BLANKET PURCHASE AGREEMENT

Water, Waste Water and Boiler Chemicals and Repairs Blue Grass Army Depot

5 JAN 2022

BLANKET PURCHASE AGREEMENT (BPA) REQUIREMENTS

This BPA agreement shall provide miscellaneous operations and services to include, but not limited to, the following Statement of Work:

· Repair or replace defective water plant and water collection and distribution systems as necessary including water plant components, water lines, valves, and fire hydrants.

· Repair roads when water leaks occur underground. Leaks repaired in any other location shall also include replacement of excavated soils and re-seeded per the requirements of BGAD’s Land Manager, located in building S-14.

· Test, repair, or replace backflow preventers as necessary to maintain safe water supply to facilities at BGAD.

· Supply and install water filters as required.

· Repair or replace auto-flushers to maintain acceptable levels of residual chlorine in the water distribution system.

· Repair or replacement of components, as needed, on raw water pumps.

· Inspection of cleaning, as needed, of the elevated water storage tank and clear well tank.

· Provide chemicals used to treat raw and potable water.

· Repair or replace damaged wastewater collection and treatment systems including sewer lines, manholes, and wastewater plant components as necessary to keep the systems operational, prevent injury.

· Minimize inflow and infiltration of storm water into the sewer system as required.

· Repair of lift stations as needed to maintain proper functionality.

· Repair or replacement of supervisory control and data acquisition (SCADA) systems and components to maintain system utilization.

· Repair of boilers, boiler components, and boiler steam lines as needed.

· Collect and analyze water and wastewater samples as required.

· Sludge removal from WTP, WWTP, and Septic Tanks.

· Develop and update a Ground Water Protection Plan.

· Prepare drawings of utilities and buildings to provide updated information.

· Perform maintenance on dams, reservoirs, and lakes, including repairs to prevent sinkholes from lowering the level of Lake Buck.

· Treat seasonal algae as needed in Lake Gem and Lake Buck. Lake Vega is covered under a separate contract.

· Provide backup equipment to maintain operation of the WTP, WWTP, collection, and distribution systems, or to maintain redundancy for redundant systems, in the event of a failure at the discretion of the Government.

NOTE: This BPA is subject to comply with the Contract Services Act of 1965 for all services performed under this award. Wage Determinations may be found at www.wdol.gov. The Wage Determination in effect at the time of this award is KY 2015-4701 rev ??, dated ________.

NOTE: Rates for each project will be quoted separately followed by a Price Reasonableness Determination by the Contracting Officer.