This document is a Statement of Work (SOW) for a galley renovation project at U.S. Coast Guard (USCG) Station Washington, Building 92 located on Joint Base Anacostia-Bolling in Washington, D.C. The work consists of providing all labor, materials, and equipment to replace/remodel the kitchen, including demolition, new flooring, cabinetry, appliances, plumbing, electrical, and painting.
The related federal contract opportunity is a solicitation for this galley remodel project, with Solicitation Number 70Z08124QBNCR0001. The contract is a firm-fixed price, with a set-aside for small businesses under NAICS code 238290. All quotes must be submitted by NOON Eastern Time on September 10, 2024 via email to the Contracting Specialist. Site visits are strongly encouraged but not required. Questions about the solicitation must be submitted in writing by NOON on September 4, 2024. The USCG is the procuring agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GALLEY RENOVATION PROJECT 6/24/2024
SCOPE OF WORK
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to replace/remodel the kitchen on U.S. Coast Guard Station Washington, building 92 located on Joint Base Anacostia-Bolling, 3870 Giovannoli Street SW, Washington, DC 20032.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT thirty (10) days after notice to proceed and work diligently to complete the entire work ready for use by 30 working days after contract award.
3. SCOPE OF WORK: Contractor shall provide services, materials, and equipment including any sub-contracting specialty to remodel USCG Station Washington, Building 92 kitchen. Remodeling project includes but is not limited to;
a) Demolition of the existing cabinets, countertops.
b) Removal of door frames, lighting and flooring or any other equipment / obstructions.
c) All major kitchen appliances will be re-installed unless determined to be in an unusable condition by the on-site representative or USCG Station Washington will procure new appliances.
d) Removal of flooring
e) Installation of new sub-flooring (if needed) and commercial grade LVP flooring that is no less than 12mil.
f) Install new cabinetry and countertops with a large stainless-steel sink, faucet and any necessary plumbing in scullery area, provided by the contractor. Shaker style, commercial grade cabinetry will be provided by the contractor including finishing of paint or stain, finish clear coat sealant and assembly if required.
Uppers: 36”w x 30”h x 12”d (2), 30”w x 18”h x 12”d, 24”w x 30”h x 12”d. Lowers: 36”w x 34.5”h x 24”d (3), 24”w x 34.5”h x 24”d, 30”w x 34.5”h x 24”d, 24”w x 34.5”h x 24”d (3), 9”w x 34.5”h x 24”d (2).
g) Install garbage disposal & dishwasher to main plumbing drainage.
h) Renew closets shelving. Pantry closet is 96” H x 36” W x18” D – multi-cubicle style shelving, at least 12 is needed. Storage Closet is 96”h x 36”w x 28”d – 5 standard shelves (non-wire type)
i) Install tile backsplash above all countertops, provided by USCG Station Washington.
j) Relocation, repairs, or replacement of electrical and plumbing fixtures must be cleared by CG representative prior to moving forward.
k) Install all new lighting. 2 – double 4’x2’ recessed LED fixtures. 3 – 6” circular recessed LED fixtures
l) Install ventilation for range hood to vent to the outside of the building.
m) Walls and ceiling shall be repaired and a completely repainted.
n) Any work conducted outside of this SOW, a Condition Found Report (CFR) shall be submitted and approved by the Contracting Officer (KO) prior to any changes in SOW or commencement of work.
4. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with MKC Jason Seraphin, Work: (703)822-2138, Cell: (815)566-1328 or MK1 Ryan Smith, Work: (703)822-2138, Cell: (813)362-4234.
5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is MKC Jason Seraphin, Work: (703)822-2138, Cell: (815)566-1328 or MK1 Ryan Smith Work: (703)822-2138, Cell: (813)362-4234.
Inquiries concerning any phase of the specification before or after award shall be made to MKC Jason Seraphin or MK1 Ryan Smith.
6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification, or related documents.
7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.
GALLEY RENOVATION PROJECT 6/24/2024
8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. All electrical and plumbing work shall be conducted by a licensed electrician and plumber. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.
10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state, and local laws.
11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station’s regular hours, they may submit their request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.
13. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.
14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The Station Washington Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.
15. SAFETY REQUIREMENTS:
1. Responsibilities:
a. All contractors working on Station Washington shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.
b. Written notification must be provided to the Station Safety Officer, Jason Seraphin 815-566-1328 in their capacity as Station Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Station, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Station Safety Officer.
c. Copies of the following must be provided to the Station Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work.
GALLEY RENOVATION PROJECT 6/24/2024
d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Joint Base Anacostia-Bolling, USCG Station Washington. A USCG Station Washington authorized representative is required for all contractors Lock Out/Tag Out needs.
2. Rights:
a. Every employee working on USCG Station Washington has the right to a safe and healthy workplace.
The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
16. ENVIRONMENTAL PROTECTION REQUIREMENTS:
a. All contractors working on USCG Station Washington shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Engineer Petty Officer of Station Washington prior to starting work and must be in accordance with the Unit Environmental Guide.
b. Written notification must be provided to the Engineer Petty Officer of USCG Station Washington of any activity that could potentially cause a permit violation on USCG Station Washington. Some examples of qualifying activities are any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.
c. Copies of the following must be provided to the Engineer Petty Officer of USCG Station Washington prior to starting work in affected areas: Safety Data Sheets, permits, and notices of intent.
d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to replace/remodel the kitchen on U.S. Coast Guard Station Washington, building 92 located on Joint Base Anacostia-Bolling, 3870 Giovannoli Street ...