STATEMENT OF WORK

Purchase and Install a Shredder in WH 14

DEFENSE SUPPLY CENTER RICHMOND

8000 JEFFERSON DAVIS HIGHWAY

RICHMOND, VIRGINIA 23297-5100

September 6, 2012 SCOPE OF WORK: The purpose of this requirement is for the replacement of the current shredder. The location of the shredder is Warehouse 14, Defense Supply Center Richmond, (DSCR). Government will be responsible for off-loading and placing the equipment, which will require the need for 1 forklift and a qualified driver. Government will also be responsible for providing the electrician for the electrical hook up of the unit.

Vendor shall provide all labor, materials, equipment, tools, and incidentals necessary to deliver and install 1 complete shredder system. Vendor must also provide 2nd year warranty to cover parts and labor. In addition, vendor must provide 2 year quarterly maintenance service.

The shredder system must be the brand name or equal to following:

Brand

Model Allegheny Shredders

20-350C 40HP Shredder

HLS-84836 Tipper

Bolt-On Output Conveyor

3430-2572 CE Horizontal Baler

Salient Characteristics/minimum requirement of each item are listed below. Vendors must provide items meet or exceed these minimum requirements.

· Shredder:

· Motor: 40 HP

· Voltage: 460 volts

· Shred Width: 1/2”

· Feed Opening: 20” wide

· Cutting Assembly: 20” wide

· Crusher Paddle: 10” diameter

· Cutters: 10.75 diameter, durable cutter that can withstand heavy shock roads

· Tipper:

· Motor: 2 HP

· Voltage: 230 volts

· Discharge Height: 48”

· Bucket: 36” depth X 56” width

· Lift Capacity: 2000 lbs

· Output Conveyor:

· Width: 20” wide

· Baler:

· Voltage: 25 HP

· Ram Cycle Time: 25 seconds

· Ram Thrust: 78,000 lbs

· Cylinder: 7”

· Pump: 48 GPM

· Max Operating Pressure: 2,300 psi

SPECIAL CONDITIONS: No changes to any provision of the final agreement shall be made without the written authorization of the Contracting Officer.

ADDITIONAL REQUIREMENTS: A Quality Assurance Representative shall be contacted upon arrival on the center and at the completion of work.

SCHEDULING: Work schedules will be arranged by the Schedule Coordinator who will set up amicable dates and times between the Contractor and the Quality Assurance Representative.

POINTS OF CONTACT: The designated Quality Assurance Representative is Dave Smith, 804-279-5749. The Schedule Coordinator is Angel Quinones, 804-279-5483.