Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

SP3300

SEE CONTINUATION PAGE(S)

DLA Distribution Acquisition Operations, J-7 Mifflin Avenue, Bldg 430 New Cumberland, PA 17070

POC: Sean McDonnell

(P) 717-770-7047 sean.mcdonnell@dla.mil

9A. AMENDMENT OF SOLICITATION NUMBER

SP3300-23-Q-0070

3/2/2023

9B. DATED (SEE ITEM 11)

2/22/2023

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. X

X

SP3300-23-Q-0070

Amendment 0001

Amendment 0001 is hereby incorporated into solicitation SP3300-23-Q-0070:

• What materials are you processing (cutting/drilling/punching/shearing)?

Answer: Soft wood and some hardwood.

• What is the heaviest weight you would put onto the machine at one time?

Answer: 100 lb

• What type of tools are you using (upcut saw/chop saw, bandsaw, table saw, drill, ironworker etc) ?

Answer: Rip Saws, Radial arm Saw, Band Saws, Miter/Chop saws, Belt and hand sanders, Drill press and hand drills, Planer and router table, automated fiber board machines to cut and score, hand saws (powered and manual)

• How long is your raw material?

Answer: 16’

• What is your longest finished part (not needed for drilling applications)?

Answer: 36’ long

• Do you know if you’d like to use this work station as a stop/set point or a push feed? You may not know and I am more than happy to clarify the benefits of each style. Conversation needed.

Answer: Currently we use manual stop/set points and would like the same. Would be nice to have a repeatable but adjustable stop point/stop block.

• Do you currently use any software to generate your cut bills/lists?

Answer: We do but not at the point of cutting. I do have most of the common type of constructions that we do in an Excel spreadsheet with formulas to generate cut lists.

• Do you do a lot of one-off/custom jobs or are you cutting the same lengths regularly?

Answer: One off and custom jobs Mostly, but we do sometimes do repeatable cuts at a specific length.

• 80/20 rule. How often do you miter cut? Or are you predominantly straight cutting material 90 degrees?

Answer: Predominantly straight cut but various miter cut capability is a must.