This is a Questions and Answers document addressing contractor inquiries related to the installation of a scissor lift table at DLA Distribution Susquehanna, PA.
The document clarifies several key installation requirements and site conditions. An existing lift currently located in a pit must be removed and craned out by the contractor, with the Government assuming responsibility for final disposal. Approximately eight feet of seal tight conduit will be required to run power from the electric knife box, which is currently located in the pit with the existing equipment. The scissor table will be craned into position rather than installed in a pit or accessed via ramp. The installation area has a 10-foot garage door that the delivery vehicle must clear to enter the building. No photographs of the installation area are available at this time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 SF30 SP330026Q0096.pdf | ||
| Attach 1 - Schedule of Supplies.xlsx | XLSX spreadsheet | |
| Combined Syn Sol 26Q0096 DDSP ALOC Scissor Lift.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answers:
1. Is there any existing equipment that will need to be removed prior to installing the scissor table?
0. Yes, there is a lift in the location now that will need to be craned out. It is in a pit. This will be part of the requirement for the contractor to remove it from its current space and set it aside. The Government will take care of disposal.
1. Approximately how far will power need to be run to the table?
1. The electric knife box is in the pit with the equipment. ~ eight foot of seal tight conduit will be required.
1. Will the table be installed in a pit, or will a ramp be required for loading?
2. The table will be craned into position. There is a 10’ garage door the vehicle needs to clear to enter the building.
1. Do you happen to have any photos of the installation area you could share?
3. No pictures at this time.