Attachment A – Scope of Work
UNITED STATES DEPARTMENT
OF THE INTERIOR
FISH AND WILDLIFE SERVICE
Illinois River National Wildlife and Fish Refuge Complex
(Region 3)
Material Specification for Wilder Parking Lot Repair at the
EMIQUON NATIONAL WILDLIFE REFUGE
19031 E CR 2110N
Havana, Illinois 62644
Proposals will be received electronically to:
Merenica_Banks@fws.gov mailto:Merenica_Banks@fws.gov
Material Specification for Wilder Parking Lot Repair
SCOPE OF WORK
A. The work includes sourcing, hauling, and delivery of 2-inch clean road rock and Class B Rip Rap material approved by the U.S. Army Corps of Engineers for bank stabilization, sizes 3 and 5 to the Wilder Unit parking area Emiquon National Wildlife Refuge.
B. Contractor will deliver material to stockpiling dumpsites, refuge staff will place rock.
C. Rip rap material is required to create a spillway, armor levee, fill Gabion baskets, and rebuild a parking and driving area. 2-inch road rock will be required to resurface the parking and driving area. This will require staggered and coordinated delivery of 160 tons of 2-inch clean white road rock, 300 tons of RR3B, and 100 tons of RR5B.
LOCATION & INSPECTION OF THE SITE
A. The delivery site (orange point on map) is located approximately 0.25 miles west of Emiquon National Wildlife Refuge Wilder Unit turn off on Illinois State Hwy 97/78. The turn off is 0.71 miles north of the US-136 and Hwy 78 intersection. The site is accessible via a narrow gravel access road, shown in blue in image below. The Refuge Manager, Curt McMurl, may be contacted for further information by telephone at (309)535-2290.
B. All prospective bidders, contractors, subcontractors, and related persons are encouraged to visit the site of the proposed work and to assess the location and extent of the work prior to submitting bids/quotes.
Persons may inspect the site by contacting the Refuge Manager for an appointment.
C. Project Site and access road image:
TEMPORARY FACILITIES
A. Maintain and restore all government roads, service areas and utilities used to pre- delivery condition.
B. Temporary toilet facilities and other utilities shall be provided by the Contractor for the duration of the project.
C. Electricity may not be used at any other structures.
D. Water is not available anywhere on the premise.
SITE ACCESS & RIGHT OF WAY
A. The delivery site access limits on Government property will be established by the Government and the Contractor shall be responsible for complying with these limits and governing all work accordingly.
B. All bidders are reminded that they are responsible for contacting the local entity such as township, county, or state having jurisdiction in the project vicinity to ensure bidders are aware of any requirements of the local entity. These requirements are between the entity and the bidder. Load limits and other restrictions shall be obeyed. If the Contractor proposes to cross private property, permission must be obtained from the owner to use private property or roads in the conduct of the Work.
EMIQUON NATIONAL WILDLIFE REFUGE