SP4510‐11‐R‐1002

Attachment 3

Attachment 3 – Government Furnished Equipment/Property

Note: Equipment/property list is current as of the date of solicitation issuance. While no major changes in this list are anticipated, the DLA Disposition Services office will provide an updated list at contract award. The following will be provided at all performance locations for use by the contractor to perform the work:

a. Open-air overhead sheltered area for contractor maintenance/repair activity, including compacted ground. Some activity will require maintenance/repair outside of the sheltered area in open-air conditions.

b. Electrical generator power and compressed air to sheltered maintenance/repair area and outside work areas.

c. For parts and MHE cleaning, the Government will provide parts-cleaning solvents, water, detergent, powerwasher, vacuum, rags, and air compressor.

d. POLs for services and fluid replacement.

e. Initial stock and continued supply of critical spare parts and expendable parts.

f. Forklift and/or crane access (must be coordinated with COR in advance).

g. Technical and operators’ manual which are not to be removed from the facilities.

h. Locked storage facility with parts bins or shelves for parts inventory and vendor equipment utilized at the facility.

i. Fire extinguishers.

j. Personnel warming/cooling station.

k. Eyewash station.

l. Restroom/clean-up access.

m. Bottled drinking water to be used while at work, but not to be removed from the facilities.

n. Bookshelves, binders and/or file jackets.

o. Any additional items, services or work facility expansion required to be provided by the Government will be considered on a case-by-case basis upon request by the contractor to the COR for approval.