Attachment_3_-_Revised_Atch_J.32 _DDBC_Proposed_Productive_Hours.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Distribution and Warehouse Services - DLA Distribution Barstow, CA Federal contract opportunity
- Solicitation number
- SP3300-16-R-5003
- Issued by
- Defense Logistics Agency Distribution
About this file
Attachment 3 - Revised Attachment J.32
View the file
Other files for this federal contract opportunity
Show all 50
Distribution and Warehouse Services - DLA Distribution Barstow, CA has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Proposed Productive Labor Hours | |||||||||
| Instructions: See Section L of the RFP. *Note - The standard mearsurement of time to be used for the Standard Times in Column D shall be number of hours e.g. 5 minutes =.0833 hours. All figures shall be rounded to the tenthousandths decimal place. | |||||||||
| **Add rows below as necessary | Productive Hours | ||||||||
| PWS Paragraph | Proposed Labor Category | Specific Activity and Labor Category Responsibilities | Standard Time or Assumptions | Y1 3mo Transition | Y1 (9M0) | Y2 | Y3 | Y4 | Y5 |
| C-1.3 Personnel | |||||||||
| The Contractor shall list the minimum key personnel requirements in Atch J1, PWS and any additional key personnel labor categories identified by the contractor. | |||||||||
| Site Manager | |||||||||
| Alternate Site Manager/Operations Manager | |||||||||
| Quality Control Specialist | |||||||||
| Supply Systems Analyst | |||||||||
| Inventory Manager | |||||||||
| Transportation Manager |
| C-1.4 Security |
| C-1.5 Safety and Occupational Health (SOH) |
C-1.6 Radiation Protection Program
C-1.7 Electrostatic Discharge (ESD) Control Program
| C-1.8 Transition Plan - N/A as it should be included in the Transition Plan submission |
| C-1.9 Surge, Sustainment and Disaster Recovery Efforts - N/A as it should be included in the plan submission for Government Acceptance |
| C-1.10 Preparedness Exercises - N/A as it will be addressed in the specific Task Order issued to direct the contractor during the contract performance period. |
C-1.11 Contract Transition-Out and Continuity of Service Plan - N/A as it will be addressed in the specific Task Order issued to direct the contractor during the contract performance period.
Section C-4 Contractor Requirements
| C-4.2 Equipment |
| C-4.2.1 Government Accountable Property |
| C-4.2.2 Operating Equipment - daily maintenance |
C-4.3 Materials and Supplies
| C-4.4 Equipment Maintenance |
| C-4.4.2 Scheduled Requirements/Preventive Maintenance |
| C-4.4.3 Unscheduled Requirements including all sub-paragraphs C-4.4.3.1 through C-4.4.3.4, paragraphs C-4.4.4 Calibraton and Certification and C-4.4.5 Equipment Disposal |
| C-4.5.1 Environmental |
C-4.5.3 Mail
C-4.5.10 Records Management
C-4.6 Training to include all sub-paragraphs
Section C-5 Specific Tasks
| Section C-5.1 Distribution Services and Performance Requirements |
| C-5.1 Information Gathers |
| C-5.1.3.1 Distribution Standard System (DSS) |
| C-5.1.3.2 Distribution Standard System (DSS) - Management Information System (DSS-MIS) |
| C-5.1.4 Quality Control Plan (QCP) |
| C-5.1.5 Customer Service Plan and Support to include all sub-paragraphs and C-5.1.6 NAVSUP WSS NITA) |
| Section C-5.2 Receiving |
| C-5.2.1 In-Bound Traffic Management |
| C-5.2.2 Off-Load and Tally |
| C-5.2.4 Product Receipt Evaluation including the processes from C-5.2.3 Receipt Process Docs and C-5.2.4.1 SDRs; C-5.2.4.2 Non-Procurement Receipts; 5.2.4.3 New Procurement Receipts and assumptions used to address all paragraphs in C-5.2.5 Additional Receiving Requirements and C-5.7.2M Level I/Subsafe (LI/SS) Material WEIGHT BAND 1 |
| C-5.2.4 Product Receipt Evaluation including the processes from C-5.2.3 Receipt Process Docs and C-5.2.4.1 SDRs; C-5.2.4.2 Non-Procurement Receipts; 5.2.4.3 New Procurement Receipts and assumptions used to address all paragraphs in C-5.2.5 Additional Receiving Requirements and C-5.7.2M Level I/Subsafe (LI/SS) Material WEIGHT BAND 2 |
| C-5.2.4 Product Receipt Evaluation including the processes from C-5.2.3 Receipt Process Docs and C-5.2.4.1 SDRs; C-5.2.4.2 Non-Procurement Receipts; 5.2.4.3 New Procurement Receipts and assumptions used to address all paragraphs in C-5.2.5 Additional Receiving Requirements and C-5.7.2M Level I/Subsafe (LI/SS) Material WEIGHT BAND 3 |
| C-5.2.4 Product Receipt Evaluation including the processes from C-5.2.3 Receipt Process Docs and C-5.2.4.1 SDRs; C-5.2.4.2 Non-Procurement Receipts; 5.2.4.3 New Procurement Receipts and assumptions used to address all paragraphs in C-5.2.5 Additional Receiving Requirements and C-5.7.2M Level I/Subsafe (LI/SS) Material WEIGHT BAND 4 |
| Section C-5.3 Warehousing |
| C-5.3.1 Stow of Receipts to include various types of material received to be stowed |
| C-5.3.2 General Warehousing/Storage Requirements to include variuos types of material received and stowed |
| C-5.3.3 Care of Supplies In Storage (COSIS); C-5.3.3.2 Special Inspections and assumptions used to address all paragraphs in C-5.3.4 Additional Storage Requirements |
| C-5.3.5 AutoCAD Planographs / DSS Location Identification / Storage Space Management Report (SSMR) |
| C-5.3.6 Weight and Cube National Stock Number (NSN) Program |
| C-5.3.7 Rewarehousing of Material |
| C-5.3.8 Issue of Material (On-base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 1 |
| C-5.3.8 Issue of Material (On-base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 2 |
| C-5.3.8 Issue of Material (On-base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 3 |
| C-5.3.8 Issue of Material (On-base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 4 |
| C-5.3.8 Issue of Material (Off-Base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 1 |
| C-5.3.8 Issue of Material (Off-Base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 2 |
| C-5.3.8 Issue of Material (Off-Base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 3 |
| C-5.3.8 Issue of Material (Off-Base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 4 |
| C-5.3.1 Local Delivery Issues |
| C-5.3.11 Issue to DLA Disposition Services (DROs) including all sub-paragraphs |
| C-5.3.12 Shipment Preparation to include various types of material |
| Section C-5.4 Physical Inventory Control |
| C-5.4.1 Physical Inventory Control (F2B 1st Counts) |
| C-5.4.1 Physical Inventory Control (F2B 2nd Counts) |
| C-5.4.1 Physical Inventory Control (F2B TPIC M) |
| C-5.4.1 Physical Inventory Control (F2B 3rd Counts) |
| C-5.4.1 Physical Inventory Control (F2B Causative Research) |
| C-5.4.1.1 DSS Inventories (All TPICs) |
| C-5.4.1.2 Research of Potential or Actual Physical Inventory Adjustments |
| C-5.4.2 Denial Research |
| C-5.4.3 Item Data Maintenance |
| C-5.4.4 Location Surveys |
| C-5.4.5 ADHOC Discrepancy Research and Resolution |
| C-5.4.6 Potential Book to Book Processing |
| C-5.4.7 Incoming Supply Discrepancy Report (ISDR) Research and Resolution |
| Section C-5.5 Transportation |
| C-5.5.2 Traffic Managementincluding types of material addressed in C-5.5.7 Additional Transportation Requirements and all sub-paragraphs and C-5.5.8 Deployment Support |
| C-5.5.3 Shipping / Outloading including types of material addressed in C-5.5.7 Additional Transportation Requirements and all sub-paragraphs and C-5.5.8 Deployment Support |
| C-5.5.4 Transshipments |
| C-5.5.5 Astray Freight (Government Cargo Recovery Effort (GOCARE)) Program |
| C-5.5.6 Security Assistance Program (SAP) Shipments: Foreign Military Sales (FMS) and Grant Aid and all sub-paragraphs |
| Section C-5.6 Packaging |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M): X-Small |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M):Small |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M): Medium |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M): Large |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M): X-Large |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M): XX-Large |
| C-5.6.2 Container Reclamation |
| C-5.6.3 Container Fabrication Support: Small |
| C-5.6.3 Container Fabrication Support: Medium |
| C-5.6.3 Container Fabrication Support: Large |
| C-5.6.3 Container Fabrication Support: X-Large |
| C-5.6.3 Container Fabrication Support: Fiberboard Containers |
| C-5.6.4 Specialized Container Fabrication Support |
| C-5.6.5 Wood Packaging Material (WPM) |
| C-6.6 Mandatory Reports -CDRLs not addressed elsewhere (A005 AND A010-A015) in J.1 and J.2 |
| Section C-5.7M Site Specific Functions |
C-5.7.1M Load and Off-load Support
| C-5.7.4M Retail Support |
| C-5.7.4.1 Warehousing and Inventory Requirements Retail Support *NOTE* This section shall be performed IAW the Stow of Receipts IAW C-5.3, Warehousing, and all sub-paragraphs and C-5.4 Inventory and all sub-paragraphs. |
C-5.7.4.2M Local Delivery
C-5.7.4.3M Line Side Stock
C-5.7.4.4M Material Consolidation Support for Vehicle Repair/Maintenance
Attachment J.32
SP330016R5003
Contractor Proposed Productive Labor Hours
File details come from the government source that posted it. Updated .