Attachment_6_-_Submittal_Register_BAF_2017.pdf

PDF 126 KB Posted

Attached to
Supply and install industrial fans in Warehouses 13, 16, 20, 56, and 58, DLA Distribution San Joaquin CA (DDJC)
Solicitation number
SP330017B0013
Issued by

About this file

Attachment 6 Submittal Register

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division 01 Special Requirements

FORM 4288

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

INSTALL INDUSTRIAL FANS DDJ TRACY - Division 1 - General Requirements

CONTRACTOR

A C T I V I T Y

N O

R A N S M I T T

L

S P E

DESCRIPTION OF ITEM SUBMITTED

R A G R A

H

G

V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR SCHEDULE DATES CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH

REMARKS

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

T I

D

DATE OF

DATE FWD

TO APPR

AUTH

DATE RCD

CONTR

TO OTHER

REVIEWER

DATE RCD

FROM OTH

T I

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

010110 STATEMENT OF WORK /SPECIAL

REQUIREMENTS

SD-01 PRECONSTRUCTION SUBMITTALS

List of Schedule of Values 1.17.1 G List of recycled material to be used 1.2

013201 PROJECT SCHEDULE

SD-01 PRECONSTRUCTION SUBMITTALS

Construction Project Schedule 3.3 G

013300 SUBMITTAL PROCEDURES

SD-01 PRECONSTRUCTION SUBMITTALS

Submittal Register 1.11 G

013529 SAFETY AND OCCUPATIONAL HEALTH REQTS.

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP) 1.6 G Injury Prevention Plan G Activity Hazard Analysis (AHA) 1.7 G Crane/Fork Lift plan 1.6 G

SD-06 TEST REPORTS

Accident Reports 1.11.1 G Monthly Exposure Reports 1.11.3 G Crane/Fork Lift Report 1.11.4 G

SD-07 CERTIFICATES

Hot Work Permit 1.12 G

014500 CONTRACTOR QUALITY CONTROL

SD-01 PRECONSTRUCTION SUBMITTALS

Contractor Quality Control Plan 3.2 G

Division 01 Special Requirements

INSTALL INDUSTRIAL FANS DDJ TRACY - Division 1 - General Requirements

T I V I

A N S M I T T

R A G R A

V

C T L A O S R S I A F / I E C A R T E I V O W N R

CONTRACTOR SCHEDULE DATES CONTRACTOR

MAILED TO

CONTR/

DATE RCD

APPR AUTH

APPROVAL

MATERIAL

T I

TO APPR

AUTH

DATE RCD

TO OTHER

DATE RCD

FROM OTH

T I

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

015719 ENVIRONMENTAL PROTECTION

SD-01 PRECONSTRUCTION SUBMITTALS

Environmental Protection Plan 1.7 G

SD-11 CLOSEOUT SUBMITTALS

017800 PROJECT CLOSEOUT

SD-02 SHOP DRAWINGS

As-Built Drawings 1.2.1 G

SD-03 PRODUCT DATA

As-Built Record of Equipment and Material. 1.2.2 G Warranty Management Plan 1.3.1 G Final Cleaning 1.6 G

SD-11 CLOSEOUT SUBMITTALS

Record Drawings 1.2.1 G Post construction Survey 1.6.1 G

Page 3/3

INSTALL INDUSTRIAL FANS DDJ TRACY - Division 26 - Electrical

T I V I

A N

S M I T T

R

A

G

R

A

CONTRACT

OR

ACTION O

APPROV

AL

NEEDED

BY

MATERI

AL

NEEDED

BY

T I

DATE

OF

ACTIO

FWD

TO

APPR

AUTH

DATE

RCD

FWD TO

OTHER

REVIEW

ER

RCD

FROM

OTH

REVIEW

ER

T I

OF

ACTIO

N

V C T L A O S R S I A F / I E C A R T E I V O W N R

CONTR/

DATE

FROM

APPR

AUTH

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

ELECTRICAL

260500 SD 02 Product Data Conduit 1.3 G Wires and cables 1.3 G Circuit Breakers 1.3 G 010110 SD 03 Product Data Industrial Fan 1.1.1.2 G

Division 26 E l e c t r i c a l