SOW_USCGC RELIANCE REVERSE OSMOSIS TECH SUPPORT.docx

DOCX document 24 KB Posted

Attached to
USCGC RELIANCE REVERSE OSMOSIS TECH SUPPORT (Notice of Intent)
Solicitation number
52000SN270000399
Issued by
Not on record

About this file

This is a Statement of Work (SOW) for reverse osmosis technical support services required by the United States Coast Guard (USCG) for USCGC RELIANCE. The vendor must provide onsite troubleshooting of programmable logic controllers (PLCs) to restore the reverse osmosis system to full operational functionality. The requirement specifies a systems engineer from the original equipment manufacturer (OEM), Aqua-Chem, for one day of onsite support at USCGC RELIANCE located in Pensacola, Florida. Any additional materials or parts required beyond the initial onsite support shall be quoted separately by Aqua-Chem and are excluded from this SOW.

The period of performance includes three designated dates: primary service date of November 3, 2026, with secondary and tertiary backup dates of November 10, 2026, and November 17, 2026, respectively. The work shall be performed at USCGC RELIANCE, 211 South Ave, Pensacola, FL 32508. This procurement is being conducted as a sole-source purchase order under Simplified Acquisition Procedures through the USCG's Surface Forces Logistics Center (SFLC), with the Contracting Officer Technical Representative being LT Megan Wadleigh, reachable at (650) 421-5806 or megan.a.wadleigh@uscg.mil. The associated Notice of Intent to Award invites capability statements from alternative vendors who can demonstrate equivalent technical services.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

For services to USCGC RELIANCE REVERSE OSMOSIS TECH SUPPORT

1. Background and Current Observed Issues

CGC RELIANCE is requesting SERVICES to continue troubleshooting PLC issues, functionality, and system operation. A systems engineer is requested from OEM, Aqua-Chem, for one day of onsite support. Any additional materials needed are excluded.

2. REFERENCES

None

3. REQUIREMENTS

Vendor to provide troubleshooting of PLCs with the goal of returning the RO to full functionality. If additional parts are needed a separate quote shall be provided by Aqua Chem.

4. PERIOD OF PERFORMANCE

Primary: 3 Nov 2026 Secondary: 10 Nov 2026 Tertiary: 17 Nov 2026

5. PLACE OF PERFORMANCE

The primary place of performance shall be at CGC RELIANCE located at below address:

CGC RELIANCE

211 South Ave Pensacola, FL 32508

Contracting Officer Technical Representative (COR):

LT Megan Wadleigh, EO Cell: (650) 421-5806 Email: megan.a.wadleigh@uscg.mil

File details come from the government source that posted it. Updated .