SOW72.pdf

PDF 132 KB Posted

Attached to
Lakeview IRA - Driveway Replacement
Solicitation number
2110938
Issued by
Wyoming County, New York

About this file

This document is a Scope of Work (SOW) for a Driveway Replacement project at the Lakeview IRA facility located at 3660 Walker Rd, Perry, NY 14530. The project is being solicited by the Finger Lakes DDSO and requires the awarded vendor to furnish all labor and materials necessary to complete the driveway renovation according to the provided blueprints and specifications. The project has a 90-day completion timeline from the time of award. A mandatory site visit is scheduled for June 25, 2024 at 10:00 AM, and bids will not be accepted from vendors that do not attend. This is a New York State Public Works project, and prevailing wages must be paid.

The bid price is to include all materials, labor, disposal fees, and site cleanup. The work is to be performed Monday through Friday during specified hours, as the facility will be occupied during this time. The contractor is responsible for having all underground utilities marked prior to any excavation. Additionally, the contractor must adhere to several safety and communication requirements outlined in the SOW.

View the file

Other files

File Type Posted
Approved Construction Docs_20240516.pdf PDF
CP-FL-H2302-20240516-_Driveway_Replacement-_LAKEVIEW.pdf PDF
Bid Tab182.pdf PDF
RFQ91.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SCOPE

DESCRIPTION:

The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 90 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of Driveway Replacement, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.

SCOPE OF WORK includes, but is not necessarily limited to the following:

1. Furnish materials and labor to complete the driveway renovation following the

Blueprints and Specifications as designed by: Zaxis Architectural Dated: 3/29/24.

2. If a Highway Work Permit, and Work Zone Traffic Control Plan is needed for the project, it shall be acquired by the awarded contracted vendor from NYS Department of Transportation and provided to the Point of Contact listed above before work can begin.

3. It is the winning bidders’ responsibility to have all underground utilities marked, prior to any excavation work.

GENERAL REQUIREMENTS:

1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.

Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.

2. Work is to be done between the hours of TBD, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.

3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.

4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.

5. Smoking is prohibited by contractors at all residential and program sites owned by

OPWDD.

Facility:

Lakeview IRA 263-FLA-2302

Facility Address:

3660 Walker Rd, Perry, NY 14530

Point of Contact:

Jim Colon – Maintenance Supervisor 2

Contact Phone Number:

585-335-4119

Project Title:

Driveway Replacement

SCOPE: JC0091

Summary of Work:

Remove existing asphalt driveway, repair substructure, install new pavement.

6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.

7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.

8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

SITE VISIT

A site visit is mandatory. The site visit date is scheduled for Tuesday, June 25, 2024 @ 10:00am at the project site. All prospective bidders are encouraged to attend.

A. Lawn Damage/Property Damage

• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.

• Personal vehicles are not to be parked on the grass.

• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.

B. Continuity of Work/Communication/Scheduling

• Once the job has begun, it is to be worked on continuously until completed.

• If there are any delays, even if due to inclement weather, a Work Control Representative

MUST be contacted.

• Work must be completed within 90 days of receiving the purchase order.

C. House Safety

• The residence will be occupied during the job.

• The contractor must take all reasonable care to safeguard the residents and the staff.

• The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.

• Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.

• The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Plant Superintendent listed above.

SCOPE OF WORK includes, but is not necessarily limited to the following:
1. Furnish materials and labor to complete the driveway renovation following the Blueprints and Specifications as designed by: Zaxis Architectural Dated: 3/29/24.
2. If a Highway Work Permit, and Work Zone Traffic Control Plan is needed for the project, it shall be acquired by the awarded contracted vendor from NYS Department of Transportation and provided to the Point of Contact listed above before work can be...
3. It is the winning bidders’ responsibility to have all underground utilities marked, prior to any excavation work.
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of TBD, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD.
6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

SITE VISIT

File details come from the government source that posted it. Updated .