Attachment_9_-_Proposal_Breakdown_of_Unit_Pricing_for_Evaluation_Purposes.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
Material Handling Equipment Preventive and Remedial Maintenance Services Located at DLA Distribution, Disposition, and Aviation Warner Robins, GA
Solicitation number
SP3300-13-R-0016
Issued by

About this file

Attachment 9 Price Breakdown for Proposal Evaluation Purposes

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BaseYear

ITEM NO. DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

BaseYear - September 1, 2013 through August 31, 2014-Dist & Aviation Only
Base Year - October 1, 2013 through August 31, 2014-DLA Disposition Only
FIRM FIXED PRICE
0001Daily Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work DLA Distribution Warner Robins, GA12MO$0.00$0.00
0002Preventive Maintenance Services for Government Owned Equipment DLA Distribution Warner Robins, GA12MO$0.00$0.00
Price Breakdown for Proposal Evaluation Purposes

CONTRACTOR MANPOWER REPORTING $0.00

SEMI-ANNUAL PM SERVICES
Diesel Forklift prt swmst 6k2EA$0.00$0.00

Reserved 0 EA $0.00 $0.00

Diesel Forklift prt 15k 144-210" 3 EA $0.00 $0.00

Reserved 0 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 6 EA $0.00 $0.00

Electric Forklift fr/s 4/3k 217 11 EA $0.00 $0.00

Electric Forklift 3wh 4k stand 7 EA $0.00 $0.00

Reserved 0 EA $0.00 $0.00

Gas Forklift srt 4k 180" 26 EA $0.00 $0.00

Maintenance Platform telescope 1 EA $0.00 $0.00

Stock Selector 168-218" (Waves) 23 EA $0.00 $0.00

Stock Selector, wire guided 34 EA $0.00 $0.00

Warehouse tractor gas prt 4000 4 EA $0.00 $0.00

Trailer, special purpose 2 EA $0.00 $0.00

Truck, 20 ton 6x4 tractor 1 EA $0.00 $0.00

Truck, 3/4 ton pickup 4x2 1 EA $0.00 $0.00

Truck, 5 ton stake 4 EA $0.00 $0.00

Truck, 5 ton van 1 EA $0.00 $0.00

Truck, Conveyorized 8 ton 9 EA $0.00 $0.00

Truck trailer spotter 3 EA $0.00 $0.00

Warehouse sweeper riding 4 EA $0.00 $0.00

Forklift, gas, prt 15k 210" 4 EA $0.00 $0.00

Forklift, gas prt 6k 127" 6 EA $0.00 $0.00

Forklift, elec, turret 3-4k 7 EA $0.00 $0.00

Forklift elc 4k 180-185" (Hydrogen 2 Convert) 20 EA $0.00 $0.00

Forklift, elec prtswmst, 6k 3 EA $0.00 $0.00

Scaffold Mobile Battery Power 1 EA $0.00 $0.00

Tractor, Tow Truck 10k 2 EA $0.00 $0.00

Stock Selector Rail Guide 10 EA $0.00 $0.00

ANNUAL PM SERVICES
Reserved0EA$0.00$0.00
Diesel Forklift prt 15k 144-210"3EA$0.00$0.00

Reserved 0 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 6 EA $0.00 $0.00

Electric Forklift fr/s 4/3k 217 11 EA $0.00 $0.00

Electric Forklift 3wh 4k stand 7 EA $0.00 $0.00

Gas Forklift srt 4k 180" 26 EA $0.00 $0.00

Maintenance Platform telescope 1 EA $0.00 $0.00

Scrubbing Machine, floor 4 EA $0.00 $0.00

Stock Selector 168-218" (Waves) 23 EA $0.00 $0.00

Stock Selector, wire guided 34 EA $0.00 $0.00

Warehouse tractor gas prt 4000 4 EA $0.00 $0.00

Trailer, special purpose 2 EA $0.00 $0.00

Truck, 20 ton 6x4 tractor 1 EA $0.00 $0.00

Truck, 3/4 ton pickup 4x2 1 EA $0.00 $0.00

Truck, 5 ton stake 4 EA $0.00 $0.00

Truck, 5 ton van 1 EA $0.00 $0.00

Truck, Conveyorized 8 ton 9 EA $0.00 $0.00

Truck trailer spotter 3 EA $0.00 $0.00

Warehouse sweeper riding 4 EA $0.00 $0.00

Forklift, gas, prt 15k 210" 4 EA $0.00 $0.00

Forklift, gas prt 6k 127" 6 EA $0.00 $0.00

Forklift, elec, turret 3-4k 7 EA $0.00 $0.00

Forklift elc 4k 180-185" (Hydro 2 Convert) 20 EA $0.00 $0.00

Forklift, elec prtswmst, 6k 3 EA $0.00 $0.00

Scaffold Mobile Battery Power 1 EA $0.00 $0.00

Tractor, Tow Truck 10k 2 EA $0.00 $0.00

Stock Selector Rail Guide 10 EA $0.00 $0.00

Trailer, Semi 36-50 Tow Bed 4 EA $0.00 $0.00

Trailer, Semi 11-14t stake 3 EA $0.00 $0.00

Trailer, Semi 15-20 ton lowbed 11 EA $0.00 $0.00

Trailer, Retriever 7k 1 EA $0.00 $0.00

Scooter, electric, 3 or 4 wheel 22 EA $0.00 $0.00

Scooter, gas, 3 or 4 wheel 17 EA $0.00 $0.00

Warehouse trailer 16 EA $0.00 $0.00

0003Preventive Maintenance Services for Government Owned Equipment DLA Disposition Warner Robins, GA11MO$0.00$0.00
Price Breakdown for Proposal Evaluation Purposes
SEMI-ANNUAL PM SERVICES
Diesel Forklift prt 4k 144-187"4EA$0.00$0.00

Gas Forklift prt 4k 180-187" 1 EA $0.00 $0.00

Diesel Forklift prt 15k 144-210" 2 EA $0.00 $0.00

Diesel Forklift prt 35-45k 1 EA $0.00 $0.00

Diesel Forklift prt 6k 100-189" 7 EA $0.00 $0.00

Gas Forklift prt 6k 180-189" 1 EA $0.00 $0.00

Gas Forklift srt 6k 180" 1 EA $0.00 $0.00

Elec Forklift 3wh 4kstand 4 EA $0.00 $0.00

Elec Forklift tier 4k 150" 3 EA $0.00 $0.00

Elec Forklift tier 4kstand 1 EA $0.00 $0.00

Front End Loader 2 EA $0.00 $0.00

Mobile Trailer Ramp (Loading Ramp) 3 EA $0.00 $0.00

Warehouse Sweeper riding 1 EA $0.00 $0.00

Crane Crawl 11-20t 3/4cu 1 EA $0.00 $0.00

ANNUAL PM SERVICES
Gas Forklift prt 4k 180-187"1EA$0.00$0.00

Diesel Forklift prt 15k 144-210" 2 EA $0.00 $0.00

Diesel Forklift prt 35-45k 1 EA $0.00 $0.00

Diesel Forklift prt 6k 100-189" 7 EA $0.00 $0.00

Gas Forklift prt 6k 180-189" 1 EA $0.00 $0.00

Gas Forklift srt 6k 180" 1 EA $0.00 $0.00

Elec Forklift 3wh 4kstand 4 EA $0.00 $0.00

Elec Forklift tier 4k 150" 3 EA $0.00 $0.00

Elec Forklift tier 4kstand 1 EA $0.00 $0.00

Front End Loader 2 EA $0.00 $0.00

Mobile Trailer Ramp (Loading Ramp) 3 EA $0.00 $0.00

Warehouse Sweeper riding 1 EA $0.00 $0.00

Crane Crawl 11-20t 3/4cu 1 EA $0.00 $0.00

Scooter gas, 3 or 4 wheel 1 EA $0.00 $0.00

0004Preventive Maintenance Services for Government Owned Equipment DLA Aviation Warner Robins, GA12MO$0.00$0.00
Price Breakdown for Proposal Evaluation Purposes
SEMI-ANNUAL PM SERVICES
Warehouse sweeper walking1EA$0.00$0.00

Electric Forklift 4k 36v 144-168" 1 EA $0.00 $0.00

Electric Forklift 4k 180-185" 2 EA $0.00 $0.00

Warehouse Tractor, Gas, prt 4000 1 EA $0.00 $0.00

Warehouse Tractor Elec srt 4000 2 EA $0.00 $0.00

Stock Selector 168-218" 1 EA $0.00 $0.00

Diesel Forklift prt 4k 144-180 3 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 4 EA $0.00 $0.00

Diesel Forklift prt 15k 100" 1 EA $0.00 $0.00

ANNUAL PM SERVICES
Warehouse sweeper walking1EA$0.00$0.00

Electric Forklift 4k 36v 144-168" 2 EA $0.00 $0.00

Electric Forklift 4k 180-185" 2 EA $0.00 $0.00

Warehouse Tractor, Gas, prt 4000 1 EA $0.00 $0.00

Warehouse Tractor, Electric srt 4000 2 EA $0.00 $0.00

Stock Selector 168-218" 1 EA $0.00 $0.00

Diesel Forklift prt 4k 144-180 3 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 4 EA $0.00 $0.00

Diesel Forklift prt 15k 100" 1 EA $0.00 $0.00

Scooter, gas, 3 or 4 wheel 12 EA $0.00 $0.00

Scooter, electric, 3 or 4 wheel 10 EA $0.00 $0.00

Trailor, unpowered 4 EA $0.00 $0.00

Battery Charger 6 EA $0.00 $0.00

0005Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Warner Robins, GA.CEILING PRICE
0005AALabor Hours performed during the Principal Period of Maintenance2,920HR$0.00$0.00
0005ABLabor Hours performed outside the Principal Period of Maintenance100HR$0.00$0.00
0005ACReplacement Parts for Remedial Maintenance (Actual Costs)$83,000.00
0005ADOff-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$2,000.00
CLIN Total Ceiling Price$85,000.00
0006Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Disposition Services Warner Robins, GA.CEILING PRICE
0006AALabor Hours Performed930HR$0.00$0.00
0006ABReplacement Parts for Remedial Maintenance (Actual Costs)$25,000.00
0006ACOff-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$500.00
CLIN Total Ceiling Price$25,500.00
0007Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Aviation Services Warner Robins, GA.CEILING PRICE
0007AALabor Hours Performed1,230HR$0.00$0.00
0007ABReplacement Parts for Remedial Maintenance (Actual Costs)$25,000.00
0007ACOff-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$500.00
CLIN Total Ceiling Price$25,500.00
TOTAL BASE YEAR CEILING PRICE$136,000.00
OPTION YEAR ONE CEILING PRICE$136,000.00
OPTION YEAR TWO CEILING PRICE$136,000.00
TOTAL CONTRACT CEILING PRICE$408,000.00

&"Arial,Bold"ATTACHMENT 9 Price Breakdown for Proposal Evaluation Purposes &"Arial,Bold"SP3300-13-R-0016

OptionYear1

ITEM NO. DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

Option Year One - September 1, 2014 through August 31, 2015

FIRM FIXED PRICE
1001Daily Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work DLA Distribution Warner Robins, GA12MO$0.00$0.00
1002Preventive Maintenance Services for Government Owned Equipment DLA Distribution Warner Robins, GA12MO$0.00$0.00
Price Breakdown for Proposal Evaluation Purposes

CONTRACTOR MANPOWER REPORTING $0.00

SEMI-ANNUAL PM SERVICES
Diesel Forklift prt swmst 6k2EA$0.00$0.00

Reserved 0 EA $0.00 $0.00

Diesel Forklift prt 15k 144-210" 3 EA $0.00 $0.00

Reserved 0 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 6 EA $0.00 $0.00

Electric Forklift fr/s 4/3k 217 11 EA $0.00 $0.00

Electric Forklift 3wh 4k stand 7 EA $0.00 $0.00

Reserved 0 EA $0.00 $0.00

Gas Forklift srt 4k 180" 26 EA $0.00 $0.00

Maintenance Platform telescope 1 EA $0.00 $0.00

Stock Selector 168-218" (Waves) 23 EA $0.00 $0.00

Stock Selector, wire guided 34 EA $0.00 $0.00

Warehouse tractor gas prt 4000 4 EA $0.00 $0.00

Trailer, special purpose 2 EA $0.00 $0.00

Truck, 20 ton 6x4 tractor 1 EA $0.00 $0.00

Truck, 3/4 ton pickup 4x2 1 EA $0.00 $0.00

Truck, 5 ton stake 4 EA $0.00 $0.00

Truck, 5 ton van 1 EA $0.00 $0.00

Truck, Conveyorized 8 ton 9 EA $0.00 $0.00

Truck trailer spotter 3 EA $0.00 $0.00

Warehouse sweeper riding 4 EA $0.00 $0.00

Forklift, gas, prt 15k 210" 4 EA $0.00 $0.00

Forklift, gas prt 6k 127" 6 EA $0.00 $0.00

Forklift, elec, turret 3-4k 7 EA $0.00 $0.00

Forklift elc 4k 180-185" (Hydrogen 2 Convert) 20 EA $0.00 $0.00

Forklift, elec prtswmst, 6k 3 EA $0.00 $0.00

Scaffold Mobile Battery Power 1 EA $0.00 $0.00

Tractor, Tow Truck 10k 2 EA $0.00 $0.00

Stock Selector Rail Guide 10 EA $0.00 $0.00

ANNUAL PM SERVICES
Reserved0EA$0.00$0.00
Diesel Forklift prt 15k 144-210"3EA$0.00$0.00

Reserved 0 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 6 EA $0.00 $0.00

Electric Forklift fr/s 4/3k 217 11 EA $0.00 $0.00

Electric Forklift 3wh 4k stand 7 EA $0.00 $0.00

Gas Forklift srt 4k 180" 26 EA $0.00 $0.00

Maintenance Platform telescope 1 EA $0.00 $0.00

Scrubbing Machine, floor 4 EA $0.00 $0.00

Stock Selector 168-218" (Waves) 23 EA $0.00 $0.00

Stock Selector, wire guided 34 EA $0.00 $0.00

Warehouse tractor gas prt 4000 4 EA $0.00 $0.00

Trailer, special purpose 2 EA $0.00 $0.00

Truck, 20 ton 6x4 tractor 1 EA $0.00 $0.00

Truck, 3/4 ton pickup 4x2 1 EA $0.00 $0.00

Truck, 5 ton stake 4 EA $0.00 $0.00

Truck, 5 ton van 1 EA $0.00 $0.00

Truck, Conveyorized 8 ton 9 EA $0.00 $0.00

Truck trailer spotter 3 EA $0.00 $0.00

Warehouse sweeper riding 4 EA $0.00 $0.00

Forklift, gas, prt 15k 210" 4 EA $0.00 $0.00

Forklift, gas prt 6k 127" 6 EA $0.00 $0.00

Forklift, elec, turret 3-4k 7 EA $0.00 $0.00

Forklift elc 4k 180-185" (Hydro 2 Convert) 20 EA $0.00 $0.00

Forklift, elec prtswmst, 6k 3 EA $0.00 $0.00

Scaffold Mobile Battery Power 1 EA $0.00 $0.00

Tractor, Tow Truck 10k 2 EA $0.00 $0.00

Stock Selector Rail Guide 10 EA $0.00 $0.00

Trailer, Semi 36-50 Tow Bed 4 EA $0.00 $0.00

Trailer, Semi 11-14t stake 3 EA $0.00 $0.00

Trailer, Semi 15-20 ton lowbed 11 EA $0.00 $0.00

Trailer, Retriever 7k 1 EA $0.00 $0.00

Scooter, electric, 3 or 4 wheel 22 EA $0.00 $0.00

Scooter, gas, 3 or 4 wheel 16 EA $0.00 $0.00

Warehouse trailer 16 EA $0.00 $0.00

1003Preventive Maintenance Services for Government Owned Equipment DLA Disposition Warner Robins, GA12MO$0.00$0.00
Price Breakdown for Proposal Evaluation Purposes
SEMI-ANNUAL PM SERVICES
Diesel Forklift prt 4k 144-187"4EA$0.00$0.00

Gas Forklift prt 4k 180-187" 1 EA $0.00 $0.00

Diesel Forklift prt 15k 144-210" 2 EA $0.00 $0.00

Diesel Forklift prt 35-45k 1 EA $0.00 $0.00

Diesel Forklift prt 6k 100-189" 7 EA $0.00 $0.00

Gas Forklift prt 6k 180-189" 1 EA $0.00 $0.00

Gas Forklift srt 6k 180" 1 EA $0.00 $0.00

Elec Forklift 3wh 4kstand 4 EA $0.00 $0.00

Elec Forklift tier 4k 150" 3 EA $0.00 $0.00

Elec Forklift tier 4kstand 1 EA $0.00 $0.00

Front End Loader 2 EA $0.00 $0.00

Mobile Trailer Ramp (Loading Ramp) 3 EA $0.00 $0.00

Warehouse Sweeper riding 1 EA $0.00 $0.00

Crane Crawl 11-20t 3/4cu 1 EA $0.00 $0.00

ANNUAL PM SERVICES
Gas Forklift prt 4k 180-187"1EA$0.00$0.00

Diesel Forklift prt 15k 144-210" 2 EA $0.00 $0.00

Diesel Forklift prt 35-45k 1 EA $0.00 $0.00

Diesel Forklift prt 6k 100-189" 7 EA $0.00 $0.00

Gas Forklift prt 6k 180-189" 1 EA $0.00 $0.00

Gas Forklift srt 6k 180" 1 EA $0.00 $0.00

Elec Forklift 3wh 4kstand 4 EA $0.00 $0.00

Elec Forklift tier 4k 150" 3 EA $0.00 $0.00

Elec Forklift tier 4kstand 1 EA $0.00 $0.00

Front End Loader 2 EA $0.00 $0.00

Mobile Trailer Ramp (Loading Ramp) 3 EA $0.00 $0.00

Warehouse Sweeper riding 1 EA $0.00 $0.00

Crane Crawl 11-20t 3/4cu 1 EA $0.00 $0.00

Scooter gas, 3 or 4 wheel 1 EA $0.00 $0.00

1004Preventive Maintenance Services for Government Owned Equipment DLA Aviation Warner Robins, GA12MO$0.00$0.00
Price Breakdown for Proposal Evaluation Purposes
SEMI-ANNUAL PM SERVICES
Warehouse sweeper walking1EA$0.00$0.00

Electric Forklift 4k 36v 144-168" 1 EA $0.00 $0.00

Electric Forklift 4k 180-185" 2 EA $0.00 $0.00

Warehouse Tractor, Gas, prt 4000 1 EA $0.00 $0.00

Warehouse Tractor Elec srt 4000 2 EA $0.00 $0.00

Stock Selector 168-218" 1 EA $0.00 $0.00

Diesel Forklift prt 4k 144-180 3 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 4 EA $0.00 $0.00

Diesel Forklift prt 15k 100" 1 EA $0.00 $0.00

ANNUAL PM SERVICES
Warehouse sweeper walking1EA$0.00$0.00

Electric Forklift 4k 36v 144-168" 2 EA $0.00 $0.00

Electric Forklift 4k 180-185" 2 EA $0.00 $0.00

Warehouse Tractor, Gas, prt 4000 1 EA $0.00 $0.00

Warehouse Tractor, Electric srt 4000 2 EA $0.00 $0.00

Stock Selector 168-218" 1 EA $0.00 $0.00

Diesel Forklift prt 4k 144-180 3 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 4 EA $0.00 $0.00

Diesel Forklift prt 15k 100" 1 EA $0.00 $0.00

Scooter, gas, 3 or 4 wheel 12 EA $0.00 $0.00

Scooter, electric, 3 or 4 wheel 10 EA $0.00 $0.00

Trailor, unpowered 4 EA $0.00 $0.00

Battery Charger 6 EA $0.00 $0.00

1005Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Warner Robins, GA.CEILING PRICE
1005AALabor Hours performed during the Principal Period of Maintenance2,920HR$0.00$0.00
1005ABLabor Hours performed outside the Principal Period of Maintenance100HR$0.00$0.00
1005ACReplacement Parts for Remedial Maintenance (Actual Costs)$83,000.00
1005ADOff-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$2,000.00
CLIN Total Ceiling Price$85,000.00
1006Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Disposition Services Warner Robins, GA.CEILING PRICE
1006AALabor Hours Performed930HR$0.00$0.00
1006ABReplacement Parts for Remedial Maintenance (Actual Costs)$25,000.00
1006ACOff-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$500.00
CLIN Total Ceiling Price$25,500.00
1007Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Aviation Services Warner Robins, GA.CEILING PRICE
1007AALabor Hours Performed1,230HR$0.00$0.00
1007ABReplacement Parts for Remedial Maintenance (Actual Costs)$25,000.00
1007ACOff-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$500.00
CLIN Total Ceiling Price$25,500.00
TOTAL OPTION YEAR ONE CEILING PRICE$136,000.00

OptionYear2

ITEM NO. DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

Option Year 2 - September 1, 2015 through August 31, 2016

FIRM FIXED PRICE
2001Daily Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work DLA Distribution Warner Robins, GA12MO$0.00$0.00
2002Preventive Maintenance Services for Government Owned Equipment DLA Distribution Warner Robins, GA12MO$0.00$0.00
Price Breakdown for Proposal Evaluation Purposes

CONTRACTOR MANPOWER REPORTING $0.00

SEMI-ANNUAL PM SERVICES
Diesel Forklift prt swmst 6k2EA$0.00$0.00

Reserved 0 EA $0.00 $0.00

Diesel Forklift prt 15k 144-210" 3 EA $0.00 $0.00

Reserved 0 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 6 EA $0.00 $0.00

Electric Forklift fr/s 4/3k 217 11 EA $0.00 $0.00

Electric Forklift 3wh 4k stand 7 EA $0.00 $0.00

Reserved 0 EA $0.00 $0.00

Gas Forklift srt 4k 180" 26 EA $0.00 $0.00

Maintenance Platform telescope 1 EA $0.00 $0.00

Stock Selector 168-218" (Waves) 23 EA $0.00 $0.00

Stock Selector, wire guided 34 EA $0.00 $0.00

Warehouse tractor gas prt 4000 4 EA $0.00 $0.00

Trailer, special purpose 2 EA $0.00 $0.00

Truck, 20 ton 6x4 tractor 1 EA $0.00 $0.00

Truck, 3/4 ton pickup 4x2 1 EA $0.00 $0.00

Truck, 5 ton stake 4 EA $0.00 $0.00

Truck, 5 ton van 1 EA $0.00 $0.00

Truck, Conveyorized 8 ton 9 EA $0.00 $0.00

Truck trailer spotter 3 EA $0.00 $0.00

Warehouse sweeper riding 4 EA $0.00 $0.00

Forklift, gas, prt 15k 210" 4 EA $0.00 $0.00

Forklift, gas prt 6k 127" 6 EA $0.00 $0.00

Forklift, elec, turret 3-4k 7 EA $0.00 $0.00

Forklift elc 4k 180-185" (Hydrogen 2 Convert) 20 EA $0.00 $0.00

Forklift, elec prtswmst, 6k 3 EA $0.00 $0.00

Scaffold Mobile Battery Power 1 EA $0.00 $0.00

Tractor, Tow Truck 10k 2 EA $0.00 $0.00

Stock Selector Rail Guide 10 EA $0.00 $0.00

ANNUAL PM SERVICES
Reserved0EA$0.00$0.00
Diesel Forklift prt 15k 144-210"3EA$0.00$0.00

Reserved 0 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 6 EA $0.00 $0.00

Electric Forklift fr/s 4/3k 217 11 EA $0.00 $0.00

Electric Forklift 3wh 4k stand 7 EA $0.00 $0.00

Gas Forklift srt 4k 180" 26 EA $0.00 $0.00

Maintenance Platform telescope 1 EA $0.00 $0.00

Scrubbing Machine, floor 4 EA $0.00 $0.00

Stock Selector 168-218" (Waves) 23 EA $0.00 $0.00

Stock Selector, wire guided 34 EA $0.00 $0.00

Warehouse tractor gas prt 4000 4 EA $0.00 $0.00

Trailer, special purpose 2 EA $0.00 $0.00

Truck, 20 ton 6x4 tractor 1 EA $0.00 $0.00

Truck, 3/4 ton pickup 4x2 1 EA $0.00 $0.00

Truck, 5 ton stake 4 EA $0.00 $0.00

Truck, 5 ton van 1 EA $0.00 $0.00

Truck, Conveyorized 8 ton 9 EA $0.00 $0.00

Truck trailer spotter 3 EA $0.00 $0.00

Warehouse sweeper riding 4 EA $0.00 $0.00

Forklift, gas, prt 15k 210" 4 EA $0.00 $0.00

Forklift, gas prt 6k 127" 6 EA $0.00 $0.00

Forklift, elec, turret 3-4k 7 EA $0.00 $0.00

Forklift elc 4k 180-185" (Hydro 2 Convert) 20 EA $0.00 $0.00

Forklift, elec prtswmst, 6k 3 EA $0.00 $0.00

Scaffold Mobile Battery Power 1 EA $0.00 $0.00

Tractor, Tow Truck 10k 2 EA $0.00 $0.00

Stock Selector Rail Guide 10 EA $0.00 $0.00

Trailer, Semi 36-50 Tow Bed 4 EA $0.00 $0.00

Trailer, Semi 11-14t stake 3 EA $0.00 $0.00

Trailer, Semi 15-20 ton lowbed 11 EA $0.00 $0.00

Trailer, Retriever 7k 1 EA $0.00 $0.00

Scooter, electric, 3 or 4 wheel 22 EA $0.00 $0.00

Scooter, gas, 3 or 4 wheel 17 EA $0.00 $0.00

Warehouse trailer 16 EA $0.00 $0.00

2003Preventive Maintenance Services for Government Owned Equipment DLA Disposition Warner Robins, GA12MO$0.00$0.00
Price Breakdown for Proposal Evaluation Purposes
SEMI-ANNUAL PM SERVICES
Diesel Forklift prt 4k 144-187"4EA$0.00$0.00

Gas Forklift prt 4k 180-187" 1 EA $0.00 $0.00

Diesel Forklift prt 15k 144-210" 2 EA $0.00 $0.00

Diesel Forklift prt 35-45k 1 EA $0.00 $0.00

Diesel Forklift prt 6k 100-189" 7 EA $0.00 $0.00

Gas Forklift prt 6k 180-189" 1 EA $0.00 $0.00

Gas Forklift srt 6k 180" 1 EA $0.00 $0.00

Elec Forklift 3wh 4kstand 4 EA $0.00 $0.00

Elec Forklift tier 4k 150" 3 EA $0.00 $0.00

Elec Forklift tier 4kstand 1 EA $0.00 $0.00

Front End Loader 2 EA $0.00 $0.00

Mobile Trailer Ramp (Loading Ramp) 3 EA $0.00 $0.00

Warehouse Sweeper riding 1 EA $0.00 $0.00

Crane Crawl 11-20t 3/4cu 1 EA $0.00 $0.00

ANNUAL PM SERVICES
Gas Forklift prt 4k 180-187"1EA$0.00$0.00

Diesel Forklift prt 15k 144-210" 2 EA $0.00 $0.00

Diesel Forklift prt 35-45k 1 EA $0.00 $0.00

Diesel Forklift prt 6k 100-189" 7 EA $0.00 $0.00

Gas Forklift prt 6k 180-189" 1 EA $0.00 $0.00

Gas Forklift srt 6k 180" 1 EA $0.00 $0.00

Elec Forklift 3wh 4kstand 4 EA $0.00 $0.00

Elec Forklift tier 4k 150" 3 EA $0.00 $0.00

Elec Forklift tier 4kstand 1 EA $0.00 $0.00

Front End Loader 2 EA $0.00 $0.00

Mobile Trailer Ramp (Loading Ramp) 3 EA $0.00 $0.00

Warehouse Sweeper riding 1 EA $0.00 $0.00

Crane Crawl 11-20t 3/4cu 1 EA $0.00 $0.00

Scooter gas, 3 or 4 wheel 1 EA $0.00 $0.00

2004Preventive Maintenance Services for Government Owned Equipment DLA Aviation Warner Robins, GA12MO$0.00$0.00
Price Breakdown for Proposal Evaluation Purposes
SEMI-ANNUAL PM SERVICES
Warehouse sweeper walking1EA$0.00$0.00

Electric Forklift 4k 36v 144-168" 1 EA $0.00 $0.00

Electric Forklift 4k 180-185" 2 EA $0.00 $0.00

Warehouse Tractor, Gas, prt 4000 1 EA $0.00 $0.00

Warehouse Tractor Elec srt 4000 2 EA $0.00 $0.00

Stock Selector 168-218" 1 EA $0.00 $0.00

Diesel Forklift prt 4k 144-180 3 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 4 EA $0.00 $0.00

Diesel Forklift prt 15k 100" 1 EA $0.00 $0.00

ANNUAL PM SERVICES
Warehouse sweeper walking1EA$0.00$0.00

Electric Forklift 4k 36v 144-168" 2 EA $0.00 $0.00

Electric Forklift 4k 180-185" 2 EA $0.00 $0.00

Warehouse Tractor, Gas, prt 4000 1 EA $0.00 $0.00

Warehouse Tractor, Electric srt 4000 2 EA $0.00 $0.00

Stock Selector 168-218" 1 EA $0.00 $0.00

Diesel Forklift prt 4k 144-180 3 EA $0.00 $0.00

Diesel Forklift prt 6k 100-180" 4 EA $0.00 $0.00

Diesel Forklift prt 15k 100" 1 EA $0.00 $0.00

Scooter, gas, 3 or 4 wheel 12 EA $0.00 $0.00

Scooter, electric, 3 or 4 wheel 10 EA $0.00 $0.00

Trailor, unpowered 4 EA $0.00 $0.00

Battery Charger 6 EA $0.00 $0.00

2005Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Warner Robins, GA.CEILING PRICE
2005AALabor Hours performed during the Principal Period of Maintenance2,920HR$0.00$0.00
2005ABLabor Hours performed outside the Principal Period of Maintenance100HR$0.00$0.00
2005ACReplacement Parts for Remedial Maintenance (Actual Costs)$83,000.00
2005ADOff-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$2,000.00
CLIN Total Ceiling Price$85,000.00
2006Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Disposition Services Warner Robins, GA.CEILING PRICE
2006AALabor Hours Performed930HR$0.00$0.00
2006ABReplacement Parts for Remedial Maintenance (Actual Costs)$25,000.00
2006ACOff-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$500.00
CLIN Total Ceiling Price$25,500.00
2007Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Aviation Services Warner Robins, GA.CEILING PRICE
2007AALabor Hours Performed1,230HR$0.00$0.00
2007ABReplacement Parts for Remedial Maintenance (Actual Costs)$25,000.00
2007ACOff-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$500.00
CLIN Total Ceiling Price$25,500.00
TOTAL OPTION YEAR TWO CEILING PRICE$136,000.00

File details come from the government source that posted it. Updated .