Submittal Registers.pdf

PDF 66 KB Posted

Attached to
Replace 25 Ton Air Conditioner at Building 54-1, Defense Distribution Depot Susquehanna, New Cumberland, PA
Solicitation number
SP3300-09-B-5010
Issued by

About this file

Submittal Registers (13 pages) - for Project 3690 Replace 25 ton air conditioning unit in Building 54-1

View the file

Other files

File Type Posted
09B5010 AMD 0002.pdf PDF
Specifications Attachment F revised 8-17-09.pdf PDF
AMD 0001 09B5010.pdf PDF
Items Discussed.pdf PDF
Site Visit Attendance.pdf PDF
Davis Bacon WD PA10 - Attachment H.txt TXT text file
SECURITY ATTACHMENTS A - E.pdf PDF
Specifications Attachment F.pdf PDF
SP330009B5010.pdf PDF
Full Drawing Set Attachment G.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

01011 SPECIAL REQUIREMENTS

SD-01 PRECONSTRUCTION SUBMITTALS

List of Schedule of Values 1.17.1

List of Recycled Materials 2.1

SD-11 CLOSEOUT SUBMITTALS

Dollar Value/Content of Recycled Matl's 2.1

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Replace Air Conditioning Unit in USASAC, Bldg 54-1, DDSP New Cumberland, PA. CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

01140 WORK RESTRICTIONS

SD-01 PRECONSTRUCTION SUBMITTALS

Special Access Determination Form 1.4.1.5 G

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Replace Air Conditioning Unit in USASAC, Bldg 54-1, DDSP New Cumberland, PA. CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

01320 PROJECT SCHEDULE

SD-01 PRECONSTRUCTION SUBMITTALS

Project Schedule 3.3 G

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Replace Air Conditioning Unit in USASAC, Bldg 54-1, DDSP New Cumberland, PA. CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

01330 SUBMITTAL PROCEDURES

SD-01 PRECONSTRUCTION SUBMITTALS

Submittal Register 1.8 G

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Replace Air Conditioning Unit in USASAC, Bldg 54-1, DDSP New Cumberland, PA. CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

01525 SAFETY AND OCCUPATIONAL HEALTH REQTS.

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP) 1.6 G

Activity Hazard Analysis (AHA) 1.7 G

Crane Critical Lift Plan 1.6.1 G

Proof of qualification for Crane Operators 1.5.1.3 G

Occupant Protection Plan 1.6.1 G

Lead Compliance Plan 1.6.1 G

PCB Plan 1.6.1 G

Asbestos Hazard Abatement Plan 1.6.1 G

Site Demolition Plan 1.6.1 G

Excavation Plan 1.6.1 G

SD-06 TEST REPORTS

Accident Reports 1.11.1 G

Monthly Exposure Reports 1.11.3 G

Crane Reports 1.11.4 G

Regulatory Citations and Violations 1.4

SD-07 CERTIFICATES

Confined Space Entry Permit 3.9

Hot Work Permit 1.12

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Replace Air Conditioning Unit in USASAC, Bldg 54-1, DDSP New Cumberland, PA. CONTRACTOR

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

01780 PROJECT CLOSEOUT

SD-02 SHOP DRAWINGS

As-Built Drawings 1.2.1 G

SD-03 PRODUCT DATA

As-Built Record of Equipment and Matls. 1.2.2 G

Warranty Management Plan 1.3.1 G

Warranty Tags 1.3.5

Final Cleaning 1.8 G

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

05090 WELDING, STRUCTURAL

SD-03 Welding Certificate 1.5.2 G

05120 STRUCTURAL STEEL

SD-07 Structural Steel 2.1 G

SD-06 Bolts, Nuts & Washers 2.2 G

SD-02 Fabrication 2.7 G

ENG FORM 4288, May 91 EDITION OF Aug 89 IS OBSOLETE

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Replace Air Conditioning Unit in USASAC, Bldg 54-1, DDSP New Cumberland, PA. CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM APPR

AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

15080 THERMAL INSULATION FOR MECHANICAL SYSTEMS

SD-02 SHOP DRAWINGS

Mica Plates 3.2.2.4

SD-03 PRODUCT DATA

Products 2 G

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

15700 UNITARY HEATING AND COOLING EQUIPMENT

SD-02 SHOP DRAWINGS

Drawings 1.5.2

SD-03 PRODUCT DATA

Unitary Equipment 2.3 G

Spare Parts 1.5.3

Posted Instructions 3.5

Verification of Dimensions 1.5.1

System Performance Tests 3.4

Demonstrations 3.5 G

SD-06 TEST REPORTS

Refrigerant Tests, Charging, and Start-up 3.3 G

System Performance Tests 3.4 G

Test Data 3.4.1 G

SD-07 CERTIFICATES

Materials and Equipment 2.1

Service Organization 2.1

SD-10 OPERATION AND MAINTENANCE DATA

Operation and Maintenance Manuals 3.5

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

15890 DUCTWORK AND DUCTWORK ACCESSORIES

SD-03 PRODUCT DATA

Metal ducts 2.1 G

Flexible connectors 2.2 G

Sealand 2.3

Hangers and supports 2.4

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

15990 TESTING, ADJUSTING, AND BALANCING OF HVAC SYSTEM

SD-02 SHOP DRAWINGS

TAB Schematic Drawings and Report Forms 3.3 G

SD-03 PRODUCT DATA

TAB Related HVAC Submittals 3.2

TAB Procedures 3.5.1 G

Calibration 1.4

Systems Readiness Check 3.5.2

TAB Execution 3.5.1 G

TAB Verification 3.5.4 G

SD-06 TEST REPORTS

Design Review Report 3.1 G

Systems Readiness Check 3.5.2 G

TAB Report 3.5.3 G

TAB Verification Report 3.5.4 G

SD-07 CERTIFICATES

Ductwork Leak Testing 3.4

TAB Firm 1.5.1 G

TAB Specialist 1.5.2 G

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

15995 COMMISSIONING OF HVAC SYSTEMS

SD-02 SHOP DRAWINGS

Commissioning Plan 1.6 G

SD-03 PRODUCT DATA

Pre-Functional Performance Test Checklists 3.2.1 G

Functional Performance Tests 3.2.2 G

SD-06 TEST REPORTS

Commissioning Report 3.3 G

SD-07 CERTIFICATES

Commissioning Firm 1.5.1 G

Commissioning Specialist 1.5.2 G

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

CONTRACTOR

ACTION

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

SUBMITTAL REGISTER CONTRACT NO.

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c ) (d) (e) (f) (g) (h) (I) (j) (k) (l) (m) (n) (o) (p) (q) (r )

16402 INTERIOR DISTRIBUTION SYSTEM

SD-02 Shop Drawings Wiring Diagrams 1.3 G

Installation Details 1.3 G

Marking Strips Drawings 1.3 G

SD-03 Product Data GFCI Receptacle 1.3 G

Circuit Breakers 1.3 G

Wires and Cables 1.3 G

Disconnect Safety Switch 1.3 G

SD-06 Test Reports 600-volt wiring test 1.3 G

Grounding Test 1.3 G

Ground-Fault Receptacle Test 1.3 G

SD-07 Certificates SD-10 Operation and Maintenance Data Electrical Systems, Data Package 5 1.3 G

SUBMITTAL REGISTER CONTRACT NO.

TITLE AND LOCATION

Replace Air Conditioning Unit in USASAC, Bldg 54-1, DDSP New Cumberland, PA. CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C

T DESCRIPTION OF ITEM SUBMITTED

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FROM

APPR AUTH REMARKS

P A R A G R A P H

N O

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR SCHEDULE DATES

Submittal Register DIV 01
01011
01140
01320
01330
01525
01780
Submittal Register DIV 05
05090 & 05120
Submittal Register DIV 15
15080
15700
15890
15990
15995
Submittal Register DIV 16
Division 16