Text version
DLA Disposition Services Ft. Bragg Lawn Maintenance
BID SCHEDULE
BASE PERIOD 12 MONTHS
Contract Line Item No. (CLIN)
Description of Supplies/Services
| Estimated Qty. |
| Unit of Issue |
| Unit Price |
Amount
| 0001 |
| Complete Lawn Service Cycle per PWS |
| 20 |
| Each |
| 0002 |
| Clear Cutting per PWS |
| 2 |
| Each |
ESTIMATED TOTAL AMOUNT BASE PERIOD:
BID SCHEDULE -- FIRST OPTION PERIOD 12 MONTHS
Contract Line Item No. (CLIN)
Description of Supplies/Services
| Estimated Qty. |
| Unit of Issue |
| Unit Price |
Amount
| 1001 |
| Complete Lawn Service Cycle per PWS |
| 20 |
| Each |
| 1002 |
| Clear Cutting per PWS |
| 2 |
| Each |
ESTIMATED TOTAL AMOUNT FIRST OPTION PERIOD:
Contract Line Item No. (CLIN)
Description of Supplies/Services
| Estimated Qty. |
| Unit of Issue |
| Unit Price |
Amount
| 2001 |
| Complete Lawn Service Cycle per PWS |
| 20 |
| Each |
| 2002 |
| Clear Cutting per PWS |
| 2 |
| Each |
BID SCHEDULE -- SECOND OPTION PERIOD 12 MONTHS
ESTIMATED TOTAL AMOUNT SECOND OPTION PERIOD:
Contract Line Item No. (CLIN)
Description of Supplies/Services
| Estimated Qty. |
| Unit of Issue |
| Unit Price |
Amount
| 3001 |
| Complete Lawn Service Cycle per PWS |
| 20 |
| Each |
| 3002 |
| Clear Cutting per PWS |
| 2 |
| Each |
BID SCHEDULE --THIRD OPTION PERIOD 12 MONTHS
ESTIMATED TOTAL AMOUNT THIRD OPTION PERIOD:
BID SCHEDULE -- FOURTH OPTION PERIOD 12 MONTHS
Contract Line Item No. (CLIN)
Description of Supplies/Services
| Estimated Qty. |
| Unit of Issue |
| Unit Price |
Amount
| 4001 |
| Complete Lawn Service Cycle per PWS |
| 20 |
| Each |
| 4002 |
| Clear Cutting per PWS |
| 2 |
| Each |
ESTIMATED TOTAL AMOUNT FOURTH OPTION PERIOD:
GRAND TOTAL, ALL PERIODS:
Performance Work Statement
1. INTRODUCTION- The contractor shall provide all personnel, equipment, tools, materials, and supervision necessary to perform grounds maintenance services as defined in this Performance-Based Work Statement (PWS) at DLA Disposition Services Bragg, Building J-1334 Knox Street, Fort Bragg, Fayetteville, NC 28310. The facility is approximately 9 acres in size with at least 80% of the area being concrete or asphalt surfaces. The contractor shall perform ground maintenance services, to include trimming of bushes and shrubs in landscaped areas on property around DLA Disposition Services Bragg in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat and professional appearance. The bushes and shrubs along the front of Building J-1334 will be keep at a uniform height of no more than 4 feet high or just below the window frame. The bushes and shrubs will be property trimmed and maintained as needed during every complete lawn service.
2. DEFINITIONS
BRUSH: Weeds, grass, vines, vegetation, shrubs or saplings that have grown to a height greater than 8 inches.
CLEAR-CUT: To remove or cut brush.
DEBRIS: Leaves, grass cuttings, tree and shrubbery limbs, construction waste (excluding any waste generated by another Contractor) and similar waste material.
DRAWINGS (PLOT PLANS): Plot plans will designate areas and type of service.
EDGING: The cutting of overhanging vegetation away from the edges of a hard surface (curbs, sidewalks, driveways, etc) to include actual depth penetration of soil.
GRASS: Botanical, any plant of the Grameneae family which is characterized by narrow leaves with parallel veins; the leaves are composed of blade, sheath and ligule. The plants have jointed stems and fibrous roots and inconspicuous flowers usually arranged in spikelets.
GROUNDS: All land and water acreage on the installation. Precautions shall be taken to prevent scalping, uneven mowing, rutting by equipment, and damage to fence, buildings and property stored in the yard. The contractor shall repair or replace damage that occurs during mowing operations. All mowing equipment shall be properly adjusted. Grounds are grouped in the three categories:
1) IMPROVED includes to the areas at the facility where the grass will be cut/mowed (mulched) between 2 and 3 inches high, sidewalks, parking lot and drive ways will be trimmed and edged. To include picking up all visible grass trimmings, fallen tree limbs, trash and other debris.
2) SEMI-IMPROVED grounds that require mowing only, no trimming or edging performed except for along fences. Grass will be cut between 2 and 3 inches high as scheduled. Includes picking up all visible grass trimmings, fallen tree limbs, trash and other debris.
3) UNIMPROVED grounds not include in the above categories (gravel area). Areas requiring very limited service. Grass will be cut between 2 and 4 inches high as scheduled. Requires mowing only, no trimming, edging or pruning performed, except for along fences. Includes picking up all fallen limbs from trees, trash and other debris.
QUALITY ASSURANCE (QA): Actions taken by the Government to inspect or check goods or services to determine that they meet the requirements of the contract.
TRIMMING GRASS/WEEDS: The cutting of grass and weeds in areas that are inaccessible to mowers due to obstacles.
TURF: A surface layer of soil containing a dense growth of grass and its matted roots.
WEED: Any plant growing where it is not desired. Plants such as, but not limited to: clover, dandelions, purslane, chickweed, plantain, knot weed, black medic, and volunteer trees are also considered weeds. Grass is plant, rock, and shrub beds, cracks in sidewalks, streets, and parking lots is also a weed.
3. SPECIFIC TASKS
GENERAL INFORMATION: Contractor shall take precautions to prevent scalping, uneven mowing or cutting by equipment. The contractor shall repair damaged government facilities, government owned property and equipment. The contractor shall control grass and / or weeds growing in the paved areas through cracks, holes, around the scales, scrap bins, buildings, and internal fence line. On an annual or bi-annual basis (as determined by the site) the contractor will maintain the 5 foot Clear Cut area outside of the fence.
GRASS/VEGETATION MOWING: Contractor shall perform this service where specified in the plot plans. Areas will be cut to a uniform height between 2 to 3 inches during each service. Grass clippings shall be removed or may be mulched if the lawn maintains a neat appearance and no clippings are visible. Grass clippings shall be disposed of properly. Fence lines will be maintained at the mowing cycle frequency on both sides of the fence. The grass on the outside of the warehouse yard fence near front parking lot shall be maintained at a height between 2 to 3 inches to the tree line during complete lawn service cycle.
TRIMMING OF SHRUBS AND BUSHES in Landscaped area will be included in a Mowing Cycle as needed, as determined by the contractor and COR.
MOWING CYCLES: Mowing, weeding, trimming, edging, and policing of all areas which have been mowed shall constitute a mowing cycle. All mowing, weeding, trimming, edging and policing shall be done as one operation, to be fully completed before acceptance by the Contracting Officer. The term “Mowing of areas” shall include trimming by Contractor around fire hydrants, expansion joints in sidewalks and curbs, between sidewalks and curbs and between cracks in the paved areas, electrical poles, internal fence lines, parking lot and other areas supporting vegetation. All grass, weeds, vines, etc. will be removed from the fences (both sides) and railroad tracks. Clippings deposited on driveways, sidewalks and adjacent streets as a result of the mowing, trimming and edging operations shall be cleared promptly after completing the above operations. Trimming of Shrubs and Bushes in landscaped areas will be included in a Mowing Cycle as determined by the contractor and COR.
CLEAR CUTTING will be ordered under a separate CLIN 0002. The area will include five feet around the entire external fence line. All grass, weeds, vines, etc. will be removed from the area including any growth on the fence.
LAWN EDGING: The Contractor shall edge around areas as part of every mowing cycle including lawns where they adjoin sidewalks, curbs and paved roadways.
POLICING: The Contractor shall pick up and dispose of trash, litter, and debris as part of each mowing cycle or clear cut event. The trash, litter and debris will be disposed of properly.
4. MOWING CYCLE FREQUENCY The cycle frequency will be to complete a set number of cycles during contract period. The cycles will be completed as needed as determined by the QAE and/or COR. The QAE and/or COR will determine when a cycle is needed and contact the contractor by phone and request the service. The contractor is then required to complete the cycle within 5 workdays of the date of request. The QAE and/or COR also has the option to develop a schedule of cycles to be completed within a time period, i.e., 2 weeks during the months of April through August. The schedule of service will be provided to the contractor after contract award. Mowing will begin no earlier than 7:00 A.M. on the work day and completed no later than 2:30 P.M. on the same day, and if not finished that day will return on the following work day to complete the task. No work shall be done on weekends or holidays unless approved by the Contracting Officer’s Representative.
CLEAR CUT FREQUENCY will be ordered on an as needed basis. The contractor is then required to complete within 5 workdays of the date of request. Mowing will begin no earlier than 7:00 A.M. on the work day and completed no later than 2:30 P.M. on the same day, and if not finished that day will return on the following work day to complete the task. No work shall be done on weekends or holidays unless approved by the Contracting Officer’s Representative.
5. SECURITY REQUIREMENTS Contractor Employees and property shall be subject to search and seizure upon entering, while on and when leaving Government property confines. Contract Employees may be denied entry or removed from Government property if it is determined that such presence may be contrary to good order, discipline or the security of the facility.
6. GOVERNMENT SURVEILLANCE The government has the right to inspect all services called for by the contract at all times and places during the term of the contract. The Government shall perform inspection in a manner that will not unduly delay the work. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. The Government shall notify the Contractor of any deficiencies within 8 hours of discovery. The Contractor shall have 8 hours to correct the deficiencies. When the defects in services are not corrected by re-performance the Government may: (b) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and (c) Reduce the contract price to reflect and ensure future performance in conformity with contract requirements, the Government may:
(a) By contract or otherwise, perform the services and the charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or
(b) Terminate the contract for default.
7. POLICING GROUNDS
The pickup and disposal of litter, such as paper, bottles, cans, cardboard, plastic, rags, tree limbs, braches, twigs, broken glass, chunks of concrete, leaves, tumbleweeds, dead animals, paper and plastic hung on fences and under them, and other items identified by the QAE(s) as trash and other debris.
8. CONTRACTOR FURNISHED ITEMS AND SERVICES
The Contractor shall furnish everything required to perform this contract. The Government shall not be liable for loss or damage to the Contractor’s or Contractor employee’s property, equipment, or materials or the Contractor’s privately owned possessions. The Contractor shall use materials, tools, chemicals, equipment, supplies and etc. that conform to the requirements listed in this contract. The Contractor shall use his own tools and equipment of a designed type, size, rating and power for the intended use and shall be kept in a safe and operable condition at all times. No tools equipment and/or fuel shall be stored on government property.
9. CHEMICALS
Chemicals used in the performance of the work shall be purchased and issued to the Contractor’s employees in the original manufacturer’s containers. All such containers shall identify the type of chemical, instructions for use, dilution and any hazardous warnings.
Products used shall be components that are formulated to be chemically compatible. Products shall be recommended by the manufacturer for their intended use and shall be compatible with other manufacture’s products used in conjunction with these products. They shall have been available in the market for commercial use for at least 2 years. Manufacturer’s published data will be the only acceptable evidence of materials meeting this requirement.
10. CLEAN-UP
All supplies, equipment and machines shall be kept out of traffic lanes or other areas where they might be hazardous and shall be secured at the end of each work period in a location off of government property.
11. GOVERNMENT INSPECTIONS
The Government reserves the right to inspect supplies, materials, equipment, and chemicals used to perform the requirements of this contract. The Government’s inspection will not constitute acceptance nor will it in any way replace the Contractor’s inspection system or otherwise relieve the Contractor of responsibility to furnish an acceptable item.
12. SPILL RESPONSIBILITY
The contractor is solely responsible for any and all spills or leaks during the performance of this contract, which occurs as a result of, or is contributed to by the actions of its agents, employees, or subcontractors. The contractor agrees to clean up such spills or leaks to the satisfaction of the Government in a manner that complies with applicable Federal, state, and local laws and regulations. The clean-up shall be at no cost to the Government. The contractor shall report all such spills or leaks, regardless of their quantity, to the COR and CO immediately upon discovery. A written follow-up report shall be submitted to the COR and CO not later than twenty-four (24) hours after the initial telephonic report. The written report shall be in narrative form and as a minimum include the following:
(1) Description of item spilled (including identity, quantity, etc.).
(2) Whether amount spilled is EPA/state reportable, and if so, whether it was reported.
(3) Exact time and location of spill including a description of the area involved.
(4) Containment procedures initiated, etc. the reduced value of the services performed. If the Contractor fails to promptly perform the services again or to take the necessary action
(5) Summary of any communications contractor has with press or Government officials other than the contracting officer.
(6) Description of clean-up procedures employed or to be employed at the site including disposal location of spill residue.
13 PERIOD OF PERFORMANCE
The period of performance shall be one calendar year starting on date of award.
14 PAYMENTS
All invoices will be submitted electronically through the WAWF program per the WAWF clause in the awarded contract. Invoices can be submitted as service cycles are completed, but are not to exceed one invoice per month (thus 2-3 cycles in one month would be within one invoice).
15 CONTRACTOR MANPOWER REPORTING
The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Logistics Agency via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2019. The contractor may direct questions to the help desk at: http://www.ecmra.mil.