About this file

Attachment 3 - Revised Attachment J.32

View the file

Other files for this federal contract opportunity

Other files attached to Distribution and Warehouse Services - DLA Distribution Barstow, CA, newest first.
File Type Posted
Attachment_2_-_QA_Document_(11-21-16).pdf PDF
SP3300-16-R-5003_0005.pdf PDF
Attachment_1_-_Conformed_RFP_SP3300-16-R-5003_Sections_B-M_through_Amendment_0004.pdf PDF
SP3300-16-R-5003_0004.pdf PDF
Attachment_2_-_Revised_Attachment_J.25 TE_5.2__Projected_Workload_DDBC_Tracked_Changes_v4.pdf PDF
Attachment_1_-_Revised_Attachment_J.24 TE_5_1_DDBC_Historical_Workload_DDBC_Tracked_Changes.pdf PDF
Attachment_4_-_QA_Document_(J.32_questions_only)_11-10-2016.pdf PDF
Attachment_1_-_Revised_Attachment_J.24 TE_5_1_DDBC_Historical_Workload_DDBC_Tracked_Changes.pdf PDF
Attachment_3_-_Revised_Atch_J.32 _DDBC_Proposed_Productive_Hours.xlsx XLSX spreadsheet
SP3300-16-R-5003_0004.pdf PDF
SP3300-16-R-5003_0003.pdf PDF
Attachment_13_-_QA_Document_(non_J.32_questions).pdf PDF
Attachment_7_-_Revised_Attachment_J.18 _TE_4.1_Contractor_Training_Tracked_Changes_.pdf PDF
Attachment_8_-_Revised_Attachment_J.19 TE_4.2_Gov_Oper_Equip_for_Ctr_Maint_Changed.xlsx XLSX spreadsheet
Attachment_12_-_Revised_CDRL_A021_-_Training_Report.pdf PDF
Attachment_10_-_Revised_Attachment_J.28 TE_5.5__Type_Physical_Inventory_Code_(TPIC)_Matrix_Conformed_through_Amendment_A003.pdf PDF
Attachment_2_-_Revised_Attachment_J.1_Section_C_-_PWS.pdf PDF
Attachment_1_-_Revised_RFP_SP3300-16-R-5003_Sections_B-M_Tracked_Changes.pdf PDF
Attachment_4_-_Revised_Attachment_J.6 GE_MHE_Changed.xlsx XLSX spreadsheet
Attachment_3_-_Revised_Attachment_J.2_Tracked_Changes.pdf PDF
Attachment_11_-_Revised_CDRL_A006_-Quality_Control_Plan.pdf PDF
Attachment_J.19 TE_4.2_Gov_Oper_Equip_for_Ctr_Maint.xlsx XLSX spreadsheet
Attachment_J.9 _Contractor_Furnished_Equipment.doc DOC document
Attachment_J.17 TE_3.3_Government_Data_Systems.doc DOC document
Attachment_J.16 _TE_3.2_Government_Training.docx DOCX document
Attachment_J.28 TE_5.5__Type_Physical_Inventory_Code_(TPIC)_Matrix.docx DOCX document
Attachment_J.13 TE_1.2_CAC_Procedures.docx DOCX document
Attachment_J.14 TE_2.1_Definitions _Acronyms_.doc DOC document
Attachment_J.23 TE_5.0_APLs_with_Retail.doc DOC document
RFP_SP3300-16-R-5003.pdf PDF
Attachment_J.29 TE_5.9_DSS_Load_and_Maintain_.docx DOCX document
Attachment_J.4 DD254_Barstow2016.pdf PDF
Attachment_J.25 TE_5.2__Projected_Workload_DDBC_for_final_RFP.docx DOCX document
Attachment_J.6 GE_MHE.xlsx XLSX spreadsheet
Attachment_J.22 TE_4.5_Other_Equip_PM_Task_Codes.xlsx XLSX spreadsheet
Attachment_J.32 _DDBC_Proposed_Productive_Hours_UPDATE.xlsx XLSX spreadsheet
Attachment_J.2 _PWS_Site_Specific.pdf PDF
Attachment_J.15 TE_3.1_GF-4.21.11.docx DOCX document
Attachment_J.30 _TE_6.1_Government_Forms.docx DOCX document
Attachment_J.20 TE_4.3_MHE_PM_Task_Codes.xlsx XLSX spreadsheet
Attachment_J.31 DDBC_Draft_Training_Calendar.xlsx XLSX spreadsheet
Attachment_J.27 TE_5.4_Transshipment_of_Hazardous_Assets.pdf PDF
Attachment_J.3 Wage_Determination.pdf PDF
Notice_Regarding_Restricted_Access.pdf PDF
Pre-Solicitation_Conference_List_-_Attendees.pdf PDF
DRAFT_RFP_Attachment_J.24 TE_5_1_DDBC_Historical_Workload.pdf PDF
DRAFT_RFP_Attachment_J.2_Section_C_-_PWS_Local.pdf PDF
DRAFT_RFP_Attachment_J.1_Section_C_-_PWS.pdf PDF
DRAFT_RFP_Sections_L_and_M.pdf PDF
Pre-Proposal_Conference_Instructions.pdf PDF
Show all 50

Distribution and Warehouse Services - DLA Distribution Barstow, CA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Proposed Productive Labor Hours
Instructions: See Section L of the RFP. *Note - The standard mearsurement of time to be used for the Standard Times in Column D shall be number of hours e.g. 5 minutes =.0833 hours. All figures shall be rounded to the tenthousandths decimal place.
**Add rows below as necessaryProductive Hours
PWS ParagraphProposed Labor CategorySpecific Activity and Labor Category ResponsibilitiesStandard Time or AssumptionsY1 3mo TransitionY1 (9M0)Y2Y3Y4Y5
C-1.3 Personnel
The Contractor shall list the minimum key personnel requirements in Atch J1, PWS and any additional key personnel labor categories identified by the contractor.
Site Manager
Alternate Site Manager/Operations Manager
Quality Control Specialist
Supply Systems Analyst
Inventory Manager
Transportation Manager
C-1.4 Security
C-1.5 Safety and Occupational Health (SOH)

C-1.6 Radiation Protection Program

C-1.7 Electrostatic Discharge (ESD) Control Program

C-1.8 Transition Plan - N/A as it should be included in the Transition Plan submission
C-1.9 Surge, Sustainment and Disaster Recovery Efforts - N/A as it should be included in the plan submission for Government Acceptance
C-1.10 Preparedness Exercises - N/A as it will be addressed in the specific Task Order issued to direct the contractor during the contract performance period.

C-1.11 Contract Transition-Out and Continuity of Service Plan - N/A as it will be addressed in the specific Task Order issued to direct the contractor during the contract performance period.

Section C-4 Contractor Requirements

C-4.2 Equipment
C-4.2.1 Government Accountable Property
C-4.2.2 Operating Equipment - daily maintenance

C-4.3 Materials and Supplies

C-4.4 Equipment Maintenance
C-4.4.2 Scheduled Requirements/Preventive Maintenance
C-4.4.3 Unscheduled Requirements including all sub-paragraphs C-4.4.3.1 through C-4.4.3.4, paragraphs C-4.4.4 Calibraton and Certification and C-4.4.5 Equipment Disposal
C-4.5.1 Environmental

C-4.5.3 Mail

C-4.5.10 Records Management

C-4.6 Training to include all sub-paragraphs

Section C-5 Specific Tasks

Section C-5.1 Distribution Services and Performance Requirements
C-5.1 Information Gathers
C-5.1.3.1 Distribution Standard System (DSS)
C-5.1.3.2 Distribution Standard System (DSS) - Management Information System (DSS-MIS)
C-5.1.4 Quality Control Plan (QCP)
C-5.1.5 Customer Service Plan and Support to include all sub-paragraphs and C-5.1.6 NAVSUP WSS NITA)
Section C-5.2 Receiving
C-5.2.1 In-Bound Traffic Management
C-5.2.2 Off-Load and Tally
C-5.2.4 Product Receipt Evaluation including the processes from C-5.2.3 Receipt Process Docs and C-5.2.4.1 SDRs; C-5.2.4.2 Non-Procurement Receipts; 5.2.4.3 New Procurement Receipts and assumptions used to address all paragraphs in C-5.2.5 Additional Receiving Requirements and C-5.7.2M Level I/Subsafe (LI/SS) Material WEIGHT BAND 1
C-5.2.4 Product Receipt Evaluation including the processes from C-5.2.3 Receipt Process Docs and C-5.2.4.1 SDRs; C-5.2.4.2 Non-Procurement Receipts; 5.2.4.3 New Procurement Receipts and assumptions used to address all paragraphs in C-5.2.5 Additional Receiving Requirements and C-5.7.2M Level I/Subsafe (LI/SS) Material WEIGHT BAND 2
C-5.2.4 Product Receipt Evaluation including the processes from C-5.2.3 Receipt Process Docs and C-5.2.4.1 SDRs; C-5.2.4.2 Non-Procurement Receipts; 5.2.4.3 New Procurement Receipts and assumptions used to address all paragraphs in C-5.2.5 Additional Receiving Requirements and C-5.7.2M Level I/Subsafe (LI/SS) Material WEIGHT BAND 3
C-5.2.4 Product Receipt Evaluation including the processes from C-5.2.3 Receipt Process Docs and C-5.2.4.1 SDRs; C-5.2.4.2 Non-Procurement Receipts; 5.2.4.3 New Procurement Receipts and assumptions used to address all paragraphs in C-5.2.5 Additional Receiving Requirements and C-5.7.2M Level I/Subsafe (LI/SS) Material WEIGHT BAND 4
Section C-5.3 Warehousing
C-5.3.1 Stow of Receipts to include various types of material received to be stowed
C-5.3.2 General Warehousing/Storage Requirements to include variuos types of material received and stowed
C-5.3.3 Care of Supplies In Storage (COSIS); C-5.3.3.2 Special Inspections and assumptions used to address all paragraphs in C-5.3.4 Additional Storage Requirements
C-5.3.5 AutoCAD Planographs / DSS Location Identification / Storage Space Management Report (SSMR)
C-5.3.6 Weight and Cube National Stock Number (NSN) Program
C-5.3.7 Rewarehousing of Material
C-5.3.8 Issue of Material (On-base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 1
C-5.3.8 Issue of Material (On-base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 2
C-5.3.8 Issue of Material (On-base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 3
C-5.3.8 Issue of Material (On-base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 4
C-5.3.8 Issue of Material (Off-Base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 1
C-5.3.8 Issue of Material (Off-Base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 2
C-5.3.8 Issue of Material (Off-Base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 3
C-5.3.8 Issue of Material (Off-Base) including C-5.3.8 Issue of Material and all sub-paragraphs and C-5.3.9 Additional Issue Requirements and C-5.7.2.2M L1/SS WEIGHT BAND 4
C-5.3.1 Local Delivery Issues
C-5.3.11 Issue to DLA Disposition Services (DROs) including all sub-paragraphs
C-5.3.12 Shipment Preparation to include various types of material
Section C-5.4 Physical Inventory Control
C-5.4.1 Physical Inventory Control (F2B 1st Counts)
C-5.4.1 Physical Inventory Control (F2B 2nd Counts)
C-5.4.1 Physical Inventory Control (F2B TPIC M)
C-5.4.1 Physical Inventory Control (F2B 3rd Counts)
C-5.4.1 Physical Inventory Control (F2B Causative Research)
C-5.4.1.1 DSS Inventories (All TPICs)
C-5.4.1.2 Research of Potential or Actual Physical Inventory Adjustments
C-5.4.2 Denial Research
C-5.4.3 Item Data Maintenance
C-5.4.4 Location Surveys
C-5.4.5 ADHOC Discrepancy Research and Resolution
C-5.4.6 Potential Book to Book Processing
C-5.4.7 Incoming Supply Discrepancy Report (ISDR) Research and Resolution
Section C-5.5 Transportation
C-5.5.2 Traffic Managementincluding types of material addressed in C-5.5.7 Additional Transportation Requirements and all sub-paragraphs and C-5.5.8 Deployment Support
C-5.5.3 Shipping / Outloading including types of material addressed in C-5.5.7 Additional Transportation Requirements and all sub-paragraphs and C-5.5.8 Deployment Support
C-5.5.4 Transshipments
C-5.5.5 Astray Freight (Government Cargo Recovery Effort (GOCARE)) Program
C-5.5.6 Security Assistance Program (SAP) Shipments: Foreign Military Sales (FMS) and Grant Aid and all sub-paragraphs
Section C-5.6 Packaging
C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M): X-Small
C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M):Small
C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M): Medium
C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M): Large
C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M): X-Large
C-5.6.1 Preservation, Packaging, Packing and Marking (PPP&M): XX-Large
C-5.6.2 Container Reclamation
C-5.6.3 Container Fabrication Support: Small
C-5.6.3 Container Fabrication Support: Medium
C-5.6.3 Container Fabrication Support: Large
C-5.6.3 Container Fabrication Support: X-Large
C-5.6.3 Container Fabrication Support: Fiberboard Containers
C-5.6.4 Specialized Container Fabrication Support
C-5.6.5 Wood Packaging Material (WPM)
C-6.6 Mandatory Reports -CDRLs not addressed elsewhere (A005 AND A010-A015) in J.1 and J.2
Section C-5.7M Site Specific Functions

C-5.7.1M Load and Off-load Support

C-5.7.4M Retail Support
C-5.7.4.1 Warehousing and Inventory Requirements Retail Support *NOTE* This section shall be performed IAW the Stow of Receipts IAW C-5.3, Warehousing, and all sub-paragraphs and C-5.4 Inventory and all sub-paragraphs.

C-5.7.4.2M Local Delivery

C-5.7.4.3M Line Side Stock

C-5.7.4.4M Material Consolidation Support for Vehicle Repair/Maintenance

Attachment J.32

SP330016R5003