Truck Fueling Station Modification at USCG Air Station Miami
Solicitation number
20140PR260000108
Issued by

About this file

This is a Scope of Work (SOW) for the modification and reinstallation of a truck fueling station at USCG Air Station Miami in Opa Locka, Florida. The project involves relocating components from the current offline truck refueling station to a modified offloading module upstream of a failed underground supply line to restore organic fueling capabilities while achieving Coast Guard compliance with the addition of a flow meter and deadman switch.

The contractor must provide all equipment, materials, tools, and labor to complete work including uninstalling existing piping and equipment, installing a blind flange on a 4-inch isolation valve, prepping and pouring two equipment pad foundations, fabricating and installing two pipe supports and equipment stands, fabricating a 4-inch stainless steel spool piece for directional piping changes, installing current load position equipment, conducting system checks and purging, and performing final cleanup. Required submittals include a Job Safety Analysis (JSA) and Safe Work Plan (SWP), a work schedule with milestones due within seven calendar days of contract award, and equipment submittals for Coast Guard review and approval prior to purchase. The contractor must complete all work within 30 calendar days after notice to proceed. Work is limited to 8:00 AM to 4:00 PM, Monday through Friday, excluding holidays, and the facility must remain operational throughout. The contractor is wholly responsible for work site safety, must comply with EM 385-1-1 and OSHA regulations, and must submit a written safety plan within seven calendar days of award. The contractor shall provide a working personnel list, ensure all personnel carry proper laminated identification with facial photographs, manage their own materials and equipment security, and coordinate closely with the Government Point of Contact, LT Thomas Jones at (305) 619-0573 or thomas.m.jones@uscg.mil, to minimize interference with Coast Guard operations.

View the file

Other files

File Type Posted
Davis-Bacon Act WD FL20260215.pdf PDF
COMBINED SYNOPSIS SOLICITATION CONSTUCTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work for Truck Fueling Station Modification At

USCG Air Station Miami Opa Locka, Florida

1 BACKGROUND

The Coast Guard AIRSTA Miami fuel pits were taken offline after a leak was discovered in the underground supply lines servicing the fueling stations. As a result, Air Station Miami no longer has organic fueling capabilities. By utilizing the components of the current truck refueling station and re-installing them at a modified offloading module upstream of the supply line cutoff, Air Station Miami will be able to conduct truck refueling operations. This install will ensure the truck fueling station is compliant with Coast Guard fueling policies with the addition of a flow meter & deadman switch.

2 DESCRIPTION OF WORK

2.1 SCOPE OF WORK:

2.1.1 Provide all equipment, materials, tools, and labor to perform scope of work.

2.1.1.1 All equipment and materials from the current truck fueling station will be utilized for the project to include trough, load hose/swivel, some piping and instrumentation.

2.1.1.2 Procure necessary pipe, fittings, structural steel, gaskets and stud bolt fasteners.

2.1.2 Provide JSA and SWP.

2.1.3 Uninstall existing piping and equipment from current truck fueling station.

2.1.4 Install blind flange on existing 4” isolation valve.

2.1.5 Prep, form and pour two (2) equipment pad foundations at the new truck fueling station utilizing existing concrete pad for embedment and mounting.

2.1.6 Fabricate and install two (2) new pipe supports & equipment stands to accommodate equipment, piping and instrumentation relocation.

2.1.7 Perform LOTO and isolate load rack line, assist with drain down of line as necessary.

2.1.8 Fabricate one (1) 4” SS spool piece to accommodate directional change of piping to ensure alignment of current equipment being reutilized.

2.1.9 Install current load position equipment to new truck fueling station.

2.1.10 Conduct system check. Ensure system restoration, purging and functionality of reinstalled equipment.

2.1.11 Clean up work area.

3 SUBMITTALS AND OUTCOMES

3.1 Safety Plan (see 21.3)

3.2 The Contractor shall submit a work schedule including all milestones within seven (7) calendar days following contract award.

3.3 Provide equipment submittal for USCG review and approval prior to purchase (see 2.1.5).

4 PROJECT PERFORMANCE TIME

The contractor must complete all work, deliverables and outcomes within 30 calendar days after notice to proceed is given by the Government.

5 LOCATION

All work shall take place at the following location:

CG AIRSTA Miami 14750 NW 44th Ct.

Opa Locka, FL 33054

6 POINT OF CONTACT

The Government Point of Contact (POC) for this work is LT Thomas Jones, (305) 619-0573, thomas.m.jones@uscg.mil. The Contractor shall coordinate with the POC to minimize interference with Coast Guard operations or personnel. All work shall be coordinated with other trades involved in the project and carefully laid out in advance.

7 WORK PHASING

7.1 Work shall be completed as expeditiously as possible; Contractor shall coordinate with the POC to coordinate phasing and job sequencing. Contractor shall submit construction schedule for Government review and approval prior to commencing in any work to be performed.

7.2 The facility shall remain in operation throughout the service. Contractor access to the service site shall be limited to the following: 8:00am to 4:00pm, Monday through Friday, excluding holidays. Access to the site shall not be permitted on the weekends without prior approval from the Coast Guard (COR).

8 AVAILABILITY OF UTILITIES

8.1 Reasonable amounts of the following utilities will be made available to the Contractor without charge.

8.1.1 Electricity

8.1.2 Potable Water

8.2 The Contractor shall pay all costs incurred in connecting, converting, and transferring the utilities to the work. The Contractor shall be responsible for making connections including providing back flow preventer devices on connections to domestic water lines, providing transformers, and for disconnections. The POC shall designate the outlets available to the Contractor.

9 CONTRACTOR USE OF PREMISES

The Contractor will be working on a Coast Guard operational military installation. Become familiar with and obey installations’ fire, traffic, and security regulations. Personnel shall not stray from the immediate area of work nor direct avenues of ingress and egress unless authorized in advance by the Government.

10 LAYDOWN AREA

The Contractor will be provided with an uncovered lay-down area in the immediate vicinity of the work. The Contractor shall be responsible for restoring the area to its original condition at the completion of the work. The Contractor shall be responsible for repair of any damage incurred to buildings or pavement as a result of storage activities.

11 STORM PROTECTION

Should warnings of extreme weather (such as storm surge, wind of gale force) be issued, the Contractor shall take every practicable precaution to minimize danger to personnel, the work and adjacent property. Precautions shall include, but not be limited to, closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing fencing, scaffolding and other temporary work.

12 ENVIRONMENTAL PROTECTION

All Federal, State and local laws must be strictly adhered to. Demolition and construction debris shall be disposed of at a permitted facility.

13 DELIVERY AND STORAGE

Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations. Damaged or defective items shall be replaced. Location of storage and staging area shall be designated by the POC. The contractor will be responsible for security of all materials and equipment.

14 RECEIPT OF MATERIALS

Shipment of equipment, materials, and supplies shall be addressed to the Contractor - not the Government. The Contractor must be on hand to accept shipments; the Government will not accept shipments.

15 CLEANUP

The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials on a daily basis and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpsters.

16 UTILITY OUTAGES

Before interrupting or shutting down any utility, make a request for the interruption to the POC at least two (2) working days before the anticipated interruption. Identify the utility, reason for interruption, proposed time of interruption, and duration of interruption. Do not interrupt utilities until authorized by the POC.

17 SECURITY

17.1 Working Personnel List.

The Contractor shall provide the COR with a list of names of all personnel who will be working on the site. The Contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site.

17.2 Personnel Identification.

All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual’s driver’s license, or a company issued ID. The identification must be laminated, and show facial picture of the individual. Individuals without proper ID will be escorted off the Coast Guard premises.

18 QUALITY

Quality of Contractor Furnished Material. Materials supplied by the Contractor shall be of a quality conforming to applicable Federal specifications and lead and asbestos free.

19 WARRANTIES

All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government.

20 FINAL INSPECTION AND ACCEPTANCE

When the work is complete and ready for final inspection, submit a written request to schedule final inspection to the Government. Prior to such requests, all submittals must be complete and approved. Such requests shall allow a minimum of two (2) days notice prior to final inspection date.

21 SAFETY

21.1 General

The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property and avoids work interruptions. The Contractor shall provide appropriate safety measures including but not limited to barricades, signs and signal lights as well as complying with the requirements of all applicable Federal, State and Local safety laws, rules and regulations.

21.2 Compliance

The Contractor is specifically required to comply with the requirements of the U. S. Army Corps of Engineers "Safety and Health Requirements Manual" (EM 385-1-1, latest version available) and the “Accident Prevention” clause (FAR 52.236-13). Once accepted, this safety plan shall become part of the contract requirements. Note: This review/acceptance does not in any way relinquish the Contractor from responsibility for work site safety nor the obligation to comply with the OSHA regulations found in 29 CFR 1910 & 1926 or any other State or Local safety law, rule or regulation applicable to the contract work. The Coast Guard will cooperate fully with the Department of Labor (Occupational Safety and Health Administration) in their enforcement of OSHA regulations.

21.3 Safety Plan

The Contractor shall submit a written safety plan within seven (7) calendar days following contract award. At a minimum, this plan shall describe the Contractor's general safety program and identify specific safety provisions for hazards incidental to the contract work such as elevated working surfaces, working over water, working from floating work platforms, overhead crane operations or similar conditions of the work. This Safety Plan shall be approved prior to commencing any work on site.