Sol_Attachment__2_Bid_Sheet.pdf
PDF 21 KB Posted
- Attached to
- Replace Boilers BLDG 11 Federal contract opportunity
- Solicitation number
- SP470216R0023
About this file
Solicitation Attachment 2 - Bid Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SP470216R0023_-Amd._0001.pdf | ||
| Attachment__1_updated_drawings.pdf | ||
| Attachment__3_Wall_Drawings.pdf | ||
| Attachment__2_STEAM_BOILERS_AND_EQUIPMENT_Spec.pdf | ||
| Final_Solicitation_Boiler_Rooms.pdf | ||
| SOL_Attachment__1_Wage_Rate.pdf | ||
| Sol_Attachment__3_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO. DATE:
PROJECT TITLE:
PRELIMINARY DESIGN XXX OTHER
NO. OF
UNITS
UNIT OF
MEASURE
PER UNIT TOTAL
UNIT
MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL
Boiler, 125 hp, 50 psi steam, gas fired 2 ea
Circulating pumps 2 ea
Blowdown tanks 1 ea
Boiler Controllers 1 ea
Breeching re-work 2 ea crane work 1 ea
Piping re-work 2 ea
Insualtion re-work 2 ea
Electric work 2 ea remove existing boilers 2 ea ea ea
SUBTOTAL
10% profit
18% OH
5% contingency
TOTAL
FINAL DESIGN
DRAWING NO.
Replace Boilers Building 11
ARCHITECT/ENGINEER: Webster ESTIMATOR:
ITEM TOTAL COST
CONSTRUCTION COST ESTIMATE
CSC-16709
QUANTITY MATERIAL LABOR
EQUIP COST
4-567 July 21, 2016
File details come from the government source that posted it. Updated .