SOW - Vinyl Strip Installation.pdf
PDF 91 KB Posted
- Attached to
- Vinyl Door Kit Installation Holloman AFB, NM
- Solicitation number
- FA4801-24-Q-0477
About this file
This document is a Statement of Work (SOW) for the installation of vinyl door strip kits at Holloman Air Force Base in New Mexico. The SOW outlines the specific procedures for temporarily attaching a PVC strip to the mounting bar, centering and leveling the bar, marking the anchor holes, drilling the holes, and attaching the bar with lag screws. The related federal contract opportunity is for the installation of these vinyl door kits in Building 311, per the SOW. The solicitation number is FA4801-24-Q-0477, and the procuring agency is the Department of the Air Force Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Updated Combo.pdf | ||
| Combo.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
• Wall Mounting Procedures:
• Temporarily attach a PVC strip to either end of the Mounting Bar(s).
• Center and level the bar(s) above the opening so the strips are 1/2” above the floor.
• Mark Mounting Bar(s) anchor holes and remove the bar.
• Drill anchor holes and place anchors (not included) into those holes.
• Take the temporary strips off the Mounting Bar(s) and attach the Bar(s) with lag screws (not included).
• Header Mounting Procedures:
• Center the Mounting Bar(s) on the underside of the door header. Mark the mounting holes.
• Remove the Bar(s) and drill the mounting holes. If the door header is concrete or a similar material, drill anchor holes.
• Attach the Mounting Bar(s) with lag screws (not included). If anchors are required, place anchors
(not included) in each hole and attach the Mounting Bar(s) with lag screws (not included).
File details come from the government source that posted it. Updated .