SOW_-_WFRC_Vault_Cleaning.pdf
PDF 167 KB Posted
- Attached to
- Process Water Vault and Spillway Cleaning Federal contract opportunity
- Solicitation number
- 140G0324Q0123
About this file
This document is a Statement of Work (SOW) for the vacuum truck cleaning of a 12,156-gallon process water settling vault located at the United States Geological Survey (USGS) Western Fisheries Research Center (WFRC) in Seattle, Washington. The SOW outlines the general requirements, which include cleaning the vault and vault spillway, material analysis and disposal, and the use of necessary confined space equipment and permits. The period of performance is from April 8, 2024, through June 30, 2024. The contractor is required to provide deliverables, including the start and finish of the job, the duration, and the material analysis and disposal. The related federal contract opportunity is Solicitation Number 140G0324Q0123, for the Process Water Vault and Spillway Cleaning, issued by the Department of the Interior USGS Office of Acquisitions and Grants.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140G0324Q0123.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
WFRC PROCESS WATER VAULT CLEANING
1.0 INTRODUCTION AND BACKGROUND
The Seattle WFRC requires vacuum truck cleaning of the approximately 12,156 gallon process water settling vault located under the parking lot between the wet laboratory and the facilities building. The tank is 8’ diameter corrugated steel x 32’-4” long. It has a 7’ fill level yielding approximately 11,384-gallon capacity. The vault is accessed by a manhole cover in the parking lot. It is estimated to have approximately 10 tons of wet sediment accumulation that will be removed. The vault is used to hold 2-3 ppm of chlorinated process water for a one-hour period before being dechlorinated and returned to the Magnuson Park wet land.
The United States Geological Survey (USGS) Western Fisheries Research Center (WFRC) located in Seattle, Washington. The WFRC carries out research and provide technical assistance to support the best possible stewardship of the Nation's natural resources, emphasizing fish populations and aquatic ecosystems of the West. The WFRC has a 50-year history of excellence in fisheries disciplines and are leaders in the field of molecular and microbiology within the U.S. Geological Survey (USGS). The WFRC addresses the unique issues of large western river systems such as the Columbia, and the challenges faced by desert aquatic systems and their threatened or endangered fish species.
2.0 SCOPE
2.1
2.2
Place of Performance - The USGS WFRC, 6506 NE 65TH ST, Seattle, WA 98115.
Period of Performance – April 8, 2024 through June 30, 2024.
2.3 General Requirements – Cleaning of process water vault and vault spillway through vacuum truck service. Water to be pumped down by USGS Western Fishery Research prior to vac truck crew starting the cleaning. Material analysis is included in cost. Use all necessary confined space equipment and permits. Include in the proposal separate line-item pricing for any additional testing and disposal if initial material analysis requires additional sample testing.
3.0 Technical Requirements
3.1 Contractor mobilization and de-mobilization of personnel and equipment to the Seattle WFRC.
3.2 Clean all debris from water storage vault and vault spillway.
3.3 Material analysis and disposal according to current laws and regulations.
4.0 Deliverables
The contractor shall provide deliverables in accordance with the Reporting Requirements Checklist:
Reporting Requirements Checklist
Reference Requirement Due
2.3 Include in the proposal separate line-item pricing for any additional testing and disposal if initial material analysis requires additional sample testing.
Initial Proposal
3.1 Contractor mobilization and de-mobilization of personnel and equipment to the Seattle WFRC.
Start and finish of job
2.3 Use all necessary confined space equipment and permits. Duration of job
3.2 Clean all debris from water storage vault and vault spillway. Deliverable
3.3 Material analysis and disposal according to current laws and regulations.
Deliverable
| 1.0 INTRODUCTION AND BACKGROUND |
| The Seattle WFRC requires vacuum truck cleaning of the approximately 12,156 gallon process water settling vault located under the parking lot between the wet laboratory and the facilities building. The tank is 8’ diameter corrugated steel x 32’-4” lon... |
| The United States Geological Survey (USGS) Western Fisheries Research Center (WFRC) located in Seattle, Washington. The WFRC carries out research and provide technical assistance to support the best possible stewardship of the Nation's natural resourc... |
| 2.0 SCOPE |
| 2.1 Place of Performance - The USGS WFRC, 6506 NE 65TH ST, Seattle, WA 98115. |
| 2.2 Period of Performance – April 8, 2024 through May 31, 2024. |
| 2.3 General Requirements – Cleaning of process water vault and vault spillway through vacuum truck service. Water to be pumped down by USGS Western Fishery Research prior to vac truck crew starting the cleaning. Material analysis is included in cost... |
| 3.0 Technical Requirements |
| 3.1 Contractor mobilization and de-mobilization of personnel and equipment to the Seattle WFRC. |
| 3.2 Clean all debris from water storage vault and vault spillway. |
| 3.3 Material analysis and disposal according to current laws and regulations. |
| 4.0 Deliverables |
| The contractor shall provide deliverables in accordance with the Reporting Requirements Checklist: |
File details come from the government source that posted it. Updated .