This document is a Statement of Work (SOW) for cleaning, marking, and restriping the parking lots at the National Marine Fisheries Service (NMFS) Laboratory in Woods Hole, Massachusetts.

The key details are:

  • The work includes cleaning parking lots, sidewalks, and stairs, as well as marking and restriping parking lines at two locations: the main parking area around both buildings at 166 Water Street (approximately 19,000 square feet) and a location at 22 Albatross Street (approximately 8,000 square feet).
  • The contractor must be knowledgeable of all contract requirements, verify measurements, and relocate any obstacles as necessary. Demolished materials must be removed and disposed of legally offsite.
  • The work must comply with all applicable codes and industry standards. The contractor must submit a schedule, material safety data sheets, and a safety plan.
  • The period of performance is 30 calendar days after the notice to proceed. The government will provide electrical power and water at no cost to the contractor.
  • The contractor must submit a 5-year warranty covering labor and materials, as well as the manufacturer's warranty.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Cleaning, Marking and Restriping Parking lots at the Northeast Fisheries Science Center and the Woods Hole Aquarium located in Woods Hole, MA

DESCRIPTION

A. The NMFS Laboratory is located at 166 Water Street, Woods Hole, Massachusetts.

B. The work includes but is not limited to cleaning parking lots, sidewalks, stairs, marking and restriping parking lines. This includes the main parking area around both buildings at 166 Water Street and along the water that is approximately 19,000 square feet. It also includes a location at 22 Albatross Street, that is approximately 8,000 square feet. (See Appendix 2 for pictures of both locations)

C. The contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work. Contractor to verify all dimensions and equipment prior to submitting quotation.

D. Contractor shall be required to relocate, and/or move any obstacle preventing work from meeting all requirements within the contract documents.

E. Remove and legally dispose of demolished materials off site.

F. The National Marine Fisheries Service (NMFS), a part of the National Oceanic and

Atmospheric Administration (NOAA) of the Department of Commerce (DOC), is a governmental agency charged with the mission of stewardship for living marine resources.

G. Site and Project Location: (See Appendix 2 for an Aerial Overview)

PRE-BID SITE VISIT

It is highly recommended that a site visit be conducted prior to submitting a quote in order to view site conditions and verify measurements. Contact the TPOC to schedule a site visit between the hours of 7:30 AM– 4:00 PM, Monday through Friday. Please plan to coordinate site visits at least two working days in advance of the intended site visit.

GENERAL

A. The contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work.

B. The contractor shall comply with all applicable codes (NFPA, NEC, IBC, BOCA etc.) and other published instructions for the installation of specified products, and installation requirements per the contract documents.

C. The contractor is responsible for his/her own security arrangements including subcontractor’s materials, tools, equipment, and personnel.

D. Work in Progress: The contractor shall be responsible for the protection and safe keeping of all work in progress prior to final acceptance by the Government.

E. All methods, materials and workmanship provided by the contractor under this contract shall, as a minimum, be performed in accordance with professional industry standards and shall comply with applicable codes for construction. Field measurements are the responsibility of the contractor.

F. See Appendix 1 for List of Acronyms.

SPECIFIC TASKS

TASK 1- CLEAN AND RESTRIPE PARKING LOT

A. Contractor shall ensure the parking lot is dust and dirt free prior to re-striping. Contractor shall comply by cleaning parking lots, all sidewalks and the stairs by the Aquarium building.

Contractor shall also mark and restripe parking lines at both locations. This includes the main parking area around both buildings at 166 Water Street and along the water. It also includes a location at 22 Albatross Street.

B. Parking lot measurements are the responsibility of the contractor. Parking spaces and layout should be similar as prior lay out (this includes both parking lots).

C. Handicap Spaces should be painted/labeled in the same space as the previous layout. All lines shall be based on the trade standard/codes as far as size and ADA requirements.

D. Contractor shall apply traffic paint to match the existing layout. Specification TTP-1952D

ACCESS TO WORK SITE

A. All persons employed within the boundaries of the property or restricted-access areas therein, and all persons permitted to enter such property and areas shall comply with the security regulations for the NEFSC Woods Hole.

B. The Government reserves the right to close down the job site and order contractor personnel off the premises in the event of a national emergency or a shut-down, for as long as security problems persist. The contractor may only return to the site with verbal approval from the

TPOC.

C. The Government reserves the right to exclude or remove from the site or building any employee of the contractor or a subcontractor whom the Government deems incompetent, careless, insubordinate or otherwise objectionable, or whose continued employment on the work is deemed by the Government to be contrary to the public interest.

D. Personnel may be subject to inspection of their personal effects when entering and leaving the facility. In addition, unscheduled inspections of personnel may be made when entering or while on site.

FINAL ACCEPTANCE AND INSPECTIONS

A. Inspection of work to be performed by the NEFSC facilities maintenance supervisor (TPOC).

Any corrective action required as a result of the inspection will be accomplished prior to final monthly billing.

B. The contractor may be notified of deficiencies in performance in writing by the TPOC. Oral deficiency notifications will be confirmed in writing. Prompt corrective action shall be taken by the contractor upon notice of deficiency.

C. The contractor shall advise the Government when all work is completed. The Government will not accept the work until it determines that all work has been satisfactorily completed within the terms of the contract.

EXISTING CONDITIONS

If discrepancies are discovered between the existing conditions and those noted on the SOW/drawings, immediately notify the TPOC. Upon receipt of Bidding Documents verify documents are complete. Notify TPOC if documents are incomplete. Immediately notify TPOC upon finding discrepancies or omissions in Bidding Documents.

JOB SITE PROTECTIONS

A. It shall be the responsibility of the contractor to protect the property of others as well as his/her own property, and to repair or replace any property damaged by the contractor in fulfilling this project. The contractor shall keep the area clean and upon completion of the project, the contractor shall clean up the work area and remove all debris from the job site in a timely and legally acceptable manner so as to not detract from the aesthetics or the functions of the building. Government dumpsters will not be available for contractor use.

The contractor shall repair or be responsible for costs to repair all property damaged during the performance of work.

B. The contractor shall take precautions to prevent the spread of dust, moisture and debris. The contractor shall provide labor and materials to construct, maintain and remove necessary temporary enclosures to prevent dust or debris in the construction area(s) from entering the remainder of the building.

C. All work shall comply with applicable Federal, State and Local regulations.

D. The contractor shall be responsible for all means and methods as they relate to safety and shall comply with all applicable OSHA, NEC, NFPA, EPA 40 CFR Part 745, local, state and federal requirements and other regulatory agencies during the course of the project. Safety shall be the responsibility of the general contractor. All related personnel shall be instructed daily to be mindful of the full time requirement to maintain a safe environment for the facility’s occupants including staff, visitors, customers and the occurrence of the general public on or near the site.

PERIOD OF PERFORMANCE

A. The actual start date shall be coordinated with the TPOC.

B. Upon notice to proceed, the contractor shall be required to complete work within 30 calendar days.

SUBMITTALS

The contractor shall submit the following:

● Schedule (5 days after NTP)

● Material Safety Data Sheets (MSDS) (10 days after NTP)

● Safety Plan (5 days after NTP)

PLACE OF PERFORMANCE

National Marine Fisheries Service/ NEFSC 166 Water Street, Woods Hole, MA

GOVERNMENT FURNISHED MATERIALS

The Government will furnish electrical power at no cost to the contractor. Utilities shall be used only for the performance of work related to this contract. Electricity will be provided from the most convenient existing source. No Government equipment shall be unplugged from receptacles to accommodate contractor equipment. Water will be provided.

DELIVERY, STORAGE, HANDLING, AND PROTECTION

A. Deliver materials to the job site in the manufacturer’s original, unopened containers or wrappings with the manufacturer’s name, brand name and installation instructions intact and legible. Deliver in sufficient quantity to permit work to continue without interruption.

B. Comply with the manufacturer’s written instructions for proper material storage.

C. Any materials which are found to be damaged shall be removed and replaced at the contractor’s expense.

D. Care shall be exercised to provide protection of surrounding structures, parking lot, and hallways and buildings structure.

QUALITY CONTROL

A. The contractor shall submit manufacture cut sheets and other specification literature for materials to be installed.

B. All work described in the Statement of Work shall comply with the manufacturers installation guidelines.

C. The contractor shall furnish all labor, materials, tools, transportation, services and supplies as stated in this requirement.

D. Work is required to be completed in accordance with the construction industry standards and codes.

E. The contractor shall supply the TPOC with the onsite supervisor contact information and any other key personnel.

WARRANTY

The contractor shall submit a written warranty guaranteeing to correct failures occurring within the period indicated after substantial completion. Without reducing or otherwise limiting any other rights to correction which the owner may have under the contract documents.

A. Furnish five (5) year warranty to include coverage for labor and materials with no dollar limitation.

B. Manufacturer’s warranty.

USE OF THE PREMISES

Before beginning work, the contractor shall secure approval from the TPOC for the following:

A. Contact the TPOC for parking information and facility access.

B. Access to the site.

C. Areas permitted for storage of materials and debris.

D. Security: Obey the government’s requirements for personnel identification, inspection and other security measures.

E. The NEFSC is a smoke free campus. The Contractor and its employees shall adhere to all applicable rules and regulations regarding maintenance of a smoke free environment on the job site.

F. Use of Government facilities

1. Water and electricity for construction purposes are available at the work site.

2. Contractor shall provide storage for tools and materials. The Government is not responsible for providing storage or security of materials, tools, or equipment.

G. The premises will be occupied during the performance of the work. Contractor to coordinate work with the TPOC to accommodate the work schedule, continuing access and completion date.

H. Working hours shall be 7:30 AM – 4 PM (M-F). Contractor shall observe all federal holidays.

WORKMANSHIP

All work shall be of highest quality and in strict accordance with the manufacturer’s published specifications and to the building owner’s satisfaction, most recent codes and standards.

QUALITY ASSURANCE

A. Unless otherwise noted in the contract documents, the contractor shall comply with the manufacturer’s current specifications and details.

B. The contractor shall provide an adequate number of experienced workmen regularly engaged in this type of work who are skilled in the application techniques of the materials specified.

C. There shall be a site superintendent on the job site at all times while work is in progress. The site superintendent must be an employee of the general contractor and on the site all times during the course of any ongoing work.

D. There shall be no deviations made from this specification or the approved shop drawings (if any) without the prior written approval of the TPOC. Any deviation from the manufacturer’s installation procedures must be supported by a written certification on the manufacturer’s letterhead and presented to the TPOC for consideration.

E. All substitution requests for products, equipment, materials and methods described within the contract documents shall be submitted to the TPOC. Substitutions request are not permitted prior to the Notice to Proceed. Substitute products will be considered when the request is submitted in writing to the TPOC. The TPOC will have seven (7) working days to approve/disapprove the substitution request. Substitution requests shall not result in schedule extensions.

FACILITIES AND CONTROLS

A. The contractor shall remove and dispose of all debris and trash from the job site in a timely and legally acceptable manner so as to not detract from the aesthetics or the functions of the building.

B. Contractor shall comply with all applicable Federal, State, and local laws and regulations concerning environmental pollution prevention control and waste disposal.

C. Contractor shall immediately inform the TPOC of any environmentally hazardous situations that may arise as well as contact required regulatory agencies.

D. Perform daily clean-up to collect all wrappings, empty containers, paper, and other debris from the project site. Upon completion, all debris must be disposed of in a legally acceptable manner. The contractor shall ensure that the project area and areas adjacent to the project area are maintained in a clean and safe condition.

SAFETY

A. The contractor shall be responsible for all means and methods as they relate to safety and shall comply with all applicable OSHA, NEC, NFPA, and EPA, local, state and federal requirements. Safety shall be the responsibility of the general contractor. All related personnel shall be instructed daily to be mindful of the full time requirement to maintain a safe environment for the facility’s occupants including staff, visitors, customers and the occurrence of the general public on or near the site.

B. The contractor shall comply with the requirements of 29 CFR, Part 1910: Occupational Safety and Health Administration (OSHA) General Industry and Health Standards. The contractor shall promptly correct any non-complying work or conditions. Contractor shall be responsible to ensure its work does not affect the safety of the public or employees of the Government. Neither the Government nor its representatives shall bear any responsibility for safety precautions at the project work site. If, however, in the opinion of the TPOC, a life-threatening condition exists, the TPOC will orally (to be confirmed in writing) require the contractor to immediately suspend work in the affected area until the condition is corrected. Whenever a contractor's operations may create a hazardous condition, it shall at its sole expense, furnish, install and maintain such guards, fences, barricades, railing, light, signs, or other devices necessary to prevent accident, injury or damage to people or equipment.

C. Five days prior to start of work the contractor shall submit a safety plan. To include but not limited, open flames, welding, debris, cleanup, workplace safety methods, and emergency procedures. The Safety Plan must be available on site at all times and must be reviewed with all subcontractors working under this contract for the duration of the contract project.

E. It is the contractor’s responsibility to ensure all employees; sub-contractors, vendors, and other company representatives adhere to all safety rules, regulations, policies and practices.

F. Contractor shall observe lock/out tag/out regulations and as required by OSHA.

G. The contractor shall keep the project site in a neat and orderly condition at all times.

JOB CONDITIONS, CAUTIONS AND WARNINGS

A. Material Safety Data Sheets (MSDS) must be on location at all times during the transportation, storage and application of materials. A separate set shall be given to the TPOC five (5) days prior to starting of the work.

B. The contractor shall not cause or permit any hazardous material to be brought upon, kept or used in or about the premises by its agents, employees, or subcontractors without the prior consent of the TPOC. Hazardous materials that are necessary to the performance of this contract shall be used, kept and stored in a manner that complies with all laws regulating any such hazardous material brought upon or used or kept at this site. Contractor shall provide Material Safety Data Sheets to the TPOC for any hazardous materials used in the performance of this contract.

C. As used herein, the term “Hazardous Material” means any hazardous or toxic substance, material, or waste, including but not limited to, those substances, materials, and wastes listed in the Department of Transportation Hazardous Material Table (49 CFR 172.101) or by the Environmental Protection Agency as hazardous substances (40 CFR Part 68.130) and amendments thereto, petroleum products, or such other substances, material, and wastes that are or become regulated under any applicable local, state, or Federal law.

PERSONNEL

A. The contractor shall provide proof that all on-site employees are US citizens or legal aliens.

B. The contractor shall not employ personnel with felony convictions, or with a record of narcotics use, for work at the Narragansett Laboratory.

C. The contractor is responsible for completing a security investigation on all employees working at the Woods Hole in connection with this contract.

APPENDIX 1

List of Acronyms:

AAMA American Architectural Manufacturers Association ACI American Concrete Institute ASTM American Society for Testing and Materials BMP Best Management Practices BOCA Building Officials and Codes Administrators COR Contracting Officer's Representative EB Encased Burial EPA Environmental Protection Agency IT Information Technology MSDS Material Safety Data Sheets NEC National Electric Code NFPA National Fire Protection Association OSHA Occupational Safety and Health and Administration PVC Polyvinyl Chloride SOW Statement of Work TPOC Technical Point of Contact UL Underwriters Laboratory

APPENDIX 2

Main Parking Lot - 166 Water Street

22 Albatross Street

Aerial Overview of site and project location