This is a Statement of Work for Request for Proposal No. 210000002224 issued by the State of Michigan Department of Transportation (MDOT) Saginaw East Side Maintenance Garage. The solicitation requests the furnishing and shipment of two 8,400-gallon double-wall High Density Polyethylene (HDPE) vertical storage tanks with a 141-inch diameter to support SPC 5000 application during winter maintenance operations of the Zilwaukee Bridge. Each tank must include a 3-inch double wall NPT threaded bulkhead fitting located 6 inches from the bottom, a screened vent, a cover for the top manway opening, and a reverse float level indicator marked in 500-gallon increments. The tanks must be delivered within 45 calendar days from the date of order to 3510 E. Washington Avenue, Saginaw, MI 48601 during normal business hours. Bidders may submit alternate bids that vary from specifications provided they clearly describe all variances and include complete descriptive literature. Packaging must be optimized for freight rates and palletized whenever possible using standard 4-way shipping pallets.
Pricing must remain firm for the entire contract term. The State will make payment by Electronic Funds Transfer (EFT) and requires invoices to include date, purchase order number, contract number, quantity, service description, unit price, shipping costs, vendor invoice number, and total price. Late or improper completion of contract activities will result in liquidated damages of $2,500 plus an additional $50 per day for each day the contractor fails to remedy the delay. Contractors must appoint a designated contractor representative and key personnel assigned to the State account, provide 24/7 technical support availability between 8 a.m. and 5 p.m. EST Monday through Friday at minimum, and disclose any subcontractors including their legal business names, addresses, and service descriptions. Contractors must also address environmental and energy efficiency standards, hazardous chemical identification with Material Safety Data Sheets, mercury content compliance, and brominated flame retardant disclosure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPC Storage Tanks PI.CT.VQ.docx | DOCX document | |
| Attachment A - Double Wall Tank Drawing 2224.jpg | JPG image | |
| SPC Storage Tanks Sch.B Pricing.docx | DOCX document | |
| standard_contract_terms.tanks.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan.gov/MiProcurement
Contractor must enter company name here.
Michigan.gov/MiProcurement
SCHEDULE A – STATEMENT OF WORK CONTRACT ACTIVITIES
Request for Proposal No. 210000002224 Two 8400 Gallon HDPE Double Wall Vertical Tanks for SPC 5000
This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required.
The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.
BACKGROUND
The MDOT Saginaw East Side Maintenance Garage maintains the Zilwaukee Bridge during the winter season. These services include SPC 5000 application during winter maintenance operations. This solicitation will provide improved storage facilities for the SPC 5000 to support future winter maintenance operations of the Zilwaukee Bridge.
SCOPE
Furnish and ship two 8,400-gallon Double Wall ,141” diameter High Density Polyethylene (HDPE) tanks to the MDOT Saginaw East Side Maintenance Garage. Tanks must have a 3-inch double wall NPT threaded bulkhead fitting 6 inches from the bottom of the center fitting. Fitting and top opening to be on the same side of the tank, a screened vent, a reverse float level indicator or marked/molded in 500-gallon increments.
REQUIREMENTS
1. General Requirements
1.1. Product Specifications
The Contractor must provide the following:
Furnish and Ship Two- 8,400 gallon 141” diameter double wall storage tanks
1. Tank must be approximately 141” in diameter
2. Polyethylene Double Wall construction
3. 3” double wall NPT threaded bulkhead fitting 6 inches from the bottom of the center fitting
4. Fitting and top opening to be on the same side of the tank
5. Screened Vent
6. Cover must be furnished for the manway in the top of the tank
7. Reverse float level indicator or marked/molded in 500-gallon increments.
The Contractor may offer an alternate bid that varies from the specifications. An alternate bid must clearly describe all variances from the specifications and the proposal must include descriptive literature that contains complete specifications, if available.
1.2. Warranties
Describe any warranties included in the bid and provide the length of the warranty. Explain the process for reporting warranty issues and how the Contractor how any repairs or replacements are made, including timing. If the warranty is provided through a third-party or manufacturer, the Contractor must confirm that the manufacturer’s warranty passes through to the State. Provide the name, address, contact name, phone number and email address of the party responsible for the warranty.
The State reserves the right to require additional warranties other than those identified by the Contractor in its response to this RFP.
Describe any warranties included in the bid (if none, write N/A):
Provide the length of the warranty:
Explain the process for reporting warranty issues:
Explain how any repairs or replacements are made, including timing, etc.:
If the warranty is provided through a third-party or manufacturer, the Contractor must confirm that the manufacturer’s warranty passes through to the State.
Provide the name, address, contact name, phone number and email address of the party responsible for the warranty:
1.3. Recall Requirements and Procedures
Describe any recall requirements and procedures.
Bidder must provide detailed information as requested in the above requirement(s). If none, enter N/A.
1.4. Quality Assurance Program
Explain your Quality Assurance Program(s).
Bidder must provide detailed information as requested in the above requirement(s). If none, enter N/A.
1.5. Incentives
Explain any special incentives or services including, but not limited to, return policies, trade-in programs, quantity discounts, etc.
Bidder must provide detailed information as requested in the above requirement(s). If none, enter N/A.
1.6. Transition
A. Post-Contract Transition: Invoices must be sent within 45 days after expiration of contract. Any invoices received after 45 days will result in a non-payment of invoice.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
2. Service Levels
2.1. Time Frames
All Contract Activities must be delivered within 45 days from receipt of order. The receipt of order date is pursuant to the Notices section of the Standard Contract Terms.
2.2. Delivery
Delivery will be expected within 45 calendar days upon date of order between during normal business hours. Delivery will be made at 3510 E. Washington Avenue, Saginaw, MI 48601.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
3. Staffing
3.1. Contractor Representative
The Contractor must appoint 1 individual specifically assigned to State of Michigan accounts who will respond to State inquiries regarding the Contract Activities, answer questions related to ordering and delivery, etc. (the “Contractor Representative”).
The Contractor must notify the Contract Administrator at least 3 calendar days before removing or assigning a new Contractor Representative.
3.2. Key Personnel
The Contractor must appoint 1 individual who will be directly responsible for the day-to-day operations of the Contract (“Key Personnel”). Key Personnel must be specifically assigned to the State account, be knowledgeable on the contractual requirements, and respond to State inquiries within 6 hours.
The Contractor may not remove or assign Key Personnel without the prior consent of the State. Prior consent is not required for reassignment for reasons beyond the Contractor’s control, including illness, disability, death, leave of absence, personal emergency circumstances, resignation, or termination for cause. The State may request a résumé and conduct an interview before approving a change. The State may require a 30-calendar day training period for replacement personnel.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
1) Key Personnel – (name, phone, e-mail) (can be same person) Contract Representative:
Program Manager:
3.3. Non-Key Personnel
The Contractor must notify the Contract Administrator at least 10-calendar days before removing or assigning non-key personnel.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List Key Personnel Contact Information:
3.4. Organizational Chart
Provide an overall organizational chart that details staff members, by name and title, and subcontractors.
The Bidder must provide an overall organizational chart that details staff members, by name and title, and subcontractors - either in this response box or identified here as an attachment to this RFP.
3.5. Customer Service Number
The Contractor must specify its number for the State to contact the Contractor Representative who must be available for calls during the hours of 8 am to 4 pm EST Monday through Friday, at a minimum. Identify customer service availability for this proposal by hours and days of the week.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
The Bidder must specify its number for the State to make contact with the Contractor Representative:
Identify customer service availability for this proposal by hours and days of the week.
3.6. Technical Support, Repairs and Maintenance
The Contractor must specify its number for the State to contact the Contractor for technical support, repairs and maintenance. The Contractor must be available for calls and service during the hours of 8 am to 5 pm EST Monday through Friday at a minimum. Identify availability for this proposal by hours and days of the week.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
The Bidder must specify its number for the State to make contact with the Contractor for technical support:
3.7. Disclosure of Subcontractors
If the Contractor intends to utilize subcontractors, the Contractor must disclose the following:
The legal business name; address; telephone number; a description of subcontractor’s organization and the services it will provide; and information concerning subcontractor’s ability to provide the Contract Activities.
The relationship of the subcontractor to the Contractor. Of the total bid, the price of the subcontractor’s work. Whether the Contractor has a previous working experience with the subcontractor. If yes, provide the details of that previous relationship.
A complete description of the Contract Activities that will be performed or provided by the subcontractor.
The legal business name, address, telephone number of the subcontractor(s):
A description of subcontractor’s organization and the services it will provide and information concerning subcontractor’s ability to provide the Contract Activities:
The relationship of the subcontractor to the Bidder:
Whether the Bidder has a previous working experience with the subcontractor.
If yes, provide the details of that previous relationship:
A complete description of the Contract Activities that will be performed or provided by the subcontractor:
Of the total bid, the price of the subcontractor’s work:
3.8. Security
The Contractor will be subject the following security procedures:
The Contractor must explain any additional security measures in place to ensure the security of State facilities.
The Contractor’s staff may be required to make deliveries to or enter State facilities. The State may require the Contractor’s personnel to wear State issued identification badges.
The Contractor must: (a) explain how it intends to ensure the security of State facilities, (b) whether it uses uniforms and ID badges, etc., (c) identify the company that will perform background checks, and (d) the scope of the background checks.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
4. Pricing
4.1. Price Term
Pricing is firm for the entire length of the Contract.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
5. Ordering
5.1. Authorizing Document
The appropriate authorizing document for the Contract will be purchase order.
5.2. Order Verification
The Contractor must have internal controls approved by Central Procurement Services, to verify abnormal orders and to ensure that only authorized individuals place orders.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
6. Delivery
6.1. Delivery Programs
The Contractor must explain in detail its delivery programs (e.g., standard delivery and quick-ship), including any limitations such as quantity.
The Contractor must explain the transportation method (e.g., UPS, FedEx, Contractor fleet, or other third-party carrier) it intends on utilizing in delivery of the Contract Activities.
6.2. Packaging and Palletizing
Packaging must be optimized to permit the lowest freight rate. Shipments must be palletized whenever possible using manufacturer's standard 4-way shipping pallets.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
Contractor to explain delivery program:
7. Invoice and Payment
7.1. Invoice Requirements
All invoices submitted to the State must include: (a) date; (b) purchase order; (c) contract number) (d) quantity; (e) description of the Contract Activities; (f) unit price; (g) shipping cost (if any); (h) vendor-generated invoice number and (h) total price.
7.2. Payment Methods
The State will make payment for Contract Activities by EFT.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):
8. Licensing Agreement The Contractor must provide a copy of any applicable licensing agreement.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
9. Liquidated Damages Late or improper completion of the Contract Activities will cause loss and damage to the State and it would be impracticable and extremely difficult to fix the actual damage sustained by the State. Therefore, if there is late or improper completion of the Contract Activities the State is entitled to collect liquidated damages in the amount of $2500 and an additional $50 per day for each day Contractor fails to remedy the late or improper completion of the Work.
Unauthorized Removal of Key Personnel will interfere with the timely and proper completion of the Contract, to the loss and damage of the State, and it would be impracticable and extremely difficult to fix the actual damage sustained by the State. Therefore, the State may assess liquidated damages against Contractor as specified below.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
10. Additional Requirements
10.1. Environmental and Energy Efficiency Product Standards
The Contractor must identify any energy efficient, bio-based, or otherwise environmentally friendly products used in the products. Contractor must include any relevant third-party certification, including the verification of a United States Department of Agriculture certified bio-based product label. Contractor must describe how products that meet these requirements are identified or otherwise labelled and list any exceptions to this requirement.
10.2. Hazardous Chemical Identification
In accordance with the federal Emergency Planning and Community Right-to-Know Act, 42 USC 11001, et seq., as amended, the Contractor must provide a Material Safety Data Sheet listing any hazardous chemicals as defined in 40 CFR §370.2, to be delivered. Each hazardous chemical must be properly identified, including any applicable identification number, such as a National Stock Number or Special Item Number.
The Contractor must identify any hazardous chemicals that will be provided under any resulting contract.
10.3. Mercury Content
Pursuant to MCL 18.1261d, mercury-free products must be procured when possible. The Contractor must explain if it intends to provide products containing mercury, the amount or concentration of mercury, and whether cost competitive alternatives exist. If a cost competitive alternative does exist, the Contractor must provide justification as to why the particular product is essential. All products containing mercury must be labeled as containing mercury.
10.4. Brominated Flame Retardants
The State prefers to purchase products that do not contain brominated flame retardants (BFRs) whenever possible. The Contractor must disclose whether the products contain BFRs and describe how the products are identified or otherwise labelled.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirements and have noted all exception(s) below. |
List all exception(s):