Amendment_0001.pdf
PDF 71 KB Posted
- Attached to
- Hazardous Waste Services-Italy
- Solicitation number
- SP4520-15-R-0005
About this file
Amendment 0001 to Solicitation No. SP4520-15-R-0005
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SP4520 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SP452015R0005
X
2015 JUN 01
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor X is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA DISPOSITION SERVICES J-761
MANNHEIMERSTRASSE
KLEBER KASERNE BLDG 3227 67657
D- KAISERSLAUTERN
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
2015 JUL 01
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUED ON NEXT PAGE
A. The purpose of this amendment is to answer prospective offerors’ questions and extend the solicitation closing date.
B. Government answers to offeror questions are as follows:
1. Clause 4(c)(2): Kindly confirm that WMS/Receiving Services will only be required for Aviano and Vicenza.
Since the price schedule only reflects CLINs N6310 and N6397C. No other locations will be applicable?
Government’s Answer: WMS and/or Receiving Services are only required at Aviano and/or Vicenza at this time.
2. In the past, removals have also been conducted from Niscemi/Sicily, but there is no reference of this location on Attachment 7.
Government’s Answer: Locations listed in Attachment 7 are the current locations for possible removals at this time.
3. Could the positions for the Contract Manager and Alternate be covered by a consultant?
Government’s Answer: Yes, provided that the consultant is capable of making binding decisions for the contractor.
4. Can we appoint different trained “On Site Technical Representatives” per location?
Government’s Answer: Yes.
5. Are the additional Waste Management Services for the Aviano Base (CLIN N6310) and Vicenza Base (CLIN N6397C) granted or may one or both not be awarded? In case of performing one or both tasks does the Government provide Government Furnished Property (office, building, utilities) for our personnel and vehicles?
Government’s Answer: The additional Waste Management Services for Aviano (CLIN N6310) and Vicenza (CLIN N6397C) could be one and/or both. The Government will not provide any Government Furnished Property.
6. Can the Government provide historical data for the internal base quantity movements for Aviano and Vicenza?
Government’s Answer: Past historical data wouldn’t reveal any real time information to offerors due to the additional number of locations and/or waste streams required under this solicitation.
7. Does the contractor apply all the bases included in the solicitation or only part of them?
Government’s Answer: Yes, all bases are expected to require hazardous waste removals.
8. Must offerors complete 52.212-03 for the due date (06 Jun 2015) or complete it only in case of award of the tender?
Government’s Answer: This must be completed and submitted with the proposal.
9. In reference to Waste Management Services (B-4 Special Services), can you please provide a detail list of the HWAP from Vicenza and Aviano specifying the number of containers that are required for each HWAP?
Government’s Answer: No. Container numbers vary according to mission requirements and regulations by waste streams.
10. In reference to clause C(4)(2)(J) which states “Time WMS is Tuesday and Thursday from 1300 to 1530”, can you please explain if this is the time that should be performed to complete WMS as listed in clause 4(c), or
PAGE 2 OF 5 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP452015R0005-0001
is it the time to receive hazardous waste from the units and perform all the requirements listed in the WMS clause can be performed during the rest of the week?
Government’s Answer: This time is to complete WMS at Aviano – CLIN N6310.
11. In reference to clause 9 Use of Facilities and Transporters, if transporters or facilities are downloaded from the Quality List website do we need to also provide Past Performance information? And if we want to use a different facility or transporter not listed on the Quality List, which documents besides Attachment 10a and Attachment 10b should be provided?
Government’s Answer: Additional requirements for new facilities or transporters are listed at “10.
ADDITIONAL TSDRS AND TRANSPORTERS”.
12. In reference to clause 22, can we use more than one alternate contract manager and on-site contract manager? And which past performance information listed in the attachment should we provide?
Government’s Answer: Yes, more than one alternate contract manager and on-site representative may be used.
If past performance information is provided for key personnel, offerors should follow the stipulations outlined in Paragraph 4 of Attachment 9a.
13. In reference to Part 12 Provisions, Instructions to Offerors, do we need to furnish a CD for the proposal divided in Volume I and Volume II electronically only or do we need to provide the print forms of all the documentation necessary to complete both Volumes?
Government’s Answer: Paper proposals/offers will not be accepted for this solicitation. You are required to submit your offer electronically as described in the section “DLA Disposition Services Electronic Proposal Guidance” shown on pages 47-48 of the solicitation.
14. In reference to Pre-Removal, paragraph 1, fifth line on page 7, what does “FGS documents” mean?
Government’s Answer: FGS is Final Governing Standards - These documents are developed in accordance with DOD Instruction 4715.5, Management of Environmental Compliance at Overseas Installations, dated 22 April 1996, to address the protection of human health and the environment in each foreign country where DOD maintains substantial installations.
15. In reference to Pre-Removal, paragraph 3(vi)(B) Waste Report, line 1 states “host national language”, can you please explain if the language of the annual report is in the Italian language? And instead of the contractor, can the report be issued from the final plant of treatment?
Government’s Answer: This waste report is a requirement by the host nation authorities and has to be provided to the host nation authorities in the host nation language. The request for the completion of the waste report is to the contractor and the sole responsibility for the completion, timeliness and accuracy of the waste report is the contractor.
16. In reference to Past Performance Information on page 49, should the Past Performance Information be prepared only referencing the services performed for US Government or is it possible to send Past Performance Information for services provided to Italian companies?
Government’s Answer: Yes, past performance information can be provided for relevant services provided to Italian companies.
17. In reference to Attachment 10a of the solicitation SP4520-15-R-0005, can the questions 1, 3, 5, 7, be marked with “N/A" as they do not apply to the European States Facility? Also in the same attachment, can you please explain what it means on the second page “ECHO report review”?
PAGE 3 OF 5 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
Government’s Answer: The ECHO Report is if the Contractor decides to use a TSDF in the States. ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.
If TSDFs are located in countries other than the US - Attachment 10a of the solicitation SP4520-15-R-0005, questions 1, 3, 5, 7, under the "Regulatory and Financial Assurance Section" would be N/A .
18. On the Past Performance Information part 4A, 4C, 4B and 5, it is not clear where the Offeror/Primary Subcontractor/Personnel Key should send the documents. Consequently my question is on each of the front pages to who do I need have them faxed or e-mailed to? (I need the name, fax number and e-mail address.)
Government’s Answer: Please submit this information to Kay Lynn Machacek at kay.machacek@dla.mil.
19. On the solicitation there is a contradiction on where to send the proposal. On page 47 paragraph (a) states “ …..Offers and quotes submitted in paper form are unacceptable and will be returned…….” and on page 50 at the bottom, paragraph (a) states “…..Proposal submissions are required to contain an original and two copies, unless being submitted electronically”. With these two statements, do you mean that I submit the proposal and the quote in two distinct Volumes via e-mail, or is it necessary to mail to you one original and two copy of the Volume I and II?
Government’s Answer: Note that the complete statement shown on page 50, paragraph (a) is as follows:
“Proposal submissions are required to contain an original and two copies, unless being submitted electronically.” Again no paper proposals will be accepted in response to this solicitation.
20. About the 1155, do you intend to combine different locations like Aviano and Vicenza in one 1155?
Government’s Answer: No.
21. Identify Unknown Waste requires the parameter of total pesticides. After consultation of several laboratories we still have to say that there is no known analytical method to determine the total pesticides.
Pesticides are a group of chemicals which contain thousands of different possible substances. Please provide the Lab Procedure DIN for the determination of total pesticide in a satisfying way.
Government’s Answer: Identifying pesticides must be completed according to the methods and proper protocols to possibly identify any pesticides which may be harmful to the environment (land, air, water and humans).
22. Receiving service (e) is not mentioned in the Price Schedule is it reserved?
Government’s Answer: Receiving services have been added to the Bid Schedule (see revised Attachment 1).
23. The general description says that WMS is conducted on a daily, weekly or monthly basis. I guess it will be monthly.
Government’s Answer: Monthly is the unit of measure per the CLIN for payment. It is still the responsibility of the contractor to fulfill the requirements list under the Waste Management Services section of the contract at all times during the month.
24. The question we have for Aviano is that Waste Management shall take place weekly Tuesday and Thursday between 13:00 and 15:30. Can you please clarify the Additional WMS Requirements for Aviano Chapter C and J.
The HWAP are noted in Attachment 7. We are not sure how many HWAP are at Aviano.
Government’s Answer: The requirements are listed 4(C)(1) & 4(C)(2)(i) (A-J).
PAGE 4 OF 5 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
25. The Requirement mentions 58 annual inspections and 60 high yield. Do you think it is possible to maintain 20% per week or 60 high yield per month in the time Tuesday and Thursday between 13:00 and 15:30?
Government’s Answer: Yes
26. WMS at Vicenza the contractor shall determine the time needed for the WMS at minimum 1 day per week.
Thursday is mentioned. Is it mandatory to that the WMS on Thursday or can we chose other days?
Government’s Answer: Thursday is the customer's requested day of the week
27. Drums. We understand that it is the contractor’s responsibility to provide drums only for the WMS.
Government’s Answer: The contractor shall provide all containers needed to the locations and/or associated sites identified in Attachment 7. Coordination with the Installation Environmental Office is required. The containers must meet the requirements outlined in the PWS and all containers must be placed no later than 21 calendar days from date of award.
28. Locations without WMS will buy the drums as listed in the price schedule. Is this correct?
Government’s Answer: No.
29. Italian Customs and waste management law SISTRI require prior to every removal a notification 24 hours in advance. After this 24 hour notice you can do the removal. 24 hour removals are not in compliance with the relevant waste management and customs regulations.
Government’s Answer: Generators /customers will be able to provide advanced notice for an expedited (24 hour) removal. At a minimum the generator/customer will give a 48 hour notice to the contractor which should provide adequate time to meet the 24 hour notice to the local authorities.
C. The date and time for submission of offeror proposals has been extended to 8 July 2015 @ 1530 hours local (Germany) time.
D. All other terms and conditions remain unchanged.
PAGE 5 OF 5 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
File details come from the government source that posted it. Updated .