SP470215R00340001.pdf
PDF 47 KB Posted
- Attached to
- Base Wide Painting Maintenance
- Solicitation number
- SP4702-15-R-0034
About this file
SP470215R0034 00001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SP4702-15-R-0034.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO.
CSC - 15719
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SP4702 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SP470215R0034
X
2015 JUL 22
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA CONTRACTING SVCS OFF COLUMBUS
ATTN DCSO-C
P O BOX 3990
COLUMBUS OH 43218-3990
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
20 AUG 2015
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Amendment 0001 has been issued to provide a response to all potential vendors for this solicitation. The below information would provide questions (Q) submitted by the contractors due to Site Visit. And answers (A) to those questions by the Government.
Q. Can louvers be removed to be blasted off site so as to have dust contained 72 hours from removal to replacement; ~30 a time?
A. Yes, the louvers may be removed for blasting off site for up to 72 hours with three requirements: 1.
Plastic shall be secured over the opening in order to keep the rain from ruining the insulation; 2. Plastic shall be checked before departing the installation each day 3. The plastic may not be left over a weekend or holiday. For example, if removed on a Wednesday, they must be back up by Friday afternoon in order that the plastic may be checked each day. Roughly 30 at a time is not a problem.
Q. Can both steel stair cases be blasted so grated steps can be painted (so can the parking lot next to the building be closed for one day) while blasting?
A. Yes, the parking lot next to building 306 can be partially closed in order to blast the staircase.
Additionally, Standard Form 1442, first (1) page, block # 1 "solicitation number" shall read SP4702-15-R-0034 in lieu of SP4702-14-R-0034.
The following provision will be included: FAR 52.228-13 Alternative Payment Protections.
Terms/Conditions for this solicitation remains unchanged.
PAGE 2 OF 2 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP470215R0034-0001
File details come from the government source that posted it. Updated .