SOWCADPLATE.pdf

PDF 122 KB Posted

Attached to
CCU-22 Firing Pin Housing Federal contract opportunity
Solicitation number
N0017422Q0028
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to CCU-22 Firing Pin Housing, newest first.
File Type Posted
SOW CCU-22 Housing FP (FAT).pdf PDF
RFQ.pdf PDF
SOW CCU-22 Housing FP 600.pdf PDF
RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (CADMIUM PLATING)

1. Unless otherwise specified, parts are to be cadmium plated to the requirements of AMS-QQ-P-416, Revision E, plus the following

2. Coverage: There shall be no rack marks, air bubbles, pin holes nor any other bare areas, except those specifically denoted as such by the contract/purchase order/or bankcard order.

All internal and external threads shall have at least a presence of plating (verifiable by visual examination) and a maximum coverage thickness of .00040 inches. All surfaces not controlled for plating thickness by the contract/purchase order/or bankcard order shall have presence of plating (verifiable by visual inspection) and a maximum coverage thickness of .00080 inches. These requirements shall be met regardless of part configuration, contour, part size, and any in-process controls needed to perform the plating. (This includes all internal and external surfaces.)

3. Adhesion: Plating shall show no indication of separation from the base metal when tested in accordance with ASTM D3359-95A, and shall meet adhesion requirements of the governing plating specification.

4. Embrittlement Relief: All cadmium plated parts, regardless of hardness, must be baked, after plating, but prior to chromate finish, as specified below. Any parts exceeding R/C 36 (160 ksi) in hardness, shall also be subject to the following baking requirements between stripping and replating.

Time between Plating and Baking: shall not exceed 4 hours

Temperature for Baking: 375 F +/- 25 F

Time for Baking: 23 hours minimum

5. Corrosion and Hydrogen Embrittlement Tests: Although the vendor is not required to perform this test, the government reserves the right to perform the test at any time, at government expense.