The Gordian Group Constructuin Task Catalog

View the file

Other files

File Type Posted
amend 02.PDF PDF
amendment 01.PDF PDF
upb.pdf PDF
rfp09r0003.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Defense Logistics Agency Richmond, Virginia

JOB ORDER CONTRACT

Technical Specifications Book 1 of 5

CSI SECTIONS 01- 07

January 2009

THIS PAGE INTENTIONALLY LEFT BLANK

Table of Contents

Defense Logistics Agency, Richmond VA TOC - 1

01 General Requirements

01 22 20 00 No Specification Required 01 32 30 00 Schedule Of Values 01 32 30 00a Special Procedures for Historic Treatment 01 32 30 00b LEED Requirements 01 32 30 00c References 01 32 30 00d Abbreviations, Acronyms, Definitions, and Symbols 01 32 30 00e Cutting and Patching 01 51 10 00 Electrical Renovation 01 51 10 00a Panelboards 01 52 10 00 Temporary Facilities and Controls 01 54 20 00 Scaffolding Tubular Steel 01 74 10 00 Construction Waste Management

02 Existing Conditions

02 25 10 00 Selective Demolition 02 32 10 00 Subsurface Drilling, Sampling, And Testing 02 41 10 00 Building Demolition 02 41 10 00a Portland Cement Concrete Removal 02 61 10 00 Excavation And Handling Of Contaminated Material 02 61 10 00a Precision Testing Of Underground Fuel Oil Tanks 02 61 10 00b Hydrostatic Pressure Testing Of Air Receiving Tanks 02 65 00 00 Underground Storage Tank Removal 02 81 00 00 Disposal Of Hazardous Materials 02 82 00 00 Removal Of Friable Asbestos-Containing Materials 02 82 00 00a Removal Of Nonfriable Asbestos-Containing Materials 02 82 00 00b Encapsulation (Lock-Down) Of Asbestos-Containing Materials 02 83 00 00 Removal And Disposal Of Lead-Containing Paint 02 83 00 00a Lead Paint Related Abatement Procedures 02 83 00 00b XRF Testing For Lead-Based Paint 02 83 00 00c Lead Dust Wipe, Air And Tclp Sampling And Analysis 02 84 30 00 Overhead Electrical Distribution 02 85 00 00 Mold Remediation 02 87 00 00 Bird And Bird Waste Abatement

03 Concrete

03 01 30 00 Concrete Rehabilitation 03 05 00 00 Cast-In-Place Concrete 03 05 00 00a Cast-In-Place Architectural Concrete 03 35 20 00 Exposed Aggregate Surface Concrete Walls 03 35 30 00 Rusticated Concrete Finishes 03 37 10 00 Shotcrete 03 37 10 00a Glass Fiber Reinforced Concrete 03 41 10 00 Plant-Precast Structural Concrete 03 41 10 00a Precast Lighweight Roof Slabs 03 41 20 00 Unbonded Post-Tensioned Concrete 03 41 20 00a Architectural Precast Concrete 03 51 10 00 Cementitious Wood-Fiber Deck 03 51 10 00a Gypsum Plank Decking 03 51 10 00b Gypsum Concrete Decks 03 52 10 00 Lightweight Insulating Concrete 03 53 00 00 Concrete Floor Topping 03 54 00 00 Cement-Based Underlayment 03 62 10 00 Tilt-Up Precast Concrete

TOC - 2 Defense Logistics Agency, Richmond VA

04 Masonry

04 01 20 00 Clay Masonry Restoration And Cleaning 04 01 40 00 Stone Masonry 04 01 40 00a Stone Restoration And Cleaning 04 05 10 00 Unit Masonry Assemblies 04 23 10 00 Glass Unit Masonry Assemblies 04 41 00 00 Dimension Stone Cladding 04 41 00 00a Interior Stone Facing 04 43 00 00 Dimension Stone Tile 04 72 00 00 Cast Stone

05 Metals

05 05 20 00 Cold-Formed Metal Framing 05 05 20 00a Metal Fabrications 05 12 20 00 Structural Steel 05 14 10 00 Structural Aluminum 05 15 10 00 Ornamental Metal 05 21 10 00 Steel Joists 05 31 00 00 Steel Deck 05 51 10 00 Metal Stairs 05 51 10 00a Fabricated Spiral Stairs 05 52 10 00 Pipe And Tube Railings 05 53 00 00 Gratings 05 58 10 00 Ornamental Formed Metal 05 73 00 00 Miscellaneous Ornamental Metals 05 73 00 00a Ornamental Railings

06 Wood, Plastics, and Composites

06 01 20 00 Exterior Finish Carpentry 06 01 20 00a Interior Finish Carpentry 06 01 20 00b Wood Restoration 06 05 20 00 Timber Bridge Components 06 05 20 00a Rough Carpentry 06 05 20 00b Miscellaneous Carpentry 06 05 20 00c Heavy Timber Construction 06 05 20 00d Structural Glued-Laminated Timber 06 05 70 00 Wood Decking 06 05 70 00a Exterior Architectural Woodwork 06 11 10 00 Rough Carpentry Renovation 06 15 10 00 Exterior Rough Carpentry 06 16 20 00 Sheathing 06 17 30 00 Metal-Plate-Connected Wood Trusses 06 25 10 00 Paneling 06 41 10 00 Interior Architectural Woodwork 06 41 10 00a Door Hardware 06 41 10 00b Residential Cabinets 06 42 10 00 Plastic Paneling 06 48 10 00 Wood Doors 06 49 10 00 Exterior Shutters 06 51 10 00 Plastic Lumber 06 51 10 00a Composite Plastic Lumber 06 51 10 00b Structural Plastic Lumber 06 82 00 00 Pultruded Fiberglass Structural Shapes 06 82 00 00a Pultruded Fiberglass Industrial Grating

Defense Logistics Agency, Richmond VA TOC - 3

07 Thermal And Moisture Protection

07 01 40 00 Built-Up Coal-Tar Roofing 07 01 40 00a Membrane Reroofing Preparation 07 11 10 00 Bituminous Dampproofing 07 11 10 00a Cold Fluid-Applied Waterproofing 07 11 10 00b Hot Fluid-Applied Rubberized Asphalt Waterproofing 07 13 10 00 Bituminous Waterproofing 07 13 50 00 Self-Adhering Sheet Waterproofing 07 13 50 00a Elastomeric Sheet Waterproofing 07 16 10 00 Modified Cement Waterproofing 07 16 10 00a Crystalline Waterproofing 07 16 10 00b Metal-Oxide Waterproofing 07 17 10 00 Bentonite Waterproofing 07 19 10 00 Water Repellents 07 21 10 00 Building Insulation 07 22 10 00 CSPE Membrane Roofing 07 22 10 00a Thermoplastic Membrane Roofing 07 22 10 00b APP-Modified Bituminous Membrane Roofing 07 22 10 00c SBS-Modified Bituminous Membrane Roofing 07 22 10 00d Fluid-Applied Protected Membrane Roofing 07 24 10 00 Polymer-Based Exterior Insulation And Finish System (EIFS) 07 24 10 00a Water-Drainage Exterior Insulation and Finish System (EIFS) 07 31 10 00 Asphalt Shingles 07 31 10 00a Metal Shingles 07 31 10 00b Preparation for Reroofing 07 31 20 00 Slate Shingles 07 31 20 00a Wood Shingles And Shakes 07 31 30 00 Composite Rubber Shingles 07 32 10 00 Clay Roof Tiles 07 32 10 00a Concrete Roof Tiles 07 41 10 00 Metal Roof Panels 07 41 10 00a Sheet Metal Roofing 07 42 10 00 Glazing 07 46 10 00 Metal Wall Panels 07 46 10 00a Metal Plate Wall Panels 07 46 10 00b Siding 07 46 60 00 Insulated-Core Metal Wall Panels 07 51 10 00 Built-Up Asphalt Roofing 07 51 30 00 Modified Bitumous Protected Membrane Roofing 07 53 10 00 EPDM Membrane Roofing 07 54 10 00 Polyvinyl-Chloride (PVC) Roofing 07 54 20 00 Thermoplastic Polyolefin (TPO) Roofing 07 56 00 00 Coated Foamed Roofing 07 62 00 00 Sheet Metal Flashing And Trim 07 62 00 00a Common Work Results for Fire Suppression 07 62 00 00b Common Work Results for Plumbing 07 62 00 00c Common Work Results for HVAC 07 71 10 00 Manufactured Roof Specialties 07 72 10 00 Packaged, Outdoor, Central-Station Air-Handling Units 07 72 10 00a Power Ventilators 07 72 10 00b Intake and Relief Ventilators 07 72 20 00 Roof Accessories 07 81 10 00 Sprayed Fire-Resistive Materials 07 81 10 00a Board Fire Protection 07 84 10 00 Through-Penetration Firestop Systems 07 84 10 00a Fire-Resistive Joint Systems 07 84 10 00b Firestopping 07 92 00 00 Joint Sealants 07 95 10 00 Architectural Joint Systems 07 95 10 00a Roof Expansion Assemblies

08 Openings

08 01 10 00 Steel Doors And Frames 08 01 10 00a Steel Entry Doors 08 01 50 00 Wood Windows

TOC - 4 Defense Logistics Agency, Richmond VA

08 01 50 00a Roof Windows 08 11 60 00 Aluminum Storm Doors 08 11 60 00a Steel Storm Doors 08 11 60 00b Security Window Screens and Doors 08 11 70 00 Sliding Metal Fire Doors 08 12 10 00 Stainless Steel Doors And Frames 08 13 10 00 Sound Control Doors 08 14 10 00 Flush Wood Doors 08 14 10 00a Stile And Rail Wood Doors 08 16 10 00 Fiberglass Reinforced Plastic (FRP) Doors and Frames 08 16 10 00a Insulated Fiberglass Doors and Frames 08 16 10 00b Fiberglass Reinforced Polyester (FRP) Flush Doors 08 31 10 00 Access Doors And Frames 08 32 10 00 Sliding Aluminum-Framed Glass Doors 08 32 10 00a Sliding Wood-Framed Glass Doors 08 33 10 00 Overhead Coiling Doors 08 33 20 00 Overhead Coiling Grilles 08 33 30 00 Side Coiling Grilles 08 34 50 00 Detention Doors And Frames 08 34 50 00a Security Grilles 08 34 50 00b Security Vault Doors 08 34 50 00c Vault Doors and Day Gates 08 34 50 00d Modular Vaults 08 34 60 00 Detention Door Hardware 08 34 60 00a Detention Enclosures 08 34 60 00b Detention Furniture 08 35 10 00 Folding Doors 08 36 10 00 Sectional Overhead Doors 08 38 10 00 Flexible Doors 08 41 00 00 Aluminum-Framed Entrances And Storefronts 08 42 20 00 ICU/CCU Entrance Doors 08 42 20 00a All-Glass Entrances And Storefronts 08 42 30 00 Revolving Entrance Doors 08 44 10 00 Glazed Aluminum Curtain Walls 08 44 10 00a Structural-Sealant-Glazed Curtain Walls 08 44 10 00b Sloped Glazing Assemblies 08 51 10 00 Aluminum Windows 08 51 10 00a Aluminum Replacement Windows 08 51 20 00 Steel Windows 08 51 60 00 Aluminum Storm Windows 08 53 10 00 Vinyl Windows 08 56 10 00 Security Windows 08 63 00 00 Unit Skylights 08 63 00 00a Metal-Framed Skylights 08 63 00 00b Structured-Polycarbonate-Panel Assemblies 08 63 00 00c Fiberglass-Sandwich-Panel Assemblies 08 74 10 00 Clock And Program Control 08 75 00 00 Automatic Door Operators 08 83 00 00 Mirrors 08 84 00 00 Plastic Glazing 08 87 50 00 Fragment Retention Film For Glass 08 88 50 00 Security Glazing 08 91 10 00 Louvers And Vents

09 Finishes

09 01 60 00 Portland Cement Terrazzo Flooring 09 22 10 00 Non-Load-Bearing Steel Framing 09 22 10 00a Gypsum Plaster 09 22 10 00b Gypsum Veneer Plaster 09 22 10 00c Portland Cement Plaster 09 22 30 00 Lath and Plaster Renovation 09 23 10 00 Gypsum Board Renovation 09 28 10 00 Gypsum Board 09 28 10 00a Gypsum Board Shaft-Wall Assemblies 09 31 00 00 Ceramic Tile

Defense Logistics Agency, Richmond VA TOC - 5

09 51 10 00 Acoustical Panel Ceilings 09 51 20 00 Acoustical Tile Ceilings 09 51 30 00 Acoustical Metal Pan Ceilings 09 54 20 00 Linear Metal Ceilings 09 57 00 00 Security Ceiling Systems 09 61 30 00 Static-Control Resilient Floor Coverings 09 62 00 00 Resinous Flooring 09 63 10 00 Brick Flooring 09 64 20 00 Wood Flooring 09 64 20 00a Wood Sports-Floor Assemblies 09 65 10 00 Cork Flooring 09 65 10 00a Resilient Floor Tile 09 65 10 00b Resilient Sheet Flooring 09 65 10 00c Resilient Wall Base And Accessories 09 65 10 00d Linoleum Floor Coverings 09 65 60 00 Fluid-Applied Athletic Flooring 09 65 60 00a Resilient Sports-Floor Coverings 09 66 30 00 Resinous Matrix Terrazzo Flooring 09 68 10 00 Carpet 09 68 10 00a Carpet Tile 09 69 10 00 Access Flooring 09 72 10 00 Wall Coverings 09 84 10 00 Acoustical Wall Panels 09 91 10 00 Exterior Painting 09 91 10 00a Wood Stains and Transparent Finishes 09 91 10 00b High-Temperature-Resistant Coatings 09 91 20 00 Interior Painting 09 91 20 00a Multicolored Interior Coatings 09 93 00 00 Floor Treatment Refinishing Wood Floors 09 93 00 00a High-Performance Coatings 09 96 50 00 Fiberglass Reinforced Epoxy Coating 09 96 60 00 Cementitious Coatings

10 Specialties

10 11 10 00 Visual Display Surfaces 10 14 10 00 Signage 10 14 10 00a Turnstiles 10 14 50 00 Traffic Signs 10 17 10 00 Telephone Specialties 10 21 10 00 Toilet Compartments 10 21 10 00a Solid Surface Material Toilet Compartments 10 21 10 00b Shower and Dressing Compartments 10 21 10 00c Cubicle Curtains and Tracks 10 22 10 00 Wire Mesh Partitions 10 22 10 00a Demountable Partitions 10 22 20 00 Operable Panel Partitions 10 26 10 00 Impact-Resistant Wall Protection 10 28 10 00 Toilet And Bath Accessories 10 28 10 00a Detention Toilet Accessories 10 28 10 00b Bath Accessories 10 28 10 00c Plumbing Fixtures 10 44 10 00 Fire Extinguisher Cabinets 10 44 10 00a Fire Extinguishers 10 51 10 00 Metal Lockers 10 51 20 00 Solid Plastic Lockers 10 55 20 00 Postal Specialties 10 56 10 00 Metal Storage Shelving 10 73 10 00 Awnings 10 73 20 00 Extruded Aluminum Walkway Cover 10 75 10 00 Flagpoles 10 81 10 00 Oriented Flexible Netting Bird Barrier

TOC - 6 Defense Logistics Agency, Richmond VA

11 Equipment

11 12 10 00 Parking Control Equipment 11 12 10 00a Prefabricated Control Booths 11 13 10 00 Loading Dock Equipment 11 21 10 00 Food Service Equipment 11 26 10 00 Unit Kitchens 11 27 10 00 Revolving Darkroom Doors 11 27 10 00a Revolving Darkroom Pass-Through Windows 11 31 10 00 Residential Appliances 11 31 10 00a Refrigerators 11 31 10 00b Gas Ranges 11 31 10 00c Electric Ranges 11 31 10 00d Range Hoods 11 41 30 00 Residential Casework 11 52 10 00 Projection Screens 11 66 10 00 Playground Equipment And Structures 11 66 10 00a Recreational Facilities 11 66 10 00b Gymnasium Equipment 11 66 50 00 Gymnasium Dividers 11 68 20 00 Playing Fields 11 82 10 00 Packaged Incinerators 11 82 20 00 Waste Compactors

12 Furnishings

12 01 60 00 Fixed Audience Seating 12 21 10 00 Horizontal Louver Blinds 12 21 10 00a Vertical Louver Blinds 12 22 10 00 Draperies and Tracks 12 24 10 00 Roller Shades 12 24 10 00a Pleated Shades 12 31 10 00 Kitchen Casework, Stainless Steel Cabinets 12 36 20 00 Stone Countertops 12 36 60 00 Solid Polymer Fabrications 12 48 10 00 Floor Mats And Frames 12 48 10 00a Foot Grilles 12 66 00 00 Telescoping Stands 12 93 10 00 Miscellaneous Site and Street Furnishings 12 93 20 00 Site Furnishings

13 Special Construction

13 12 10 00 Water Distribution 13 34 10 00 Fixed Wood Bleachers (Exterior) 13 34 10 00a Demountable Bleachers (Exterior) 13 34 10 00b Portable Bleachers 13 34 10 00c Grandstands And Bleachers 13 34 10 00d Metal Building Systems 13 49 00 00 Radiation Protection

14 Conveying Equipment

14 01 20 00 Electric Traction Elevators 14 01 20 00a Hydraulic Elevators 14 11 00 00 Dumbwaiters 14 21 20 00 Limited-Use/Limited-Application Elevators 14 24 10 00 Hydraulic Freight Elevators 14 31 00 00 Escalators

Defense Logistics Agency, Richmond VA TOC - 7

14 41 10 00 Personnel Lifts 14 42 10 00 Wheelchair Lifts 14 91 30 00 Chutes

21 Fire Suppression

21 01 10 00 Fire-Suppression Piping 21 05 10 00 Meters and Gages for Plumbing Piping 21 05 10 00a Meters and Gages for HVAC Piping 21 09 00 00 Piped Utilities Basic Materials And Methods 21 11 10 00 Fire-Suppression Standpipes 21 13 10 00 Wet-Pipe Fire-Suppression Sprinklers 21 13 10 00a Dry-Pipe Fire-Suppression Sprinklers 21 13 30 00 Foam Fire Extinguishing 21 22 10 00 Clean-Agent Extinguishing Systems 21 31 10 00 Electric-Drive, Centrifugal Fire Pumps 21 31 10 00a Diesel-Drive, Centrifugal Fire Pumps 21 31 10 00b Electric-Drive, Vertical-Turbine Fire Pumps 21 31 10 00c Diesel-Drive, Vertical-Turbine Fire Pumps 21 31 10 00d Pressure-Maintenance Pumps 21 31 10 00e Controllers for Fire-Pump Drivers

22 Plumbing

22 01 40 00 Emergency Plumbing Fixtures 22 05 20 00 General-Duty Valves for Plumbing Piping 22 05 20 00a General-Duty Valves for HVAC Piping 22 05 70 00 Sanitary Sewerage 22 05 70 00a Storm Drainage Piping Specialties 22 07 10 00 Fire-Suppression Systems Insulation 22 07 10 00a Plumbing Insulation 22 11 10 00 Storm Drainage 22 11 10 00a Domestic Water Piping 22 11 10 00b Sanitary Waste And Vent Piping 22 11 10 00c Storm Drainage Piping 22 11 10 00d Hydronic Piping 22 11 10 00e Steam And Condensate Piping 22 11 10 00f Refrigerant Piping 22 11 10 00g General-Service Compressed-Air Piping 22 11 10 00h Compressed-Air Piping For Laboratory And Healthcare Facilities 22 11 10 00i Vacuum Piping For Laboratory And Healthcare Facilities 22 11 10 00j Gas Piping For Laboratory And Healthcare Facilities 22 11 20 00 Water Supply Wells 22 11 20 00a Hydronic Pumps 22 11 20 00b Water Distribution Pumps 22 11 20 00c Packaged Booster Pumps 22 12 10 00 Elevated Water-Storage Tanks 22 12 10 00a Surface Water-Storage Tanks 22 12 10 00b Potable-Water Storage Tanks 22 12 20 00 Underground Storage Tanks 22 12 20 00a Electric, Domestic Water Heaters 22 12 20 00b Fuel-Fired, Domestic Water Heaters 22 13 10 00 Interceptors 22 13 10 00a Relief Wells 22 13 20 00 Packaged Sewage Pumping Stations 22 13 20 00a Lift Station 22 13 20 00b Sewage Pumps 22 14 20 00 Sump Pumps 22 15 10 00 General-Service Packaged Air Compressors and Receivers 22 15 10 00a HVAC Instrumentation And Controls 22 35 20 00 Domestic Water Heat Exchangers 22 42 10 00 Medical Plumbing Fixtures 22 42 10 00a Porcelain Steel Bathtub Liners and Surrounds 22 46 10 00 Security Plumbing Fixtures 22 47 10 00 Drinking Fountains And Water Coolers

TOC - 8 Defense Logistics Agency, Richmond VA

22 66 80 00 Chemical-Waste Systems for Laboratory and Healthcare Facilities

23 Heating, Ventilating, And Air-Conditioning (HVAC)

23 01 10 00 Sequence Of Operation 23 01 10 00a Testing, Adjusting, And Balancing 23 01 30 00 Air Duct Cleaning 23 01 60 00 Condensing Units 23 05 10 00 Common Motor Requirements for Equipment 23 05 10 00a Common Motor Requirements for Fire Suppression Equipment 23 05 10 00b Common Motor Requirements for Plumbing Equipment 23 05 10 00c Common Motor Requirements for HVAC Equipment 23 05 20 00 Hangers and Supports for Plumbing Piping and Equipment 23 05 20 00a Hangers and Supports for HVAC Piping and Equipment 23 05 40 00 Vibration And Seismic Controls For Fire-Suppression Piping And Equipment 23 05 40 00a Vibration And Seismic Controls For Plumbing Piping And Equipment 23 05 40 00b Vibration And Seismic Controls For HVAC Piping And Equipment 23 05 40 00c Expansion Fittings and Loops for Plumbing Piping 23 05 40 00d Expansion Fittings and Loops for HVAC Piping 23 05 50 00 Identification for Plumbing Piping and Equipment 23 05 50 00a Identification for HVAC Piping and Equipment 23 05 90 00 Processed Water Piping 23 05 90 00a Cast-Iron Boilers 23 05 90 00b Radiant Heating Piping 23 07 10 00 Steam Distribution 23 07 10 00a HVAC Insulation 23 13 20 00 Packaged Engine Generators 23 21 10 00 Monitoring Wells 23 21 10 00a Facility Fuel-Oil Piping 23 21 10 00b Facility Natural-Gas Piping 23 21 10 00c Facility Liquefied-Petroleum Gas Piping 23 22 20 00 Steam Condensate Pumps 23 23 10 00 Refrigerant Detection And Alarm 23 25 10 00 HVAC Water Treatment 23 25 10 00a Feedwater Equipment 23 31 10 00 Tailpipe Exhaust Equipment 23 31 10 00a Metal Ducts 23 31 10 00b Nonmetal Ducts 23 31 10 00c HVAC Casings 23 31 10 00d Duct Accessories 23 33 10 00 Draft Control Devices 23 33 10 00a Air Terminal Units 23 34 10 00 Axial Fans 23 34 10 00a Centrifugal Fans 23 34 30 00 Air Curtains 23 36 10 00 Fan-Coil Units 23 36 10 00a Diffusers, Registers, And Grilles 23 41 10 00 Air Filters 23 41 10 00a Electronic Air Cleaners 23 41 30 00 High-Efficiency Particulate Filtration 23 42 10 00 Gas-Phase Air Filtration 23 51 10 00 Breechings, Chimneys, And Stacks 23 52 10 00 Electric Boilers 23 52 30 00 Condensing Boilers 23 52 30 00a Water-Tube Boilers 23 52 30 00b Fire-Tube Boilers 23 53 10 00 Deaerators 23 54 10 00 Furnaces 23 55 20 00 Radiant Heating and Cooling Units 23 55 20 00a Radiant-Heating Electric Panels 23 55 30 00 Fuel-Fired Unit Heaters 23 55 30 00a Unit Heaters 23 57 10 00 Heat Exchangers 23 61 10 00 Centrifugal Water Chillers 23 61 10 00a Rotary-Screw Water Chillers 23 62 10 00 Indirect-Fired Absorption Water Chillers

Defense Logistics Agency, Richmond VA TOC - 9

23 62 10 00a Direct-Fired Absorption Water Chillers 23 63 10 00 Air-Cooled Condensers 23 63 30 00 Direct-Fired, Makeup Air Units 23 63 30 00a Indirect-Fired, Packaged H&V Units 23 63 30 00b Dehumidification Units 23 64 10 00 Reciprocating Water Chillers 23 64 20 00 Scroll Water Chillers 23 65 00 00 Cooling Towers 23 72 10 00 Air-To-Air Energy Recovery Units 23 73 10 00 Modular Indoor Central-Station Air-Handling Units 23 74 10 00 Rooftop Replacement Air Units 23 74 10 00a Self-Contained Air-Conditioners 23 74 20 00 Split-System Air-Conditioning Units 23 81 10 00 Packaged Terminal Air Conditioners 23 81 20 00 Computer-Room Air-Conditioners 23 82 10 00 Air Coils 23 82 10 00a Unit Ventilators 23 82 20 00 Convection Heating Units 23 83 10 00 Radiant-Heating Electric Cables 23 83 10 00a Heat Tracing for Fire-Suppression Piping 23 83 10 00b Heat Tracing for Plumbing Piping 23 83 10 00c Heat Tracing for HVAC Piping 23 84 10 00 Humidifiers

26 Electrical

26 01 50 00 Removal of Fluorescent Light Ballasts/Capacitors and Fluorescent Light Tubes 26 01 50 00a Interior Lighting 26 01 50 00b Exterior Lighting 26 01 50 00c Exterior Athletic Lighting 26 05 10 00 Monorails With Electric Powered Hoists 26 05 10 00a Cranes, Overhead Electric, Underrunning (Under 20,000 Pounds) 26 05 10 00b Common Work Results for Electrical 26 05 10 00c Common Work Results for Communications 26 05 10 00d Common Work Results for Electronic Safety and Security 26 05 10 00e Conductors And Cables 26 05 10 00f Undercarpet Cables 26 05 10 00g Control-Voltage Electrical Power Cables 26 05 10 00h Medium-Voltage Cables 26 05 10 00i Raceways And Boxes 26 05 10 00j Underfloor Raceways For Electrical Systems 26 05 10 00k Communications Equipment Room Fittings 26 05 10 00l Communications Backbone Cabling 26 05 10 00m Communications Horizontal Cabling 26 05 10 00n Conductors and Cables for Electronic Safety and Security 26 05 20 00 Lightning Protection 26 05 20 00a Cathodic Protection 26 05 20 00b Grounding And Bonding 26 05 20 00c Hangers And Supports For Electrical Systems 26 05 20 00d Vibration And Seismic Controls For Electrical Systems 26 05 30 00 Cable Trays 26 05 30 00a Wiring Devices 26 05 50 00 Electrical Identification 26 09 20 00 Lighting Controls 26 09 20 00a Lighting Control Devices 26 09 20 00b Motor-Control Centers 26 09 20 00c Central Dimming Controls 26 09 20 00d Modular Dimming Controls 26 11 10 00 Secondary Unit Substations 26 11 10 00a Switchgear 26 12 10 00 Medium-Voltage Transformers 26 12 10 00a Low-Voltage Transformers 26 23 10 00 Medium-Voltage Switchgear 26 24 10 00 Electricity Metering 26 24 10 00a Enclosed Controllers 26 24 10 00b Switchboards 26 24 10 00c Power Distribution Units 26 25 00 00 Enclosed Bus Assemblies

TOC - 10 Defense Logistics Agency, Richmond VA

26 28 10 00 Fuses 26 33 40 00 Central Battery Inverters 26 33 40 00a Nurse Call 26 33 40 00b Public Address and Mass Notification Systems 26 33 50 00 Static Uninterruptible Power Supply 26 33 50 00a Variable Frequency Controllers 26 33 50 00b Enclosed Switches And Circuit Breakers 26 35 30 00 Power Factor Correction Capacitors 26 36 10 00 Transfer Switches 26 55 60 00 Stage Lighting

27 Communications

27 05 20 00 Intercommunications and Program Systems 27 11 10 00 Loose-Tube Gel-Filled Fiber Optic Cables 27 51 10 00 Educational Intercommunications and Program Systems

28 Electronic Safety And Security

28 13 30 00 Perimeter Security 28 13 30 00a Intrusion Detection 28 23 00 00 Video Surveillance 28 31 20 00 Digital, Addressable Fire-Alarm System 28 31 20 00a Zoned (DC Loop) Fire-Alarm System

31 Earthwork

31 05 10 00 Earthwork 31 05 10 00a Subdrainage 31 11 00 00 Site Clearing 31 13 10 00 Tree Protection And Trimming 31 23 10 00 Dewatering 31 23 10 00a Excavation Support And Protection 31 23 10 00b Embankment 31 24 10 00 Levee Closure 31 25 10 00 Sediment Removal 31 25 10 00a Geosynthetic Fabric 31 25 10 00b Erosion Control 31 25 50 00 Silt Fences 31 31 10 00 Termite Control 31 31 10 00a Soil Sterilization 31 32 10 00 Soil Stabilization-Lime 31 32 10 00a Sewage Treatment Lagoons 31 32 10 00b Pond Reservoir Liners 31 36 00 00 Wire Mesh Gabions 31 37 00 00 Riprap 31 41 10 00 Drilled Piers 31 45 10 00 Soil Stabilization-Vibroflotation

32 Exterior Improvements

32 01 10 00 Asphalt Paving 32 01 10 00a Crack Sealing Of Bituminous Pavements 32 01 10 00b Grinding/Grooving Pavement 32 01 10 00c Spray Applications, Seal Coats, And Surface Treatments 32 01 10 00d Bituminous Rejuvenation 32 01 10 00e Cold Mix Recycling

Defense Logistics Agency, Richmond VA TOC - 11

32 01 10 00f Central Plant Hot-Mix Recycling 32 11 10 00 Crushed Stone Paving 32 11 10 00a Crushed Stone 32 11 10 00b Select Gravel 32 11 10 00c Bituminous Paving-Repair And Resurfacing 32 11 10 00d Pavement Joint Sealants 32 11 10 00e Asphaltic Concrete Overlays 32 12 10 00 Cement Concrete Pavement 32 12 10 00a Asphalt Concrete Sidewalks 32 12 10 00b Miscellaneous Sidewalks 32 12 10 00c Precast Sidewalks And Pavers 32 12 10 00d Unit Pavers 32 13 10 00 Roller Compacted Concrete Pavement 32 13 10 00a Decorative Cement Concrete Pavement 32 13 10 00b Portland Cement Concrete Overlays 32 13 10 00c Steel Reinforced Portland Cement Concrete Overlays 32 13 10 00d Fiber Reinforced Portland Cement Concrete Overlays 32 14 40 00 Porous Unit Paving 32 14 40 00a Vitrified Brick Pavement Replacement 32 16 10 00 Steel Curbs 32 17 20 00 Track, Court, And Playground Markings 32 17 20 00a Traffic Coatings 32 17 20 00b Tactile/Detectable Warning Tile 32 18 10 00 Playground Surface Systems 32 18 10 00a Synthetic Running Track Surface 32 18 20 00 Colored Athletic Wearing Surface 32 18 20 00a Synthetic Turf 32 18 20 00b Lawns And Grasses 32 31 10 00 Chain-Link Fences And Gates 32 31 10 00a High-Security Chain-Link Fences And Gates 32 31 10 00b Ornamental Metal Fences and Gates 32 31 20 00 Farm-Type Wire Fencing 32 31 20 00a Snow And Other Temporary Fencing 32 31 20 00b Permanent Wood Fencing 32 32 10 00 Segmental Retaining Walls 32 32 10 00a Modular Retaining Wall 32 84 10 00 Irrigation Systems 32 91 10 00 Concrete Revetment 32 91 10 00a Septic Tank Systems 32 91 10 00b Tree Relocation 32 93 10 00 Exterior Plants

33 Utilities

33 01 30 00 Repair And Maintenance Of Siphon Tank And Siphons 33 01 30 00a Pipe Lining 33 01 30 00b Sewer Line Cleaning 33 05 10 00 Underground Ducts And Utility Structures 33 05 20 00 Trenchless Excavation Using Microtunneling 33 11 10 00 Sand Drains 33 11 10 00a Concrete-Filled Steel Piles 33 11 10 00b Hydronic Distribution 33 13 00 00 Repair And Maintenance Of Imhoff Tanks 33 21 00 00 Well Repair 33 41 10 00 Ground-Loop Heat-Pump Piping 33 42 10 00 Culverts 33 44 10 00 Oil/Water Separator

34 Transportation

34 41 10 00 Electrical Traffic Control Signals 34 71 10 00 Active Vehicle Barriers 34 71 10 00a Beam-Type Guardrail

TOC - 12 Defense Logistics Agency, Richmond VA

35 Waterway and Marine Construction

35 20 10 00 Sluice Gate

41 Material Processing And Handling Equipment

41 01 20 00 Material Handling Hoists 41 22 20 00 Ash Hoists 41 22 20 00a Monorails With Air Motor Powered Hoist 41 22 20 00b Monorails With Manual Hoist

01 - General Requirements

January 2009 No Specification Required Defense Logistics Agency, Richmond VA 01 22 20 00 - 1

SECTION 01 22 20 00 - NO SPECIFICATION REQUIRED

1.1 GENERAL

A. A separate specification is not required for this item. The description given in the line item of the Construction Task Catalog completely defines the item.

1.2 PRODUCTS - (Not Used)

1.3 EXECUTION - (Not Used)

END OF SECTION 01 22 20 00

No Specification Required January 2009

01 22 20 00 - 2 Defense Logistics Agency, Richmond VA

January 2009 Schedule Of Values Defense Logistics Agency, Richmond VA 01 32 30 00 - 1

SECTION 01 32 30 00 - SCHEDULE OF VALUES

A. Description Of Work

1. This specification covers the preparation, content and submittal of the schedule of values. The

Schedule of Values is an itemized list that establishes the value or cost of each part of the Work.

It shall be used as the basis for preparing progress payments.

B. Preparation

1. Schedule shall show breakdown of labor, materials equipment and other costs as directed by the

Contracting Officer.

2. Costs shall be in sufficient detail to indicate separate amounts for each major subsection of the

Work. The Contractor may include an item for bond, insurance, temporary facilities and job mobilization.

3. Schedule of Values shall be prepared on 8-1/2-inch by 11-inch white paper.

4. Use the major subsections of the Detailed Scope of Work as the basis for Schedule format. List sub-items of major products or systems as appropriate or when requested by the Contracting Officer.

5. When requested by the Contracting Officer, support values with data that will substantiate their correctness.

6. The sum of the individual values shown on the Schedule of Values must equal the total Job Order Price.

7. Schedule shall show the purchase and delivery costs for materials and equipment that the Contractor anticipates he shall request payment for prior to their installation.

C. Submittal: Submit two copies of Schedule, or any other number of copies as directed by the Contracting Officer, to the Contracting Officer for approval at least 20 days prior to submitting first application for a progress payment. After review by the Contracting Officer, revise and resubmit Schedule as required until it is approved.

1.2 PRODUCTS (Not Used)

1.3 EXECUTION (Not Used)

END OF SECTION 01 32 30 00

Schedule Of Values January 2009

01 32 30 00 - 2 Defense Logistics Agency, Richmond VA

January 2009 Special Procedures for Historic Treatment Defense Logistics Agency, Richmond VA 01 32 30 00a - 1

SECTION 01 32 30 00a - SPECIAL PROCEDURES FOR HISTORIC TREATMENT

A. Summary

1. This Section includes special procedures for historic treatment on Project including, but not limited to, the following:

a. Storage and protection of existing historic materials.

b. Temporary protection of historic materials during construction.

c. Protection during application of chemicals.

d. Protection during use of heat-generating equipment.

e. Historic treatment procedures.

f. Removal of bird excrement.

2. This specification applies to all tasks in the Construction Task Catalog® when they are used on Historic Buildings or Historic Sites.

B. Definitions

1. "Preservation": To apply measures necessary to sustain the existing form, integrity, and materials of a historic property. Work may include preliminary measures to protect and stabilize the property.

2. "Rehabilitation": To make possible a compatible use for a property through repair, alterations, and additions while preserving those portions or features that convey its historical, cultural, or architectural values.

3. "Restoration": To accurately depict the form, features, and character of a property as it appeared at a particular period of time by means of the removal of features from other periods in its history and the reconstruction of missing features from the restoration period.

4. "Reconstruction": To reproduce in the exact form and detail a building, structure, or artifact as it appeared at a specific period in time.

5. "Stabilize": To apply measures designed to reestablish a weather-resistant enclosure and the structural reinforcement of an item or portion of the building while maintaining the essential form as it exists at present.

6. "Protect and Maintain": To remove deteriorating corrosion, reapply protective coatings, and install protective measures such as temporary guards; to provide the least degree of intervention.

7. "Repair": To stabilize, consolidate, or conserve; to retain existing materials and features while employing as little new material as possible. Repair includes patching, piecing-in, splicing, consolidating, or otherwise reinforcing or upgrading materials. Within restoration, repair also includes limited replacement in kind, rehabilitation, and reconstruction, with compatible substitute materials for deteriorated or missing parts of features when there are surviving prototypes.

8. "Replace": To duplicate and replace entire features with new material in kind. Replacement includes the following conditions:

a. Duplication: Includes replacing elements damaged beyond repair or missing. Original material is indicated as the pattern for creating new duplicated elements.

b. Replacement with New Materials: Includes replacement with new material when original material is not available as patterns for creating new duplicated elements.

c. Replacement with Substitute Materials: Includes replacement with compatible substitute materials. Substitute materials are not allowed, unless otherwise indicated.

9. "Remove": To detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.

10. "Remove and Salvage": To detach items from existing construction and deliver them to the

Contracting Officer ready for reuse.

11. "Remove and Reinstall": To detach items from existing construction, repair and clean them for reuse, and reinstall them where indicated.

12. "Existing to Remain" or "Retain": Existing items of construction that are not to be removed and that are not otherwise indicated to be removed and salvaged, or removed and reinstalled.

Special Procedures for Historic Treatment January 2009

01 32 30 00a - 2 Defense Logistics Agency, Richmond VA

13. "Material in Kind": Material that matches existing materials, as much as possible, in species, cut, color, grain, and finish.

C. Submittals

1. Historic Treatment Program: Submit a written plan for each phase or process including protection of surrounding materials during operations. Describe in detail materials, methods, and equipment to be used for each phase of work.

2. Alternative Methods and Materials: If alternative methods and materials to those indicated are proposed for any phase of work, provide a written description including evidence of successful use on other, comparable projects, and program of testing to demonstrate effectiveness for use on this Project.

3. Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including finish surfaces, that might be misconstrued as damage caused by historic treatment operations. Submit before work begins.

D. Quality Assurance

1. Historic Treatment Specialist Qualifications: A firm that employs personnel, including supervisory personnel, experienced and skilled in the processes and operations indicated.

2. Historic Treatment Preconstruction Conference: Conduct conference at Project site.

E. Storage And Protection Of Historic Materials

1. Removed and Salvaged Historic Materials:

a. Clean salvaged historic items.

b. Pack or crate items after cleaning. Identify contents of containers.

c. Store items in a secure area until delivery to the Contracting Officer.

d. Transport items to the Contracting Officer's storage area on-site OR off-site OR designated by the Contracting Officer OR indicated on Drawings, as directed.

e. Protect items from damage during transport and storage.

f. Do not dispose of items removed from existing construction without prior written consent of the Contracting Officer.

2. Removed and Reinstalled Historic Materials:

a. Clean and repair historic items to functional condition adequate for intended reuse.

b. Pack or crate items after cleaning and repairing. Identify contents of containers.

c. Protect items from damage during transport and storage.

d. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

3. Existing Historic Materials to Remain: Protect construction indicated to remain against damage and soiling during historic treatment. When permitted, items may be removed to a suitable, protected storage location during historic treatment and cleaned and reinstalled in their original locations after historic treatment operations are complete.

4. Storage and Protection: When removed from their existing location, store historic materials within a weathertight enclosure where they are protected from wetting by rain, snow, or ground water, and temperature variations. Secure stored materials to protect from theft.

a. Identify removed items with an inconspicuous mark indicating their original location.

F. Project-Site Conditions

1. Exterior Cleaning and Repairing:

a. Proceed with the work only when forecasted weather conditions are favorable.

1) Wet Weather: Do not attempt repairs during rainy or foggy weather. Do not apply primer, paint, putty, or epoxy when the relative humidity is above 80 percent. Do not remove exterior elements of structures when rain is forecast or in progress.

2) Do not perform exterior wet work when the air temperature is below 40 deg F (5 deg C).

Defense Logistics Agency, Richmond VA 01 32 30 00a - 3

3) Do not begin cleaning, patching, or repairing when there is any likelihood of frost or freezing.

4) Do not begin cleaning when either the air or the surface temperature is below 45 deg F (7 deg C) unless approved means are provided for maintaining a 45 deg F (7 deg C) temperature of the air and materials during, and for 48 hours subsequent to, cleaning.

b. Perform cleaning and rinsing of the exterior only during daylight hours.

2. the Contracting Officer will occupy portions of building immediately adjacent to historic treatment area. Conduct historic treatment so the Contracting Officer's operations will not be disrupted.

Provide not less than 72 hours' notice to the Contracting Officer of activities that will affect the Contracting Officer's operations.

1.2 PRODUCTS (Not Used)

1.3 EXECUTION

A. Protection, General

1. Comply with manufacturer's written instructions for precautions and effects of products and procedures on adjacent building materials, components, and vegetation.

2. Ensure that supervisory personnel are present when work begins and during its progress.

3. Temporary Protection of Historic Materials during Construction:

a. Protect existing materials during installation of temporary protections and construction. Do not deface or remove existing materials.

b. Attachments of temporary protection to existing construction shall be approved prior to installation.

4. Protect landscape work adjacent to or within work areas as follows:

a. Provide barriers to protect tree trunks.

b. Bind spreading shrubs.

c. Use coverings that allow plants to breathe and remove coverings at the end of each day.

Do not cover plant material with a waterproof membrane for more than 8 hours at a time.

d. Set scaffolding and ladder legs away from plants.

5. Existing Drains: Prior to the start of work or any cleaning operations, test drains and other water removal systems to ensure that drains and systems are functioning properly. Notify the Contracting Officer immediately of drains or systems that are stopped or blocked. Do not begin Work of this Section until the drains are in working order.

a. Provide a method to prevent solids including stone or mortar residue from entering the drains or drain lines. Clean out drains and drain lines that become blocked or filled by sand or any other solids because of work performed under this Contract.

b. Protect storm drains from pollutants. Block drains or filter out sediments, allowing only clean water to pass.

B. Protection During Application Of Chemicals

1. Protect persons, motor vehicles, surrounding surfaces of building being restored, building site, plants, and surrounding buildings from harm or damage resulting from applications of chemical cleaners and paint removers.

2. Comply with requirements in Division 01 Section "Temporary Facilities And Controls".

3. Cover adjacent surfaces with materials that are proven to resist chemical cleaners selected for

Project unless chemicals being used will not damage adjacent surfaces. Use covering materials that contain only waterproof, UV-resistant adhesives. Apply masking agents to comply with manufacturer's written instructions. Do not apply liquid masking agent to painted or porous surfaces. When no longer needed, promptly remove masking to prevent adhesive staining.

4. Do not clean surfaces during winds of sufficient force to spread cleaning solutions to unprotected surfaces.

01 32 30 00a - 4 Defense Logistics Agency, Richmond VA

5. Neutralize and collect alkaline and acid wastes and dispose of off the Contracting Officer's property.

6. Dispose of runoff from chemical operations by legal means and in a manner that prevents soil erosion, undermining of paving and foundations, damage to landscaping, and water penetration into building interiors.

C. Protection During Use Of Heat-Generating Equipment

1. Comply with the following procedures while performing work with heat-generating equipment, including welding, cutting, soldering, brazing, paint removal with heat, and other operations where open flames or implements utilizing heat are used:

a. Obtain the Contracting Officer's approval for operations involving use of open-flame or welding equipment.

1) Notification shall be given for each occurrence and location of work with heat-generating equipment.

b. As far as practical, use heat-generating equipment in shop areas or outside the building.

c. Before work with heat-generating equipment commences, furnish personnel to serve as a fire watch (or watches) for location(s) where work is to be performed.

d. Do not perform work with heat-generating equipment in or near rooms or in areas where flammable liquids or explosive vapors are present or thought to be present. Use a combustible gas indicator test to ensure that the area is safe.

e. Remove and keep the area free of combustibles, including, rubbish, paper, waste, etc., within area of operations.

1) If combustible material cannot be removed, provide fireproof blankets to cover such materials.

f. Where possible, furnish and use baffles of metal or gypsum board to prevent the spraying of sparks or hot slag into surrounding combustible material.

g. Prevent the extension of sparks and particles of hot metal through open windows, doors, holes, and cracks in floors, walls, ceilings, roofs, and other openings.

h. Inspect each location of the day's work not sooner than 30 minutes after completion of operations to detect hidden or smoldering fires and to ensure that proper housekeeping is maintained.

2. Where sprinkler protection exists and is functional, maintain it without interruption while operations are being performed. If operations are performed close to automatic sprinkler heads, shield the individual heads temporarily with guards.

D. Historic Treatment Procedures

1. The principal aim of preservation work is to halt the process of deterioration and stabilize the item's condition, unless otherwise indicated. Repair is required where specifically indicated. The following procedures shall be followed:

a. Retain as much existing material as possible; repair and consolidate rather than replace.

b. Use additional material or structure to reinforce, strengthen, prop, tie, and support existing material or structure.

c. Use reversible processes wherever possible.

d. Use traditional replacement materials and techniques. New work shall be distinguishable to the trained eye, on close inspection, from old work.

e. Record the work before the procedure with preconstruction photos and during the work with periodic construction photos.

2. Prohibit smoking by personnel performing work on or near historic structures.

3. Obtain review and written approval in the form of a Constructive Change Directive or

Supplemental Instruction before making changes or additions to construction or removing historic materials.

4. Notify the Contracting Officer of visible changes in the integrity of material or components whether due to environmental causes including biological attack, UV degradation, freezing, or thawing; or due to structural defects including cracks, movement, or distortion.

a. Do not proceed with the work in question until directed.

Defense Logistics Agency, Richmond VA 01 32 30 00a - 5

5. Where missing features are indicated to be repaired or replaced, provide features whose designs are based on accurate duplications rather than on conjectural designs, subject to the approval of the Contracting Officer and Historic Treatment Specialist.

6. Where Work requires existing features to be removed, cleaned, and reused, perform these operations without damage to the material itself, to adjacent materials, or to the substrate.

7. Identify new or replacement materials and features with inconspicuous, permanent marks to distinguish them from original materials. Record the legend of identification marks and the locations of these marks on Record Drawings.

8. When cleaning, match samples of existing materials that have been cleaned and identified for acceptable cleaning levels. Avoid overcleaning to prevent damage to existing materials during cleaning.

E. Removal Of Bird Excrement

1. General: Before disturbing accumulated bird excrement, consult with an occupational medicine physician, industrial hygienist, and authorities having jurisdiction to determine acceptable removal procedures and appropriate protective measures for personnel.

2. Removing Bird Excrement: Treat bird excrement before its removal as required by authorities having jurisdiction.

a. Prior to removal, dampen excrement to prevent it from becoming airborne.

b. Use only nonmetallic tools (plastic spatulas and brushes with natural fiber or nylon bristles, or their equivalent) to remove excrement.

c. Collect removed excrement and legally disposed of off site.

d. Perform bird excrement removal work from the outside of the building with windows and other openings in the building closed.

END OF SECTION 01 32 30 00a

01 32 30 00a - 6 Defense Logistics Agency, Richmond VA

January 2009 LEED Requirements Defense Logistics Agency, Richmond VA 01 32 30 00b - 1

SECTION 01 32 30 00b - LEED REQUIREMENTS

A. Summary

1. Section includes general requirements and procedures for compliance with certain USGBC LEED prerequisites and credits needed for Project to obtain LEED –Certified OR Silver OR Gold OR Platinum, as directed, certification based on LEED-NC, Version 2.2 OR LEED-CI, Version 2.0, as directed.

a. Other LEED prerequisites and credits needed to obtain LEED certification depend on material selections and may not be specifically identified as LEED requirements.

Compliance with requirements needed to obtain LEED prerequisites and credits may be used as one criterion to evaluate substitution requests and comparable product requests.

b. Additional LEED prerequisites and credits needed to obtain the indicated LEED certification depend on design and other aspects of Project that are not part of the Work of the Contract.

B. Definitions

1. Chain-of-Custody Certificates: Certificates signed by manufacturers certifying that wood used to make products was obtained from forests certified by an FSC-accredited certification body to comply with FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship." Certificates shall include evidence that manufacturer is certified for chain of custody by an FSC-accredited certification body.

2. LEED: Leadership in Energy & Environmental Design.

3. Rapidly Renewable Materials: Materials made from plants that are typically harvested within a

10-year or shorter cycle. Rapidly renewable materials include products made from bamboo, cotton, flax, jute, straw, sunflower seed hulls, vegetable oils, or wool.

4. Regional Materials (for LEED-NC): Materials that have been extracted, harvested, or recovered, as well as manufactured, within 500 miles (800 km) of Project site. If only a fraction of a product or material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value.

5. Regionally Manufactured Materials (for LEED-CI): Materials that are manufactured within a radius of 500 miles (800 km) from Project site. Manufacturing refers to the final assembly of components into the building product that is installed at Project site.

6. Regionally Extracted and Manufactured Materials (for LEED-CI): Regionally manufactured materials made from raw materials that are extracted, harvested, or recovered within a radius of 500 miles (800 km) from Project site.

7. Recycled Content (for LEED-NC): The recycled content value of a material assembly shall be determined by weight. The recycled fraction of the assembly is then multiplied by the cost of assembly to determine the recycled content value.

a. "Post-consumer" material is defined as waste material generated by households or by commercial, industrial, and institutional facilities in their role as end users of the product, which can no longer be used for its intended purpose.

b. "Pre-consumer" material is defined as material diverted from the waste stream during the manufacturing process. Excluded is reutilization of materials such as rework, regrind, or scrap generated in a process and capable of being reclaimed within the same process that generated it.

8. Recycled Content (for LEED-CI): The percentage by weight of constituents that have been recovered or otherwise diverted from the solid waste stream, either during the manufacturing process (pre-consumer), or after consumer use (post-consumer).

a. Spills and scraps from the original manufacturing process that are combined with other constituents after a minimal amount of reprocessing for use in further production of the same product are not recycled materials.

LEED Requirements January 2009

01 32 30 00b - 2 Defense Logistics Agency, Richmond VA

b. Discarded materials from one manufacturing process that are used as constituents in another manufacturing process are pre-consumer recycled materials.

C. Submittals

1. General: Submit additional LEED submittals required by other Specification Sections.

2. LEED submittals are in addition to other submittals. If submitted item is identical to that submitted to comply with other requirements, submit duplicate copies as a separate submittal to verify compliance with indicated LEED requirements.

3. Project Materials Cost Data: Provide statement indicating total cost for building materials used for Project, excluding mechanical, electrical, and plumbing components, and specialty items such as elevators and equipment. Include statement indicating total cost for wood-based materials used for Project, as directed.

4. LEED Action Plans: Provide preliminary submittals within seven OR 14 OR 30 OR 60, as directed, days of date established for commencement of the Work OR the Notice to Proceed OR the Notice of Award, as directed, indicating how the following requirements will be met:

a. Credit MR 2.1 and Credit MR 2.2, as directed: Waste management plan complying with

Division 01 Section "Construction Waste Management And Disposal".

b. Credit MR 3.1 and Credit MR 3.2, as directed: List of proposed salvaged and refurbished materials. Identify each material that will be salvaged or refurbished, including its source and cost.

c. Credit MR 4.1 and Credit MR 4.2, as directed: List of proposed materials with recycled content. Indicate cost, post-consumer recycled content, and pre-consumer recycled content for each product having recycled content.

d. Credit MR 5.1 and Credit MR 5.2 (for LEED-NC), as directed: List of proposed regional materials. Identify each regional material, including its source, cost, and the fraction by weight that is considered regional.

e. Credit MR 5.1 and Credit MR 5.2 (for…