Amendment 0001.pdf

PDF 261 KB Posted

Attached to
DDCN Sheet Metal Storage and installation
Solicitation number
SP330026Q0279
Issued by

About this file

This file is Amendment 0002 to solicitation SP3300-26-Q-0279, issued by DLA Distribution Acquisition Operations (J7) and administered by Adrienne Hawkins (614-693-1280, adrienne.hawkins@dla.mil). The amendment extends the offer submission deadline to September 22, 2026, at 3:00 PM EDT and provides clarifications to seven questions submitted by potential offerors.

The solicitation requires three pallet rack storage units to be delivered to Building 147 at a government facility. Key clarifications include: the government will handle offloading and setup, with the contractor providing only material delivery with assembly hardware; the government will perform floor anchoring; manufacturer certification to ANSI MH16.1 is acceptable in lieu of stamped AISC 360 structural calculations; frame height slightly exceeding the nominal 10 feet is acceptable to achieve 16 pallet locations at 4-inch spacing; the 66-inch by 150-inch dimension refers to pallet size and must accommodate 5-foot by 12-foot sheet metal storage; site visits cannot be coordinated, with building doorways measuring 20 feet wide and aisles at least 30 feet wide; and phased delivery of the three units within 60 calendar days after award is acceptable. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

File Type Posted
SF1449_SP330026Q0279.pdf PDF
Attachment 1 - Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

SP3300

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE CONTINUATION PAGE(S)

6. ISSUED BY

DLA DISTRIBUTION ACQUISITION OPERATIONS (J7)

5430 MIFFLIN AVENUE SUITE 3102A NEW

CUMBERLAND PA 17070-5008 USA

7. ADMINISTERED BY (If other than Item 6)

POC: Adrienne Hawkins

(P) 614-693-1280 adrienne.hawkins@dla.mil

9A. AMENDMENT OF SOLICITATION NUMBER

SP3300-26-Q-0279

9/18/2026

9B. DATED (SEE ITEM 11)

9/15/2026

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.

SP3300-26-Q-0279

Amendment 0002

This amendment hereby extends the submission date to 9/22/2026 at 3:00 EDT and answers questions.

1. Paragraph 1 of the Statement of Work states the site is responsible for unloading and setting up all equipment upon delivery. Task 2 states the contractor shall install the three units.

Please confirm the division of responsibility. Is the contractor responsible for offloading at the dock, for rigging and setting the units in final position inside Building 147, or both?

The government will offload and arrange set up so we only need the material delivered with hardware for assembly.

2. 5. Will the Government require the units to be anchored to the floor? If so, please provide the anchoring detail and the slab thickness and load capacity in Building 147 Bay A.

It will be anchored to the floor, but this task will be performed by the government

3. 6. The salient characteristics require ANSI/AISC compliance. Will the Government accept manufacturer certification to ANSI MH16.1, or is a stamped AISC 360 structural calculation required?

We will accept a manufacturer certification

4. 7. Is the 10 foot frame height a nominal dimension or a not to exceed overall height? If a frame slightly over 10 feet is needed to achieve 16 pallet locations at 4 inch spacing, is that acceptable?

Yes that is acceptable

5. 8. Please confirm the 66 inch by 150 inch dimension refers to the pallet itself and not to the sheet metal stored on it.

Yes to pallet size, needs to store 5’x12’ sheet metal

6. 9. Is a site visit available before the closing date, and what are the door and aisle clearances into Building 147 Bay A?

A site visit cannot be coordinated; doors are 20 feet wide and aisles are at least 30 feet wide

7. 10. Delivery is stated as 60 days. Please confirm this is 60 calendar days after award and whether phased delivery of the three units is acceptable.

Phased out is acceptable

All other terms and conditions remain the same.

TAB 11 - Amendment 0001
TAB 11 - Amendment 0001 verbiage

File details come from the government source that posted it. Updated .