribed in 40.205(b), substitute the following paragraph (e)(1) for paragraph (e)(1) of the basic clause:
(e) Governmentwide exclusion and removal orders.
(1) Contractors are prohibited from providing or using as part of the performance of the contract any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by any applicable FASCSA orders identified by the checkbox(es) in this paragraph (e) (1). [Contracting Officer must select either “yes” or “no” for each of the following types of FASCSA orders:] Yes [] No [] DHS FASCSA Order Yes [] No [] DoD FASCSA Order Yes [] No [] DNI FASCSA Order
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) DFARS
252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR REPORTED CYBER INCIDENT
INFORMATION (JAN 2023) DFARS
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (DEVIATION 2026-O0025)
(JUN 2026) DFARS
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION I - CONTRACT CLAUSES (CONTINUED)
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES
(JAN 2023) DFARS
252.225-7051 PROHIBITION ON ACQUISITION OF CERTAIN FOREIGN COMMERCIAL SATELLITE SERVICES (DEC 2022) DFARS
252.240-7995 PROHIBITION ON CONTRACT AWARDS WITH ENTITIES THAT CONTRACT WITH LOBBYISTS FOR CHINESE
MILITARY COMPANIES -- REPRESENTATION (DEVIATION 2026-O0025) (SEP 2026) DFARS
Standard Element ZB_240_7999 has no Title
52.243-1 CHANGES - FIXED PRICE (AUG 1987) FAR
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991) DFARS
52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEVIATION 2026-O0038) (FEB 2026)
(a) Definitions. As used in this clause -- Commercial product, commercial service and nondevelopmental item have the meanings contained in Federal Acquisition Regulation (FAR) 2.101.
Subcontract has the meaning at FAR 44.401
(b) Requirements.
(1) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial products, commercial services, or non-developmental items as components of items to be supplied under this contract.
(2) If a clause in the following table is included in the contract, the Contractor shall insert the clause in subcontracts for commercial products or commercial services and must flow down the requirements of the clause to subcontracts as indicated in the specific clause:
Number Title Date 52.203-13 Contractor Code of
Business Ethics and Conduct
NOV 2021
52.203-17 Contractor Employee Whistleblower Rights
NOV 2023
52.203-19 Prohibition on Requiring Certain Internal
Confidentiality Agreements or Statements
JAN 2017
52.204-9 Personal Identity Verification of Contractor
Personnel
JAN 2011
52.219-8* Utilization of Small Business Concerns
JAN 2025
52.222-35 Equal Opportunity for Veterans
JUN 2020
52.222-36 Equal Oppurtunity for Workers with Disabilities
JUN 2020
52.222-37 Employment Reports for Veterans
JUN 2020
52.222-40 Notification of Employee Rights Under the National
Labor Relations Act
DEC 2010
52.222-41 Service Contract Labor Standards
AUG 2018
52.222-50 Combating Trafficking in Persons
NOV 2021
52.222-50 with Alt I Combating Trafficking in Persons, with its Alternate I
MAR 2015
52.222-51 Exemption from Application of the Service Contract
Labor Standards to
MAY 2014
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 16 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION I - CONTRACT CLAUSES (CONTINUED)
Number Title Date Contracts for Maintenance, Calibration, or Repair of Certain Equipment -
Requirements 52.222-53 Exemption from Application of the Service Contract Labor Standards to
Contracts for Certain Services - Requirements
MAY 2014
52.222-54 Employment Eligibility Verification
JAN 2025
52.222-62 Paid Sick Leave Under Executive Order 13706
JAN 2022
52.224-3 Privacy Training JAN 2017 52.224-3 with Alt I Privacy Training, with
Alternate I
JAN 2017
52.225-26 Contractors Performing Private Security Functions Outside the United States
OCT 2016
52.232-40 Providing Accelerated Payments to Small
Business Subcontractors
MAR 2023
52.240-91 Security Prohibitions and Exclusions
DATE
52.240-91 with Alt I Security Requirements, with its Alternate I
DATE
52.240-92 Security Requirements DATE 52.240-92 with Alt II Security Requirements, with its Alternate II
DATE
52.247-64 Preference for Privately Owned U.S.-Flag
Commercial Vessels
NOV 2021
* Include only if the subcontract offers further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.109(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(c) Subcontracts. The Contractor shall include the terms of this clause, including this paragraph (c), in subcontracts awarded under this contract.
252.244-7000 SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES (NOV 2023) DFARS
52.246-17 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003) FAR
As prescribed in 46.710(a)(1), insert a clause substantially as follows:
(a) Definitions. As used in this clause.
“Acceptance” means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, ownership of existing supplies, or approves specific services as partial or complete performance of the contract.
“Supplies” means the end items furnished by the Contractor and related services required under this contract. The word does not include “data.”
(b) Contractor's obligations.
(1) Notwithstanding inspection and acceptance by the Government of supplies furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the Contractor warrants that for 1 YEAR [Contracting Officer shall state specific period of time after delivery, or the specified event whose occurrence will terminate the warranty period; e.g., the number of miles or hours of use, or combinations of any applicable events or periods of time].
(i) All supplies furnished under this contract will be free from defects in material or workmanship and will conform with all requirements of this contract; and
(ii) The preservation, packaging, packing, and marking, and the preparation for, and method of, shipment of such supplies will conform with the requirements of this contract.
(2) When return, correction, or replacement is required, transportation charges and responsibility for the supplies while in transit shall be borne by the Contractor. However, the Contractor's liability for the transportation charges shall not exceed an amount equal to the cost of transportation by the usual commercial method of shipment between the place of delivery specified in this contract and the Contractor's plant, and return.
(3) Any supplies or parts thereof, corrected or furnished in replacement under this clause, shall also be subject to the terms of this clause to the same extent as supplies initially delivered. The warranty, with respect to supplies or parts thereof, shall be equal in duration to that in paragraph (b)(1) of this clause and
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 17 OF 26 PAGES
SPE1C1-27-Q-0206
SECTION I - CONTRACT CLAUSES (CONTINUED)
shall run from the date of delivery of the corrected or replaced supplies.
(4) All implied warranties of merchantability and “fitness for a particular purpose” are excluded from any obligation contained in this contract.
(c) Remedies available to the Government.
(1) The Contracting Officer shall give written notice to the Contractor of any breach of warranties in paragraph (b)(1) of this clause within 45 DAYS AFTER DISCOVERY [Contracting Officer shall insert specific period of time; e.g., “45 days of the last delivery under this contract,” or “45 days after discovery of the defect”].
(2) Within a reasonable time after the notice, the Contracting Officer may either.
(i) Require, by written notice, the prompt correction or replacement of any supplies or parts thereof (including preservation, packaging, packing, and marking) that do not conform with the requirements of this contract within the meaning of paragraph (b)(1) of this clause; or
(ii) Retain such supplies and reduce the contract price by an amount equitable under the circumstances.
(3)(i) If the contract provides for inspection of supplies by sampling procedures, conformance of supplies or components subject to warranty action shall be determined by the applicable sampling procedures in the contract. The Contracting Officer.
(A) May, for sampling purposes, group any supplies delivered under this contract;
(B) Shall require the size of the sample to be that required by sampling procedures specified in the contract for the quantity of supplies on which warranty action is proposed;
(C) May project warranty sampling results over supplies in the same shipment or other supplies contained in other shipments even though all of such supplies are not present at the point of reinspection; provided, that the supplies remaining are reasonably representative of the quantity on which warranty action is proposed; and
(D) Need not use the same lot size as on original inspection or reconstitute the original inspection lots.
(ii) Within a reasonable time after notice of any breach of the warranties specified in paragraph (b)(1) of this clause, the Contracting Officer may exercise one or more of the following options:
(A) Require an equitable adjustment in the contract price for any group of supplies.
(B) Screen the supplies grouped for warranty action under this clause at the Contractor's expense and return all nonconforming supplies to the Contractor for correction or replacement.
(C) Require the Contractor to screen the supplies at locations designated by the Government within the contiguous United States and to correct or replace all nonconforming supplies.
(D) Return the supplies grouped for warranty action under this clause to the Contractor (irrespective of the f.o.b. point or the point of acceptance) for screening and correction or replacement.
(4)(i) The Contracting Officer may, by contract or otherwise, correct or replace the nonconforming supplies with similar supplies from another source and charge to the Contractor the cost occasioned to the Government thereby if the Contractor.
(A) Fails to make redelivery of the corrected or replaced supplies within the time established for their return; or
(B) Fails either to accept return of the nonconforming supplies or fails to make progress after their return to correct or replace them so as to endanger performance of the delivery schedule, and in either of these circumstances does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure.
(ii) Instead of correction or replacement by the Government, the Contracting Officer may require an equitable adjustment of the contract price. In addition, if the Contractor fails to furnish timely disposition instructions, the Contracting Officer may dispose of the nonconforming supplies for the Contractor's account in a reasonable manner.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .