Attachment_J.23 TE_5.0_APLs_with_Retail.doc

DOC document 101 KB Posted

Attached to
Distribution and Warehouse Services - DLA Distribution Barstow, CA Federal contract opportunity
Solicitation number
SP3300-16-R-5003
Issued by
Defense Logistics Agency Distribution

About this file

Attachment J.23 - TE 5.0

View the file

Other files for this federal contract opportunity

Other files attached to Distribution and Warehouse Services - DLA Distribution Barstow, CA, newest first.
File Type Posted
Attachment_1_-_Conformed_RFP_SP3300-16-R-5003_Sections_B-M_through_Amendment_0004.pdf PDF
Attachment_2_-_QA_Document_(11-21-16).pdf PDF
Attachment_3_-_Revised_Atch_J.32 _DDBC_Proposed_Productive_Hours.xlsx XLSX spreadsheet
Attachment_4_-_QA_Document_(J.32_questions_only)_11-10-2016.pdf PDF
Attachment_1_-_Revised_Attachment_J.24 TE_5_1_DDBC_Historical_Workload_DDBC_Tracked_Changes.pdf PDF
Attachment_2_-_Revised_Attachment_J.25 TE_5.2__Projected_Workload_DDBC_Tracked_Changes_v4.pdf PDF
Attachment_4_-_QA_Document_(J.32_questions_only)_11-10-2016.pdf PDF
Attachment_3_-_Revised_Atch_J.32 _DDBC_Proposed_Productive_Hours.xlsx XLSX spreadsheet
SP3300-16-R-5003_0004.pdf PDF
Attachment_3_-_Revised_Attachment_J.2_Tracked_Changes.pdf PDF
Attachment_11_-_Revised_CDRL_A006_-Quality_Control_Plan.pdf PDF
Attachment_9_-_Revised_Attachment_J.20 TE_4.3_MHE_PM_Task_Codes_Changed.xlsx XLSX spreadsheet
Attachment_5_-_Revised_Attachment_J.16 _TE_3.2_Government_Training_Tracked_Changes.pdf PDF
Attachment_6_-_Revised_Attachment_J.17 TE_3.3_Government_Data_Systems_Tracked_Changes.pdf PDF
SP3300-16-R-5003_0002_11-01-16.pdf PDF
SP3300-16-R-5003_0001_10-24-16.pdf PDF
Attachment_J.32 _DDBC_Proposed_Productive_Hours_UPDATE.xlsx XLSX spreadsheet
Attachment_J.2 _PWS_Site_Specific.pdf PDF
Attachment_J.15 TE_3.1_GF-4.21.11.docx DOCX document
Attachment_J.30 _TE_6.1_Government_Forms.docx DOCX document
Attachment_J.20 TE_4.3_MHE_PM_Task_Codes.xlsx XLSX spreadsheet
Attachment_J.31 DDBC_Draft_Training_Calendar.xlsx XLSX spreadsheet
Attachment_J.27 TE_5.4_Transshipment_of_Hazardous_Assets.pdf PDF
Attachment_J.3 Wage_Determination.pdf PDF
Attachment_J.8 GE MISC _final_4-29-2016.xlsx XLSX spreadsheet
Attachment_J.34 _LOSReporting.xls XLS spreadsheet
Attachment_J.5 _CLIN_X006_Labor_Rate_Table.xlsx XLSX spreadsheet
Attachment_J.11 _Contract_Data_Requirements_List_CDRLs.pdf PDF
Attachment_J.33 _Proposed_Training_Hrs.xlsx XLSX spreadsheet
Attachment_J.24 TE_5_1_DDBC_Historical_Workload_for_final_RFP_9-21-16.docx DOCX document
Attachment_J.18 _TE_4.1_Contractor_Training_.docx DOCX document
Attachment_J.10 Past_Performance_Questionnaire.docx DOCX document
Attachment_J.12 TE_1.1__Contractor_Personnel_Security.docx DOCX document
Attachment_J.1 _Section_C_-_PWS.pdf PDF
Attachment_J.17 TE_3.3_Government_Data_Systems.doc DOC document
Attachment_J.16 _TE_3.2_Government_Training.docx DOCX document
Attachment_J.28 TE_5.5__Type_Physical_Inventory_Code_(TPIC)_Matrix.docx DOCX document
Attachment_J.13 TE_1.2_CAC_Procedures.docx DOCX document
Attachment_J.14 TE_2.1_Definitions _Acronyms_.doc DOC document
RFP_SP3300-16-R-5003.pdf PDF
Attachment_J.29 TE_5.9_DSS_Load_and_Maintain_.docx DOCX document
Attachment_J.4 DD254_Barstow2016.pdf PDF
Attachment_J.25 TE_5.2__Projected_Workload_DDBC_for_final_RFP.docx DOCX document
Notice_Regarding_Restricted_Access.pdf PDF
Pre-Solicitation_Conference_List_-_Attendees.pdf PDF
DRAFT_RFP_Attachment_J.2_Section_C_-_PWS_Local.pdf PDF
DRAFT_RFP_Attachment_J.1_Section_C_-_PWS.pdf PDF
DRAFT_RFP_Sections_L_and_M.pdf PDF
DRAFT_RFP_Attachment_J.32 _DDBC_Proposed_Productive_Hours_UPDATE.xlsx XLSX spreadsheet
DRAFT_RFP_Section_B_Schedule.pdf PDF
Show all 50

Distribution and Warehouse Services - DLA Distribution Barstow, CA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300-16-R-5003

Attachment J.23

TECHNICAL EXHIBIT 5.0

ACCEPTABLE PERFORMANCE LEVELS (APLS)

5.2 RECEIVING

TIMELINESS

ACTIVITY
STANDARD
APL
MEASUREMENT UNIVERSE
Receipt Processing-New Procurement Receipts Tailgate to Induction On Time
Tailgate to Induction and post to accountable record in 24 hours or less
≥ 90% of receipts inducted on time against a 24 hour standard excluding weekends and holidays (DSS-MIS Data Element 15177)
New Procurement lines received per month (DSS-MIS Data Element 15101)

Receipt Processing

– New Procurement Receipts Tailgate to Stow

Tailgate to Stow in 7 days or less
≥ 90% of receipts Stowed on time against a 7 day standard (DSS-MIS Data Element 15118)
New Procurement lines received per month (DSS-MIS Data Element 15102)
Receipt Processing – MILSVC Redistributions Order (RDO) Tailgate to Induction
Tailgate to Induction and post to accountable record in 48 hours or less
>90% of receipts inducted on time against a 48 hour standard

excluding weekends and holidays (DSS-MIS Data Element 15277) Redistribution Order (RDO) lines received per month (DSS-MIS Data Element 15201)

Receipt Processing – DLA Stock Transfer Order (STO) Tailgate to Induction
Tailgate to Induction and post to accountable record in 48 hours or less
≥ 90% of receipts inducted on time against a 48 hour standard

excluding weekends and holidays (DSS-MIS Data Element 15577) Stock Transfer Order (STO) lines received per month (DSS-MIS Data Element 15501)

Receipt Processing – MILSVC Redistribution (RDO) Receipts Tailgate to Stow
Tailgate to Stow in 10 days or less
≥ 90% of receipts stowed against a 10 day standard (DSS-MIS Data Element 15218)
Redistribution Order (RDO) lines received per month (DSS-MIS Data Element 15202)
Receipt Processing – DLA Stock Transfer Orders (STO) Receipts Tailgate to Stow
Tailgate to Stow in 10 days or less
≥ 90% of receipts stowed against a 10 day standard (DSS-MIS Data Element 15518)
Stock Transfer Order (STO) lines received per month (DSS-MIS Data Element 15502)
Receipt Processing – Customer Returns Receipts Tailgate to Inducted
Tailgate/Turn-in to Induction and post to the accountable record in 120 hours or less
>90% of receipts inducted on time against a 120 hour standard excluding weekends and holidays (DSS-MIS Data Element 15377)
Customer Returns lines received per month (DSS-MIS Data Element 15301)

5.2 RECEIVING

TIMELINESS

ACTIVITY
STANDARD
APL
MEASUREMENT UNIVERSE

Receipt Processing

– Customer Return Receipts Tailgate to Stow on Time

Tailgate/Turn-in to Stow in 10 days or less
≥ 90% of receipts Stowed on time against a 10 day standard (DSS-MIS Data Element 15318)
Customer Return lines received per month (DSS-MIS Data Element 15302)

5.4 PHYSICAL INVENTORY CONTROL STANDARDS

QUALITY

ACTIVITY
STANDARD
APL
MEASUREMENT

UNIVERSE

Denial Rate

(DSS)

The right quantity, condition and item is located to fill the MRO and CC
≤ 0.4%

(DSS-MIS Data Element 26330) MROs per month (Excluding Denial Management Code 3 (Shelf Life))

TPIC N Category A – Unit Price > $1,000
Physical Inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
99% Accuracy
Items/Lines counted at time of Government-conducted TPIC N inventory

Annual

TPIC N Category B – Unit of Issue not equal to each or on hand balance greater than 50 and extended value less than $50,000 or NSN activity greater than 50
Physical Inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a 10% Tolerance on the count variance
95% Accuracy
Items/Lines counted at time of Government-conducted TPIC N inventory

Annual

TPIC N Category C – Date of Last Inventory > 24 months and on hand balance < 50
Physical Inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a 5% Tolerance on the count variance
95% Accuracy
Items/Lines counted at time of Government-conducted TPIC N inventory

Annual

5.4 PHYSICAL INVENTORY CONTROL STANDARDS

QUALITY

ACTIVITY
STANDARD
APL
MEASUREMENT

UNIVERSE

TPIC N Category D – Other
Physical Inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
95% Accuracy
Items/Lines counted at time of Government-conducted TPIC N inventory

Annual

TPIC G

Inventories

Physical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
100% Accuracy
All items counted at time of annually scheduled Government-conducted TPIC G inventory (Controlled Items – Classified and Sensitive)

TPIC P

Inventories

Physical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
95% Accuracy
All items counted for all inventories scheduled and released under Government-conducted TPIC P or approved sample process (Pilferable Items)
Radiological
Physical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
100% Accuracy
All items counted at time of annually scheduled Government-conducted inventory
Location Accuracy
Physical material in location by NSN, Shelf-Life, CC, and Unit of Issue match storage activity locator records
99.5% Accuracy
Number of location surveys completed per month; DSS Report: YE6Z

5.3.8 ISSUE

QUALITY

ACTIVITY
STANDARD
APL
MEASUREMENT UNIVERSE
Issue Material – All Issue Document Types
Material shipped is the correct item, quantity, and CC and shipped to the right customer
> 99.75%

Monthly ISDR Report Valid complaints per month as a % of total issues (sum of DSS MIS Elements 21740, 22002, and 20762)

MRO High Priorities - Wholesale/Retail (Excluding Dedicated Trucks and Special Project Codes)
Receipt of MRO at the Distribution Center to ship in 1 day or less
> 85% of Hi Pri MROs on time against a 1 day standard

(DSS-MIS Data Element 22306) High priority lines issued per month (DSS-MIS Data Element 22302)

MRO Routines - Wholesale/Retail (Excluding Dedicated Trucks and Special Project Codes)
Receipt of MRO at the Distribution Center to ship in 3 days or less
> 85% of Routine MROs on time against a 3 day standard

(DSS-MIS Data Element 22311) Routine lines issued per month. (DSS-MIS Data Element 22307)

STO Routines (DLA) – Wholesale/Retail (Excluding Special Project Codes)
Receipt of STO at Distribution Center to ship in 5 days or less
≥ 85% of RDOs shipped on time against a 5 day standard (DSS-MIS Data Element 20808)
DLA Routine STO lines issued per month (DSS-MIS Data Element 20803)
RDO Routines (MILSVC) – Wholesale/Retail (Excluding Special Project Codes)
Receipt of RDO at Distribution Center to ship in 3 days or less
≥ 85% of RDOs shipped on time against a 3 day standard (DSS-MIS Data Element 20708)
MILSVC Routine RDO lines issued per month (DSS-MIS Data Element 20703)
FMS MRO High Priority
Receipt of MRO at the Distribution Center to ship (or to date of first notice, if NOA) in 3 days or less.
≥ 85% Hi Pri FMS MROs on time against a 3 day standard

(DSS-MIS Data Element to be developed) FMS MRO High Priority lines (as defined by DLA Distribution, currently RDD 777, RDD E_, RDD N_, Project Code 9G_, and CASREP (11th position of document number is ‘G’ or ‘W’)) received per month. QMF program run by the Government until MIS elements are available.

5.3.8 ISSUE

TIMELINESS *

ACTIVITY
STANDARDS
APL
MEASUREMENT UNIVERSE
FMS MRO Routine Priority
Receipt of MRO at the Distribution Center to ship (or to date of first notice, if NOA) in 10 days or less.
≥ 85% Routine FMS MROs on time against a 10 day standard

(DSS-MIS Data Element to be developed) FMS MRO Routine Priority lines (as defined by DLA Distribution, currently FMS MROs excluding RDD 777, RDD E_, RDD N_, Project Code 9G_, and CASREP (11th position of document number is ‘G’ or ‘W’)) received per month. QMF program run by the Government until MIS elements are available.

*NOTES:

1. The APL clock starts when the MROs free flow from DAASC into DSS.

RETAIL APLS

5.7.4 RETAIL SUPPORT

ACTIVITY
STANDARD
APL
MEASUREMENT UNIVERSE
Receipt Processing – Stow
Tailgate to stow in 2 days or less.
≥ 95% of receipts stowed on time against a 2 day standard
Retail lines received per month. QMF run by the Government until MIS elements are available
Inventory - Denial Rate
The right quantity, condition and item is located to fill the MRO and CC
≤ 2.00%

(DSS-MIS Data Element 26750) MROs per month (Excluding Denial Management Codes 1, 2, 4-7, 9, B, W, or X)

Inventory – Location Accuracy
Physical material in location by NSN, Shelf-Life, CC, and Unit of Issue match storage activity locator records
95% Accuracy
Number of location surveys completed per month; DSS Report: YE6Z
Delivery Response Time – Direct/DTO Issues
Receipt of MRO at retail warehouse to delivery of material in 8 hours or less.
≥ 90% of Direct/DTO issues on time against a 8 hour standard
Retail Direct/DTO issues per month. QMF run by the Government until MIS Elements are available.
Delivery Response Time – Line Side Stock Issues
Receipt of MRO at retail warehouse to delivery of material in 1 day or less.
≥ 90% of Line Side Stock issues on time against a 1 day standard
Retail Line Side Stock issues per month. QMF run by the Government until MIS Elements are available.

TE 5.0

Acceptable Performance Levels (APL)

File details come from the government source that posted it. Updated .