This document is a Statement of Work (SOW) for diagnostic services to repair six turret trucks at the DLA Distribution Norfolk, Virginia (DDNV) facility. The SOW outlines the scope of work required, which includes determining the parts needed to make the vehicles operational, assessing whether the batteries need replacement, developing a complete bill of materials and labor costs, and providing a timeline for part availability. The work is to be performed at DDNV's Bldg. X-218 HAZMAT Facility and Bldg. Y-109 Material Processing Center. The SOW also includes a request for a price quote to relocate a Raymond 960-CSR30T vehicle from Bldg. W-148 to Bldg. Y-109. The related federal contract opportunity, Solicitation Number SP330024Q0188, seeks a contractor to perform the vehicle diagnostic services within 30 days after award, with the repair work to be done under a separate contract.

View the file

Other files

File Type Posted
CSS SP3300-24-Q-0188.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

For

Diagnostic Services for Repair of Turret Truck

Vehicles

DLA Distribution Norfolk, VA

Bldgs. Y-109 and X-218

Erase

21 Mar 17

12 Apr 24

Prepared By:

DLA Installation Management for Distribution

Bldg. 430, Rm. 2227

DM-FDI

New Cumberland, PA 17070

Statement of Work for Diagnostic Services for Repair of Turret Truck Vehicles at DDNV

1. Background:

a. Work Locations: DLA Distribution Norfolk, VA is located at Norfolk Naval

Base, 1968 Gilbert Street; Norfolk, VA 23512-0001. Diagnostics work for two turret trucks is to be performed in the Bldg. X-218 HAZMAT Facility and four turret trucks in Bldg. Y-109 Material Processing Center (MPC). Turret Truck relocation work is from Bldg. W-148 to Bldg. Y-109.

b. Project History: DDNV has six turret truck which are problematic and require service to make them fully operational again. The vehicles in Bldg. Y-109 are

Raymond model SB-CSR30T Turret Trucks that were purchased in 2006 and 3 out of

4 of them do not function properly. The asset IDs on them are 200131140, 200131141, 20012142 and 20013143. The X-218 vehicles (20162179 and 20152180 are Crown Model TSP 6000-30, 2008 vehicles and will not run because the batteries discharge after 30 seconds of operation. The lead time for new vehicles is currently

18 months. Therefore, we need a contractor to diagnose what is wrong with these vehicles and give us pricing options for repairs to keep them running for at least another year. The one Y-109 vehicle that was cannibalized for parts may not be worth fixing but we need contract support to determine the cost of the parts and labor on each of these trucks to refurbish these vehicles for temporary operation until they can be replaced.

Current status of each turret truck is as follows:

Y-109 - 200012140 - Not operational (Cannibalized)

Y-109 – 200131141 - Vehicle is being reviewed to determine additional maintenance issues after repair parts were installed as of 4/8/2024.

Y-109 – 20013142 - Operational but not always reliable.

Y-109 – 20131143 – Vehicle overheats and shutters while in operation. This was reported to the maintenance Staff as of 3/22/2024. Root cause has not been determined as of 4/8/2024.

X-218 – 20162179 - Completely discharged battery which will not hold a charge for more than 30 seconds.

X-218 – 20162180 - Completely discharged battery which will not hold a charge for more than 30 seconds.

W-148 – 20202128 – Completely operational and just requires relocation to Y-

109, Section 3.

2. Scope of Work to be performed: The work required is to bring service technicians in with SB350 jumper cables to jump the batteries so they can bring up the diagnostic screens on the vehicles to obtain the service codes for troubleshooting. From the service codes, the technician shall provide the follow: 1) Determine what parts are required to make the vehicles run. 2) Determine if the batteries need replaced. 3) Develop a complete bill of materials for all replacement parts and labor to install them to make the vehicles operational again and 4) Determine the parts availability and give a delivery time for each part required. From this data, the DM-FDI Equipment Management Branch and Industrial

Engineering Branch can determine if the vehicles could be fixed to be reliable or if they need replaced. DM will determine the following: 1) Should a short term fix be done to keep the vehicles running for the next year to 18 months until a replacement vehicle can be obtained? 2) Should the vehicle be scrapped because it is missing too many parts and/or the parts are no longer available?

Bldg. W-148, adjacent to Y-109, has a Raymond 960-CSR30T vehicle, vehicle no.

20202128, which is in good condition and was purchased in 2019. Request a price quote to remove the mast, transport into Y-109 and reassemble it Y-109 to ensue that DDNV has at least one totally reliable vehicle in Y-109 until additional vehicles can be purchased and delivered.

3. Definitions of Terms and Abbreviations:

a. SOW: Statement of Work

b. DDNV: DLA Distribution Norfolk, VA

4. Certification and Acceptance: The contractor is required to submit an invoice in sufficient detail to allow certification and acceptance by the COR when the work is completed in WAWF.

6. Project Management Approach: The Contractor’s performance shall be monitored by the COR, Mr. Tim Flynn, DM-FDI, Office: (717) 770-8600, cell: (717) 713-7123 and

Tim Hoban, Office: (717) 770-6152.

7. Performance and/or Delivery Schedule: The contractor shall be required to perform the vehicle diagnostic services within 30 days after award and provide price quotes for the repairs. The repair work will be done under a separate contract. The vehicle relocation work from W-148 to Y-109 will be done under this contract.

8. Security Requirements: The contractor shall be required to follow all applicable installation security and safety requirements at DDNV.

9. Billing: A final payment will be due and payable by Government within 30 days after receipt of a submitted invoice in WAWF.

File details come from the government source that posted it. Updated .