Attachment_8_-_Schedule_of_Supplies_or_Services.pdf
PDF 32 KB Posted
- Attached to
- MHE PREVENTIVE AND REMEDIAL MAINTENANCE
- Solicitation number
- SP330013Q0131
- Issued by
-
Defense Logistics Agency Distribution
About this file
ATTACHMENT 8 SCHEDULE OF SUPPLIES OR SERVICES
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0001.pdf | ||
| Attachment_3__-_Maintenance_Task_Lists.docx | DOCX document | |
| Attachment_1-_Statement_of_Work_(SOW).docx | DOCX document | |
| RFQ_SP330013Q0131_combined_synopsis-solicitation.docx | DOCX document | |
| Attachment_7_-_Wage_Determination.pdf | ||
| Attachment_9_-_CERTIFICATION_OF_OFFEROR's_account_system.docx | DOCX document | |
| Attachment_2-_DLA_Dist_Barstow_CA_Equip_Invent_List_(CGA).xlsx | XLSX spreadsheet | |
| Attachment_5_-_Vehicle_Technical_Inspection_DLA_Form_1730.pdf | ||
| Attachment_6_-_Past_Performance_Questionnaire.doc | DOC document | |
| Attachment_4_-_EMACS_Workorder_Sample.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 8
ITEM NO. DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE
Firm-fixed-price 0001 Semi-Annual Preventive Maintenance
Services for Government Owned Material Handling Equipment located at DLA Distribution Barstow, CA. (CGA).
0001AA Automatic Guided Vehicles (Waves) 2 EA $ $
Firm-fixed-price
0002 Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution Barstow, CA. (CGA).
0002AA Automatic Guided Vehicles (Waves) 2 EA $ $
0002AB Segways 4 EA $ $
0002AC Electric Scooters 3-4 Wheel 3 EA $ $
TIME AND MATERIAL CEILING PRICE
Labor to perform equipment repair in conjunction with Remedial Maintenance.
The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked
0003AA DLA Distribution Barstow, CA (CGA) 200 HR $ $
TIME AND MATERIAL CEILING PRICE
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate based on the Governments best estimate. Contractor will be paid for the actual dollars used.
0004AA DLA Distribution Barstow, CA (CGA) $20,000.00
BASE YEAR PERIOD - 01 October 2013 through 30 September 2014
TIME AND MATERIAL CEILING PRICE
0005 Labor to perform Technical Inspections in accordance with paragraph 3.0 of the Statement of Work. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
0005AA DLA Distribution Barstow, CA (CGA) 10 HR $ $
FIRM FIXED PRICE CEILING PRICE
Off-Site Transportation for major repairs of equipment in accordance with paragraph
2.1 of the Statement of Work. The quantity is an estimate only based on the Governments best estimate and are NOT TO BE EXCEEDED (NTE) without notifying the contracting officer prior to performing this task.
0006AA DLA Distribution Barstow, CA (CGA) 1 UN $ $
NTE
Total amount required by each activity:
DLA Distribution Barstow, CA (CGA) $
TOTAL CEILING AMOUNT FOR BASE YEAR $
Firm-fixed-price 0001 Semi-Annual Preventive Maintenance
Services for Government Owned Material Handling Equipment located at DLA Distribution Barstow, CA. (CGA).
0001AA Automatic Guided Vehicles (Waves) 2 EA $ $
Firm-fixed-price
0002 Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution Barstow, CA. (CGA).
0002AA Automatic Guided Vehicles (Waves) 2 EA $ $
0002AB Segways 4 EA $ $
0002AC Electric Scooters 3-4 Wheel 3 EA $ $
TIME AND MATERIAL CEILING PRICE
Labor to perform equipment repair in conjunction with Remedial Maintenance.
The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked
0003AA DLA Distribution Barstow, CA (CGA) 200 HR $ $
TIME AND MATERIAL CEILING PRICE
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate based on the Governments best estimate. Contractor will be paid for the actual dollars used.
OPTION YEAR ONE PERIOD - 01 October 2014 through 30 September 2015
0005 Labor to perform Technical Inspections in accordance with paragraph 3.0 of the Statement of Work. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
0005AA DLA Distribution Barstow, CA (CGA) 10 HR $ $
FIRM FIXED PRICE CEILING PRICE
Off-Site Transportation for major repairs of equipment in accordance with paragraph
2.1 of the Statement of Work. The quantity is an estimate only based on the Governments best estimate and are NOT TO BE EXCEEDED (NTE) without notifying the contracting officer prior to performing this task.
0006AA DLA Distribution Barstow, CA (CGA) 1 UN $ $
NTE
Total amount required by each activity:
TOTAL CEILING AMOUNT FOR OPTION YEAR ONE PERIOD $
Firm-fixed-price 0001 Semi-Annual Preventive Maintenance
Services for Government Owned Material Handling Equipment located at DLA Distribution Barstow, CA. (CGA).
0001AA Automatic Guided Vehicles (Waves) 2 EA $ $
Firm-fixed-price
0002 Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution Barstow, CA. (CGA).
0002AA Automatic Guided Vehicles (Waves) 2 EA $ $
0002AB Segways 4 EA $ $
0002AC Electric Scooters 3-4 Wheel 3 EA $ $
TIME AND MATERIAL CEILING PRICE
Labor to perform equipment repair in conjunction with Remedial Maintenance.
The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked
0003AA DLA Distribution Barstow, CA (CGA) 200 HR $ $
TIME AND MATERIAL CEILING PRICE
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate based on the Governments best estimate. Contractor will be paid for the actual dollars used.
OPTION YEAR TWO PERIOD - 01 October 2015 through 30 September 2016
0005 Labor to perform Technical Inspections in accordance with paragraph 3.0 of the Statement of Work. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
0005AA DLA Distribution Barstow, CA (CGA) 10 HR $ $
FIRM FIXED PRICE CEILING PRICE
Off-Site Transportation for major repairs of equipment in accordance with paragraph
2.1 of the Statement of Work. The quantity is an estimate only based on the Governments best estimate and are NOT TO BE EXCEEDED (NTE) without notifying the contracting officer prior to performing this task.
0006AA DLA Distribution Barstow, CA (CGA) 1 UN $ $
NTE
Total amount required by each activity:
TOTAL CEILING AMOUNT FOR OPTION YEAR TWO PERIOD $
| SCHEDULED BASE YEAR |
| OPTION YEAR ONE |
| OPTION YEAR TWO |
File details come from the government source that posted it. Updated .