View the file

Other files

File Type Posted
Terms and Conditions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Objective The United States Department of Agriculture (USDA), Agricultural Research Service (ARS) requires annual service to provide (or create DI water from tap water) deionized water including tank rentals and exchanges, filters, and cartridges for the Laboratory and Greenhouse water supplies at the US Salinity Laboratory, 450 W. Big Springs Rd., Riverside, CA 92507.

2. Technical Requirements

The vendor/company must be certified as ISO 9000 compliant and qualified as required by international system of standards.

3. Deliverables/Schedule Laboratory water needs to reduce the electrical conductivity of City of Riverside CA tap water

(0.55-0.65 dS/m) down to less than 0.001 dS/m (0.001 μS/cm). Water volume needed is variable (estimated usage 40,000 – 50,000 gallons/year). 8 small tanks - 4 in service 4 on standby Approximately 45” L x 22” W x 60” H available space

Statement of Work United States Department of Agriculture (USDA)

Agricultural Research Service (ARS), U.S. Salinity Laboratory (USSL)

Deionized Water Service Contract & Annual Tank Rental

Green house water needs to reduce electrical conductivity of City of Riverside CA tap water

(0.65-0.7 dS/m) down to less than 0.05 dS/m. Water volume needed is variable (estimated usage 40,000-50,000 gallons/year) 4 large tanks- 2 in service 2 in standby.

Approximately 40” L x 55” W x 60” H available space

Tank exchanges and other services will be periodically requested by government.

Service shall be provided with 1-3 days of request.

Service must be provided during regular non-holiday business hours of 8:00AM to

4:00PM.

4. Government Furnished Resources USSL will provide connection to tap water supply. Company shall not damage government’s domestic water connections nor cause any unsafe backflows to occur.

5. Administrative Considerations Tank rentals shall be invoiced quarterly in arrears.

Tank exchanges and other services will be periodically requested by government.

6. Period(s) and Place of Performance The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows:

Base Year: January XX, 2022 - January XX, 2023 Option Year I: January, 2023 - January , 2024 Option Year II: January, 2024- January , 2025 Option Year III: January, 2025 - January, 2026 Option Year IV: January, 2026- January, 2027

Place of Performance: USDA, ARS, USSL 450 W. Big Springs Rd., Riverside, CA 92507

1. Objective
2. Technical Requirements
3. Deliverables/Schedule
Laboratory water needs to reduce the electrical conductivity of City of Riverside CA tap water (0.55-0.65 dS/m) down to less than 0.001 dS/m (0.001 μS/cm). Water volume needed is variable (estimated usage 40,000 – 50,000 gallons/year). 8 small tanks ...
Green house water needs to reduce electrical conductivity of City of Riverside CA tap water (0.65-0.7 dS/m) down to less than 0.05 dS/m. Water volume needed is variable (estimated usage 40,000-50,000 gallons/year) 4 large tanks- 2 in service 2 in sta...
Approximately 40” L x 55” W x 60” H available space
4. Government Furnished Resources
USSL will provide connection to tap water supply. Company shall not damage government’s domestic water connections nor cause any unsafe backflows to occur.
USSL will provide connection to tap water supply. Company shall not damage government’s domestic water connections nor cause any unsafe backflows to occur.
5. Administrative Considerations
6. Period(s) and Place of Performance

File details come from the government source that posted it. Updated .